Zhongchun Road station

{{Short description|Railway and metro station in Shanghai, China}}

{{Infobox station

| name = Zhongchun Road

| native_name = 中春路

| native_name_lang = zh

| symbol_location = shanghai

| symbol = metro

| symbol_location2 =

| symbol2 =

| symbol_location3 =

| symbol3 =

| symbol_location4 =

| symbol4 =

| image = Exit 9A of Zhongchun Road Station in Shanghai 2024.jpg

| alt =

| caption = Exit 9A of the station

| mlanguage =

| other_name =

| address = Husong Highway ({{lang|zh|沪松公路}}) and Zhongchun Road

| borough = Qibao, Minhang District, Shanghai

| country = China

| map_type = China Shanghai

| map_size =

| map_caption = Location in Shanghai

| coordinates = {{coord|31.1503|N|121.331|E|type:railwaystation_region:CN-31_source:kolossus-zhwiki|display=title,inline}}

| operator = {{ubl|Shanghai No. 1 Metro Operation Co. Ltd.|Shanghai Suburban Railway}}

| line = {{plainlist|1=

  • {{rail color box|system=SHM|line=9|inline=yes}}
  • {{rail color box|system=SSR|line=ap|inline=yes}}

}}

| platforms = 5 (1 island and 3 side platforms)

| tracks = 5

| connections =

| structure = Underground

| accessible = Yes

| code =

| opened = {{ubl|December 29, 2007 (Line 9)|December 27, 2024 (Airport Link Line)}}

| closed =

| former =

| passengers =

| pass_year =

| services = {{Adjacent stations|system1=SHM|line1=9|left1=Jiuting|right1=Qibao|system2=SSR|line2=ap|left2=Hongqiao Airport Terminal 2|right2=Jinghong Road}}

}}

Zhongchun Road ({{zh|c=中春路|p=Zhōngchūn Lù}}) is a station on Line 9 of the Shanghai Metro, and on the Airport Link Line of the Shanghai Suburban Railway. The station is located at the intersection of Husong Highway and Zhongchun Road in Qibao, Minhang District. It was first opened on December 29, 2007, as part of Line 9. The station became an interchange station when the first phase of the Airport Link Line opened on December 27, 2024.

History

Zhongchun Road was originally not part of the original Line 9 design, with only two tracks leading out of Jiuting Depot planned to the west of the current station. In March 2004, the Ministry of Railways (MOR) revised the layout for railway stations built in Shanghai, with a high-speed rail station planned in Qibao. The government of Shanghai subsequently planned to route Lines 2 and 10 to the newly proposed station, and in November Shentong Metro Group decided to insert an additional station to serve the proposed railway station. One of the tracks to Jiuting Depot, which had already started construction, was expanded to become the new station, with revisions completed by March 2005 and construction drawing design starting in May. However, the MOR decided that the high-speed rail station would be moved to Hongqiao (to become the present day Shanghai Hongqiao railway station). Shentong Metro ultimately decided to keep the newly-added Zhongchun Road station, while rerouting Line 2 and Line 10 to the new station in Hongqiao.{{cite book |author=Shanghai Shentong Metro Group |title=上海市轨道交通9号线一期(松江新城站—宜山路站)工程设计 |last2=The Third Railway Survey and Design Institute Group Co., Ltd. |publisher=Shanghai Scientific & Technical Publishers |year=2012 |isbn=978-7-5478-1161-0 |trans-title=Shanghai Metro Line 9 Phase 1 (Songjiang New Town-Yishan Road stations) Engineering Design}}{{rp|86-87}} Zhongchun Road station opened on December 29, 2007, as part of Phase 1 of Line 9.{{Cite web |date=December 27, 2007 |title=沪轨交6、8、9号线29日通车 "一环七射八换乘"格局确立 |url=https://sh.eastday.com/qtmt/20071227/u1a386975.html |url-status=dead |archive-url=https://web.archive.org/web/20200530010819/https://sh.eastday.com/qtmt/20071227/u1a386975.html |archive-date=May 30, 2020 |website=sh.eastday.com |language=zh-cn}}

From June until December 2024, to prepare for the opening of the Airport Link Line section of the station, several exits of the Line 9 segment of the station were closed to facilitate the construction of a walkway between the two lines.{{Cite web |date=June 26, 2024 |title=对接机场联络线,这个轨交站点出入口临时变动! |url=https://www.thepaper.cn/newsDetail_forward_27867222 |website=The Paper |language=zh-cn}} The Airport Link Line section started operations on December 27, 2024.{{Cite web |last=Zheng |first=Zheng |date=December 28, 2024 |title=Shanghai airport rail link cuts transit time to 40 mins |url=https://global.chinadaily.com.cn/a/202412/28/WS676f3c5fa310f1265a1d562c.html |website=China Daily}}

Station Layout

The Line 9 station was constructed as a large hub station in anticipation of the originally proposed high-speed rail station, with a returning track originally planned at neighbouring Qibao station moved here. The station also includes transfer walkways to Line 2 and Line 10, which are not currently in use.{{rp||page=85}}

File:The Line 9 Platform of Zhongchun Road Station in Shanghai 2024.jpg|Line 9 platforms

File:The Airport Link Line Platform of Zhongchun Road Station in Shanghai 2024.jpg|Airport Link Line platforms

cellspacing=0 cellpadding=3

|2

| colspan="2" |{{rail color box|system=SHM|line=ap|inline=yes}} Concourse

rowspan="5" |G

| style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="100" |Entrances and Exits

| style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="350" |Exits 1-6, 8 & 9

style="border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2 |{{center|Side platform, doors open on the right}}
colspan="2" |← {{rail color box|system=SHM|line=ap|inline=yes}} towards Hongqiao Airport Terminal 2
colspan="2" |{{0|→}} {{rail color box|system=SHM|line=all|inline=yes}} towards Pudong Airport Terminal 1&2 (Jinghong Road)
style="border-right:solid 2px black;border-left:solid 2px black;border-top:solid 2px black;" colspan=2|{{center|Side platform, doors open on the right}}
style="border-bottom:solid 1px gray;border-top:solid 1px gray" |B1

| colspan="2" style="border-bottom:solid 1px gray;" |{{rail color box|system=SHM|line=9|inline=yes}} Concourse

style="border-bottom:solid 1px gray;" rowspan=5|B2

|style="border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2|{{center|Side platform, doors open on the right}}

colspan="2" style="border-bottom:solid 1px gray;" |← {{rail color box|system=SHM|line=9|inline=yes}} towards Songjiang South Railway Station (Jiuting)
colspan="2" |Not in service
style="border-right:solid 2px black;border-left:solid 2px black;border-top:solid 2px black;border-bottom:solid 2px black;" colspan=2|{{center|Island platform, doors open on the left}}
colspan="2" style="border-bottom:solid 1px gray;" |{{0|→}} {{rail color box|system=SHM|line=9|inline=yes}} towards Caolu (Qibao)

References

{{reflist}}

{{Shanghai Metro|line9=yes}}

{{Shanghai Metropolitan Area Intercity Railway|airport=yes}}

Category:Shanghai Metro stations in Minhang District

Category:Railway stations in Shanghai opened in 2007

Category:Line 9, Shanghai Metro

Category:Airport Link Line (Shanghai Suburban Railway)

{{Shanghai-metro-stub}}