A Line (Los Angeles Metro)

{{Short description|Light rail line in Los Angeles County, California}}

{{Use American English|date=April 2024}}

{{Use mdy dates|date=April 2024}}

{{Infobox rail line

| name = A Line

| color = {{rcr|Los Angeles Metro Rail|A}}

| logo = LACMTA Circle A Line.svg

| image = Gold Line Overpass on I-210.jpg

| caption = Foothill Freeway overpass east of Sierra Madre Villa station in 2015

| other_name = Blue Line (1990–2019)
Gold Line/L Line (north of Little Tokyo/Arts District)

| status =

| owner = Los Angeles County Metropolitan Transportation Authority

| linenumber = 801

| start = {{LAMs|APU/Citrus College}}

| end = {{LAMs|Downtown Long Beach}}

| stations = 44 (4 more under construction)

| website = {{URL|metro.net/riding/guide/a-line}}

| type = Light rail

| system = Los Angeles Metro Rail

| depot = Division 11 (Long Beach)
Division 24 (Monrovia)

| stock = Siemens P2000, AnsaldoBreda P2550, or Kinki Sharyo P3010 running in 2- or 3-car consists

| daily_ridership = {{formatnum:69216}} (weekday, May 2024) {{increase}}{{cite web|url=https://isotp.metro.net/MetroRidership/YearOverYear.aspx|archiveurl=https://web.archive.org/web/20231208184046/https://isotp.metro.net/MetroRidership/YearOverYear.aspx|title=Interactive Estimated Ridership Stats|publisher=Los Angeles County Metropolitan Transportation Authority|archivedate=December 8, 2023|accessdate=December 30, 2023}}

| ridership2 = {{formatnum:22282648}} (2024) {{increase}} {{#expr: ((22282648-15819994) / 15819994)*100 round 1}}%

| open = {{Start date and age|1990|07|14}}

| linelength = {{cvt|48.5|mi}}{{Cite web |date=June 2023 |title=Facts At A Glance |url=https://www.metro.net/news/facts-glance/ |publisher=Los Angeles County Metropolitan Transportation Authority |access-date=June 22, 2023 |url-status=live |archive-url=https://web.archive.org/web/20230319120952/https://www.metro.net/about/facts-glance/ |archive-date=March 19, 2023}}

| tracks = 2 (except single track Long Beach loop)

| character = Mostly at-grade in private right of way, with some street-running, elevated and underground sections

| gauge = {{Track gauge|ussg|allk=on}}

| electrification = {{750 V DC|conductor=overhead}}

| speed = {{convert|55|mph|abbr=on}} ({{Tooltip|max.|maximum speed}})
{{convert|24|mph|abbr=on}} ({{Tooltip|avg.|average speed, including stops}})

| map = {{switcher

| {{maplink-road|from=A Line (Los Angeles Metro).map}} A Line highlighted in blue


| Show interactive map

| {{A Line (Los Angeles Metro)|inline=yes}}

| Show route diagram

}}

}}

The A Line (formerly and colloquially known as the Blue Line){{Cite news |last=Fonseca |first=Ryan |date=September 25, 2019 |title=Ignore Those 'Line A' Signs. Metro's Blue Line Will Reopen As The 'A Line' |work=laist.com |publisher=Southern California Public Radio |url=https://laist.com/2019/09/25/la_metro_blue_line_will_reopen_as_the_a_line.php |url-status=dead |access-date=September 26, 2019 |archive-url=https://web.archive.org/web/20190926084240/https://laist.com/2019/09/25/la_metro_blue_line_will_reopen_as_the_a_line.php |archive-date=September 26, 2019}}{{Cite web |last=Nelson |first=Laura J. |date=2019-10-17 |title=Light rail to Long Beach will reopen soon — but it won't be called the Blue Line |url=https://www.latimes.com/california/story/2019-10-17/metro-rail-blue-line-closure-construction-los-angeles-long-beach |url-status=live |archive-url=https://web.archive.org/web/20191018203408/https://www.latimes.com/california/story/2019-10-17/metro-rail-blue-line-closure-construction-los-angeles-long-beach |archive-date=October 18, 2019 |access-date=2019-10-18 |website=Los Angeles Times |language=en-US}} is a light rail line in Los Angeles County, California. It is one of the six lines of the Los Angeles Metro Rail system, operated by the Los Angeles County Metropolitan Transportation Authority (Metro). The A Line serves 44 stations and runs east-west between Azusa and Pasadena, then north-south between Pasadena and Long Beach, interlining and sharing five stations with the E Line in Downtown Los Angeles. It operates for approximately 19 hours per day with headways of up to 8 minutes during peak hours. It runs for {{convert|48.5|mi}}, making it the world's longest light rail line since 2023.

The A Line is the oldest and busiest light rail line in the Los Angeles Metro Rail system, carrying over 15 million passengers in 2023, with an average of 69,216 weekday riders in May 2024. Its initial segment from Downtown Los Angeles to Long Beach opened in 1990, utilizing much of the original right of way of the former Pacific Electric Long Beach Line. Since its opening, the line has undergone numerous upgrades to improve its capacity, safety, and reliability. Plans to extend the line north to Pasadena in the San Gabriel Valley surfaced in the 1980s but were postponed due to funding constraints. The Gold Line (renamed the L Line in 2020) completed a segment of the planned extension from Union Station to Pasadena on a separate line. It opened in 2003 and extended east to Azusa in 2016.

Planning for the northern extension resumed in the early 2000s as part of the Regional Connector Transit Project, with construction starting in 2014. The project enabled A Line trains to run north to the San Gabriel Valley by constructing a light rail tunnel in Downtown Los Angeles, connecting the A Line to the L Line. The A Line's current Azusa–Long Beach service commenced in June 2023 with the completion of the project, incorporating the Union Station–Pasadena–Azusa portion of the L Line. Subsequently, the L Line ceased service, and as part of the project, three additional downtown stations opened in the constructed tunnel alignment. Construction is underway to extend the A Line further east to Pomona and Montclair.

Service description

= Route description =

The A Line runs {{convert|48.5|mi|km}} between Azusa and Downtown Long Beach, serving 44 stations. It is the longest light rail line in the world, surpassing the {{convert|42|mi|km|abbr=out|adj=on}} Coast Tram in Belgium.{{Cite news |last=Morino |first=Douglas |date=2023-06-23 |title=L.A. Opens Its New Light-Rail Link |url=https://www.nytimes.com/2023/06/23/us/los-angeles-transit-regional-connector.html |access-date=2024-06-26 |work=The New York Times |language=en-US |issn=0362-4331}}

The line's northern terminus is at APU/Citrus College station just west of Citrus Avenue and north of the two universities. The line runs west through Azusa before stopping at Azusa Downtown station at Azusa Avenue, north of Foothill Boulevard. Continuing west, the line crosses over the I-210 freeway and runs parallel to it, entering Irwindale before stopping at Irwindale station at Irwindale Avenue. After this station, the line continues west, crossing over the San Gabriel River and underneath the I-605 freeway, diverging from I-210 and entering Duarte, before stopping at Duarte/City of Hope station located on the north side of Duarte Road, across from the City of Hope National Medical Center.

Continuing west, the line parallels Duarte Road, entering Monrovia, before diverging northwest just before arriving at Monrovia station. Entering Arcadia, the line crosses all street crossings on bridges except for First Avenue at the at-grade Arcadia station. Continuing west, the line reconverges with and enters the median of I-210 and continues west to Sierra Madre Villa station in Pasadena. Six stations serve different parts of Pasadena, with three of them in the freeway's median. In Old Pasadena, the line travels underground for almost half a mile, passing under Pasadena's main thoroughfare, Colorado Boulevard, which makes the Memorial Park station below grade. The station serves most of Pasadena's fine dining, shops, malls, and civic center. The line continues south through downtown Pasadena and South Pasadena, primarily at grade. North of Highland Park, the line crosses over the Arroyo Seco Parkway (State Route 110) via the Santa Fe Arroyo Seco Railroad Bridge towards Highland Park.

After Highland Park station, the line runs in the median of Marmion Way, where trains go at only {{convert|20|mph|km/h}}. After Avenue 50, the line runs primarily at grade in its own right of way, except for a short tunnel underneath the intersection of Figueroa Street and Pasadena Avenue. From here, the line continues, with a handful of stations serving the hillside areas north of downtown, including Lincoln Heights, Mount Washington, and the Southwest Museum of the American Indian. Northeast of Chinatown, the line crosses over the Los Angeles River on an elevated viaduct. Continuing on the elevated viaduct, the line stops at Chinatown station before arriving at Union Station. At Union Station, passengers can transfer to the B and D rapid transit lines, Metrolink commuter rail, Amtrak, and buses.{{Cite web |title=Transportation |url=https://www.unionstationla.com/transportation/ |access-date=November 7, 2024 |website=Union Station Los Angeles |language=en-US}} The entire section of the line north of Union Station follows the current and former right of way of the Pasadena Subdivision.

South of Union Station, trains use the Regional Connector through Downtown Los Angeles. In Little Tokyo, the line enters the new tunnel north of Temple Street to serve the replacement underground Little Tokyo/Arts District station, where the line merges with the E Line. The two lines turn west to run under 2nd Street and the 2nd Street Tunnel, as well as the B and D lines, with clearances as low as {{convert|7|ft|m}}. The Regional Connector tunnel connects to the north end of 7th Street/Metro Center station, the former northern terminal of the A Line. The line continues south along Flower Street, transitioning from underground to street level at 11th St. Passengers can connect to the bus rapid transit J Line at 7th Street/Metro Center, Pico, and Grand/LATTC stations.

The A and E Lines diverge at Flower Street and Washington Boulevard. E Line trains continue south along Flower Street, and the A Line turns east onto Washington Boulevard before turning south into the former Pacific Electric right of way at Long Beach Avenue. This historic rail corridor has four tracks, two for A Line trains and two for freight trains. Along the corridor, there are some flyovers to either eliminate grade crossings in more densely populated areas or pass over diverging freight tracks. Passengers can connect with the C Line at the Willowbrook/Rosa Parks station. Just south of Willow Street station, A Line trains exit the rail corridor and begin street running in the median of Long Beach Boulevard into the city of Long Beach, where trains travel through the Long Beach Transit Mall while making a loop using 1st Street, Pacific Avenue, and 8th Street.

= Hours and frequency =

{{LA Metro hours and frequency|A}}

class="wikitable" style="text-align: center;"

!Time

!4A

!5A

!6A

!7A

!8A-1P

!2-6P

!7P

!8P-12A

Weekdays

|20

|8-20

| colspan="2" |8

|10

|8

|10-12

|20

Weekends/Holidays

| colspan="2" |20

|10-20

| colspan="3" |10

|10-12

|20

= Speed =

The full travel time of the {{convert|48.5|mi|km|adj=on}} line is approximately two hours, including a brief layover at Union Station to change train crews. Southbound trips over the full line are scheduled at 1 hour and 55 minutes, with northbound trips scheduled at 1 hour and 55 minutes.{{Cite web |date=December 10, 2023 |title=Metro A Line Timetable |url=https://cdn.beta.metro.net/wp-content/uploads/2023/12/01154124/801_TT_12-10-23-1.pdf |publisher=Los Angeles County Metropolitan Transportation Authority}}

The line's scheduled average speed is approximately {{convert|25-26|mph|km/h}}. Top speeds on the line vary, from below {{Convert|10|mph|km/h}} at surface level in Downtown Los Angeles, to {{Convert|55|mph|km/h}} on grade-separated infrastructure.{{Cite web |last=Sharp |first=Steven |date=2021-02-23 |title=Metro staff provides update on effort to speed up street-running light rail |url=https://la.urbanize.city/post/metro-staff-provides-update-effort-speed-street-running-light-rail |access-date=2024-03-02 |work=Urbanize LA}}

= Station listing =

The following table lists the stations (including the six future stations) of the A Line, from north to south:

class="wikitable"
width="190" | Station

! Date Opened

! City/Neighborhood

! Major connections and notes{{Cite web |title=Metro A Line (Blue) |url=https://www.metro.net/riding/guide/A-line/ |access-date=2020-07-23 |website=www.metro.net |language=en-US |archive-date=September 28, 2020 |archive-url=https://web.archive.org/web/20200928125114/https://www.metro.net/riding/guide/A-line/ |url-status=live }}{{Cite web |title=Metro Parking Lots by Line |url=https://www.metro.net/riding/parking/lotsbyline/ |access-date=2020-07-23 |website=www.metro.net |language=en-US |archive-date=August 10, 2020 |archive-url=https://web.archive.org/web/20200810121559/https://www.metro.net/riding/parking/lotsbyline/ |url-status=live }}{{cite web |title=About the Stations |url=https://foothillgoldline.org/construction_phases/glendora-to-montclair/ |website=Foothill Gold Line |access-date=April 28, 2024}}

! Grade

bgcolor="lightgray"

|{{LAMs|Montclair}}

| rowspan="2" |2030

|Montclair

|Park and ride: 1,600 spaces
{{rint|losangeles|metrolink}} Metrolink

| rowspan="6" | At-grade

bgcolor="lightgray"

|{{LAMs|Claremont}}

|Claremont

|Park and ride: 539 spaces
{{rint|losangeles|metrolink}} Metrolink

bgcolor="lightgray"

|{{LAMs|Pomona North}}

| rowspan="4" |2025

|Pomona

|Park and ride: 300 spaces
{{rint|losangeles|metrolink}} Metrolink

bgcolor="lightgray"

|{{LAMs|La Verne/Fairplex}}

|La Verne

|Park and ride: 299 spaces

bgcolor="lightgray"

|{{LAMs|San Dimas}}

|San Dimas

|Park and ride: 289 spaces

bgcolor="lightgray"

|{{LAMs|Glendora}}

|Glendora

|Park and ride: 302 spaces

{{LAMs|APU/Citrus College}}

| rowspan="6" |March 5, 2016

| rowspan="2" |Azusa

|Park and ride: 200 spaces

| rowspan="7" | At-grade

{{LAMs|Azusa Downtown}}

|Park and ride: 521 spaces

{{LAMs|Irwindale}}

|Irwindale

|Park and ride: 350 spaces

{{LAMs|Duarte/City of Hope}}

|Duarte

|Park and ride: 125 spaces

{{LAMs|Monrovia}}

|Monrovia

|Park and ride: 350 spaces

{{LAMs|Arcadia}}

|Arcadia

|Park and ride: 300 spaces

{{LAMs|Sierra Madre Villa}}

| rowspan="13" |July 26, 2003

| rowspan="6" |Pasadena

|Park and ride: 965 spaces

{{LAMs|Allen}}

|

|Elevated

{{LAMs|Lake}}

|Park and ride: 22 spaces

|rowspan="2"|Below-grade

{{LAMs|Memorial Park}}

|

{{LAMs|Del Mar}}

|Park and ride: 610 spaces

|rowspan="6"|At-grade

{{LAMs|Fillmore}}

|Park and ride: 155 spaces

{{LAMs|South Pasadena}}

|South Pasadena

|Park and ride: 142 spaces

{{LAMs|Highland Park}}

|Los Angeles (Highland Park)

|

{{LAMs|Southwest Museum}}

|Los Angeles (Mount Washington)

|

{{LAMs|Heritage Square}}

|Los Angeles (Montecito Heights)

|Park and ride: 129 spaces

{{LAMs|Lincoln/Cypress}}

|Los Angeles (Lincoln Heights/Cypress Park)

|Park and ride: 94 spaces

|rowspan="2"|Elevated

{{LAMs|Chinatown}}

|Los Angeles (Chinatown)

|

{{LAMs|Union Station}}

|Los Angeles (Downtown)

|{{LACMTA icon strip|B|D|J}}
{{Rint|us|amtrak}}Amtrak, {{Rint|air|link=FlyAway (bus)}} LAX FlyAway and {{Rint|losangeles|metrolink}} Metrolink
Paid parking: 3,000 spaces

|At-grade

{{LAMs|Little Tokyo/Arts District}}

|November 15, 2009

|Los Angeles (Little Tokyo/Arts District)

|{{LACMTA icon|E}}

|rowspan="4"|Underground

{{LAMs|Historic Broadway}}

| rowspan="2" |June 16, 2023

| rowspan="5" |Los Angeles (Downtown)

|{{LACMTA icon|E}}

{{LAMs|Grand Avenue Arts/Bunker Hill}}

|{{LACMTA icon strip|E|J}}

{{LAMs|7th Street/Metro Center}}

|February 15, 1991

|{{LACMTA icon strip|B|D|E|J}}

{{LAMs|Pico}}

| rowspan="17" |July 14, 1990

|{{LACMTA icon strip|E|J}}

|rowspan="5"|At-grade

{{LAMs|Grand/LATTC}}

|{{LACMTA icon|J}}

{{LAMs|San Pedro Street}}

| rowspan="4" |Los Angeles (South Los Angeles)

|

{{LAMs|Washington}}

|

{{LAMs|Vernon}}

|

{{LAMs|Slauson}}

|

|Elevated

Florence

| rowspan="2" |Florence-Graham

|Park and ride: 116 spaces

|At-grade

{{LAMs|Firestone}}

|

|Elevated

{{LAMs|103rd Street/Watts Towers}}

|Los Angeles (Watts)

|Park and ride: 64 spaces

|rowspan="4"|At-grade

Willowbrook/Rosa Parks station

|Willowbrook

|{{LACMTA icon|C}}
Park and ride: 234 spaces

{{LAMs|Compton}}

| rowspan="2" |Compton

|

{{LAMs|Artesia}}

|Park and ride: 288 spaces

{{LAMs|Del Amo}}

|Carson

|Park and ride: 362 spaces

|Elevated

{{LAMs|Wardlow}}

| rowspan="8" |Long Beach

|Park and ride: 139 spaces

|rowspan="8"|At-grade

{{LAMs|Willow Street}}

|Park and ride: 927 spaces

{{LAMs|Pacific Coast Highway}}

|

{{LAMs|Anaheim Street}}

|

{{LAMs|5th Street}}
(southbound only)

| rowspan="4" |September 1, 1990

|

{{LAMs|1st Street}}
(southbound only)

|

{{LAMs|Downtown Long Beach}}
(northbound only)

|

{{LAMs|Pacific Avenue}}
(northbound only)

|

= Ridership =

{{Div flex row| align-items=center}}

class="wikitable sortable" style="border-spacing: 1px; text-align:center; font-size:95%;"
+ Annual ridership
style="border-bottom:1px solid black"| Yearstyle="border-bottom:1px solid black"| Ridershipstyle="border-bottom:1px solid black"| {{abbr|%±|Percent change}}
2009{{formatnum:25735979}}
2010{{formatnum:25119753}}{{Change|25735979|25119753|disp=out|dec=1}}
2011{{formatnum:26053645}}{{Change|25119753|26053645|disp=out|dec=1}}
2012{{formatnum:28959483}}{{Change|26053645|28959483|disp=out|dec=1}}
2013{{formatnum:28185745}}{{Change|28959483|28185745|disp=out|dec=1}}
2014{{formatnum:27276468}}{{Change|28185745|27276468|disp=out|dec=1}}
2015{{formatnum:24457253}}{{Change|27276468|24457253|disp=out|dec=1}}
2016{{formatnum:24988825}}{{Change|24457253|24988825|disp=out|dec=1}}
2017{{formatnum:22383828}}{{Change|24988825|22383828|disp=out|dec=1}}
2018{{formatnum:19836016}}{{Change|22383828|19836016|disp=out|dec=1}}
2019{{formatnum:8905140}}{{Change|19836016|8905140|disp=out|dec=1}}
2020{{formatnum:9290318}}{{Change|8905140|9290318|disp=out|dec=1}}
2021{{formatnum:9099416}}{{Change|9290318|9099416|disp=out|dec=1}}
2022{{formatnum:11350035}}{{Change|9099416|11350035|disp=out|dec=1}}
2023{{formatnum:15819994}}{{Change|11350035|15819994|disp=out|dec=1}}
2024{{formatnum:22335581}}{{Change|15819994|22335581|disp=out|dec=1}}
class="sortbottom"

| colspan="3" style="border-top:1px solid black; font-size:85%; text-align:left" |Source: Metro{{Cite web |date=March 2023 |title=Metro Ridership |url=https://isotp.metro.net/MetroRidership/IndexRail.aspx |access-date=March 10, 2023 |website=Metro.net |publisher=Los Angeles County Metropolitan Transportation Authority |archive-date=April 10, 2021 |archive-url=https://web.archive.org/web/20210410181403/https://isotp.metro.net/MetroRidership/IndexRail.aspx |url-status=live }}

{{Graph:Chart|width=350|height=200|type=rect|showValues=format:.3s|xAxisAngle=-40|yType=integer|yAxisFormat=s

|colors=#{{rcr|Los Angeles Metro Rail|A}}

|xAxisTitle=Year

|x=2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022, 2023

|yAxisTitle=Ridership

|y=25735979, 25119753, 26053645, 28959483, 28185745, 27276468, 24457253, 24988825, 22383828, 19836016, 8905140, 9290318, 9099416, 10663617, 15069823

}}

{{Div flex row end}}

History

{{Main|History of Los Angeles Metro Rail and Busway}}

{{see|Long Beach Line}}

File:LA Blue Line Opening Celebration.jpg

File:Long Beach Civic Center Station 2.JPG train (now retired) leaving Downtown Long Beach station.]]

= Long Beach Line =

Much of the initial segment of the A Line from Downtown Los Angeles to Long Beach follows the route of the Pacific Electric's Long Beach Line, which ended service in 1961. The old route gave the new light rail trains a private right of way between {{LAMs|Washington}} and {{LAMs|Willow Street}} stations allowing them to reach higher speeds between stops.{{Cite news |last=Reft |first=Ryan |date=February 26, 2015 |title=A Clear Blue Vision: L.A. Light Rail Transit and Twenty-Five Years of the Blue Line |agency=KCET |url=https://www.kcet.org/history-society/a-clear-blue-vision-l-a-light-rail-transit-and-twenty-five-years-of-the-blue-line |access-date=February 8, 2021 |archive-date=February 8, 2021 |archive-url=https://web.archive.org/web/20210208185036/https://www.kcet.org/history-society/a-clear-blue-vision-l-a-light-rail-transit-and-twenty-five-years-of-the-blue-line |url-status=live }}

The line initially opened as the Blue Line on Saturday, July 14, 1990, and ran from {{LAMs|Pico}} to {{LAMs|Anaheim Street}}. The Long Beach Loop section to {{LAMs|Long Beach}} opened in September 1990,{{cite news |title=New Long Beach Loop |url=https://www.newspapers.com/clip/114597405/ |access-date=14 December 2022 |newspaper=The Los Angeles Times |via=Newspapers.com |date=September 1, 1990 |page=B10 |archive-date=March 23, 2023 |archive-url=https://web.archive.org/web/20230323081224/https://www.newspapers.com/clip/114597405/the-los-angeles-times/ |url-status=live }} {{free access}} followed by the tunnel into {{LAMs|7th Street/Metro Center}} in February 1991.{{cite journal |last=Curiel |first=Socorro C. |year=1991 |title=Los Angeles County Transportation Commission Joins SHPE Strategic Technical Employment Program (STEP) |url=https://books.google.com/books?id=sFM0tFypbd0C&pg=PA20 |url-status=live |department=Society of Hispanic Professional Engineers |journal=Hispanic Engineer |publisher=Career Communications Group, Inc. |issue=Fall 1991 |page=20 |archive-url=https://web.archive.org/web/20230323084012/https://books.google.com/books?id=sFM0tFypbd0C&pg=PA20 |archive-date=March 23, 2023 |access-date=November 19, 2013}} The initial light rail segment cost US$877 million (${{Format price|{{Inflation|US|877000000|1990}}}} in {{inflation year|US}} adjusted for inflation).{{cite web |date=November 18, 2013 |title=Facts at a Glance |url=https://www.metro.net/news/facts-glance/ |url-status=dead |archive-url=https://web.archive.org/web/20190820202535/https://www.metro.net/news/facts-glance/ |archive-date=August 20, 2019 |access-date=November 16, 2013 |publisher=Los Angeles County Metropolitan Transit Authority}}

The route reached full capacity after one decade of service, and from 1999 to 2001, the Blue Line underwent a US$11 million project to lengthen 19 of its platforms to accommodate three-car trains.{{Cite web |title=MTA Starts 3-Car Train Service on Busy Metro Blue Line |url=https://www.metro.net/news/simple_pr/mta-starts-3-car-train-service-busy-metro-blue-lin/ |url-status=dead |archive-url=https://web.archive.org/web/20210603123130/https://www.metro.net/news/simple_pr/mta-starts-3-car-train-service-busy-metro-blue-lin/ |archive-date=June 3, 2021 |access-date=2020-01-22 |website=www.metro.net |language=en-US}} There were also plans since the 1980s to extend the Blue Line north to Pasadena but the connection through downtown was postponed due to funding constraints from the voter-approved 1998 Proposition A. The proposition restricted local county subway funding, halting the process of the Blue Line extension and other rail transit projects from advancing.{{Cite web |last=Rabin |first=Jeffrey L. |date=1998-10-18 |title=SPECIAL REPORT * As critics move to cut subway funding, supporters deride the measure as shortsighted. The MTA awaits voters' decision because . . . : Approval of Prop. A Would Chart a New Course for Transportation |url=https://www.latimes.com/archives/la-xpm-1998-oct-18-me-33853-story.html |access-date=2024-04-14 |website=Los Angeles Times |language=en-US}}

The Blue Line was renovated in 2019, with the southern half of the line being closed for the first five months and the northern half closing for the following five months (10 months total). Metro provided a bus shuttle service to compensate for the lack of rail service. Metro officially reopened the line on November 2, 2019, rebranding it as the A Line.{{Cite web |title=A Line |url=https://www.metro.net/riding/guide/Aline-blue/ |access-date=2019-11-18 |website=www.metro.net |archive-date=October 18, 2019 |archive-url=https://web.archive.org/web/20191018202313/https://www.metro.net/riding/guide/Aline-blue/ |url-status=dead }} The renovation helped improve the line's speed and reliability by replacing and modernizing old tracks, signals, train control systems, and bridges.{{Cite web |last=Hymon |first=Steve |date=2019-10-17 |title=Metro reopens the A Line (Blue) on Saturday, Nov. 2, with three days of free rides on refurbished line |url=https://thesource.metro.net/2019/10/17/metro-reopens-the-a-line-blue-on-saturday-nov-2-with-three-days-of-free-rides-on-refurbished-line/ |access-date=2024-04-13 |website=The Source |language=en-US}}

= Pasadena Blue Line =

File:Northbound train arriving at LA Metro Chinatown station, September 2023.jpg train at Chinatown station]]

Much of the A Line's right of way north of {{LAMs|Union Station}} through the San Gabriel Valley was built by the Los Angeles and San Gabriel Valley Railroad in 1885. It was eventually taken over by the Atchison, Topeka and Santa Fe Railway, as part of the Pasadena Subdivision, which saw Amtrak service until 1994, when construction began on the conversion to light rail.{{cite news |date=January 15, 1994 |title=The Last Train Out |url=https://www.newspapers.com/article/pasadena-star-news/125751668/ |access-date=April 13, 2024 |newspaper=Pasadena Star-News |page=1 |via=Newspapers.com}} The light rail project was initially called the "Pasadena Metro Blue Line."{{Cite web |title=Construction Authority |url=https://foothillgoldline.org/construction_authori/construction-authority/ |access-date=2024-04-13 |website=Foothill Gold Line |language=en-US}}

Planners envisioned extending the existing Blue Line (A Line) north of 7th Street/Metro Center, but it was canceled due to funding shortages. However, the mostly above-ground segment of the extension from Union Station to Pasadena advanced and began construction in 1994 as a separate line but was suspended again by 1998 due to the Proposition A ban.{{Cite web |date=April 8, 1994 |title=MTA Breaks ground on Pasadena Blue Line - Third Light Rail System In Metro Rail Network |url=https://libraryarchives.metro.net/Press/Press%20Releases%201994/April%208,%201994%20-%20MTA%20Breaks%20ground%20on%20Pasadenda%20Blue%20Line%20-%20Third%20Light%20Rail%20System%20In%20Metro%20Rail%20Network.pdf |access-date=April 13, 2024 |publisher=Los Angeles County Metropolitan Transportation Authority}}{{Cite news |last=Claiborne |first=William |date=June 10, 1998 |title=L.A. SUBWAY TESTS MASS TRANSIT'S LIMITS |url=https://www.washingtonpost.com/archive/politics/1998/06/10/la-subway-tests-mass-transits-limits/215a22b3-6287-467f-9485-e873960371f5/ |access-date=April 14, 2024 |work=Washington Post |language=en-US |issn=0190-8286}} Later that year, a bill was authorized to create a new independent construction authority to finish the line. The agency, now known as the Foothill Gold Line Construction Authority, resumed light rail construction in 2000 and completed the line three years later.

The now-renamed Gold Line, between Union Station and Sierra Madre Villa station in East Pasadena, opened on July 26, 2003.{{cite news |last=Streeter |first=Kurt |date=June 19, 2003 |title=Gold Line Is Set to Open July 26 |url=https://www.latimes.com/archives/la-xpm-2003-jun-19-me-mta19-story.html |url-status=live |archive-url=https://web.archive.org/web/20160314105818/http://articles.latimes.com/2003/jun/19/local/me-mta19 |archive-date=14 March 2016 |access-date=14 March 2016 |newspaper=Los Angeles Times}}

= Foothill Extension Phase 2A =

File:Gold_Line_Construction_LA.jpg has not been installed yet.]]

{{Main|Foothill Extension#Planning and Phase 2A}}

In 2016, the Gold Line was extended east from Pasadena as part of Phase 2A (Phase 1 was the initial Los Angeles to Pasadena segment) of the Foothill Extension, running between Sierra Madre Villa and {{LAMs|APU/Citrus College}} stations in Azusa. The extension was constructed by the Foothill Gold Line Construction Authority and added six new stations to the Gold Line serving the cities of Arcadia, Monrovia, Duarte, Irwindale, and Azusa. A groundbreaking ceremony for Phase 2A was held on June 26, 2010; construction began the following summer and was completed in September 2015, with the extension entering service on March 5, 2016.{{Cite web |title=Pasadena to Azusa |url=https://foothillgoldline.org/construction_phases/pasadena_to_azusa/ |access-date=2024-04-12 |website=Foothill Gold Line |language=en-US}}{{cite news |last=Scauzillo |first=Steve |date=February 17, 2015 |title=Gold Line authority makes push for next extension from Azusa to Montclair |url=http://www.sgvtribune.com/general-news/20150217/gold-line-authority-makes-push-for-next-extension-from-azusa-to-montclair |url-status=live |archive-url=https://web.archive.org/web/20160313124700/http://www.sgvtribune.com/general-news/20150217/gold-line-authority-makes-push-for-next-extension-from-azusa-to-montclair |archive-date=March 13, 2016 |access-date=13 March 2016 |newspaper=San Gabriel Valley Tribune}}

Like other lines in the Los Angeles Metro system, the Gold Line's designation became a letter in 2020. This was the beginning of a process where all Metro Rail and Busway lines would be identified by a letter name rather than a system of colors. The Gold Line was renamed to the L Line.{{Cite web |title=LA, meet our new lineup |url=https://www.metro.net/riding/line-letters |access-date=December 23, 2023 |website=www.metro.net}}

= Regional Connector =

{{Main|Regional Connector}}

File:2019 Regional Connector-01.svg

The Regional Connector Transit Project constructed a {{convert|1.9|mi|adj=mid}} light rail tunnel across Downtown Los Angeles that connected A and E lines to the L Line, with the purpose of reducing transfers and travel times through downtown. The project completed the late 1990s vision of the "Pasadena Blue Line," connecting the northern (Union Station–Azusa) segment of the L Line to the A Line. This enabled A Line trains to run from Long Beach to Azusa through the new tunnel. The southern (Pico/AlisoEast LA) segment was combined with the existing E Line between Downtown Los Angeles and Santa Monica. The new east-west line kept the E Line name but uses the L Line's gold color.{{Cite web |date=2023-06-16 |title=LA Metro celebrates opening three new stations connecting the mountains to the beaches |url=https://www.cbsnews.com/losangeles/news/los-angeles-celebrates-grand-opening-of-metro-regional-connector/ |access-date=2023-07-27 |website=CBS News |language=en-US}} Two new stations were also constructed in the tunnel, providing more service to destinations and communities in Downtown Los Angeles.{{Cite web |last= |first= |date=2023-05-23 |title=The Regional Connector and three new downtown L.A. stations to open Friday, June 16, with a weekend of free rides! |url=https://thesource.metro.net/2023/05/22/the-regional-connector-and-three-new-downtown-l-a-stations-to-open-friday-june-16-with-a-weekend-of-free-rides/ |access-date=2024-04-14 |website=The Source |language=en-US}}

Formal studies and planning for the Regional Connector began in 2004 and was approved in 2012. A groundbreaking ceremony was held on September 30, 2014, marking the start of major construction.{{Cite web |last=Sotero |first=Dave |date=2012-04-26 |title=Metro Board certifies final environmental study for Regional Connector |url=https://thesource.metro.net/2012/04/26/metro-board-certifies-final-environmental-study-for-regional-connector/ |access-date=2023-12-22 |website=The Source |language=en-US}} To accommodate the new tunnel, the existing at-grade L Line Little Tokyo/Arts District station was demolished in 2020 and rebuilt as a subway station approximately {{convert|500|ft}} south and on the opposite side of Alameda Street from its former location. Starting on April 9, 2023, the A, E, and L Line trains ran through the Regional Connector tunnel for final testing.{{Cite web |last=Metro |first=L. A. |date=March 29, 2023 |title=Heads up: Regional Connector train testing is underway — and you may see and hear some changes to trains on the A, E and L Lines |url=https://thesource.metro.net/2023/03/29/heads-up-regional-connector-train-testing-is-underway-and-you-may-see-hear-some-changes-to-a-e-and-l-line-trains/ |access-date=June 20, 2023 |website=The Source |language=en-US}} The project officially opened for revenue service on June 16, 2023.{{cite news |last1=Von Quednow |first1=Cindy |date=June 16, 2023 |title=Metro Regional Connector opens in Los Angeles, bringing more direct access to downtown |url=https://ktla.com/news/metro-regional-connector-opens-in-los-angeles-brings-more-direct-access-to-downtown/ |access-date=June 16, 2023 |work=KTLA |publisher=Nexstar Media Group |archive-date=August 12, 2023 |archive-url=https://web.archive.org/web/20230812220301/https://ktla.com/news/metro-regional-connector-opens-in-los-angeles-brings-more-direct-access-to-downtown/ |url-status=dead }}

Once the Regional Connector was completed, the alignment of the L Line was split into two parts at Little Tokyo/Arts District station, with the portion north of the station joined to the A Line, extending it to connect Long Beach with Azusa. The alignment east of Little Tokyo/Arts District station was assigned to the E Line, extending it to connect Santa Monica and East Los Angeles directly. At this time, the L Line ceased to exist as a separate line.{{Cite news |last=Von Quednow |first=Cindy |date=June 16, 2023 |title=Metro Regional Connector opens in Los Angeles, bringing more direct access to downtown |url=https://ktla.com/news/metro-regional-connector-opens-in-los-angeles-brings-more-direct-access-to-downtown/ |access-date=June 16, 2023 |work=KTLA |publisher=Nexstar Media Group |archive-date=August 12, 2023 |archive-url=https://web.archive.org/web/20230812220301/https://ktla.com/news/metro-regional-connector-opens-in-los-angeles-brings-more-direct-access-to-downtown/ |url-status=dead }}

Future developments

= Foothill Extension Phase 2B =

{{Main|Foothill Extension#Phase 2B to Montclair}}

The first part of Phase 2B of the Foothill Extension, running between APU/Citrus College station in Azusa and the Pomona North Metrolink station in Pomona, is currently under construction, with a current estimated completion in 2025. This extension, like the original Gold Line to Pasadena, and the first phase of the Foothill Extension was being built by the Foothill Gold Line Construction Authority.{{cite press release |date=January 3, 2025 |title=Foothill Gold Line from Glendora to Pomona Reaches Substantial Completion |url=https://foothillgoldline.org/wp-content/uploads/2025/01/2025-01-03-PRESS-RELEASE-Foothill-Gold-Line-from-Glendora-to-Pomona-Reaches-Substantail-Completion.pdf |agency=Foothill Gold Line |access-date=January 3, 2025}}{{cite news |last1=Scauzillo |first1=Steve |title=A Line light-rail extension from Azusa to Pomona set to open in late summer |url=https://www.sgvtribune.com/2025/01/03/a-line-a-light-rail-from-azusa-to-pomona-is-done-and-set-to-open-in-late-summer/ |access-date=January 4, 2025 |work=San Gabriel Valley Tribune |publisher=Digital First Media |date=January 4, 2025}} The second part of Phase 2B will further extend the line two stations to Montclair Transcenter in Montclair, located in San Bernardino County, is planned to break ground in spring 2025 and be completed in 2030.{{Cite web |title=Gold Line Foothill Extension |url=http://www.metro.net/projects/foothill-extension/ |access-date=November 22, 2014 |publisher=Metro (LACMTA)}}{{cite news |last1=Scauzillo |first1=Steve |title=State funds Pomona-to-Montclair light rail, first LA Metro project to San Bernardino County |url=https://www.dailynews.com/2024/07/08/state-funds-pomona-to-montclair-light-rail-first-la-metro-project-to-san-bernardino-county/ |access-date=July 9, 2024 |work=Los Angeles Daily News |publisher=MediaNews Group |date=July 8, 2024}}{{cite news |last1=Scauzillo |first1=Steve |title=Board picks potential firm to build Pomona-to-Montclair light rail extension |url=https://www.sgvtribune.com/2024/07/11/board-picks-potential-firm-to-build-pomona-to-montclair-light-rail-extension/ |access-date=July 12, 2024 |work=Los Angeles Daily News |agency=San Gabriel Valley Tribune |publisher=MediaNews Group |date=July 11, 2024}}

= Southeast Gateway Line =

{{Main|Southeast Gateway Line}}

The Southeast Gateway Line is a planned light rail line, mostly following the Pacific Electric's historic West Santa Ana Branch, connecting Downtown Los Angeles to the city of Artesia, along with other cities in southeastern Los Angeles County. It will link the southeast/Gateway cities with the A Line at Slauson station. Construction is planned to begin in 2025 with service starting in 2035. Metro estimates it will take 10 years to build.{{Cite web |title=Southeast Gateway Line (previously West Santa Ana Branch Transit Corridor) |url=https://www.metro.net/projects/southeastgateway/ |access-date=2024-03-02 |work=LA Metro}}

Current issues

= Capacity limits =

File:Crowded train.jpg

The A Line often operates at capacity, and various options to increase capacity have been considered, such as four-car or more frequent trains. Both have problems: it would be difficult or impossible to lengthen some of the station platforms, and the number of trains already causes delays for other vehicles at level crossings. Since the opening of the Regional Connector, ridership on the A Line continues to increase, potentially resulting in even more capacity problems.{{Cite web |last=Plummer |first=Caitlin |date=December 10, 2023 |title=Metro Light Rail Lines Are Running More Often To Serve More Riders. Here Are The Details |url=https://laist.com/news/transportation/metro-light-rail-lines-are-running-more-often-to-serve-more-riders-here-are-the-details |access-date=April 14, 2024 |website=LAist |language=en}}

One of the biggest constraints on the capacity of the A and E lines is the at-grade section along Flower Street in Downtown Los Angeles, especially Pico Station and the wye junction at Flower and Washington. Pico Station serves both lines and cannot be bypassed, so service on both lines is limited by the capacity of the station and the grade crossing of Pico Boulevard immediately adjacent to it. The wye junction at Flower and Washington is a similar bottleneck, as trains on both lines must cross a busy intersection and freeway onramp at-grade. Accidents, gridlocked traffic, and signal delays at the junction can cause cascading service disruptions across both lines. Various grade separation projects have been considered to improve capacity and resolve the issues with this section of track.{{Cite web |last=Frazier |first=Scott |date=2017-07-18 |title=Looking at Metro's Options for Fixing Flower Street |url=https://la.urbanize.city/post/looking-metros-options-fixing-flower-street |access-date=2024-10-26 |website=Urbanize LA |language=en}}

= Safety at level crossings =

File:Willow Metro Blue Line Station- 10.JPG

Over 120 motorists and pedestrians have been killed at A Line level crossings since 1990. There have been more than 800 collisions,{{Cite news |last=Nelson |first=Laura |date=March 28, 2015 |title=Metro light rail crash near USC renews debate on rail safety |work=Los Angeles Times |url=http://www.latimes.com/local/la-me-0329-metro-expo-line-crash-20150330-story.html |access-date=October 20, 2015 |archive-date=October 19, 2015 |archive-url=https://web.archive.org/web/20151019195339/http://www.latimes.com/local/la-me-0329-metro-expo-line-crash-20150330-story.html |url-status=live }}{{Cite news |date=June 2007 |title=Summary of Blue Line Train/Vehicle and Train/Pedestrian Accidents |publisher=Los Angeles County Metropolitan Transportation Authority}} making the line easily the country's deadliest and most collision-prone rail line.{{Cite news |date=May 20, 2005 |title=Light rail fatalities, 1990–2002 |publisher=American Public Transportation Association |url=https://www.usatoday.com/news/2003-01-07-rail-fatalities.htm |access-date=May 12, 2010 |archive-date=September 26, 2010 |archive-url=https://web.archive.org/web/20100926232152/http://www.usatoday.com/news/2003-01-07-rail-fatalities.htm |url-status=live }}

File:Metro Rail Blue Line.jpg]]

In 1998, the MTA commissioned Booz Allen Hamilton, Inc. to evaluate the cause of Blue Line collisions and recommend affordable solutions. The study reported the high ridership (over 70,000 per day) was a contributor:

{{quote|The MBL has one of the highest ridership counts for light rail lines in the Country. This factor is perhaps the most important contributor to the grade-crossing accident rate. The high ridership results in increased pedestrian traffic near stations compared to other light rail systems. In addition, although MTA Operations does not allow high passenger loads to dictate safe operations, there is pressure to maintain travel times and headway schedule requirements (e.g., a passenger trip from Los Angeles to Long Beach in less than one hour).|author=}}

Other contributing factors identified were the high population density leading to more pedestrian and vehicular traffic around the tracks, the diverse, varied socio-economic community around the line that creates literacy and language difficulties for public education campaigns, driver frustration due to the slow traffic speeds around the line that leads to more risk-taking behavior, and the shared right of way with freight traffic in the fastest running section from Washington station to Willow station, where trains operate at a maximum of {{convert|55|mph|km/h|abbr=on}} between stations.{{Cite web |date=November 2, 1998 |title=Evaluation of the Current Grade Crossing Safety Improvement Program of the Metro Blue Line |url=https://docs.cpuc.ca.gov/publisheddocs/EFILE/MOTION/77267.pdf |access-date=April 14, 2024 |publisher=Los Angeles County Metropolitan Transportation Authority |page=32}}

Due to this, Metro started in the early 2000s to install four-quadrant gates at crossings where the A Line shares the right of way with freight rail between Willowbrook station and Artesia station. The gates prevent drivers from going around lowered gates.{{Cite web |last=Rabin |first=Jeffry L. |date=April 25, 2000 |title=New Gates Approved for Blue Line Crossings |url=https://www.latimes.com/archives/la-xpm-2000-apr-25-me-23092-story.html |access-date=April 14, 2024 |website=Los Angeles Times |language=en-US}} Metro also improved the safety of the A Line's pedestrian crossings by 2018.{{Cite web |last=Hymon |first=Steve |date=April 23, 2018 |title=Project to upgrade pedestrian safety at 27 Blue Line crossings is now complete |url=https://thesource.metro.net/2018/04/23/project-to-upgrade-pedestrian-safety-at-27-blue-line-crossings-is-now-complete/ |access-date=April 14, 2024 |website=The Source |language=en-US}}

{{clear left}}

Operations

On Metro Rail's internal timetables, the A Line is called line 801.

Because of the length of the line, operators do not take trains from end to end, swapping out at Union Station. Trains are operated between APU/Citrus College and Union Station by employees based at Division 24 in Monrovia. Between Long Beach and Union Station, operators are based out of Division 11 in Rancho Dominguez.{{Cite web |title=Regional Connector Slides for Customer Service Briefings |url=https://www.dropbox.com/sh/3v4qdl26tpf16z1/AADHp3fIxbU7Faw8AbAxHMi4a/About/Advisory%2520Councils/sfs/Presentations%2520%2526%2520Handouts/June%25202023?dl=0&preview=Regional+Connector+Slides+for+Customer+Service+Briefings+FINAL.pdf&subfolder_nav_tracking=1 |access-date=June 21, 2023 |website=Los Angeles County Metropolitan Transportation Authority}}

= Maintenance facilities =

The A Line is operated out of two divisions, Metro's term for train maintenance and storage facilities.

Division 11 is located at 4350 East 208th Street in Cota, North Long Beach between {{LAMs|Del Amo}} and {{LAMs|Wardlow}} stations. The facility can house and maintain 86 light rail vehicles and can perform heavy maintenance including repainting. Trains get to this yard via a wye junction on the southbound tracks. Northbound trains can enter and exit the yard via the cross tracks on the north and south sides of the junction.

Division 24 is located south of the I-210 freeway in Monrovia between {{LAMs|Monrovia}} and {{LAMs|Duarte/City of Hope}} stations. Just like Division 11, trains access the yard via the westbound/southbound tracks from either direction of its wye junction. Crossovers from the eastbound track to the yard junction are located near the California Avenue and Mountain Avenue railroad crossings.{{Cite web |date=2016 |title=Operating Divisions and Major Facilities |url=https://libraryarchives.metro.net/BOD/Operating-Divisions-and-Major-Facilities.pdf |access-date=April 14, 2024 |publisher=Los Angeles County Metropolitan Transportation Authority}}

= Rolling stock =

File:LongBeach.jpg

File:19951007 03 LRT Long Beach Blvd. @ 20th (5378831405).jpg and 20th St., 1995]]

The A Line operates trains with three light rail vehicles on weekdays and two on weekends. The line currently uses three different types of light rail vehicles: the Kinki Sharyo P3010, the Siemens P2000, and the AnsaldoBreda P2550, but has seen every type of light rail rolling stock on Metro's roster throughout its history of operation.

When the A Line, then known as the Blue Line, first opened in 1990, the line had 54 Nippon Sharyo P865 light rail vehicles, numbered 100–153. These cars wore a unique livery of several blue stripes and a single red stripe, reflecting the Blue Line's color designation and its Pacific Electric Red Car heritage.

In 2000, Metro transferred all 15 Nippon Sharyo P2020 (numbered 154-168) light rail vehicles from the Green Line (now the C Line) to the Blue Line fleet. These light rail vehicles were nearly identical to the older P865 model but were about five years newer and originally had equipment for automatic train operation.{{Cite web |title=Archived copy |url=http://www.subwaynut.com/lametro/imperial-wilmingtonblue/imperial-wilmingtonblue11.jpg |url-status=dead |archive-url=https://web.archive.org/web/20071025193238/http://www.subwaynut.com/lametro/imperial-wilmingtonblue/imperial-wilmingtonblue11.jpg |archive-date=October 25, 2007 |access-date=2007-10-22 |df=mdy-all}}

In 2012, Metro transferred some Siemens P2000 light rail vehicles from the Gold Line to the A (then Blue) Line fleet. These vehicles were used before their refurbishment. As of 2023, some are currently being tested on the A Line, and they made a rocky return to the A Line in late 2024.

In 2017, the Blue Line received 78 Kinki Sharyo P3010 light rail vehicles, the first new cars for the line since it opened in 1990. As the P3010 fleet was introduced, Metro gradually retired all of the remaining P865 light rail vehicles, followed by the P2020 fleet.

In 2023, the AnsaldoBreda P2550 light rail vehicles began service on the A Line. The P2550 trains were tested on the Blue Line in 2009, but were instead assigned to the Gold Line due to weight restrictions.{{Cite report |url=https://www.transit.dot.gov/sites/fta.dot.gov/files/FTA_Report_No._0043.pdf |title=Managing Railcar Maintenance: A Primer on Practices and Improvement Opportunities for the U.S. Transit Industry |last=Blake |first=Tagan |last2=Isaac |first2=Lauren |date=September 2013 |publisher=Federal Transit Administration |page=72 |last3=Rose |first3=David}}

References

{{Reflist|30em}}