T5 (Istanbul Tram)
{{Short description|A tram line in Istanbul}}
{{Infobox rail line
| box_width =
| name = T5 Eminönü–Alibeyköy Coach Station
| other_name =
| native_name =
| native_name_lang =
| color = 7C72B3
| logo = Istanbul T5 Line Symbol.svg
| logo_width = 50
| logo_alt =
| image = Haliç tram.jpg
| image_width =
| image_alt =
| caption =
| type = Tram
| system = Istanbul Tram
| status = Operational (Eminönü-Alibeyköy Coach Station)
| locale = Istanbul
| start = Eminönü
| end = Alibeyköy Coach Station
| stations = 14
| routes =
| daily_ridership = 114,000
| ridership2 =
| owner =
| operator = Metro Istanbul
| character =
| depot = Alibeyköy Coach Station
| stock = 30
| linelength =
| tracklength = {{convert|10.1|km|abbr=on}}
| tracks =
| gauge = {{Track gauge|sg|allk=on}}
| old_gauge =
| load_gauge =
| minradius =
| racksystem =
| routenumber =
| linenumber =
| electrification = Third rail (Alstom APS)
| speed = {{convert|20|–|45|km/h|abbr=on}}
| signalling =
| elevation =
| website = [https://www.metro.istanbul/Hatlarimiz/HatDetay?hat=T5]
| map = {{Istanbul Tram T5 route diagram|inline=1}}
| map_name = Route diagram
| map_state = uncollapsed
| embedded =
| yearcommenced =
| planopen =
| open = {{start date and age|2021|01|01|df=y}} (First section)
{{start date and age|2023|08|30|df=y}} (Last section)
| lastextension =
| yearcompleted =
| event1label = (Eminönü - Alibeyköy Coach Station)
| event1 = Operational
| event2label =
| event2 =
| event3label =
| event3 =
| close =
| reopen =
}}
The T5 Eminönü–Alibeyköy Coach Station tram line ({{langx|tr|T5 Eminönü–Alibeyköy Cep Otogarı tramvay hattı}}) is a tram line following the coastline of the Golden Horn on the European side of Istanbul, Turkey.{{Cite web|last=AGENCIES|first=DAILY SABAH WITH|date=2021-01-02|title=Golden Horn tram partially opens, to serve Istanbulites free for 10 days|url=https://www.dailysabah.com/turkey/istanbul/golden-horn-tram-partially-opens-to-serve-istanbulites-free-for-10-days|access-date=2021-01-04|website=Daily Sabah|language=en}}
Construction of the line began in 2016. The first section consisting of 12 stations between {{ill|Cibali, Fatih|tr|lt=Cibali}} (tr) and Alibeyköy Coach Station at a length of {{cvt|8.8|km}} was officially opened on 1 January 2021, and extension to Eminönü was officially opened on 30 August 2023.
The line is {{cvt|10.1|km}} long with 14 stations each {{cvt|60|m|ftin}} of length. 30 trains shall carry up to 114,000 passengers a day. Its route mostly follows the western coastline of the Golden Horn,{{Cite web|last=Uysal|first=Onur|date=2019-03-09|title=Golden Horn tram (T5)|url=https://railturkey.org/2019/03/09/golden-horn-tram/|access-date=2021-01-04|website=Rail Turkey En|language=en}} and is built on the bank next to the existing street. In some places, it crosses the water on piles. The total travel time was assumed to be 35 minutes.
The line uses Alstom's APS (a third rail embedded in the ground between the tracks) for electrification to avoid visual pollution, a difference from other tram lines in the city, which have traditional overhead wires suspended from roadside posts.
Stations and connections
The 14 stations and their connections to other lines are as following: All stations are at ground level
class="wikitable"
!No !Station !District !Transfer !Notes |
1
|Eminönü | rowspan="6" |Fatih |{{rint|istanbul|t1}}・{{rint|istanbul|ferry}} (Eminönü ferry) |
2
|Küçükpazar |{{rint|istanbul|m2}} (Haliç Metro Station) |
3
|Cibali |İETT Bus: 33ES, 55T, 99A |Kadir Has University Cibali Campus |
4
|Fener |{{rint|istanbul|ferry}} (Fener ferry) |Yavuz Sultan Selim Mosque |
5
|Balat |{{rint|istanbul|ferry}} (Balat ferry) | |
6
|Ayvansaray |{{rint|istanbul|ferry}} (Ayvansaray ferry) |It is approximately {{Cvt|1|km}} from Ayvansaray Metrobus Station. |
7
|Feshane | rowspan="8" |Eyüpsultan |{{rint|istanbul|ferry}} (Eyüpsultan ferry) | Eyüp Sultan Mosque・Artistanbul Feshane・Zal Mahmud Paşa Mosque |
8
|Eyüpsultan Teleferik |{{rint|istanbul|tf|2}} |Eyüp Sultan Mosque・Eyüpsultan Mezarlığı・Pierre Loti |
9
|Eyüpsultan Devlet Hastanesi |İETT Bus: 37M, 48A, 50B, 50R, 50K, 50V, 50Y |Eyüpsultan Country Hospital |
10
|Silahtarağa Mahallesi |İETT Bus: 37T, 38G, 48A, 50B, 50R, 50K, 50V, 50Y, 55B, 55Y |Santralistanbul・İstanbul Bilgi Üniversitesi Santralistanbul Kampüsü・Silahtarağa Yeni Camii |
11
|Üniversite |İETT Bus: 37T, 38G, 48A, 50B, 50K, 50R, 50V, 50Y, 55B, 55Y |Bezmialem Foundation University Eyüpsultan Campus・Silahtarağa Merkez Camii・İstanbul Bilgi University Santralistanbul Campus |
12
|Alibeyköy Merkez |İETT Bus: 36T, 37T, 38G, 48A, 49G, 49GB, 50A, 50B, 50C, 50D, 50E, 50K, 50L, 50M, 50N, 50R, 50S, 50T, 50V, 50Y, 55B, 55Y, TM3, TM8, TM10, TM12, TM15, TM18, TM19 |Alibeyköy Camii |
13
|{{rint|istanbul|m7}} | |
14
|Alibeyköy Cep Otogarı |İETT Bus: 47L, 49GB, 49Z, TM5, TM11, TM17 |Alibeyköy Cep Bus Terminal・5. Levent |
See also
References
{{reflist|30em|refs=
[http://www.milliyet.com.tr/eminonu-alibeykoy-tramvay-hatti-ekonomi-2542821 Eminönü -Alibeyköy Tramvay hattı projesi hızla devam ediyor] - Milliyet
{{cite news |url=https://www.sabah.com.tr/ekonomi/2019/01/28/eminonu-alibeykoy-tramvay-hattinin-raylari-yerlestiriliyor?paging=2 |newspaper=Sabah |title=Eminönü Alibeyköy tramvay hattının rayları yerleştiriliyor |date=28 January 2019 |language=tr |accessdate=30 January 2019 }}
{{cite news |title=Eminönü-Alibeyköy Tramvay Hattı'nın ilk kısmı açıldı |url=https://www.ntv.com.tr/turkiye/eminonu-alibeykoy-tramvay-hattinin-ilk-kismi-acildi,YjREXBKbvkCO3ocaplyYcA |access-date=1 January 2021 |newspaper=NTV |language=tr}}
{{cite news |url=https://www.aa.com.tr/tr/turkiye/eminonu-alibeykoy-tramvay-hattinin-ilk-bolumu-acildi/2095738 |newspaper=Anadolu News Agency |title=Eminönü-Alibeyköy Tramvay Hattı'nın ilk bölümü açıldı |date=1 January 2021 |language=tr |accessdate=3 January 2021 }}
}}
{{Public Transport in İstanbul}}
Category:Tram transport in Istanbul
Category:Transport infrastructure under construction in Turkey