Te Huka Power Station

{{Short description|Geothermal power station near Taupō, New Zealand}}

{{Use dmy dates|date=July 2019}}

{{Use New Zealand English|date=July 2019}}

{{Infobox power station

| name = Te Huka Power Station

| name_official =

| image =

| image_size =

| image_caption =

| image_alt =

| location_map_size =

| location_map_caption=

| location_map_alt =

| coordinates = {{coord|38|40|1|S|176|7|5|E|region:NZ-WKO_type:landmark|display=inline,title}}

| country = New Zealand

| location = Centennial Drive, Taupō

| status = O

| construction_began =

| commissioned = 2010

| decommissioned =

| cost =

| owner = Contact Energy

| operator =

| geo_type = Binary cycle

| geo_temp_requirement=

| geo_well_count =

| geo_well_depth =

| geo_water_output =

| th_fuel_primary =

| th_fuel_secondary =

| th_fuel_tertiary =

| ps_units_operational=

| ps_units_manu_model =

| ps_units_uc =

| ps_units_planned =

| ps_units_decommissioned=

| ps_electrical_capacity= 23 MW

| ps_electrical_cap_fac=

| ps_annual_generation=

| th_cogeneration =

| th_combined_cycle =

| website =

| extra =

}}

The Te Huka Geothermal Power Station, also known as Tauhara One, is a 23 MW binary cycle geothermal power station situated near Taupō, New Zealand. The power station is operated by Contact Energy.

In July 2008, Contact Energy announced that the contract for supply and construction of the binary cycle equipment was awarded to Ormat Technologies.{{cite press release|url=http://www.contactenergy.co.nz/web/view?page=/contentiw/pages/mediaandpublications/pressreleases/2007/2007-11-19-contactconfirmsbinarygeothermalplant&vert=mp|title=Contact confirms geothermal binary plant|publisher=Contact Energy|date=19 November 2007}}{{cite press release|url=http://www.contactenergy.co.nz/web/view?page=/contentiw/pages/mediaandpublications/pressreleases/2008/2008-07-01-centennialdrivebinaryupdate&vert=mp|title=Centennial Drive binary update|publisher=Contact Energy|date=1 July 2008}}

The plant is powered with steam and fluid from the Tauhara steamfield, and all used geothermal fluid is reinjected back into the edge of the steamfield. A 33,000-volt line connects the power station to Transpower's Wairakei substation, injecting the station's electricity into both Unison's Taupō distribution network and the national grid.

The Tauhara One plant was opened in May 2010, three weeks ahead of schedule.{{cite news|url=http://www.nzherald.co.nz/business/news/article.cfm?c_id=3&objectid=10647323|title=Geothermal power station opens early|date=25 May 2010|publisher=The New Zealand Herald }}

The power station was formerly known as Centennial Drive binary.

Image:Geothermal.Electricity.NZ.TeHuka.png

See also

{{stack|{{Portal|New Zealand|Geology|Renewable energy}}}}

References

{{Reflist}}