Tehran Metro Line 1

{{Short description|Metro line in Tehran, Iran}}

{{Infobox rail line

| name = Tehran Metro Line 1

| native_name = خط ۱ مترو تهران

| native_name_lang = fa

| logo = File:Tehran Metro Line 1.png

| color = {{rcr|Tehran Metro|1}}

| image =

| image_width =

| caption =

| type = Rapid transit

| system = Tehran Metro

| status =

| locale = Tehran, Tehran Province

| start = Tajrish Station

| end = Kahrizak Station, Parand

| stations = 29+3 (Including IKIA branch)

| routes =

| daily_ridership =

| open = 28 August 2001 (Initially){{Cite web | last=Schwandl | first=Robert | url=http://www.urbanrail.net/as/tehr/tehran.htm | title=Asia - Iran - Tehran Metro | website=UrbanRail.net | year=2010 | access-date=January 17, 2011 | url-status=dead | archive-url=https://web.archive.org/web/20151001023545/http://www.urbanrail.net/as/tehr/tehran.htm | archive-date=October 1, 2015 }}
30 November 2023 (Most recent){{Cite web |title=Parand metro extension inaugurated |url=https://www.railwaygazette.com/metros/parand-metro-extension-inaugurated/65451.article? |date=4 December 2023 |access-date=17 December 2023 |website=Metro Report International}}

| close =

| owner = Tehran Urban and Suburban Railways Organization (Metro)

| operator = Tehran Urban and Suburban Railways Organization (Metro)

| character =

| depot = Tehran-South Depot

| linelength = {{convert|86.9|km|mi|abbr=on}}

| tracklength =

| tracks =

| gauge = {{Track gauge|standard}}

| electrification = Third rail

| speed = 80 km/h (main line)
120 km/h (IKIA branch)

| elevation =

| map =

}}

{{Tehran Metro Line 1 Map}}

Tehran Metro Line 1, coloured red on system maps, runs north–south and is {{convert|86.9|km|mi|sp=us}} of which {{convert|14.9|km|mi|abbr=on}} is underground (from Tajrish station to Shush Station) and the rest at grade (at surface level). The number of stations along the main line is 29 of which 22 stations are underground and seven above. The Airport branch has another three stations, all at grade. {{As of|2005}}, the line's total capacity is 650,000 passengers per day and trains make a scheduled stop of 20 seconds per station. The trains are made up of seven wagons, giving a nominal capacity of 1,300 seated and standing passengers. The maximum speed of the trains is {{convert|80|km/h|mph|abbr=on}} per hour, in practice tempered to an average {{convert|45|km/h|mph|abbr=on}} due to station stops, but {{convert|120|km/h|mph|abbr=on}} on the Airport branch, so travel time for the {{convert|49|km|abbr=on}} from Shahed - Bagher Shahr Metro Station (short Shahed station) to Parand is just 34 minutes.{{Cite web |title=Phase 2 of Tehran Metro Line 8 Ready |url=https://financialtribune.com/articles/people/69551/phase-2-of-tehran-metro-line-8-ready |date=2 August 2017 |access-date=17 December 2023 |website=Financial Tribune}}

Line 1 runs mostly north–south, and from Shahed station has interchange platforms for its extension, sometimes in between termed as Metro Line 8, to Imam Khomeini International Airport completed in August 2017 and extended to Parand in December 2023.

First stage of the line was from Mirdamad station to Shahed station and opened in August 2001. A {{convert|4.1|km|mi|sp=us}}, three-station extension of the line from Mirdamad station to Qolhak opened on May 20, 2009; a {{convert|4|km|mi|sp=us}}, four-stations second phase from Qolhak to Tajrish Square was completed in 2012.[http://metro.tehran.ir/Default.aspx?tabid=247 List of Tehran metro stations (Tehran Metro official website)] Construction was to be completed by March 2007 but faced major issues due to large boulders and rock bed in part of the tunnels as well as water ingress/drainage issues. It also faced major financing issues as the government refused to release funds earmarked for the project to the municipality.

Route

The line starts at the northern terminus of Shari'ati Street, Tajrish neighbourhood and runs south along Shari'ati Street for about {{convert|5|km|abbr=on}}. It runs briefly more westward along Mirdamad Boulevard. After passing through Mirdamad Station, it resumes its normal axis, reaching Beheshti Station where it intersects with Line 3. It mirrors the course of Dr. Mofatteh Street and after intersecting with Line 4 at Darvazeh Dowlat Station, on Sa'adi Street it rapidly intersects with Line 2 at Imam Khomeini Station at Toopkhaneh. It again shifts briefly southwest along Khayyam Street. Past Shush Station, the line surfaces and continues south, passing through Rey, and Behesht-e Zahra, Kahrizak, reaching Shahr-e Aftab Metro Station at Shahed station.

Route map

{{Rapid transit OSM map

|system_qid=Q20110118

|single_line=y

|stations=y

|stations_qid=Q20110118

|zoom=9

|frame-width=400

|frame-height=400}}

Imam Khomeini Airport branch

Since April 2016 the {{convert|4|km|abbr=on}} branch from further platforms at Shahed - Bagher hahr Station to Shahr-e-Aftab Station opened, this new line was numbered 8 in the metro network. As line 8, it was extended by {{convert|26|km|abbr=on}} to Imam Khomeini Airport in August 2017. With the inauguration of the {{convert|19|km|abbr=on}} long phase 3, the extension to Parand in December 2023, this whole airport branch was renumbered to line 1 again.

References

{{reflist}}

{{Tehran Metro navbox|state=expanded}}

Category:Tehran Metro

Category:Railway lines opened in 2001