User:Roadsguy/Interstate 885
:This is a WIP draft of a stand-alone I-885 article. See discussion.
{{Infobox road
| header_type = UC
| state = NC
| type = INC
| route = 885
| map = {{maplink|frame=yes|plain=yes|frame-align=center|frame-width=290|frame-height=290|frame-lat=35.9523|frame-long=-78.8674|zoom=11|type=line|raw={{Wikipedia:Map data/Wikipedia KML/Interstate 885}}}}
| map_custom = yes
| map_notes = Proposed route of I-885 highlighted in red
| spur_type = I
| spur_of = 85
| maint = NCDOT
| status = Proposed
| length_mi = 8.566
| established =
| direction_a = South
| terminus_a = {{jct|state=NC|I|40|NC-Toll|147}} near Durham
| junction = {{plainlist|1=
- {{jct|state=NC|NC|147}} in Durham
- {{jct|state=NC|US|70}} in Durham
- {{jct|state=NC|NC|98}} in Durham
}}
| direction_b = North
| terminus_b = {{jct|state=NC|I|85|US|70}} in Durham
| counties = Durham
| previous_type = I
| previous_route = 840
| next_type = NC
| next_route = 901
}}
Interstate 885 (I-885) is a proposed {{convert|8.57|mi|km|adj=on}} long auxiliary Interstate highway in the U.S. state of North Carolina. It is planned to link Interstate 40 to Interstate 85 in the Durham area. The proposed route consists of two preexisting sections of freeway—North Carolina Highway 147 (NC 147/Durham Freeway) to the south and U.S. Route 70 (US 70) to the north—connected by the East End Connector, which is scheduled to open in November 2019. Sign plans from NCDOT indicate that I-885 is expected to be signed immediately upon the completion of the East End Connector, pending approval from the Federal Highway Administration (FHWA).
Route description
The planned routing of I-885 begins at the interchange between I-40 and NC 147, running north with NC 147 on the Durham Freeway through the Research Triangle Park. Three closely-spaced interchanges link the route to E Cornwallis Road, TW Alexander Drive, and and Ellis Road. At the Durham city line, I-885 will diverge from NC 147 to head northeast on the East End Connector before joining US 70, curving to the northwest concurrent with the route. The freeway turns due north as it comes to NC 98 at a junction which is being rebuilt into a diamond interchange. This interchange also provides indirect access to US 70 Business. After continuing north and meeting Cheek Road, the freeway and proposed Interstate end at a semi-directional T interchange with I-85.
History
{{See also|North Carolina Highway 147#History|U.S. Route 70 in North Carolina#History}}
The first section of what will become I-885 to be constructed was the portion of US 70 between the East End Connector and I-85, completed by 1957 with US 70 relocated onto it. The East End Connector first appeared in Durham's 1959 thoroughfare plan, but was shelved and its funding diverted to other priorities such as NC 147, the Durham Freeway. The portion of NC 147 concurrent with the proposed Interstate opened in the early 1970s, including accommodation for an interchange with the Connector. The project would resurface in the 1990s when NCDOT studied it again, but it would not receive funding until it appeared in the 2009-2015 Transportation Improvement Plan. In the meantime, as part of a larger widening project on I-85, the early 2000s saw the reconstruction of the US&nbps;70 freeway between I-85 and Cheek Road, widening the section to six lanes and bringing it up to modern Interstate Highway standard as well as adding the missing movements at the interchange with I-85.
The I-885 designation did not become public knowledge until the release of signing plans in 2014, though NCDOT had not yet received approval from the FHWA. Construction on the East End Connector began in April of the following year. In addition to the construction of a short segment of new freeway between NC 147 and US 70, the section of US 70 between Creek Road and the Connector is being realigned and widened to six lanes. Work at the interchange between NC 147 and the Connector was expected to be completed in June 2018, but work in that area continues {{as of|December}}.
The East End Connector is expected to open in November 2019, at which point I-885 will be signed on the entirety of its proposed corridor. Finishing touches, such as the seeding of grass in the Connector project area, will continue into 2020.
Future
Proposed exit list
{{jcttop|old|exit|exit_ref=|state=NC|county=Durham|hatnote=The entire route will be in Durham County. Exit numbers listed are the proposed I-885 exit numbers.}}
{{NCint|old
|location=none
|lspan=4
|type=concur
|mile=0.00
|old=5A-B
|exit=???
|road={{jct|state=NC|NC-Toll|147|dir1=south|name1=Triangle Expressway}}
A: {{jct|state=NC|I|40|dir1=east|location1=RDU Airport|city2=Raleigh}}
B: {{jct|state=NC|I|40|dir1=west|to2=To|NC|54|city1=Chapel Hill}}
|notes=Southern terminus of I-885; southern terminus of NC 147 concurrency; southbound NC 147 continuation unnumbered
}}
{{NCint|old
|mile=0.92
|old=6
|exit=1
|road=Research Triangle Park / Cornwallis Road
}}
{{NCint|old
|mile=1.87
|old=7
|exit=2
|road=Alexander Drive
}}
{{NCint|old
|mile=2.94
|old=8
|exit=3
|road=Ellis Road
}}
{{NCint|old
|location=Durham
|lspan=6
|type=concur
|mile=4.80
|old=–
|exit=4 / 5
|road={{jct|state=NC|NC|147|dir1=north|city1=Durham}}
|notes=Signed exit 4 northbound and exit 5 southbound; northern terminus of NC 147 concurrency
}}
{{NCint|old
|type=concur
|mile=5.72
|old=–
|exit=5 / 6A
|road={{jct|state=NC|US|70|dir1=east|city1=Raleigh}}
|notes=Signed exit 5 northbound and exit 6A southbound; southern terminus of US 70 concurrency
}}
{{NCint|old
|mile=6.91
|old=–
|exit=6B
|road={{jct|state=NC|US-Bus|70|dir1=west|dab1=Durham|NC|98|city1=Durham|city2=Wake Forest}}
|notes=Signed exit 6 northbound and exit 6B southbound
}}
{{NCint|old
|mile=7.91
|old=286
|exit=7
|road=Cheek Road
}}
{{NCint|old
|type=concur
|mile=8.57
|old=285
|exit=8
|road={{jct|state=NC|I|85|dir1=south|US|15|dir2=south|US|70|dir3=west|city1=Greensboro}}
8: {{jct|state=NC|I|85|dir1=north|US|15|dir2=north|city1=Henderson|location2=Petersburg}}
|notes=Northern terminus of I-885; northern terminus of US 70 concurrency; ramp to southbound I-85 unnumbered
}}
{{jctbtm|old|keys=concur}}
References
{{reflist|refs=
{{Cite web |url=https://xfer.services.ncdot.gov/dsplan/2014%20Highway%20Letting/11-18-14/Plans%20and%20Proposals/Durham%20U-0071%20C203394/Roadway/Part%20III/Signing.pdf |title=Signing.pdf |date=June 24, 2014 |publisher=North Carolina Department of Transportation |access-date=December 12, 2018}}
{{Cite web |url=https://www.ncdot.gov/news/press-releases/Pages/2015/Groundbreaking-for-East-End-Connector-Pr.aspx |title=Groundbreaking for the East End Connector Project |date=April 22, 2015 |publisher=North Carolina Department of Transportation |access-date=December 12, 2018}}
{{Cite web |url=https://www.heraldsun.com/news/local/counties/durham-county/article214858760.html |title=I-885, the next highway in Durham: What it looks like and when it will open |last=Vaughan |first=Dawn |date=July 18, 2018 |publisher=The Herald-Sun |access-date=December 12, 2018}}
{{Cite web |url=https://www.ncdot.gov/projects/east-end-connector/Pages/default.aspx |title=NCDOT: East End Connector |publisher=North Carolina Department of Transportation |access-date=December 12, 2018}}
}}
External links
{{commons category|Interstate 885}}
- [https://www.ncdot.gov/projects/east-end-connector/Pages/default.aspx NCDOT: East End Connector]
- [http://www.malmeroads.net/ncfutints/fut885.html NC Future Interstates: Future I-885 / Durham East End Connector]
{{3di|85}}