The State Railways Institution ({{langx|es| Instituto de Ferrocarriles del Estado}}, or IFE) is a state-run organization of Venezuela that manages the railway systems of the country. Its headquarters are located in Caracas, Venezuela.

According to the 1999 Constitution, its renovation is a national priority. The new infrastructure which has been added includes the first new above-ground train line constructed in Venezuela for more than 70 years, the Ezequiel Zamora Mass Transportation System. Named after the soldier Ezequiel Zamora, it was inaugurated on October 15, 2006, by President Hugo Chávez.

History

Historically, much of the original Venezuelan network was designed in the 19th century in the Federalist period and under the administration of Antonio Guzmán Blanco, in order to open up the country for trade and earn foreign revenues. However, the first licenses were signed and revoked nine times before the first stretch was operating.{{Citation needed|date=November 2022}}

Two of the first lines connected Caracas to its port of La Guaira (the La Guaira and Caracas Railway) and to Valencia (the Great Venezuela Railway) in the 1880s.

Notable engineers associated with its original development include: John Grover and Robert Fairlie. Some of the later lines were designed by William A. Welch and Thomas Kavanagh (Caracas subway).

Rail transport in Venezuela was neglected and went into a major decline from the 1950s, with bus and road transport taking its place. However, Caracas opened the first line of its subway system in 1983, and plans were made for a railway system which would include lines near Caracas and also into the interior of the country.

In 1975 was devised by the "Instituto Ferrocarriles del Estado" (IFE) a National Plan Ferrocarrilero{{cite web|url=http://1.bp.blogspot.com/-yclKTESrfkY/VbPosM0VBcI/AAAAAAAAACw/KHtOrlbO0kQ/s1600/Venezuela.gif|title=Map "Plan Ferrocarrilero 1975"}} that began in Maracaibo and reached Barquisimeto-Puerto Cabello-Valencia-Caracas-Cua, following from Cua to Barcelona and Ciudad Bolivar-Ciudad Guayana. The company "Saprolate-Tranarg" made all aerial photographic surveys and the Plan was approved by the then President Luis Herrera Campins, but in the 1980s the Plan IFE was blocked for economic reasons after the devaluation of the Bolivar in 1983 and then was finally canceled with the Caracazo of 1989. Only the section Caracas-Cúa was maintained as a budgeted project (and was made, being inaugurated in 2006 by President Hugo Chavez) .

The 1999 constitution was a signal for a major reinvestment in the infrastructure of the state. Much of the renovation of the current Venezuelan railway network is still at the planning stage, with some already constructed and the rest to be built over a period of about 30 years.

Railway network

File:Venezuela railway map.jpg

The Venezuelan network includes {{convert|682|km|mi|0|abbr=on}} of rail in standard gauge.Reference The network covers the populated and production areas in the country, and is managed by IFE under various Regional Development Plans. There are also connections between Colombia and Brazil that link to the other countries of South America, although traffic in the border areas are affected by foreign policy and defence strategy.

IFE is the sole operator of trains in Venezuela, however, they have created various railway names assigned to different regions throughout the country.

{{Clear}}

class="wikitable sortable"

! Railway !! Branch !! Present Status !! Station !! colspan=2 | Location

rowspan=18 | Ezequiel Zamora

|rowspan=6 | Capital Line

Caracas – El Sombrero

(approx 150 km)

|rowspan=6 |Passenger service on Venezuela's first electrified train line{{cite web|url=http://www.bbrail.com/case-study/Project-Caracas---Tuy-Medio--Venezuela|title=Rail: Caracas – Tuy Medio Electrification project|access-date=2012-04-10|archive-url=http://arquivo.pt/wayback/20110121133045/http://www.bbrail.com/case%2Dstudy/Project%2DCaracas%2D%2D%2DTuy%2DMedio%2D%2DVenezuela|archive-date=2011-01-21|url-status=dead}} between Caracas and Cúa (41 km) has been in operation since October 15, 2006.{{cite web|url=http://estoesvenezuela.net/videos/vidhbLqCiUHdmo.html|title=Esto es Venezuela. Videos de|website=Esto es Venezuela}} Although short this trip passes through 24 tunnels with the longest being just under 6.8 kmTunnel names and lengths - Spanish

|Libertador Simón Bolívar

|Caracas beside the Caracas Metro La Rinconada station.

|Federal District

Generalísimo Francisco de Miranda

|North Charallave

|Miranda State

Don Simón Rodríguez

|South Charallave

|Miranda State

General Ezequiel Zamora

|Cúa

|Miranda State

|Camatagua

|Aragua State

|El Sombrero

|Guarico State

rowspan=8 |Puerto Cabello – La Encrucijada (approx. 108 km)

|rowspan=8 |Under construction and originally projected completion by before 2011{{cite web|url=http://www.inelectra.com/proyectos.php?t=infraestructura-industrias-transporte-ferrocarril-puerto-cabello-la-encrucijada&lang=en|title=Inelectra|website=www.inelectra.com|access-date=2012-04-14|archive-url=https://web.archive.org/web/20130604042626/http://www.inelectra.com/proyectos.php?t=infraestructura-industrias-transporte-ferrocarril-puerto-cabello-la-encrucijada&lang=en|archive-date=2013-06-04|url-status=dead}} however there have been damage setbacks.{{cite web|url=http://www.ic-consult.co.uk/3014-Proj-metro&rail.htm|title=Damage setback|access-date=2019-04-07|archive-url=https://web.archive.org/web/20090105172346/http://www.ic-consult.co.uk/3014-Proj-metro%26rail.htm|archive-date=2009-01-05|url-status=dead}} After years of slow progress{{cite web|url=http://tunnelbuilder.com/News/Puerto-Cabello-La-Encrucijada-Rail-Line-in-Venezuela-is-50-Complete.aspx|title=Puerto Cabello-La Encrucijada Rail Line in Venezuela is 50% Complete - tunnelbuilder.com News|website=tunnelbuilder.com}} a small part of the line (San Diego-Guacara about 10 km) will be opened before the end of 2012.{{update needed|date=March 2024}}{{cite web|url=http://www.noticias24.com/venezuela/noticia/99417/tramo-del-ferrocarril-ezequiel-zamora-puerto-cabello-la-encrucijada-iniciara-pruebas-a-mediados-de-2012/|title=Tramo del ferrocarril Ezequiel Zamora: Puerto Cabello-La Encrucijada, iniciará pruebas a mediados de 2012 (+fotos y video) - Venezuela|website=www.noticias24.com}} The best optimistic estimate for 100% completion was sometime before 2015.{{update needed|date=March 2024}}{{cite web|url=http://www.vtv.gov.ve/index.php/nacionales/79605-84-de-avance-presenta-linea-puerto-cabello-la-encrucijada-del-sistema-ferroviario-central-ezequiel-zamora-ii-|archive-url=https://archive.today/20120805184012/http://www.vtv.gov.ve/index.php/nacionales/79605-84-de-avance-presenta-linea-puerto-cabello-la-encrucijada-del-sistema-ferroviario-central-ezequiel-zamora-ii-|url-status=dead|archive-date=2012-08-05|title=Government Television (Spanish)}} Presently{{when|date=March 2024}} 14 of 15 tunnels{{cite web|url=http://www.sisgeo.com/en/application-stories/puerto-cabello-la-encrucujada-railway-project-venezuela|title=Construction follows closely to Original Plans|access-date=2012-04-14|archive-url=https://web.archive.org/web/20130921061423/http://www.sisgeo.com/en/application-stories/puerto-cabello-la-encrucujada-railway-project-venezuela/|archive-date=2013-09-21|url-status=dead}} (accumulated 28 km in length) have been completed with hope for the last one to be finished before end of 2012.{{cite web|url=http://www.bnamericas.com/news/infrastructure/IFE_to_complete_Puerto_Cabello-La_Encrucijada_railway_by_end-2012|title=IFE to complete Puerto Cabello-La Encrucijada railway by end-2012 - BNamericas|date=8 November 2010}} The longest built tunnel is just a smidgen under 7.8 km in length.

In 2016 the, "Puerto Cabello railway project, was described as irregular and marked by slow payments by the client as a result of the country’s poor economic conditions, mainly related to the drop in the price of oil."{{Cite web|url=http://www.khl.com/magazines/construction-europe/detail/item122842/Salini-Impregilo-beats-targets|title=Salini Impregilo beats targets - KHL Group|website=www.khl.com|access-date=2017-01-07}}

|Puerto Cabello

|Puerto Cabello

|Carabobo State

Naguanagua

|Northern Valencia suburb

|Carabobo State

San Diego

|North-eastern Valencia suburb

|Carabobo State

Guacara

|Eastern Valencia suburb

|Carabobo State

San Joaquín

|San Joaquín

|Carabobo State

Mariara

|Mariara

|Carabobo State

Maracay

|Maracay

|Aragua State

Cagua

|Santa Crúz de Aragua{{cite web|url=http://www.aporrea.org/actualidad/n183579.html|title=Más de 13 mil kilómetros de vía férrea consolidan desarrollo productivo de la nación|date=25 June 2011}} with station near Cagua, La Encrucijada and Turmero

|Aragua State

rowspan=2 |La Encrucijada – Cúa

|rowspan=2 |planning stage

|La Victoria

|La Victoria

|Aragua State

Las Tejerías

|Las Tejerías

|Aragua State

rowspan=2 |La Encrucijada – San Juan de Los Morros

|rowspan=2 |planning stage

|Villa de Cura

|Villa de Cura

|Aragua State

San Juan de Los Morros

|San Juan de Los Morros

|Guárico State

rowspan=9 | Simón Bolívar

|rowspan=7 | Puerto Cabello – Barquisimeto

|rowspan=7 | Trial runs between Barquisimeto and Yaritagua have been successful where passenger travel time between the 2 stations is completed in 30 minutes (34 km). Also currently freight trains run from Puerto Cabello to Barquisimeto (173 km).{{cite web|url=http://www.turismo-venezuela.com/en/travel-news/45-top-headlines/933-venezuela-cargo-operations-in-the-railway-section-barquisimeto-puerto-cabello|title=Freight operation}}{{Dead link|date=April 2019 |bot=InternetArchiveBot |fix-attempted=yes }} Since the original plans for line and station renovation and modernization projected passenger travel by the end of 2010 have faltered, after considerable delay in construction, the best hope is that full service will be available in 2013.{{cite web|url=http://www.diariolacosta.com/detalles/Tramo-ferroviario-Puerto-Cabello-Barquisimeto-lleva-cuatro-anos-de-retraso-en-su-rehabilitacion/|title=Newspaper (Spanish)|date=3 November 2023 }} An additional rail will be added between the Morón and Puerto Cabello Stations to serve the expected increase in rail traffic on the shared line.{{cite web|url=http://www.railway-technology.com/news/newsvenezuela-awards-italian-consortium-additional-puerto-cabello-rail-contract/|title=Venezuela awards Italian consortium additional Puerto Cabello rail contract - Railway Technology|date=14 November 2011}}

|Puerto Cabello

|Puerto Cabello

|Carabobo State

Morón

|Western Puerto Cabello Suburb

|Carabobo State

San Felipe

|San Felipe

|Yaracuy State

Urama

|Urama

|Yaracuy State

Chivacoa

|Chivacoa

|Yaracuy State

Yaritagua

|Yaritagua

|Yaracuy State

Barquisimeto

|Barquisimeto

|Lara State

rowspan=2 |Yaritagua – Acarigua – Turén

|rowspan=2 | Trial train runs have been successfully employed between Barquisimeto and Acarigua via Yaritagua and everyone awaits the inauguration for this 101 km service.{{cite web|url=http://www.aporrea.org/actualidad/n196912.html|title=Chávez: Tramo ferroviario Barquisimeto-Yaritagua-Acarigua ya está listo|date=18 January 2012}} The travel time between Yaritagua and Acarigua is 40 minutes. As well an additional 44+ km line extension from Acarigua to Turén should be completed before the end of 2012.{{update needed|date=March 2024}}[http://www.ife.gob.ve/index.php?option=com_content&view=article&id=65:sistema-ferroviario-centro-occidental-simon-bolivar&catid=43:tramos-en-construccion&Itemid=81 Ife news] Ruezga bridge in Barquisimeto is said to be planned for completion in 2017, allowing opening of the line.{{update needed|date=March 2024}}{{Cite news|url=http://vtv.gob.ve/28978-2/|title=Corpolara culminará puente ferroviario de Barquisimeto en el primer trimestre de 2017|date=2016-11-14|newspaper=VTV|language=es-ES|access-date=2017-01-07|archive-url=https://web.archive.org/web/20170108005723/http://vtv.gob.ve/28978-2/|archive-date=2017-01-08|url-status=dead}}

|Acarigua

|Acarigua

|Portuguesa State

Turén

|Turén

|Portuguesa State

rowspan=6 | Norte Occidental (North Western)

|rowspan=4 | Morón – Riecito

|rowspan=4 | only freight services

|Morón

|Morón

|Carabobo State

Tucacas

|Tucacas

|Falcón State

Yaracal

|Yaracal

|Falcón State

Riecito

|Riecito

|Falcón State

rowspan=2 | Yaracal – Punto Fijo

|rowspan=2 | planning stage

|Coro

|Coro

|Falcón State

Punto Fijo

|Punto Fijo

|Falcón State

rowspan=19 | Norte Llanero (Northern Plains)

|rowspan=2 | Maturín – Anaco

|rowspan=2 | planning stage

|Maturín

|Maturín

|Monagas State

Anaco

|Anaco

|Anzoátegui State

rowspan=9 | Anaco – Tinaco[http://www.ife.gob.ve/index.php?option=com_content&view=article&id=63:sistema-ferroviario-eje-norte-llanero&catid=43:tramos-en-construccion&Itemid=81 Anaco Tinaco (Spanish)]{{cite web|url=http://www.bnamericas.com/project-profile/infrastructure/Sistema_Ferroviario_Nacional_tramo_Tinaco-Anaco-Ferrocarril_Tinaco-Anaco|title=Anaco Tinaco}}

|rowspan=9 | This 468 km line is under construction for over 3 years, and expected completion by year-end 2012 has amounted to just less than 25% line completion.[http://www.ife.gob.ve/index.php?option=com_content&view=article&id=1751:avanza-en-un-23-obras-ferroviarias-de-la-linea-tinaco-anaco-&catid=1:latest-news&Itemid=94 Progress (Spanish)] So far the construction rate on 5 different work fronts has been slow or even delayed.{{cite web|url=http://www.bnamericas.com/news/infrastructure/Govt_signs_US*7,5bn_contract_to_build_Tinaco-Anaco_rail_stretch,_install_factories|title=Govt signs US$7.5bn contract to build Tinaco-Anaco rail stretch, install factories - BNamericas|date=31 July 2009}}

|Aragua de Barcelona

|Anaco

|Anzoátegui State

Zaraza

|Zaraza

|Guárico State

Tucupito

|Tucupito

|Guárico State

Valle de la Pascua

|Valle de la Pascua

|Guárico State

Chaguaramos

|Chaguaramos

|Guárico State

El Sombrero

|El Sombrero

|Guárico State

Dos Caminos

|Dos Caminos

|Guárico State

El Pao

|El Pao

|Cojedes State

Tinaco

|Tinaco

|Cojedes State

rowspan=5 | Tinaco – Barinas

|rowspan=5 | planning stage

|San Carlos

|San Carlos

|Cojedes State

Acarigua

|Acarigua

|Portuguesa State

Guanare

|Guanare

|Portuguesa State

Sabaneta

|Sabaneta

|Barinas State

Barinas

|Barinas

|Barinas State

rowspan=3 | Barinas – San Cristobál

|rowspan=3 | planning stage

|Barinitas

|Barinitas

|Barinas State

San Rafael del Piñal

|San Rafael del Piñal

|Táchira State

San Cristóbal

|San Cristóbal State

|Táchira

rowspan=14 | Centro Sur (South Central)

|rowspan=7 | San Juan de Los Morros – San Fernando de Apure

|rowspan=7 | The original reconstruction and extension of this 252+ km line was to be completed by year-end 2011 for freight and passenger.{{cite web|url=http://tunnelbuilder.com/Archive/Projects/Venezuela/ve18-Railway.aspx|title=Venezuela Tunnel News – ve/18, Railway – tunnelbuilder.com|website=tunnelbuilder.com}} This project continues, however slow the main train authorities remain optimistic and emphatic that everything will be ready in 2012.{{update needed|date=March 2024}}[http://www.ife.gob.ve/index.php?option=com_content&view=article&id=64:eje-centro-sur&catid=43:tramos-en-construccion&Itemid=81 IFE Construction (Spanish)]

|San Juan de Los Morros

|San Juan de Los Morros

|Guárico State

Ortíz{{cite web|url=http://latitude.blogs.nytimes.com/2012/02/22/chavez-plan-for-high-speed-train-network-is-being-forced-onto-venezuelans|title=Chávez's Great Train Robbery|first=Francisco|last=Toro|date=22 February 2012}}

|Ortíz

|Guárico State

Dos Caminos

|Dos Caminos

|Guárico State

Calabozo

|Calabozo

|Guárico State

Corozopando

|Corozopando

|Guárico State

Camaguán

|Camaguán

|Guárico State

San Fernando de Apure

|San Fernando de Apure

|Apure State

rowspan=7 | Chaguaramas – Caicara del Orinoco

|rowspan=7 | The original reconstruction and extension to be completed by year-end 2011 for freight and passenger went by without success. The first part of the line service from Chaguaramos to Cabruta some 201 km is scheduled to be completed by 2012.{{update needed|date=March 2024}}{{cite web|url=http://www.astaldi.it/group/countries/venezuela/|title=Astaldi|date=18 July 2016}} The extended part that includes crossing on the 3rd bridge over the Orinoco River (this one is approx 8.7 km long and presently under construction) and connection to Caicara needs to have a defined date.

|Chaguaramas

|Chaguaramas

|Guárico State

Las Mercedes

|Las Mercedes

|Guárico State

El Mejo

|El Mejo

|Guárico State

Santa Rita

|Santa Rita

|Guárico State

Arrecife

|Arrecife

|Guárico State

Cabruta

|Cabruta

|Guárico State

Caicara del Orinoco

|Caicara del Orinoco

|Bolívar State

rowspan=11 | Oriental (Eastern)

|rowspan=2 | Guanta – Naricual

|rowspan=2 | abandoned line, under study for upgrade

|Guanta

|Guanta

|Anzoátegui State

Naricual

|Naricual

|

rowspan=3 |Ciudad Guayana – Manicaure

|rowspan=3 |under construction

|Puerto Ordaz

|Ciudad Guayana Este

|Bolívar State

Maturín

|Maturín

|Monagas State

Manicaure

|Manicaure

|Sucre State

rowspan=6 |Anaco – Cúa

|rowspan=6 |planning stage

|Anaco

|Anaco

|Anzoátegui State

Barcelona

|Barcelona

|Anzoátegui State

El José

|El José

|Anzoátegui State

Puerto Píritu

|Puerto Píritu

|Anzoátegui State

Higuerote

|Higuerote

|Miranda State

Cúa

|Cúa

|Miranda State

rowspan=15 | Occidental (Western)

|rowspan=9 | Maracaibo – Sabana de Mendoza

|rowspan=9 | planning stage, had symbolic laying of the first rail and project definition

|Maracaibo

|beside a Maracaibo Metro station

|Zulia State

El Tablazo

|El Tablazo

|Zulia State

Santa Rita

|Santa Rita

|Zulia State

Cabimas

|Cabimas

|Zulia State

Ciudad Ojeda

|Ciudad Ojeda

|Zulia State

Lagunillas

|Lagunillas

|Zulia State

Bachaquero

|Bachaquero

|Zulia State

Mene Grande

|Mene Grande

|Zulia State

Sabana de Mendoza

|Sabana de Mendoza

|Trujillo State

rowspan=2 | Sabana de Mendoza – Barquisimeto

|rowspan=2 | planning stage

|Carora

|Carora

|Lara State

Barquisimeto

|Barquisimeto

|Lara State

rowspan=2 | Encontrados – Machiques

|rowspan=2 | planning stage

|Encontrados

|Encontrados

|Zulia State

Machiques

|Machiques

|Zulia State

rowspan=2 | Machiques – Maracaibo – Puerto Las Américas

|rowspan=2 | planning stage

|Maracaibo

|Maracaibo

|Zulia State

Puerto Las Américas

|Puerto Las Américas

|Zulia State

rowspan=7 | Región Guayana (Guayana region)

|rowspan=6 | San Fernando – Tucupita

|rowspan=6 | planning stage

|San Fernando de Apure

|San Fernando de Apure

|Apure State

Cabruta

|Cabruta

|Gúarico State

Caicara

|Caicara

|Bolívar State

Ciudad Bolívar

|Ciudad Bolívar

|Bolívar State

Ciudad Guayana

|Puerto Ordaz

|Bolívar State

Tucupita

|Tucupita

|Delta Amacuro State

rowspan=1 | Caicara – Puerto Ayacucho

|rowspan=1 | planning stage

|Puerto Ayacucho

|Puerto Ayacucho

|Amazonas State

rowspan=3 | Caracas – La Guaira

|rowspan=3 | Caracas – La Guaira

|rowspan=3 | planning stage - In May 2007 a maglev train was proposed to link Caracas to La Guaira and Simón Bolívar International Airport. A route is being studied prior to obtaining funding.[http://www.abn.info.ve/go_news5.php?articulo=91522&lee=18 Work on a Venezuelan electromagnetic train could be started in two months] {{Webarchive|url=https://web.archive.org/web/20090925095709/http://www.abn.info.ve/go_news5.php?articulo=91522&lee=18 |date=2009-09-25 }} (in Spanish) ABN 10 May 2007

|Caracas

|La Rinconada

|Distrito Federal

Maiquetía

|Maiquetía (near the airport)

|Vargas State

La Guaira

|La Guaira by the seaport

|Vargas State

rowspan=1 | Recreacional (recreational)

|rowspan=1 | Parque Recreacional El Encanto

|rowspan=1 | Reconstruction for passenger service by end of 2012{{update needed|date=March 2024}}

|Los Teques

|Los Teques

|Miranda State

Operational

=Fully Updated=

==Caracas – Cúa branch==

File:Ferrocarril-estacion-cua.ogv Station, Cúa.]]

After 70 years without major improvements to the Venezuelan railway system, the Caracas – Cúa line was opened for public service on October 15, 2006.

The route is part of the projected Ezequiel Zamora railway axis. It starts from Caracas and ends in Cúa, Miranda State. The main terminal is located next to the Caracas Metro (subway) line 3 La Rinconada Terminal Station. This short North-South line can be passenger travelled in approximately, 30 minutes.

The following are the names of the 4 stations and the estimated travel time from Caracas and then the additional time to the next station. Also there is a delay time before the train restarts the trip which can be adjusted by management policy.

class="wikitable sortable"

! Station !! colspan=2 | Location !! Travel Time !! Wait Time

Libertador Simón Bolívar

|Caracas

|Federal District

|

|

Generalísimo Francisco de Miranda

|North Charallave

|Miranda State

|17 min

|2 min

Don Simón Rodríguez

|South Charallave

|Miranda State

|4 min

|2 min

General Ezequiel Zamora

|Cúa

|Miranda State

|10 min

File:Estacion-caracas-ferrocarril.JPG|Libertador Simón Bolívar station, Caracas

File:Ferro ezeq cua.JPG|Ezequiel Zamora station, Cúa

File:Estacion_Libertador_Simon_Bolivar_Caracas.jpg|Libertador Simón Bolívar station

File:Iafetren.JPG|Cua station, Commuter train for local passengers

= Modernization/reconstruction =

==Puerto Cabello – Yaritagua – Barquisimeto branch==

The main branch of the Simón Bolívar railway axis is a {{convert|177|km|mi|0|abbr=on}} east–west line where a full upgrade/restoration was planned with a projected completion date of 2010.{{needs update|date=March 2024}} This line connects Carabobo State, Yaracuy State and Lara State. The stations are as follows:

  • Puerto Cabello, Carabobo State;
  • Morón, Carabobo State;
  • San Felipe, Yaracuy State;
  • Urama, Yaracuy State;
  • Chivacoa, Yaracuy State;
  • Yaritagua, Yaracuy State and;
  • Barquisimeto, Lara State.

==Yaritagua – Acarigua branch==

Another branch of the Simón Bolívar railway axis is a {{convert|113|km|mi|0|abbr=on}} north–south line connection between the Yaritagua, Yaracuy State, Acarigua, Portuguesa State where a full upgrade restoration is in progress.

==San Juan de los Morros – San Fernando de Apure branch==

A {{convert|252|km|mi|0|abbr=on}} north–south line where a full upgrade/restoration was originally projected for completion by the end of 2010. This line was supposed to connect Guárico State and Apure State.

Services

The railway provides both freight and passenger service.

=Freight=

Between Puerto Cabello and Barquisimeto movement of loads over 3 million tons per month have been exceeded.

class="wikitable"

! Branch !! colspan=2 | Period !! Frequency

Puerto Cabello – Barquisimeto

| Monday to Monday

| 6:00 a.m. and 11:30 a.m.

|twice daily

=Passenger=

File:Iafetren.JPG

{{As of|2007|7|16|df=US}}, passenger service is provided only between the stations on the Caracas – Cúa Branch. The following table shows the train schedule:

class="wikitable sortable"

! Branch !! colspan=2 | Period !! Frequency

rowspan=4 | Caracas – Cúa

| rowspan=3 | Monday to Friday

| 5:00 a.m. – 9:00 a.m.

|every 20 minutes

| 9:00 a.m. – 5:00 p.m.

|every 30 minutes

| 5:00 p.m. – 10:00 p.m.

|every 20 minutes

| Saturday and holidays

|7:00 a.m. – 8:00 p.m.

|every 60 minutes

All times are subject to change depending on special events, system improvements and the decisions the managers may make. In 2023, in response to growing demand, the IFE gave in to pressure and finally introduced Sunday services.

Construction

= Work in progress =

==Puerto Cabello – La Encrucijada branch==

Another part of the Ezequiel Zamora railway axis has {{convert|108|km|mi|0|abbr=on}} under construction between the sea port city of Puerto Cabello, Carabobo State, and the crossroads town of La Encrucijada, Aragua State. The line is predominately east–west, although between the station at Naguanagua and the terminus at Puerto Cabello the route changes to a north–south direction.

14 tunnels including the {{convert|7.8|km|mi|abbr=on}} Bárbula Tunnel (the longest in South America) and many bridges are required to connect between the various stations along this line.

The project is behind schedule. In 2016 work on the Puerto Cabello railway was described as "irregular and marked by slow payments by the client as a result of the country’s poor economic conditions, mainly related to the drop in the price of oil."

{{Cite web |url=https://www.khl.com/features/salini-impregilo-beats-targets/122842.article |title=Salini Impregilo beats targets - KHL Group |last=Guthrie |date=2016 |website=www.khl.com |access-date=2019-04-27}}

The new stations under construction are found in:

  • La Encrucijada, Aragua State; the hub in La Encrucijada will provide easy access to the users from Cagua, Aragua State.
  • Maracay, Aragua State;
  • Mariara, Carabobo State;
  • San Joaquín, Carabobo State
  • San Diego, Carabobo State*
  • Naguanagua, Carabobo State*
  • Puerto Cabello, Carabobo State

(*)These two are suburban cities of Valencia.

==Chaguaramas – Las Mercedes – Cabruta – Caicara del Orinoco branch==

Another branch north–south line {{convert|201|km|mi|0|abbr=on}} found mainly in Guarico State that will cross the Orinoco River and enter the Bolívar State.

==Maracaibo – Sabana de Mendoza branch==

This {{convert|233|km|mi|0|abbr=on}} will start in the capital city of Maracaibo Zulia State nearby the Maracaibo Metro (subway) station. The line will cross the mouth of Lake Maracaibo in a combination tunnel/bridge under construction in an east–west direction and after the El Tablazo stop the line follows a north-north-west to south-south-east direction. The stations are as follows:

==Puerto Ordaz – Maturín – Manicuare branch==

This {{convert|320|km|mi|0|abbr=on}} route will start from Ciudad Guyana Bolívar State, the Puerto Ordaz section and cross the Orinoco River to go south–north to reach Maturín, Monagas State and continue till it reaches the Sucre State where the line will run east–west until it reaches the deep sea water port of Manicuare.

==Acarigua – Turén branch==

The completion of an extension of the Simón Bolívar railway axis is a {{convert|45|km|mi|0|abbr=on}} north–south line connection between Acarigua, and Turén.

==Tinaco – Anaco branch==

The first phase {{convert|468|km|mi|0|abbr=on}} is part of the North Llanero railway axis (northern plains) an east–west line that would provide service to the following cities/towns:

and work was to be completed by 2012.

As part of a National Rail Development Plan, the standard gauge Tinaco-Anaco railway,{{Cite web|url=http://www.railway-technology.com/projects/-tinaco-anaco-railway-line-venezuela/|title=Tinaco-Anaco Railway Line|website=Railway Technology|access-date=2017-01-07}} was inaugurated with Chinese funding in 2009.{{Citation needed|date=December 2020}}

About a fifth of the work had been done by 2012. However, it appears construction stalled in 2013,{{Cite news|url=http://bigstory.ap.org/article/3367297bb5cc4fc497579164f679ec75/chinese-bullet-train-venezuela-stalls-alliance-derails|title=Chinese bullet train in Venezuela stalls as alliance derails|newspaper=The Big Story|language=en-US|access-date=2017-01-07}} though the route remains on the State Railways Institution's map of railways under construction .{{Cite web|url=http://www.ife.gob.ve/Sistema_ferroviario/#lineaope|title=The State Railways Institution (Instituto de Ferrocarriles del Estado, or IFE)|website=www.ife.gob.ve|access-date=2017-01-07}}

==Parque Recreacional - El Encanto branch==

File:El Encanto railway restoration.jpg

This 7 km long branch independent of all other rail systems is for recreational purposes only. Mainly is to provide entertainment for tourists, these enchanted sights must be viewed by all. Originally this summit section was part of the Great Venezuela Railway (180 km in length) built in 1909 and operated until after 1937. If all goes well this will be available to the public in 2012.{{needs update|date=March 2024}}

Work began in 2015 on a 350 million bolivar plan to restore the {{convert|7|km|mi|abbr=on}} of track, with 7 tunnels and 5 bridges, to provide a 25-minute journey from Los Lagos to El Encanto.{{Cite web|url=http://www.mintur.gob.ve/mintur/blog/parque-recreacional-el-encanto-recuperara-su-atractivo-turistico/|title=Parque Recreacional El Encanto recuperará su atractivo turístico|website=www.mintur.gob.ve|access-date=2017-01-06|archive-date=2017-01-06|archive-url=https://web.archive.org/web/20170106173739/http://www.mintur.gob.ve/mintur/blog/parque-recreacional-el-encanto-recuperara-su-atractivo-turistico/|url-status=dead}}

= Planning/design stage =

==La Encrucijada – Cúa branch==

The completion of the connection from La Encrucijada to the Tuy Valley will be made at a later date.

==Sabana de Mendoza – Barquisimeto branch==

A follow-up future east–west phase will connect Sabana de Mendoza with Barquisimeto Lara State.

==San Juan de Los Morros – La Encrucijada branch==

Future expansion includes a north–south connection between San Juan de Los Morros and La Encrucijada Station.

==Anaco – Maturín branch==

A separate phase for the North Llanero railway axis to be constructed at a later date will connect in an east–west direction Maturín Monagas State with Anaco Anzoátegui State.

==Tinaco – San Cristóbal branch==

The full {{convert|1100|km|mi|0|abbr=on}} route, the North Llanero railway axis will be completed at a later date and will add services among the additional following cities:

==Caicara – Puerto Ayacucho branch==

This north–south branch will connect Bolívar State to Amazonas State although a possible alternative would be to join San Fernando de Apure to Puerto Ayacucho.

== San Fernando de Apure – Ciudad Bolívar – Ciudad Guayana – Tucupita branch ==

This east–west route will connect Apure State, Guarico State, Bolivar State, Anzoategui State, Monagas State and Delta Amacuro State. Also this line will have stops in Cabruta and Caicara.

==Caracas – La Guaira branch==

This dominately north–south route {{convert|50|km|mi|1|abbr=on}} joining Federal District to Vargas State will provide access to and from Caracas and its International/National Airports and one of its major Seaports.

  • Caracas (La Rinconada)
  • Maiquetía Airport
  • La Guaira Seaport

Completion of this line is expected within five years after fund approval.