Xinyi Planning District
{{Short description|Urban development area in Taipei, Taiwan}}
{{More citations needed|date=April 2020}}
{{coord|25|02|10|N|121|34|15|E|type:landmark|display=title}}
File:Taipei Skyline 2022.06.29.jpg
Xinyi Planning District ({{lang-zh|信義計畫區}}), also known as the Xinyi Planning Area, is located in Xinyi District, Taipei, Taiwan. The total area of the Xinyi Planning District is 153 hectares. It was designed in the 1970s and developed from the 1980s onward. Xinyi Planning District is the prime central business district of Taipei. Important infrastructure, such as Taipei 101, Taipei City Hall, Taipei International Convention Center and Taipei World Trade Center, is located within this area.
Historical development
It's historical development began in 1976, when the Taipei Municipal Government accepted the proposal to redevelop the area east of the Sun Yat-sen Memorial Hall. The goal of this redevelopment was to set up a secondary commercial center away from the more crowded old city center (Taipei Station, Ximending area). The redevelopment hoped to increase the prosperity of the eastern district and the convenience of urban life for existing residents.{{Cite web|title=What plans and measures are implemented to develop the modern Taipei sub-center, the Xinyi Planning District?|url=https://english.gov.taipei/News_Content.aspx?n=9466C65F1E35239A&s=6691E067D07FEFFC|access-date=2022-06-18|website=english.gov.taipei| date=18 April 2017 }}
The development framework was planned by the Japanese architect {{ill|Kaku Morin|ja|郭茂林}} (1920–2012) of Kaku Morin Group, an architect with planning experience with the Nishi-Shinjuku district, a previously planned development in Tokyo. The center's purpose was to expand business investment in the area and attract international financial services and technology firms. It also planned for residential development by building a completely new community. The Xinyi Planning District is the only commercial development area in Taipei with a wholly planned street and urban design. In addition to attracting corporations, it also features large retail spaces, department stores, and shopping malls.{{Cite web|title=Xinyi Commercial District|url=https://english.gov.taipei/News_Content.aspx?n=460F7826293CF0BA&sms=07D68BC61ECBFF67&s=9E3B5129CBEC81B2|access-date=2022-06-18|website=english.gov.taipei}}
There are currently 15 department stores in Xinyi Planning District, forming the Xinyi Commercial District. Department stores in the commercial district include Shin Kong Mitsukoshi Xinyi New Life Square (A4, A8, A9, and A11), Taipei 101 Mall, Vieshow Cinemas, ATT 4 FUN, Uni-President Hankyu Department Store, BELLAVITA, Eslite Bookstore, Breeze Xin Yi, Breeze Song Gao, Breeze Nan Shan, Neo19, and FEDS Xinyi A13. Taipei Sky Tower Mall is currently under construction and is scheduled to be completed in 2022.{{cite web |last1=劉俞青、研究員.朱晉輝 |title=百貨燙金戰記 |url=https://www.businesstoday.com.tw/article/category/80408/post/201909040038/%E7%99%BE%E8%B2%A8%E7%87%99%E9%87%91%E6%88%B0%E8%A8%98 |website=今周刊 |date=4 September 2019 |access-date=16 November 2019}} With at least 10 department stores in a mere 50-hectare site, Xinyi Commercial District is said to have the world's highest density of department stores.{{Cite web|last=TVBS|title=台北「信義商圈」 全球密度最高百貨區│TVBS新聞網|url=https://news.tvbs.com.tw/life/625138|access-date=2020-09-26|website=TVBS|language=zh-tw}}{{Cite web|title=Four major department stores in Taiwan launch special offers for UnionPay QuickPass|url=https://www.unionpayintl.com/en/mediaCenter/newsCenter/companyNews/3008626.shtml|access-date=2020-09-26|website=www.unionpayintl.com}}{{Cite web|title=Taiwan's Department Stores Continue Expansion|url=https://topics.amcham.com.tw/2018/09/taiwans-department-stores-continue-expansion/|access-date=2022-06-18|website=amcham.com.tw|date=25 September 2018 }}
Main buildings
class="wikitable sortable" | ||||||||
Block | Name | Floor | Height (m) | Floor Area (m2) | Status | Completed | Usage | Note |
---|---|---|---|---|---|---|---|---|
Station | Taipei City Hall Bus Station | 31 | 151 | 144,037.15 | Completed | 2010 | * Commercial (Uni-President Hankyu Department Store)
| |
Government | Taipei City Hall | 12 | 54.42 | 196,684.59 | Completed | 1994 | * Government | |
Government | Taipei City Council | 10 | 35 | 46,592.4 | Completed | 1990 | * Government | |
A1 | Farglory Financial Center | 32 | 208 | 61,147.58 | Completed | 2012 | * Office | |
A2 | Uni-President International Tower | 30 | 154 | 116,773.91 | Completed | 2004 | * Commercial (eslite Xinyi Store)
| |
A3 | Cathay Landmark | 46 | 212 | 152,488.6 | Completed | 2015 | * Commercial (Breeze Xin Yi)
| |
A4 | Shin Kong Mitsukoshi | 9 | 49 | 87,700 | Completed | 2005 | * Commercial (Part of Xinyi New Life Square) | |
A5 | BELLAVITA Shopping Center | 9 | 49.98 | 52,636.11 | Completed | 2009 | * Commercial | |
A6 | Walsin Lihwa Building | 27 | 134.6 | 77,824.15 | Completed | 2009 | * Office | |
A7 | The Sky Taipei | 51 | 280 | 87,464.32 | Under Construction | 2025 | * Commercial (Taipei Sky Tower Mall)
|{{cite web|url=http://www.dep.gov.taipei/News_Content.aspx?n=46CF15C455648ECE&sms=8E0B16DC6964C5D2&s=5732CBF4C6A1C981&Create=1|title=信義A7綜合大樓新建工程環境影響說明書(初稿)|last=臺北市政府環境保護局|date=2017-10-20|website=臺北市政府環境保護局}}{{notetag|1=原本為CTBC Financial Holding及CTBC Bank總行大樓和 新舞台,2014年5月中信金總部遷至南港區中國信託金融園區後,於2015年10月以151億新台幣售出95%土地所有權持分,由買方負責拆除,且需重建新舞台。}}{{cite web|url=https://www.skyscrapercenter.com/building/taipei-sky-tower/29218|title=Taipei Sky Tower - The Skyscraper Center|website=Skyscrapercenter.com|access-date=29 November 2018}}{{cite web|url=https://skyscraperpage.com/cities/?buildingID=113249|title=The Sky Taipei - The SkyscraperPage|website=Skyscraperpage.com}} | |
A8 | Shin Kong Mitsukoshi | 9 | 39.55 | 67,901.18 | Completed | 2001 | * Commercial (Part of Xinyi New Life Square) | |
A9 | Shin Kong Mitsukoshi | 9 | 47.1 | 51,854.9 | Completed | 2003 | * Commercial (Part of Xinyi New Life Square) | |
A10 | Humble House Taipei | 22 | 89.95 | 54,956.28 | Completed | 2013 | * Commercial (Breeze Song Gao)
| |
A11 | Shin Kong Mitsukoshi | 7 | 40.7 | 62,705.81 | Completed | 1997 | * Commercial (Part of Xinyi New Life Square) | |
A12 | Shin Kong Xinyi Financial Center | 22 | 89.95 | 79,689.79 | Completed | 2010 | * Hotel (Le Méridien Taipei)
| |
A13 | FEDS Xinyi A13 | 14 | 78.95 | 78,159.78 | Completed | 2019 | * Commercial (Far Eastern Xinyi A13 Department Store, Apple Xinyi A13) | |
A14 | ATT 4 FUN | 10 | 42 | 33,065.65 | Completed | 2000 | * Commercial | |
A15, 18, 20 | Taipei Nan Shan Plaza | 48 | 272 | 192,154.99 | Completed | 2018 | * Commercial (Breeze Nan Shan)
|103建字第6688號、103建字第6699號{{notetag|1=Originally the World Trade Center II, the building was demolished in 2013 after Nan Shan Life acquired the 50-year right of superficies in 2012.}} | |
A16 | Vieshow Cinemas | 3 | 21.15 | 10,944.2 | Completed | 1997 | * Commercial | |
A17 | Vieshow Cinemas | 4 | 27.9 | 20,674.15 | Completed | 1997 | * Commercial | |
A19 | Neo19 | 12 | 43.9 | 24,380.69 | Completed | 2001 | * Commercial | |
A21 | Nanshan Xinyi A21 | 43 | 232.7 | 141,528.55 | Under construction | 2028 | * Office
|112建字第8888號{{cite news|url=https://www.setn.com/news.aspx?newsid=1201153|title=(Chinese)南山世貿三館減少光污染 環評給過|publisher=SET News|date=2022-11-01}} | |
A22, A23 | Taipei 101 | 101 | 509.2 | 374,219.95 | Completed | 2004 | * Commercial (Taipei 101 Mall)
| |
A24 | Taipei World Trade Center (Exhibition Building/Hall 1) | 8 | 41 | 157,642.34 | Completed | 1986 | * Exhibition | |
A24 | TWTC International Trade Building | 34 | 142.92 | 111,791.52 | Completed | 1988 | * Office | |
A24 | Taipei International Convention Center | 10 | 48.95 | 59,997.45 | Completed | 1989 | * Exhibition | |
A24 | Grand Hyatt Taipei | 26 | 85.2 | 118,505.52 | Completed | 1990 | * Hotel | |
A25 | Fubon Xinyi A25 | 54 | 266.3 | 132,362.85 | Completed | 2022 | * Office
|106建字第0237號{{cite news|title=(1050121W) 臺北市信義區信義段三小段6地號開發計畫環境影響說明書-第五章|url=https://eiadoc.epa.gov.tw/EIAWEB/10.aspx?hcode=1050121W&srctype=0|access-date=2018-02-20|publisher=行政院環境保護署}}{{cite web|url=https://www.skyscrapercenter.com/building/fubon-group-xinyi-headquarters/30607|title=Fubon Group Xinyi Headquarters - The Skyscraper Center|website=Skyscrapercenter.com|access-date=9 April 2021}} | |
A26 | Nanshan Xinyi A26 (Set for Urban Renewal) | 30 | 153.3 | 83,099.28 | Under Construction | 2026 | * Office
|111建字第1688號{{Cite web|date=2019-11-21|title=Nan Shan wins superficies rights to plot in Xinyi - Taipei Times|url=https://www.taipeitimes.com/News/biz/archives/2019/11/21/2003726201|access-date=2020-09-26|website=www.taipeitimes.com}} | |
B1 | CPC Building | 23 | 90 | 102,920.4 | Completed | 2001 | * Office | |
B2 | Cathay Financial Center | 24 | 106.15 | 89,902.76 | Completed | 2002 | * Office | |
B3 | Hontai Trade Plaza | 18 | 81.75 | 52,801.35 | Completed | 1999 | * Office | |
B4 | Capital Financial Center | 18 | 73.5 | 52,938.29 | Completed | 1998 | * Office | |
B5 | Kelti Group Headquarters | 15 | 89.5 | 28,823.85 | Completed | 2009 | * Office | |
B6 | Hua Nan Bank Headquarters | 27 | 154.5 | 52,131.74 | Completed | 2014 | * Office | |
B7 | 55 Timeless | 31 | 127.23 | 25,931.47 | Completed | 2018 | * Residential | |
D1 | Rosewood Taipei | 37 | 144.9 | 40,329.37 | Under Construction | 2024 | * Hotel
| |
D3 | Four Seasons Hotel Taipei | 31 | 180.2 | 27,512 | Under Construction | 2025
|
|{{cite web|title=(1010111W) 臺北市信義區信義段五小段29、29-1、29-7、29-8、29-9等5筆地號集合住宅新建工程環境影響說明書-第五章|url=https://eiadoc.epa.gov.tw/EIAWEB/10.aspx?hcode=1010111W&srctype=0|access-date=2018-02-20|publisher=行政院環境保護署}}{{cite web|url=https://skyscraperpage.com/cities/?buildingID=113742|title=Four Seasons Hotels and Resorts Taipei|website=SkyscraperPage.com}} | ||
D4 | Sinyi Realty Building | 10 | 48.2 | 22,771.09 | Completed | 1995 | * Office | |
D5 | Cathay Xinyi Building | 12 | 49.95 | 47,088.36 | Completed | 2003 | * Office | |
E1 | Aurora Plaza Taipei | 18 | 72.75 | 33,747.71 | Completed | 1991 | * Office | |
E2 | Shin Kong Manhattan Building | 16 | 66.25 | 23,208.43 | Completed | 2000 | * Office | |
E4 | NanShan Financial Center | 17 | 69.95 | 27,559.93 | Completed | 2006 | * Office | |
H | Tao Zhu Yin Yuan / Agora Garden | 21 | 93.2 | 42,705.61 | Completed | 2018 | * Residential |
File:TWTC ITB, TICC and Taipei 101 20180622.jpg, Taipei Nan Shan Plaza, TWTC International Trade Building, Farglory Financial Center and Taipei World Trade Center]]
Transportation
=Rail=
- Metro
- Taipei Metro
- {{rint|taipei|R}}Tamsui–Xinyi line: Taipei 101 / World Trade Center Station, Xiangshan Station
- {{rint|taipei|G}}Songshan–Xindian line: Songshan station
- {{rint|taipei|BL}}Bannan line:Taipei City Hall Station, Yongchun Station
- File:ROC Taiwan Railways Administration Logo.svgTaiwan Railways Administration
- Taiwan Trunk Line: Songshan station
= Road =
- Xinyi Expressway
- Civic Boulevard
- HuanDong Boulevard
See also
Notes
{{reflist|group=note}}
References
{{reflist}}
{{Xinyi Planning District}}
{{Authority control}}