Reviewer: Vami IV (talk · contribs) 14:00, 13 April 2020 (UTC)
=Opening statement=
In reviews I conduct, I may make small copyedits. These will only be limited to spelling and punctuation (removal of double spaces and such). I will only make substantive edits that change the flow and structure of the prose if I previously suggested and it is necessary. For replying to Reviewer comment, please use {{Done}}, {{Fixed}}, {{Added}}, {{Not Done}}, {{Doing}}, or {{Removed}}, followed by any comment you'd like to make. I will be crossing out my comments as they are redressed, and only mine. A detailed, section-by-section review will follow. —♠Vami_IV†♠ 14:00, 13 April 2020 (UTC)
:{{ping|Epicgenius}} Hi again. –♠Vami_IV†♠ 14:00, 13 April 2020 (UTC)
::{{re|Vami IV}} Thanks for the quick review. I have resolved these issues. epicgenius (talk) 16:00, 13 April 2020 (UTC)
=<s>Background</s>=
Combine the parts of "Background" that deal with the damage caused by Hurricane Sandy into Paragraph 1, and those that deal with the immediate aftermath into Paragraph 2. {{tq|In October 2012, Hurricane Sandy caused severe damage to New York City,}} Should ideally launch into {{tq|The storm flooded nine of the system's 14 underwater tunnels [...] and completely destroyed a portion of the IND Rockaway Line (A train) in Queens, [...].}}- {{Done}}
Elaborate on this years of needed repairs.- {{Done}} The repairs were staggered over several years.
=Planning=
- {{Removed}}
{{tq|between Bedford Avenue in Brooklyn and Eighth Avenue in Manhattan}} Specify that "Bedford Avenue" and "Eighth Avenue" here are stations and not the streets.- {{Done}}
The L train needs a wikilink.- {{Done}}
{{tq|and running the M to [...] G, J/Z and M [...] of the G would [...] The M's peak [...] except for the A and R would [...] The J/Z and M would [...] The G would also [...] the G would not [...] suspended L service}} Expand with the word "train"/"trains".- {{Done}}
{{tq|and East Village, Manhattan,}} Consider "the East Village".- {{Done}}
{{tq|Lorimer Street (J and M trains),}} Redundant link to the M train here.- {{Done|Rearranged}}
The SBS, NYCDOT, NYCEDC acronyms are not explained.- {{Done}}
{{tq|speeded up transit times}} sped up- {{Done}}
{{tq|transit times for transit riders}} Delete one of these "transits".- {{Done}}
{{tq|January 6, 2019, three months before the tunnel is set to shut down}} This should not be present-tense.- {{Done}}
{{tq|Free transfers will be available}} If this is supposed to be present-tense, use "are". If not, "would".- {{Done}} this was in the past tense. epicgenius (talk) 16:00, 13 April 2020 (UTC)
{{tq|ferry and two Select Bus Service routes [...] the L5 will not be a Select Bus Service route}} Redundant links for SBS.- {{Done}} Also, I trimmed this a bit since the route was not implemented.
{{tq|analysis of possible effect}} the possible effect- {{Done}}
What's a benchwall?- {{Added}}
{{Tq|The busway would have the same vehicle restrictions as originally planned: the only vehicles that could use the busway would be buses, trucks making deliveries on 14th Street, emergency and Access-A-Ride vehicles, and local traffic traveling for no more than one block.}} Nothing after the colon here is required.- {{Done}}
{{tq|However, the busway was not implemented as scheduled in July 2019.[94][95] The implementation of the busway was pushed back to August,[96][97] before finally taking effect on October 3, 2019.[98][99]}} Condense.- {{Done}}
=GA progress=
Images are relevant and free, though few in number. Article passes copyvio scanning with 23% likelihood. –♠Vami_IV†♠ 14:00, 13 April 2020 (UTC)
{{GAProgress
| prose = y
| mos = y
| reflayout = y
| reliablesources = y
| originalresearch =y
| copyvio = y
| broadness = y
| focus = y
| neutral = y
| stable = y
| freeortaggedpics = y
| picsrelevant = y
}}
{{Archive bottom}}