Yeshwanthpur metro station

{{Short description|Namma Metro's Green Line metro station}}

{{Use dmy dates|date=January 2016}}

{{Use Indian English|date=January 2016}}

{{Infobox station

| name = Yeshwanthpur

| type = {{Namma Metro Infobox station line|line=Green}}

| other_name = Yeshwanthapura, Yesvantpur

| style = Namma Metro

| image = Yeshwanthpur metro station (Sept '23).jpg

| image_size =

| image_caption = Front Entrance of this Namma Metro Station

| address = Tumkur Main Rd, Yeshwanthpur Industrial Area, Bengaluru, Karnataka 560022

| coordinates = {{coord|13.023181|77.549942|type:railwaystation_region:IN|format=dms|display=inline,title}}

| line = {{rcb|Namma Metro|Green|croute}}

| other =

| structure = Elevated, Double track

| platform = Side platform

Platform-1 → {{stl|Namma Metro|Madavara}}
Platform-2 → {{stl|Namma Metro|Silk Institute}}

| depth =

| levels = 2

| tracks = 2

| connections = •{{rint|rail|1}} Yeshwanthpur Jn. Railway Station

•{{rint|rail|1}} Yeshwanthpura Suburban Station

{{color box|#00ff00;border: 1px solid white;border-radius: 25px; font-size:100%|Sampige|}}{{color box|#00ffff;border: 1px solid white;border-radius: 25px; font-size:100%|Mallige|}}

| parking = {{Parking symbol}} Available

| bicycle =

| baggage_check =

| opened = {{start date and age|2014|March|1|df=yes}}

| closed =

| rebuilt =

| electrified = 750 V DC third rail

| accessible = Yes {{access icon}}

| status = Staffed

| code = YPM

| owned = Bangalore Metro Rail Corporation Ltd (BMRCL)

| operator = Namma Metro

| architect = Larsen & Toubro

| architectural_style =

| zone =

| smartcardname =

| smartcardstatus =

| former =

| passengers =

| pass_year =

| pass_rank =

| pass_percent =

| pass_system =

| mpassengers =

| services = {{adjacent stations|system=Namma Metro|line=Green |left=Goraguntepalya |right=Sandal Soap Factory|to-left=Madavara}}

| route_map = {{BMR Green Line}}

| map_state = collapsed

| mapframe = yes

| mapframe-marker = rail

| mapframe-marker-color = #{{rail color|Namma Metro|Green}}

| mapframe-zoom = 14

}}

Yeshwanthpur is an important elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Yeshwanthpur area of Bengaluru, India. It was opened to the public on 1 March 2014.{{cite web|url=http://www.newindianexpress.com/cities/bangalore/Peenya-Sampige-Road-Metro-Service-From-March-1/2014/02/25/article2076639.ece#.UzQN-aPDDIU |archive-url=https://web.archive.org/web/20140327204120/http://www.newindianexpress.com/cities/bangalore/Peenya-Sampige-Road-Metro-Service-From-March-1/2014/02/25/article2076639.ece#.UzQN-aPDDIU |url-status=dead |archive-date=27 March 2014 |title=Peenya-Sampige Road Metro Service From March 1 |publisher=The Indian Express |date=25 February 2014|access-date=2014-03-27}}{{cite web|url=http://www.thehindu.com/news/cities/bangalore/this-one-feels-like-namma-metro-as-its-closer-home/article5740935.ece |title='This one feels like Namma Metro as it's closer home' |work=The Hindu |date=1 March 2014|access-date=2014-03-27}}

Skywalk

The BMRC has proposed constructing a skywalk linking Platform 6 of Yesvantpur Junction railway station with the "E" entrance of the metro station. The skywalk is estimated to cost {{INRConvert|1|c}}. Although the skywalk was first proposed shortly after the metro station's opening in 2014, disagreements over funding have delayed its construction. The BMRC wants the cost to be split evenly with the Indian Railways. However, the Railways believes that the BMRC must bear the entire cost. A Railway official stated, "The rules are quite clear on this matter. Whenever a second government agency creates a new infrastructure project at any specific place and any public amenity needs to be created for that, the onus is on the new entrant to bear the costs of the project. Metro feels the need for it and it needs to be ready to fund it. Why should Railways bear the cost for something that Metro requires?"{{cite web|title=Bengaluru Skywalk connecting Yeshwantpur Metro, railway stations yet to take off|url=https://www.newindianexpress.com/cities/bengaluru/2017/mar/06/bengaluru-skywalk-connecting-yeshwantpur-metro-railway-stations-yet-to-take-off-1578147.html|website=The New Indian Express|access-date=6 March 2017}}

The BMRC finalized plans for the skywalk and received clearance for its construction from the South Western Railway's Bengaluru division on 12 April 2019.{{cite web |title=Skywalk to link metro, rail stations at Yeshwantpur |url=https://www.deccanherald.com/city/bengaluru-infrastructure/skywalk-to-link-metro-rail-stations-at-yeshwantpur-728438.html |website=Deccan Herald |access-date=4 May 2019 |date=13 April 2019}}

Station layout

{{stack|{{Routemap

| title = Yeshwanthpur track layout

| title color = white

| title-bg = #{{rail color|Namma Metro|Green}}

| legend = track

| collapsible = no

| map = vCONTgfa

cPLT\vSTR\cPLT ~~ ~~ ~~ to {{stl|Namma Metro|Goraguntepalya}}

  • P1\cPLT\vSTR\cPLT\*P2

cPLT\vSTR\cPLT ~~ ~~ ~~ to {{stl|Namma Metro|Sandal Soap Factory}}

vCONTgfe

| bottom =

Station with two tracks and two side platforms

}}}}

table border=0 cellspacing=0 cellpadding=3

|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=30 valign=top|G

|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=85 valign=top|Street level

|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance

valign=top|L1

|valign=top|Mezzanine

|valign=top|Fare control, station agent, Metro Card vending machines, crossover

style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=30 rowspan=4 valign=top|L2

|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|Side platform | Doors will open on the left {{access icon}}

style="border-bottom:solid 1px gray;" width=85|Platform 2
Southbound

|style="border-bottom:solid 1px gray;" width=500|Towards → {{stl|Namma Metro|Silk Institute}}
Next Station: {{stl|Namma Metro|Sandal Soap Factory}}

Platform 1
Northbound

|Towards ← {{stl|Namma Metro|Madavara}}
Next Station: {{stl|Namma Metro|Goraguntepalya}}

style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|Side platform | Doors will open on the left {{access icon}}
style="border-bottom:solid 1px gray;" width=30 rowspan=2 valign=top|L2

|style="border-bottom:solid 1px gray;" width=85|

|style="border-bottom:solid 1px gray;" width=500|

Connections

The station is located opposite the Yeshvantapur railway station.

Entry/Exits

There are 7 Entry/Exit points – A, B, C, D, E, F and G. Commuters can use either of the points for their travel.

{{Empty section|date=July 2022}}

Gallery

Some of this metro station pictures are shown below:-

File:Yeshwantapur Metro Station.jpg|Outside View

File:Yeshwantapur Metro-Station Signage on Plaftorm.jpg|Station signage on the platform

File:Bangalore Metro opposite to Yeswantapur Junction.jpg|Yeshvantapur Junction located opposite to the metro station

File:Bangalore Metro as seen from Yeswantpur Junction.jpg|Bangalore Metro as seen from Yeshwantpur Junction

See also

References

{{reflist}}