Zhufangbei station

{{Short description|Beijing Subway station}}

{{Infobox station

| name = Zhufangbei

| native_name = 朱房北

| native_name_lang = zh

| symbol_location = beijing

| symbol = subway

| image = Concourse of Zhufangbei Station (20241223170035).jpg

| caption = Concourse

| address = Intersection of Xiaoying Road West (小营西路) and Zhufangbei 1st Street (朱房北一街)

| borough = Qinghe Subdistrict, Haidian District, Beijing

| country = China

| map_type = Beijing

| map_caption = Location in central Beijing

| coordinates = {{coord|40.03457|116.32467|display=it}}

| operator = Beijing Mass Transit Railway Operation Corporation Limited

| line = {{rail color box|system=BJS|line=Changping|inline=yes}}

| platforms = 2 (1 island platform)

| tracks = 2

| structure = Underground

| accessible = Yes

| opened = {{start date and age|2024|12|15}}

| services = {{Adjacent stations|system=BJS|line=Changping|left=Qinghe railway station|right=Qinghe Xiaoyingqiao}}

}}

Zhufangbei station{{cite web|url=https://www.bjsubway.com/jpg.html|title=JPG格式线路图下载 北京地铁官方网站|archive-url=https://archive.today/20221231023513/https://www.bjsubway.com/jpg.html|archive-date=2022-12-31}} ({{lang-zh|s=朱房北站|p=Zhūfángběi zhàn}}) is a subway station on the Changping line of the Beijing Subway. As this is an infill station, it did not open with the rest of the line in its initial extension phase.{{cite news|url=https://news.bjd.com.cn/2022/12/23/10274074.shtml|title=昌平线南延+16号线南段!北京两条地铁新线最后"冲刺"|publisher=北京日报客户端|date=2022-12-23|quote=昌平线南延北起清河站,南至西土城站,线路全长10.6公里,设车站6座:朱房北站(暂缓开通)、清河小营桥站、学知园站、六道口站、学院桥站、西土城站|access-date=2023-01-18|language=zh-CN}} Instead, it opened on December 15, 2024.{{cite news|author=孙宏阳; 李博|url=https://news.bjd.com.cn/2024/12/12/11000520.shtml|title=官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通|trans-title=Official announcement! Three new subway lines will be opened in Beijing this Sunday, and Chaoyang Station Hub will be opened simultaneously|publisher=Beijing Daily|date=2024-12-12|access-date=2025-01-22|language=zh-Hans|archive-date=2024-12-13|archive-url=https://web.archive.org/web/20241213203452/https://news.bjd.com.cn/2024/12/12/11000520.shtml}}

Station art

The wall of the paid area of the concourse is decorated with a public artwork called "Neighborhood".{{cite web|url=http://yewu.ghzrzyw.beijing.gov.cn/zkdncmsUploadFile/gwzykfile/ueditor/20221206/1599942717968764930.pdf|title=北京轨道交通昌平线南延公共空间艺术品方案(公示稿)|trans-title=Beijing Metro Changping Line South Extension Public Space Artwork Plan (Public Draft)|publisher=Beijing Municipal Commission of Planning and Natural Resources|date=2022-12-06|access-date=2025-01-22|language=zh-Hans}}

Exits

There are 3 exits, lettered A, C and D. Exits A and D have accessible elevators.{{cite web|url=https://news.sina.cn/2024-05-15/detail-inavhmay2936843.d.html|date=2024-05-15|access-date=2025-01-22|title=昌平线南延一期朱房北站亮相|trans-title=Zhufang North Station of Changping Line South Extension Phase I unveiled|language=zh-Hans}} Due to the land occupation of the Golden Collar Era Office Building, the long-term implementation conditions will be reserved for Exit B.{{cite web|url=http://liuyan.people.com.cn/threads/content?tid=17257476|title=关于昌平线朱房北开通的计划|trans-title=Regarding the plan to open the Zhufangbei section of the Changping Line|date=2023-02-14|access-date=2025-01-22|language=zh-Hans|archive-date=2024-05-21|archive-url=https://web.archive.org/web/20240521125725/http://liuyan.people.com.cn/threads/content?tid=17257476}}

Exit A of Zhufangbei Station (20241223165742).jpg|Exit A

Exit A lift of Zhufangbei Station (20241223165804).jpg|Exit A elevator exit

Exit C of Zhufangbei Station (20241223170315).jpg|Exit C

Exit D of Zhufangbei Station (20241223170219).jpg|Exit D

Exit D lift of Zhufangbei Station (20241223170920).jpg|Exit D elevator exit

History

During planning in March 2019, the project name for this station was called Xiaoyingxilu station.{{cite web|url=http://jyfw.bjrd.gov.cn/publicProposal/getProposalReplyInfo.shtml?proposalId=217320|title=关于昌平南延线小营西路站在学府树中街北侧路口设置进站口的建议的答复意见|date=2020-08-26|access-date=2023-01-18|archive-date=2021-01-14|archive-url=https://web.archive.org/web/20210114225111/http://jyfw.bjrd.gov.cn/publicProposal/getProposalReplyInfo.shtml?proposalId=217320|language=zh-CN}} On July 19, 2021, in the naming plan for the stations on the southern section of the Changping Line announced by the Beijing Municipal Commission of Planning and Natural Resources, the station name was adjusted to Zhufangbei station.{{cite web|url=http://yewu.ghzrzyw.beijing.gov.cn/zkdncmsUploadFile/gwzykfile/ueditor/20210719/1416957941243760641.pdf|title=轨道交通17号线、19号线一期、昌平线南延一期工程沿线车站命名预案|publisher=北京市规划和自然资源委员会|date=2021-07-19|access-date=2023-01-18|language=zh-CN}} In June 2022, the station was officially named Zhufangbei station.{{cite web|url=http://yewu.ghzrzyw.beijing.gov.cn/gwxxfb/cxghdmgg/index.html|archive-url=https://archive.today/20220611121050/http://yewu.ghzrzyw.beijing.gov.cn/gwxxfb/cxghdmgg/index.html|title=地名公告|archive-date=2022-06-11|access-date=2023-01-18|language=zh-CN}}

On February 4, 2023, the southern extension of Changping line from {{stl|BJS|Qinghe Railway Station}} to {{stl|BJS|Xitucheng}} commenced operations, but the station's construction was not finished, so trains passed the station without stopping.

On May 8, 2024, the unit project passed the site acceptance.{{cite web|url=https://mp.weixin.qq.com/s/5ZM1CeiD6LJr-QUP2WWxSA|title=【工程•喜讯】祝贺!北京地铁27号线二期(昌平线南延)朱房北站(原小营西路站)单位工程竣工顺利通过验收|trans-title=[Project•Good News] Congratulations! Beijing Metro Line 27 Phase II (Changping Line South Extension) Zhufang North Station (formerly Xiaoying West Road Station) unit project completed and passed the acceptance|date=2024-05-09|access-date=2025-01-22|language=zh-Hans}}{{cite web|url=https://m.chinanews.com/wap/detail/chs/zw/10253984.shtml|title=民建北京清河支部:让家园更美好|trans-title=Beijing Qinghe Branch of China Democratic National Construction Association: Make our homeland better|date=2024-07-19|access-date=2025-01-22|quote=In May this year, Zhufang North Station (formerly Xiaoyingxilu Station) passed the acceptance|language=zh-Hans|archive-url=http://web.archive.org/web/20241214165255/https://m.chinanews.com/wap/detail/chs/zw/10253984.shtml|archive-date=2024-12-14}} On September 25, the initial fire inspection failed. On November 26, the station passed the fire inspection.{{cite web|url=http://bjjs.zjw.beijing.gov.cn/eportal/ui?pageId=53614009|title=工程消防验收意见书查询|trans-title=Project fire protection acceptance opinion inquiry|language=zh-Hans|access-date=2025-01-22|archive-url=http://web.archive.org/web/20241128042825/http://bjjs.zjw.beijing.gov.cn/eportal/ui?pageId=53614009|archive-date=2024-11-28}} On December 15, the station commenced operations.

References