:Coventry ring road

{{short description|Road in England}}

{{Featured article}}

{{Use dmy dates|date=April 2022}}

{{Use British English|date=February 2013}}

{{Infobox road

|country=ENG

|type=A

|route=4053

|alternate_name = Coventry ring road

|length_mi=2.25

|orbital = Coventry

| direction_a = Anti-clockwise

| terminus_a = M6 & Coventry Building Society Arena

| direction_b = Clockwise

| terminus_b = Hill Cross flyover, Tamworth & Belgrade Theatre

|junction =

  • {{jct|country=GBR|A|4114}}
  • {{jct|country=GBR|A|429}}
  • {{jct|country=GBR|A|4600}}
  • {{jct|country=GBR|A|4114}}

|destinations=

|history = Constructed 1959–1974

| map={{maplink-road|frame-height=290|raw={{Wikipedia:Map data/Wikipedia KML/Coventry ring road}}}}

| map_custom=yes

| map_notes=Coventry ring road highlighted in red

| map_alt = Interactive map showing Coventry city centre and surrounding inner-city neighbourhoods, with the ring road route highlighted in red

|photo=Coventry Ring Road (A4053) at sunset.jpg

|photo_notes=Junction 9 and Hill Cross flyover, looking anti-clockwise

|photo_alt=View of both carriageways of the ring road and junction 9 slip roads, with overhead signage, taken at dusk

|previous_type = A

|next_type = A

|previous_route = 4051

|next_route = 4054

}}

The A4053 Coventry ring road is a {{convert|2.25|mi|km|adj=on}} ring road in Coventry, England, which forms a complete dual-carriageway loop around the city centre. The road encompasses the old and new Coventry Cathedrals, the city's shopping areas and much of Coventry University. With the exception of one roundabout at junction 1, the ring road's nine junctions are entirely grade separated and closely spaced, with weaving sections between them, some as short as {{convert|300|yd|m}}, giving the road a reputation for being difficult to navigate. The junctions include connections with three other A roads: the A4114, A4600 and A429.

From the 1930s, Coventry City Council began replacing the city's narrow medieval streets with modern roads, to cope with a rapidly growing population. City architect Donald Gibson began work in 1939 on a city centre redevelopment plan which expanded in scope following World War II, in which large areas of the city were destroyed by German bombs. The shopping area was rebuilt first, followed by the ring road, which was constructed in six stages from 1959. Early stages were built with at-grade junctions, cycle tracks and footpaths, envisaged as a surface-level linear park. Following traffic surveys in the early 1960s, however, the council amended the design to include grade separation and the weaving sections. Research by the city engineer indicated that it was the first urban road in the world to use this configuration at such a small scale. The road was completed in 1974, with an overall cost of £14.5 million ({{Inflation|UK|14500000|1974|fmt=eq|cursign=£|r=-5}}).

As one of the few British cities to see its ring road project pushed to completion, Coventry has received considerable attention as a source of research for post-war architecture. An article by BBC News noted that opinions about the road were varied, concluding that "you either love it or you hate it". The road was the subject of a 2015 series of poetry films and driving on it has been likened to driving a Scalextric car and riding on a roller coaster.

Route description

File:Coventry Ring Road Junction Map.png

The ring road forms a complete dual-carriageway loop around the city centre of Coventry, with the designation A4053 in the Great Britain road numbering scheme.{{sfn|Ordnance Survey|2015}} It is {{convert|2.25|mi|km}} in length and is a primary route throughout.{{cite web |publisher=BBC News |title=Coventry ring road: Building in the bombing ruins |date=19 September 2014 |url=https://www.bbc.co.uk/news/uk-england-coventry-warwickshire-29255034 |access-date=30 August 2020}}{{sfn|Ordnance Survey|2016|loc=The A4053 is coloured green, which denotes a primary route}} The road encloses an area containing the old and new Coventry Cathedrals, much of Coventry University, shopping areas such as the Upper Precinct, Lower Precinct, West Orchards and Cathedral Lanes, the medieval Spon Street and the Coventry Skydome.{{cite web |url=https://www.visitcoventry.co.uk/downloads/file/4/easy-to-print-city-centre-map |via=VisitCoventry.co.uk |publisher=Coventry City Council |title=Easy to print city centre map |access-date=25 June 2022 |archive-url=https://web.archive.org/web/20220625142556/https://www.visitcoventry.co.uk/downloads/file/4/easy-to-print-city-centre-map |archive-date=25 June 2022 |url-status=live}}

Being a complete ring road, it does not have unique start or end points. Junction 1, the road's only at-grade junction and its northernmost point, is a roundabout with four exits: the eastbound and westbound ring roads, the B4113 Foleshill Road to the north and Tower Street to the south. Proceeding east (clockwise), junction 2 is a grade separated junction with Hales Street, White Street and Bird Street and the closest to Pool Meadow Bus Station. Between junctions 2 and 4, the carriageway rises to become an elevated highway called the Swanswell viaduct.{{Cite web |title=Ring Road improvement scheme set to go ahead |last=Stretton |first=Rachel |work=Coventry Telegraph |date=27 August 2020 |access-date=8 July 2022 |url= https://www.coventrytelegraph.net/news/coventry-news/coventry-ring-road-5m-improvement-18837003}} Junction 3 is the easternmost on the circuit, providing access to the A4600 Sky Blue Way, which is the former route of the A46 and the signed route from Coventry to Leicester via the M69, as well as linking to the M6.{{Cite web |title=West Midlands Key Route Network: East of Coventry |author= |publisher=Transport for West Midlands |page=3 |access-date=8 July 2022 |url= https://www.tfwm.org.uk/media/yoxnpotm/7-east-of-coventry.pdf}} Junction 3 also serves the A428 to Rugby and the A444 to Nuneaton, via a pair of junctions half a mile (0.8 kilometres) to the east.{{sfn|Ordnance Survey|2015}}

Continuing clockwise, the road runs due south to junction 4 with the A4114 London Road. This road links to both the A46 southbound towards the M40 motorway, and also to the A45 eastbound, taking traffic to the M45 and M1 motorways towards London. The main lanes of the anticlockwise carriageway at junction 4 lead to the exit, meaning through ring road traffic must move to the left,{{Cite web |title=A4053 |author= |work=Google Street View |date=April 2021 |access-date=8 July 2022 |url= https://www.google.co.uk/maps/@52.404583,-1.5043871,3a,39.5y,87.84h,88.91t/data=!3m6!1e1!3m4!1shBVJVvEtC2ObrzMHWvY60Q!2e0!7i16384!8i8192}} and then subsequently move back to the right to avoid the junction 3 exit.{{Cite web |title=A4053 |author= |work=Google Street View |date=April 2021 |access-date=8 July 2022 |url=https://www.google.co.uk/maps/@52.4055907,-1.5023337,3a,68.6y,0.51h,82.69t/data=!3m6!1e1!3m4!1sOlZiokB1AEbDHYbOoh2K7g!2e0!7i16384!8i8192}}

Junction 5 provides access to the south-eastern part of the city centre, via the B4544 New Union Street, and also links to a pair of roads heading south towards the suburb of Cheylesmore. Junction 6, the southernmost junction, links to the A429 Warwick Road, signposted for Kenilworth, and is also the exit for the War Memorial Park, the University of Warwick and Coventry railway station, which lies just outside the ring road loop.{{Cite web |title=West Midlands Key Route Network: East of Coventry |author= |publisher=Transport for West Midlands |page=8 |access-date=8 July 2022 |url=https://www.tfwm.org.uk/media/qztpqt3w/11-north-and-south-coventry.pdf}} From junction 6, the clockwise carriageway proceeds north west. Junction 7 is the B4101 Butts Road radial, linking to the suburb of Earlsdon, the ring road passing over on the Moat Street flyover, while it passes under junction 8 for the A4114 Holyhead Road towards Birmingham, formerly the A45 westbound. The road then runs north east through junction 9 for the B4098 Radford Road radial, which it passes over on the Hill Cross flyover, before arriving back at the junction 1 roundabout.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19641204/282/0029 |title=Holyhead Rd. Section Closes on Monday |page=29 |date=4 December 1964 |edition=Lunch |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}}{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19660718/356/0030 |title=Hill Cross flyover open ahead of schedule |page=11 |date=18 July 1966 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}}

History

=Background=

File:Coventry- Spon Street - geograph.org.uk - 631504.jpg

The road layout within Coventry and its road links to other settlements were developed during the Middle Ages, becoming stable by the 17th century.{{cite web |url=https://www.british-history.ac.uk/vch/warks/vol8/pp34-39 |access-date=12 July 2020 |title=A History of the County of Warwick |volume=8 |publisher=City of Coventry and Borough of Warwick |editor-first=W. B. |editor-last=Stephens |year=1969 |pages=34–39 |work=British History Online}} During the 19th century, some roads were upgraded to turnpike status, but development was slow due to difficulty in securing funding, and much of the city's road network consisted of narrow medieval streets.{{sfn|Redknap|2004|p=19}} An exception was Thomas Telford's road from London to Holyhead, built through Coventry between 1827 and 1830.{{sfn|McGrory|2003|p=208}} Telford used advanced engineering techniques for the time with good drainage and stone foundations, and the road became the major route between London and Birmingham, replacing an older route along Spon Street.{{sfn|Redknap|2004|p=19}}{{cite web |work=Institution of Civil Engineers |title=Thomas Telford |date=8 July 2019 |access-date=12 July 2020 |url=https://www.ice.org.uk/what-is-civil-engineering/civil-engineer-profiles/thomas-telford}}

In the early 20th century, Coventry was the fastest-growing city in the UK as people relocated from across the country to work in the expanding automotive, bicycle, aviation and armament industries.{{sfn|Gould|Gould|2015|p=1}} The city's boundaries expanded in stages,{{sfn|Redknap|2004|pp=19–20}} absorbing nearby villages as well as new residential areas.{{sfn|Gould|Gould|2015|p=1}} Coventry City Council upgraded the city's radial roads but the city centre retained its medieval character until 1930.{{sfn|Redknap|2004|pp=19–20}} By then, the buildings and infrastructure were unable to cope with the needs of the increased population and the council tasked city engineer Ernest Ford with modernising it.{{sfn|Gould|Gould|2015|p=1}} During the 1930s, Ford oversaw the construction of Corporation Street and Trinity Street as well as widening other roads. This involved large-scale demolition and relocation of residents to other areas, and created the first sections of inner ring road, on what is now the inner circulatory route.{{sfn|Redknap|2004|pp=19–20}} He also created the southern bypass, re-routing the A45 and London to Birmingham traffic around the city.{{sfn|Gould|Gould|2015|p=1}} In early 1939, the council appointed Donald Gibson as city architect. A protégé of Patrick Abercrombie at the University of Liverpool School of Architecture,{{sfn|Gould|Gould|2015|p=9}} Gibson assembled a team of young architects, with whom he produced plans more radical than Ford's.{{sfn|Redknap|2004|p=23}} These were presented to the public at an exhibition in summer 1940 and included a new civic zone north east of the cathedral.{{sfn|Gould|Gould|2015|p=9}}

In November 1940 and April 1941, following the outbreak of World War II, the city was attacked by the Luftwaffe in the Coventry Blitz.{{cite web |url=https://www.coventrytelegraph.net/news/coventry-news/coventry-blitz-april-1941-ww2-11151595 |work=Coventry Evening Telegraph |title=Remembering the "forgotten" Coventry Blitz 78 years ago |first=Duncan |last=Gibbons |date=8 April 2016 |access-date=12 July 2020}} Large areas, including the cathedral, were left in ruins.{{cite news |url=https://www.iwm.org.uk/history/the-blitz-around-britain |work=Imperial War Museum |first=Amanda |last=Mason |date=8 January 2018 |title=The Blitz Around Britain}} Needing to rebuild rapidly, the council instructed Gibson and Ford to work together to agree on a blueprint for the city centre. Shortly after the first bombing, they met Lord Reith,{{sfn|Redknap|2004|pp=23–24}} the government minister responsible for rebuilding, who advised them to plan the reconstruction "boldly and comprehensively" even if this meant high costs.{{sfn|Adams|Larkham|2019|loc=Towards a Coventry of the future}} The two men did not work well together and they eventually produced two separate plans; Ford's emphasised maintaining as much of the existing architecture as possible while getting businesses running again, while Gibson advocated a comprehensive redesign with a new layout and modern architecture.{{sfn|Redknap|2004|p=26}} Gibson's plan included the use of ring roads to divert traffic away from the city centre.{{sfn|Adams|Larkham|2019|loc=Towards a Coventry of the future}} The pair presented their competing visions in February 1941, and the council decided to adopt Gibson's.{{sfn|Redknap|2004|p=26}}

Gibson developed his plan throughout the war, releasing an updated version in October 1945 at the "Coventry of the Future" exhibition. The council started work on the project in 1946, laying a commemorative stone on the future site of the shopping precinct and beginning the conversion of Broadgate, the city's historic hub, into a green central square.{{sfn|Gould|Gould|2009|p=21}}{{Cite web |title=Broadgate – Coventry City Council |publisher=Coventry City Council |date= |access-date=23 September 2022 |url= https://www.coventry.gov.uk/local-history-heritage/broadgate}} This first phase was opened in 1948 by the future Queen Elizabeth II,{{sfn|Redknap|2004|p=32}} with a statue of Lady Godiva{{efn|Godiva was a noblewoman who was married to Leofric, Earl of Mercia, who was the Lord of Coventry in the 11th century. According to a local legend, Godiva protested to her husband about the high level of taxation in Coventry at the time. He replied that he would lower the taxes only if Godiva rode naked through the city's streets. The legend says that Godiva agreed to this, and every citizen in the city barred their doors and windows out of respect for her, except for Peeping Tom, who looked at Godiva as she passed and was struck blind. As a result of her actions, Leofric kept his promise to reduce taxes.{{Cite web |title=An Anglo-Saxon Tale: Lady Godiva |work=BBC History |year=2014 |access-date=7 September 2021 |url= http://www.bbc.co.uk/history/ancient/anglo_saxons/godiva_01.shtml}} Godiva remains an important figure in the city, with the city council describing her as "apart from Boudicca ... the most celebrated woman from Dark Ages Britain".{{Cite web |title=Coventry's history: Lady Godiva |publisher=Coventry City Council |access-date=7 September 2021 |url= https://www.coventry.gov.uk/ladygodiva }}}} added a year later.{{cite web |url=https://www.coventry.gov.uk/info/99/local_history_and_heritage/1453/broadgate |work=Coventry City Council |title=Broadgate |access-date=12 July 2020}}

=Planning the ring road=

File:Coventry Council House.jpg

Gibson's 1941 plan called for "a system of radial and ring roads",{{sfn|Gould|Gould|2009|p=13}} the innermost ring centred on a proposed civic centre east of the Council House. His intention was to use existing roads wherever possible, widening them to dual carriageways and linking them to the radial roads with roundabouts. In his 1945 "Coventry of the Future" plan, Gibson moved the proposed route of the ring road to the north and west of the 1941 version, with the new alignment centred on Broadgate.{{sfn|Gould|Gould|2009|p=55}} This new route no longer followed Corporation Street and Queen Victoria Road, and Gibson designated the land between these and the ring-road route for light industry.{{sfn|Gould|Gould|2009|p=21}} The government did not initially approve the new route, citing a concern that it encircled too much of the city. But the council's position was that the ring road could not run on Corporation Street and Queen Victoria Road as planned, due to the need for businesses to have direct access to those roads, and therefore must be sited further north west. The plan included provision for the inner circulatory route, a loop comprising existing roads inside the ring road, to serve as a distributor within the city centre.{{sfn|Gould|Gould|2009|p=55}} The 1945 plan also featured two additional ring roads – a middle ring passing through the suburbs, and an outer ring extending the existing A45 southern bypass.{{cite web |access-date=12 July 2020 |url=https://www.historiccoventry.co.uk/postwar/postwar.php?pg=develop |work=Historic Coventry |title=Redevelopment Plan & Ring Road scheme}}

Gibson and the council made minor changes to the design during the subsequent years including the addition of two new roundabouts, to make a total of nine. The council and the government then agreed the final design in 1948.{{sfn|Gould|Gould|2009|p=55}} This retained many of Gibson's early ideas including a dual-carriageway layout, lanes for cyclists and pedestrians on both sides, and at-grade roundabout junctions connecting to all of the major radial routes out of the city.{{sfn|Redknap|2004|p=36}} The route was to be {{convert|2.25|mi|km}} long and would follow some existing routes, with new alignments for the remainder.{{sfn|Adams|Larkham|2019|loc=Speed, efficiency and movement}} Although the plan was agreed and signed off, the council did not begin construction immediately. Funding was limited following the economic hardship of the war,{{sfn|Redknap|2004|p=36}} and the council's priority was the rebuilding of bomb-damaged areas in the city centre and completing the precinct, to enable businesses and shops to resume full operation.{{sfn|Gould|Gould|2009|p=55}} The city-centre work lasted throughout the first half of the 1950s, as the council and businesses had to negotiate the use of the space and conduct lengthy planning applications, as well as completing the construction work.{{sfn|Gould|Gould|2009|p=23}} The ring-road plan remained active and planners ensured that no new structures were situated close to the proposed route, to maintain its availability for road development.{{sfn|Redknap|2004|p=36}}

In 1955, with the upper level of the precinct completed,{{cite news |work=Coventry Evening Telegraph |title=Incredible old plans show what Coventry COULD have looked like |first=Duncan |last=Gibbons |url=https://www.coventrytelegraph.net/news/coventry-news/coventry-blitz-world-war-ii-13721053 |access-date=12 July 2020 |date=13 November 2018}} Gibson left Coventry to become county architect for Nottinghamshire.{{sfn|Towers|2003|p=36}} His replacement as Coventry's city architect was Arthur Ling, who had been Senior Planning Officer for the London County Council since 1946.{{cite news |page=9 |date=25 January 1955 |edition=Last |title=L.C.C. Planner to be New City Architect |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19550125/082/0009 |via=British Newspaper Archive |access-date=30 August 2020}} Ling continued Gibson's work in developing the city centre while also reviewing details of the development plan. He updated the proposals to include pedestrianisation of the north–south axis of the precinct, while noting that city centre traffic congestion remained a major issue, which would be worsened by the extended pedestrianisation.{{sfn|Tiratsoo|2018|pp=77–80}}{{sfn|Gould|Gould|2015|p=58}} The council lobbied the government for permission and funding for the long-delayed ring road. The government had reduced investment expenditure significantly from late 1955, and in 1956 the Ministry of Transport and Civil Aviation (MOT) denied the council permission to build the entire road, indicating that only the south-eastern portion was likely to be approved at that time.{{sfn|Tiratsoo|2018|pp=77–80}}{{cite news |work=Coventry Evening Telegraph |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19560912/174/0011 |via=British Newspaper Archive |date=12 September 1956 |page=11 |title=Inner Ring Road Plan Rejected |access-date=4 June 2020}} Despite this, the council in 1957 approved and submitted a plan for the full route, divided into six stages with a time estimate of six or seven years.{{cite news |work=Coventry Evening Telegraph |page=9 |date=6 May 1957 |title='Extreme Urgency' of Inner Ring Road |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19570506/112/0009 |via=British Newspaper Archive |access-date=26 June 2020}}

=Stage one: London Road – Quinton Road=

File:Ringway St Johns - geograph.org.uk - 1933297.jpg

The first stage of the ring road built was a {{convert|439|yards|m|adj=on}} stretch south east of the city centre, from what is now junction 4 at London Road to junction 5 at Quinton Road. This section was intended to relieve nearby Parkside, Short Street and Much Park Street, which were heavily congested with traffic entering Coventry from London Road. The design was based on Gibson's 1940s plan, which included cycle tracks and footpaths on both sides,{{cite news |work=Coventry Evening Telegraph |page=7 |date=11 January 1958 |title=The Inner Ring Road Route |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19580111/078/0007 |via=British Newspaper Archive}} and envisaged it as a surface-level "linear park".{{sfn|Gould|Gould|2015|p=38}} The carriageways in stages one and two were {{convert|24|ft|m}} wide,{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19591027/101/0009 |via=British Newspaper Archive |work=Coventry Evening Telegraph |title=First Section of Ring Road May Be Ready in Six Weeks |access-date=22 August 2020 |page=9 |date=27 October 1959 |edition=Last}} while the adjacent cycle tracks had a width of {{convert|12|ft|m}} and the pedestrian pavements {{convert|8|ft|m}}. The MOT approved stage one in December 1957, pledging 75 per cent of the estimated £310,000 cost ({{Inflation|UK|310000|1957|fmt=eq|cursign=£|r=-5}}) for the stage. The MOT justified the grant, which was higher than was normal for the central government at the time, by citing Coventry's status as a "blitz city".{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19571203/097/0009 |via=British Newspaper Archive |work=Coventry Evening Telegraph |title=Approval for First Section of Ring Road |access-date=26 June 2020 |page=9 |date=3 December 1957}}{{sfn|Redknap|2004|p=37}}

After receiving MOT approval, the council began negotiations with businesses and homeowners along the proposed route, to purchase their properties for demolition. Compulsory purchase orders were issued in June 1958,{{cite news |work=Coventry Evening Telegraph |date=9 June 1958 |edition=Last |title=Public Notices |page=8 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19580609/074/0008 |access-date=22 August 2020 |via=British Newspaper Archive}} and by the end of the year most of the affected properties were empty and awaiting demolition. The council also announced the closure of parts of Parkside, St Patrick's Road and Quinton Road for the duration of the project. By April 1959, demolition of unoccupied properties was underway and the council served eviction orders on the remaining properties on the route. This included five pubs and several houses and shops.{{cite news |work=Coventry Evening Telegraph |date=14 April 1959 |edition=Last |title=July Start on First Stage of the Inner Ring Road |page=9 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19590414/098/0009 |access-date=22 August 2020 |via=British Newspaper Archive}} Some features of the demolished areas were retained in the new road, for example stone setts from St John's Street, which were relaid as the divide between the cycle tracks and pavements.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19591012/024/0002 |page=2 |work=Coventry Evening Telegraph |date=12 October 1959 |title=Compromise with the Penalties of Progress |access-date=22 August 2020 |edition=Last |via=British Newspaper Archive}}

On 1 July 1959, with the demolition work almost complete, construction on the Coventry ring road began.{{cite news |work=Coventry Evening Telegraph |date=2 July 1959 |edition=Emergency News Bulletin |title=Coventry Ring Road |page=1 |access-date=12 July 2020 |via=British Newspaper Archive |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19590702/003/0001}} Pirelli General Cable Works contractors laid nine long tons (9,100 kg) of power cable underneath the roadways,{{cite news |work=Coventry Evening Telegraph |date=16 July 1959 |edition=Emergency News Bulletin |title=Walkie-Talkie Aids Cable-Laying |page=1 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19590716/002/0002 |access-date=12 July 2020 |via=British Newspaper Archive}} after which the route was levelled in preparation for the laying of foundations, which began in mid-August.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19590817/084/0007 |edition=Last |date=17 August 1959 |work=Coventry Evening Telegraph |page=7 |title=Ring Road Site |access-date=12 July 2020 |via=British Newspaper Archive}} The foundation consisted of at least {{convert|6|in|mm}} of crushed stone, with {{convert|4|in|mm}} of lean concrete above it, topped with {{convert|8|in|mm|adj=on}} thick concrete slabs. The surface was tarmac, which contractors began laying in early September.{{cite news |work=Coventry Evening Telegraph |date=8 September 1959 |edition=Last |title=First Part of Coventry's Ring Road |page=8 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19590908/087/0008 |access-date=22 August 2020 |via=British Newspaper Archive}} With one carriageway fully tarmacked by late November, the council considered opening that side early, around 8 December, but ultimately they decided to open both carriageways together.{{cite news |work=Coventry Evening Telegraph |date=27 November 1959 |edition=Last |title=Progress of the new inner ring road |page=9 |access-date=22 August 2020 |via=British Newspaper Archive |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19591127/096/0010}}

By December 1959, the contractors were in the final stages of construction. Several roads at the end of the stretch were closed temporarily to allow it to be joined to the existing road network. Sodium lights, mounted on {{convert|35|ft|m|adj=on}} poles, were installed between the carriageways.{{cite news |work=Coventry Evening Telegraph |date=14 December 1959 |edition=Lunch |title=Traffic Hold-ups caused by Ring Road Diversions |page=9 |access-date=22 August 2020 |via=British Newspaper Archive |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19591214/395/0025}} Stage one was opened on 23 December 1959, Lord Mayor William Henry Edwards cutting a ribbon before being driven along the road in his civic car.{{cite news |date=23 December 1959 |work=Coventry Evening Telegraph |page=1 |title=Lord Mayor Opens Inner Ring Road 'To Speed Traffic' |edition=City |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19591223/270/0018 |access-date=12 July 2020 |via=British Newspaper Archive}} There were traffic lights at each end at the time of opening, although stage two work on the London Road roundabout at stage one's eastern end commenced shortly afterwards.

=Stage two: Bishop Street – Hill Street, and London Road roundabout=

File:Coventry Ringway St Nicholas.jpg

File:Coventry ring road London Road roundabout 1967.jpg

Stage two consisted of two separate projects – a roundabout at the eastern end of stage one and a new stretch of road to the north west of the city centre. The government approved stage two on 28 November 1958, providing a grant of £232,000 ({{Inflation|UK|232000|1958|fmt=eq|cursign=£|r=-5}}) towards total costs of £310,000 ({{Inflation|UK|310000|1958|fmt=eq|cursign=£|r=-5}}). The new road began at Hill Cross and ran roughly along the line of King Street to Swanswell Terrace, a total distance of {{convert|480|yards|m}}. Like stage one, the stage featured cycle paths and pedestrian pavements on both sides, as well as a junction with Bishop Street.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19581129/047/0005 |date=29 November 1958 |page=5 |title=Work on Coventry Inner Ring Road to Start Soon |access-date=12 July 2020 |edition=Last |work=Coventry Evening Telegraph}} The cost eventually grew to £535,445 ({{Inflation|UK|535445|1960|fmt=eq|cursign=£|r=-5}}), including compensation to landowners.

After compulsory purchase orders were issued and all objections resolved,{{cite news |title=All Objections Withdrawn at Road Inquiry |work=Coventry Evening Telegraph |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19600114/121/0011 |access-date=5 June 2020 |via=British Newspaper Archive |date=14 January 1960 |page=11}} demolition of properties had begun by March 1960, including the Canal Offices building and properties on King Street.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19600307/028/0002 |access-date=5 June 2020 |via=British Newspaper Archive |page=2 |date=7 March 1960 |work=Coventry Evening Telegraph |title=Last Stand}} A

{{convert|29|ft|m|adj=on}} section of Coventry's ancient city wall and a square watchtower were discovered during the excavation, dating to between 1350 and 1400. The wall section had been incorporated into the cellar wall of an 18th-century property on King Street, which was among those demolished.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19600526/050/0007 |work=Coventry Evening Telegraph |access-date=8 June 2020 |title=Searching for the Ancient City Wall |date=26 May 1960 |page=7 |via=British Newspaper Archive}} A team of archaeologists led by Charmian Woodfield worked on the site for the next year, discovering a medieval cesspit containing 15th century pottery and a trench outside the wall which was built for additional protection.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610325/229/0022 |work=Coventry Evening Telegraph |access-date=8 June 2020 |title=City Wall Gives Up Its Secrets |date=25 March 1961 |page=22 |via=British Newspaper Archive}} {{As of|2022}}, the watchtower and a short section of the wall surrounding it remain in place.{{cite web |url=https://www.historiccoventry.co.uk/wall/wall.php?pg=lambst-hillst |work=Historic Coventry |title=City Wall & Tower near Lamb Street |access-date=9 June 2020}} Demolition was slow, due to issues with relocating residents as well as squatters, and was still ongoing at the end of 1960.{{cite news |via=British Newspaper Archive |work=Coventry Evening Telegraph |date=29 December 1960 |access-date=8 June 2020 |title=1960: Another Year of Demolition and Construction |page=6 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19601229/085/0006 |edition=Lunch}}

By June 1961, excavation was underway at the northern end of Bishop Street to process piping and electrical services.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610627/350/0028 |via=British Newspaper Archive |page=28 |date=27 June 1961 |title=Road Works Increase Problems of Rush Hour in Coventry |work=Coventry Evening Telegraph |access-date=15 June 2020}} The foundations were laid from July 1961, starting with the southern side of the road,{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610726/355/0030 |via=British Newspaper Archive |page=30 |date=26 July 1961 |title=Diversion Aid To Ring Road |work=Coventry Evening Telegraph |access-date=15 June 2020}} and work on the roadway had begun by early August.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610803/026/0003 |via=British Newspaper Archive |access-date=17 June 2020 |work=Coventry Evening Telegraph |title=Work Proceeding on the Construction of Stage Two |page=3 |edition=lunch |date=3 August 1961}} Engineers began tarmacking the southbound stretch from Swanswell Terrace to Hill Cross during the week of 14 August, opening it to traffic on 22 August,{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610814/011/0002 |date=14 August 1961 |page=2 |work=Coventry Evening Telegraph |via=British Newspaper Archive |title=Ending a Bottleneck... Waiting for a Bypass |edition=Lunch}} with the northbound carriageway following on 8 November. At the time of opening, the road had at-grade temporary junctions with Bishop Street and the old Radford Road (now Leicester Row), as the new radials linking those roads to the ring road were not yet complete. Unlike stage one, stage two had no opening ceremony – the road opened when construction workers moved barriers away from the access roads and traffic began to use it immediately.{{cite news |title=More of Coventry Ring Road in Use |date=8 November 1961 |work=Coventry Evening Telegraph |page=40 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19611108/416/0040 |via=British Newspaper Archive}}

Stage two also included the separate roundabout project at the eastern end of the stretch constructed in stage one, at the junction with London Road, Gulson Road, Whitefriars Street and Paradise Street. To facilitate the construction of the roundabout, the council issued compulsory purchase orders on buildings owned by various shops and businesses close to the site.{{cite news |work=Coventry Evening Telegraph |date=13 August 1959 |page=14 |title=Coventry People 'Approve' of Ring Road}} Two of these businesses, a petrol station and a scrap metal merchant, objected to the purchase and an inquiry was held. The council argued that the petrol station was too close to the road and that it would be difficult to secure access routes from the new layout. The Minister of Transport upheld the landowners' appeal, agreeing with them that much of the land was not required for the road. The plans therefore had to be altered.{{cite news |work=Coventry Evening Telegraph |date=2 November 1959 |page=9 |title=Appeal Result Will Hit Inner Ring Road Plan |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19591102/087/0009 |via=British Newspaper Archive |access-date=12 July 2020 |edition=Last}} Construction of the roundabout necessitated the destruction of most houses in Paradise Street, and its residents moved out in early 1960.{{cite news |via=British Newspaper Archive |page=6 |date=29 April 1960 |title=The End of Paradise Street |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19600429/053/0006 |edition=Last |work=Coventry Evening Telegraph |access-date=5 June 2020}} It opened to traffic in December 1960, with peripheral work and finishing continuing for a further few months.{{cite news |title=Coventry Ring Road Roundabout Now in Use |work=Coventry Evening Telegraph |date=3 December 1960 |page=11 |url=https://www.britishnewspaperarchive.co.uk/viewer/BL/0000769/19601203/112/0011 |access-date=5 June 2020 |via=British Newspaper Archive}}

=Traffic surveys and redesign=

File:Coventry ring road junction 9 - 3.jpg

By 1960, despite stage one being open and stage two underway, the council realised that it needed a better understanding of Coventry's long-term traffic requirements. There was little vehicle-movement data recorded at the time, and theory for large-scale car use in cities was not well developed. The council therefore carried out a survey to establish traffic patterns. Interviewers were stationed close to the planned line of the ring road, where they asked drivers their origin and destination. The results of the survey were published in late 1960,{{sfn|Redknap|2004|p=37}} predicting a 150 per cent increase in light traffic and a 75 per cent increase in heavy traffic during the subsequent twenty years.{{cite news |via=British Newspaper Archive |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19620725/246/0024 |date=25 July 1962 |title=Council Plans October Start on Flyover Project at Spon Street |page=24 |work=Coventry Evening Telegraph |access-date=22 June 2020}} The city engineer decided that the plans as they stood would be insufficient to cater for this growth. In particular, the placing of nine roundabouts on the road was predicted to lead to considerable congestion.{{sfn|Redknap|2004|p=37}} To remedy this, the council investigated the use of grade-separated junctions to replace the planned surface roundabouts. The use of such junctions had not at the time been tested at the scale required in Coventry, either in Europe or the United States. But the Road Research Laboratory, at the time a UK government agency, had produced a formula for safe traffic weaving distances between such junctions. Using this, the city engineer concluded that the ring road's layout could cope with grade separation, and recommended its use going forward.{{sfn|Redknap|2004|pp=37–38}}

In 1961, the council began a thorough review of its road transport policy. The city's planning department had begun to question the entire ring-road concept, arguing that it was not the most effective way to reduce congestion and created a damaging divide between urban communities and the city centre. A fresh traffic study was launched, producing a development plan for the transport needs of the whole city, which continued for much of the next ten years and produced several large volumes of results.{{sfn|Redknap|2004|pp=38–39}} The council determined early in the study that it would proceed with the ring road, but remodelled to include grade separation.{{sfn|Redknap|2004|pp=38–40}} The road's character was to be quite different from that of Gibson's design, with the cycle paths removed to make way for wider lanes and slip roads, and the "linear park" concept replaced with a largely elevated motorway-type road. After completion of the ring road, the development plan's long-term goals included construction of a Y-shaped pair of high-capacity "urban motor roads" in the suburbs, catering for traffic growth through to the 1980s. One of these roads was to be aligned north–south and the other east–west, providing uninterrupted dual-carriageway links between the ring road, the A45 and A46 roads in the south and the M6 motorway in the north.{{sfn|Coventry City Council|1966|pp=90–92}}

=Stage three: Moat Street flyover and Butts radial=

File:NSB Reynolds Coventry Flyover Easter 1966.jpg

The third stage to be built, and the first with grade separation, was the section on the western side of the city centre, between Holyhead Road in the north and Queen's Road in the south. The route was previously occupied by low-cost housing and small factories. This completed junction 7, with the road passing over the junction on a {{convert|1000|ft|m|adj=on}} overpass known as the Moat Street flyover.{{cite journal |journal=The Municipal Journal |date=27 December 1963 |volume=71 |issue=3697 |pages=3991–3992 |title=Coventry takes account of future traffic needs}} It also divided Spon Street into two disconnected sections.{{cite web |publisher=BBC |url=http://www.bbc.co.uk/coventry/features/local-history/spon-street/brief-history-of-spon-street.shtml |title=Coventry's Spon street through the ages |access-date=27 June 2020}} The flyover was built using steel girders, a technique not commonly used for bridges at the time, the project benefiting from an ongoing downturn in the construction steel industry which enabled it to source material more cheaply.{{sfn|Aizlewood|Heathcote|1970|p=212}}

Compulsory purchase orders were made in August 1961, with demolition beginning in September 1962 and preparatory work for the flyover commencing by November.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610812/091/0009 |page=9 |title=Public Notice: The Highways Act, 1959 |work=Coventry Evening Telegraph |via=British Newspaper Archive |date=12 August 1961 |access-date=12 July 2020 |edition=Lunch}}{{cite news |work=Coventry Evening Telegraph |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19620608/373/0044 |via=British Newspaper Archive |page=44 |access-date=20 June 2020 |title=Autumn Start on Coventry Inner Ring Road's Third Stage}}{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19620922/270/0023 |via=British Newspaper Archive |work=Coventry Evening Telegraph |date=22 September 1962 |page=23 |title=Work Begins on Path of New Flyover |access-date=27 June 2020}}{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19621101/144/0016 |via=British Newspaper Archive |work=Coventry Evening Telegraph |date=1 November 1962 |page=16 |title=Cranes carrying out preliminary work |access-date=27 June 2020}} Construction was carried out by several companies: Dorman, Long and Co. erected the steel supports for the flyover and McKinney Foundations the piling,{{sfn|Aizlewood|Heathcote|1970|pp=228–229}} with the main carriageway work carried out initially by local firm G. R. Yeomans. But in December 1963 the City Engineer, Granville Berry, ended Yeomans' contract, citing a lack of progress, poor workmanship and the company's financial health as reasons. Galliford & Sons took over to complete the remainder of the work.{{cite news |work=Coventry Evening Telegraph |date=21 December 1963 |title=Ryton Firm's Contract on Coventry Flyover Terminated |page=9}}

The Moat Street flyover was completed in November 1964, and it had been anticipated that it would open at that time. But with the Butts radial road not yet complete the council decided to defer this, citing potential driver confusion at the southern end if complex temporary measures were put in place.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19641127/853/0070 |title=Two-Year Delay in Use of Moat Street Flyover |page=1 |date=27 November 1964 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}}{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19641229/264/0025 |title=Hope for Partial Use of Flyover From February |page=9 |date=27 November 1964 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} Traffic was routed between Queen's Road and Spon Street via the new road's slip roads for a few months and in May 1965 the flyover opened to traffic, connecting the same two roads.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19650521/182/0021 |title=Moat St. flyover opened without any fuss |page=21 |date=21 May 1965 |edition=Lunch |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} A car park in the centre of the junction's roundabout was in use by August 1965, serving employees of the General Electric Company's plant in Spon Street.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19650803/336/0026 |title=Most St. flyover opened without any fuss |page=8 |date=3 August 1965 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}}

Along with stage three, the city also constructed two link roads to the new Moat Street junction. The first was the Butts radial road, for which construction began in July 1965. This was built by Turriff Construction of Warwick,{{sfn|Aizlewood|Heathcote|1970|pp=228–229}} and its purpose was to provide access to the ring road from Coventry's south-western suburbs. It ran from the Moat Street junction to The Butts, joining the existing road network close to the then Coventry Technical College.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/BL/0000769/19650713/088/0009 |title=Start This Week on Spur Road in Butts |page=9 |date=13 July 1965 |edition=Lunch |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} It was completed and opened in late May 1966, with a pair of subways under the radial and the Moat Street roundabout allowing pedestrian access to the city centre.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19660521/229/0029 |title=New Coventry traffic link on Monday |date=21 May 1966 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} The second new road was Croft Street on the city side of the roundabout, which opened in July 1965 and, {{asof|2022|lc=y}}, carries traffic through to the inner-circulatory route at Queen Victoria Road.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19660713/104/0010 |title=Right-hand turn ban at Coventry bottle neck |date=13 July 1966 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}}

=Stage four: Hill Cross – Holyhead Road=

File:Coventry ring road Hillcross flyover.jpg

File:Coventry ring road junction 8 - 3.jpg

The fourth stage of the project was the missing link joining stage two to stage three and included completion of junctions 8 and 9. Work on this stage was closely aligned with that on stage three as the two connected with each other at Holyhead Road and stage four preparation and building began before much of the prior stage was opened. The council selected the principal stage three contractor, Galliford, as the primary contractor for stage four, including the Radford radial, while McKinney and Dorman Long once again performed the piling and the steelwork respectively. PSC Equipment were also involved for post-tensioning work on the concrete.{{sfn|Aizlewood|Heathcote|1970|pp=228–229}} The council had originally intended to make an advance order for the steel required for stage four in 1962, following the successful and economical work done on stage three. But the government vetoed this plan, and by 1964 when the Hill Cross materials were ordered, the steel market had recovered and costs were significantly higher.{{sfn|Aizlewood|Heathcote|1970|p=215}}

Compulsory purchase orders were made in 1963,{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19630528/377/0031 |title=Council Opposed Over Land For Ring Road |page=14 |date=28 May 1963 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} and were approved by the ministry.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19631009/452/0032 |title=Objections by Property Owners Upheld |page=13 |date=9 October 1963 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} Preparatory work, including rerouting of sewers under Hill Street, and temporary diversions began in October 1964.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19641017/099/0011 |title=Holyhead Rd. Section Closes on Monday |page=11 |date=17 October 1964 |edition=Lunch |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} The link between the two sections of Holyhead Road was severed permanently from the beginning of 1965 with slip roads from Spon Street to Holyhead Road, to allow work to begin on junction 8.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/fbl/0000769/19641231/403/0034 |title=Holyhead Rd. Section Closes on Monday |page=15 |date=31 December 1964 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} Holyhead Road was left as a dead end on the city-centre side, causing loss of trade for businesses on that section.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19650209/102/0009 |title=The skeleton of the Hill Cross flyover |page=9 |date=9 February 1965 |edition=Lunch |access-date=30 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} Dorman Long began erecting the steel girders in May 1965, transporting them from their Middlesbrough factory by train.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19650727/307/0033 |title=Traffic diversions as work begins on Hill Cross steel frame flyover |page=11 |date=27 July 1965 |edition=Last |access-date=29 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} Work on the roundabout underneath the junction, slip roads and the Radford radial also began around the same time.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19650609/059/0006 |title=The skeleton of the Hill Cross flyover |page=6 |date=9 June 1965 |edition=Lunch |access-date=30 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} By November, all steelwork was in place for the flyover, and it was ready for the concrete surface to be laid.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19651109/317/0035 |title=The skeleton of the Hill Cross flyover |page=16 |date=9 November 1965 |edition=Last |access-date=30 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}}

The Radford radial was completed first and opened to traffic in February 1966, linking the ring road to Radford Road. The section of the old Radford Road on the city side was cut off from the rest and left as a dead end.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19660215/089/0008 |title=Radford Road radial spur opens |page=8 |date=15 February 1966 |edition=Lunch |access-date=30 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} The slip roads were brought into use in early June, allowing traffic to travel between the junctions but not yet on the flyover or the underpass. This opened up a through route from junction 6 in the south all the way through to junction 1 in the north, via the Moat Street flyover and the stage four slip roads, allowing traffic to bypass the city centre for the first time.{{cite news |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19660528/053/0009 |title=City's New 'By-Pass': Sliproads open to traffic next week |page=9 |date=28 May 1966 |edition=Lunch |access-date=30 June 2020 |via=British Newspaper Archive |work=Coventry Evening Telegraph}} The Hill Cross flyover and Holyhead Road underpasses were both opened on 18 July 1966, three months ahead of schedule, with construction workers removing the barriers and allowing traffic to flow.

=Stage five: Foleshill Road – London Road=

File:Swanswell and Foleshill - geograph.org.uk - 560211.jpg

File:The A4053 runs under the Ringway Whitefriars (geograph 6113468).jpg

Stage five comprised the eastern section, linking the stage two and stage one sections between junction 1 and junction 4. The section included the building of junctions 2 and 3. The line of the stage crossed the River Sherbourne, downstream from the city centre, where surveyors found an artesian aquifer. This difficult terrain and the grade-separated junctions made it impractical to build the road at ground level so an elevated carriageway was constructed while also culverting the river as it ran underneath junction 3. This extended an existing culvert which had been built during the 1950s and 1960s, taking the river underground for most of its route through the city centre.{{sfn|Senior|1971|p=4}}{{cite web |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19680417/079/0008 |title=Culverting the Sherbourne |date=17 April 1968 |page=8 |edition=Lunch |work=Coventry Evening Telegraph |via=British Newspaper Archive}}{{cite web |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19570104/161/0015 |title=Car Park Over Culvert Planned |date=4 January 1957 |page=15 |edition=Last |work=Coventry Evening Telegraph |via=British Newspaper Archive}}{{Cite web |title=Tracing the hidden River Sherbourne under Coventry |last=Chambers |first=Faye |work=BBC News |date=10 January 2015 |access-date=6 August 2022 |url= https://www.bbc.co.uk/news/uk-england-coventry-warwickshire-30446327}} Steel prices had increased during the construction of stages three and four, so the council decided to use pre-stressed concrete supports rather than steel. They programmed a LEO III computer to assist with predicting the structural load on the roadway.{{sfn|Aizlewood|Heathcote|1970|p=215}} Stage five was the longest to date with a length of {{convert|1200|yard|m}}, of which {{convert|950|yard|m}} were elevated.{{cite news |edition=Lunch |date=6 November 1967 |pages=1 & 9 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=3 July 2020 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19671106/082/0009 |title=Ring Road stage cost up £733,750}} It was also the most expensive to date, with an eventual cost of £4.6 million ({{Inflation|UK|4600000|1971|fmt=eq|cursign=£|r=-5}}) including land purchases.{{sfn|Senior|1971|p=4}}

Detailed plans for the stage were released in June 1965 during the construction of stages three and four, with compulsory purchase orders for the properties on the route issued at the same time. The contract for the construction of the project was put out to tender in late 1966,{{cite news |date=18 November 1966 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19661118/703/0053 |title=Tenders Invited for Next Stage of Ring Road |edition=Last |page=21 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=3 July 2020}} with Galliford chosen once again.{{cite news |date=20 December 1967 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19671220/553/0047 |title=Tenders Invited for Next Stage of Ring Road |edition=City Final |page=13 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=3 July 2020}} Demolition and clearing of the route was underway by late 1967,{{cite news |date=9 November 1967 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19671109/677/0052 |title=Fifth Stage of the Inner Ring Road |edition=Late City |page=20 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}} and a £3.2 million MOT grant ({{Inflation|UK|3200000|1967|fmt=eq|cursign=£|r=-5}}) was approved, despite a government freeze on public spending at the time. It was projected to take two and a half years to complete.{{cite news |date=20 December 1967 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19671220/553/0047 |title=Go-Ahead For Ring Road's Fifth Stage |edition=City Final |page=13 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}} Work began in March 1968, and by June of that year the culverting work on the Sherbourne and erection of the concrete vertical supports was underway, with around six columns completed every week.{{cite news |date=13 June 1968 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19680613/081/0009 |title=Ring Road Up To Schedule |edition=Lunch |page=9 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}} From September 1968, a total of 765 concrete box beams were brought by road from the Dow-Mac concrete plants at Tallington and Gloucester, each weighing around {{convert|41|LT|t}} with lengths up to {{convert|82|ft|m}}. T-beams were also imported for use on the slip roads. Galliford used a pair of {{convert|50|LT|t|adj=on}} cranes to lift the beams into place.{{cite news |date=4 September 1968 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19680904/159/0014 |title=Monster Beams Arrive For New Flyover |edition=Lunch |page=14 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}}{{cite journal |pages=37–38 |title=Coventry's traffic now flows full circle |journal=New Civil Engineer |url=https://books.google.com/books?id=24g7AAAAMAAJ |publisher=Institution of Civil Engineers |date=3 October 1974}} Beam laying was finished in mid-1969 and was followed by approximately ten months of road surfacing and finishing, including decorative slabs made with white spar from the Isle of Skye, which the designers hoped would "soften the starkness" of the concrete.{{sfn|Senior|1971|p=4}}{{cite news |date=4 September 1968 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19680904/159/0014 |title=Decorative slabs will soften ring road starkness |edition=Lunch |page=9 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}}

The {{convert|400|yards|m|adj=on}} stretch from junction 1 to junction 2 opened first, in August 1969.{{cite news |date=13 August 1969 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19690813/616/0042 |title=Another 400 Yards of Ring Road Open |edition=City Final |page=12 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}} The road linking Foleshill Road with Stoney Stanton Road and the Coventry & Warwickshire Hospital was closed to traffic, other than buses and ambulances, with other vehicles using the ring road and White Street.{{cite news |date=11 August 1969 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19690811/582/0038 |title=Coming into Use on Wednesday |edition=City Final |page=11 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}} The remainder of the stage was completed on schedule with an official ceremony on 4 June 1970 at St Mary's Guildhall and inaugural drive on the road by the Lord Mayor, followed by the opening of the road to the public.{{cite news |date=4 June 1970 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19700604/691/0047 |title=Fifth Stage of Ring Road Opens |edition=Late City |page=1 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}}{{sfn|Senior|1971|p=13}} The completion of stage five meant that only the southern section between St Patrick's Road and the Queen's Road remained to be completed, and traffic could circumnavigate the city centre without having to use the inner circulatory road. Despite this, the council found that many motorists were continuing to use the old routes in the immediate aftermath of the opening.{{cite news |date=9 June 1970 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19700609/056/0007 |title="Switch To Ring Road" Appeal in Coventry |edition=Lunch |page=7 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}}

=Stage six: London Road – Queen's Road=

File:Coventry ring road -looking east -from footbridge near Manor Rd 27s07.JPG

The final stage covered the section south of the city centre, completing the full ring by joining the end of stage five at junction 4 with stage three at Queen's Road and constructing junctions 5 and 6. The stage replaced part of St Patrick's Road and included a rebuild of stage one, to upgrade it to the full-width grade-separated standard of the later sections. The cost was estimated in 1971 to be around £5.5 million ({{Inflation|UK|5500000|1971|fmt=eq|cursign=£|r=-5}}), of which slightly more than £4 million ({{Inflation|UK|4000000|1971|fmt=eq|cursign=£|r=-5}}) was to be covered by a government grant.{{cite news |date=16 July 1971 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19710716/168/0014 |title=£¾ Million Leap in Ring Road Cost |edition=Lunch |page=14 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=6 July 2020}} It had initially been proposed in the early 1960s that the work in the area would include widening the A429 Warwick Road, but there was local opposition citing the loss of 47 mature trees and the plan was abandoned.{{cite news |title=Opposition Among Councillors To Warwich Road Tree Felling |date=2 May 1961 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610502/366/0028 |page=11 |edition=Last |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=8 July 2020}}{{cite news |title=Trees Felled For Ring Road |date=4 October 1971 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19711004/188/0015 |page=15 |edition=Lunch |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=8 July 2020}}

Compulsory purchase orders for this phase were issued in late 1969.{{cite news |date=1 November 1969 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19691101/089/0007 |title=Ring road final phase to start in 1971 |edition=Lunch |page=7 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=4 July 2020}} An inquiry was held in July 1970, examining two outstanding objections from property owners, but the MOT approved the stage, noting that the public benefits of building the stage outweighed the objections.{{cite news |date=12 November 1970 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19701112/721/0049 |title=Way Clear For Last Stage of Ring Road |edition=Late City |page=13 |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=6 July 2020}} Two monuments were temporarily removed during the construction work and put into storage. The first was the Coventry Martyrs memorial, located in a small garden at the intersection of Quinton Road and Park Road – it was eventually put back in the centre of the junction 5 roundabout. The other was the monument to the nineteenth century bicycle entrepreneur James Starley, which was taken from Greyfriars Green and put into storage, then relocated to another position on the green after work was complete.{{cite news |title=Memorials Make Way For Inner Ring Road |date=12 November 1970 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19710510/122/0010 |page=10 |edition=Lunch |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=8 July 2020}}{{cite web |url=https://steve.historiccoventry.co.uk/nowandthen/content.php?pg=martyrs_mem |work=Historic Coventry |access-date=8 July 2020 |title=Steven Orland's Coventry, Now & Then: Martyr's Memorial}}

Stage six was opened with an official ceremony on 19 September 1974.{{cite news |title='Frustration and Delay' – now ring road opens |date=20 September 1974 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610502/366/0028 |page=11 |edition=Night Final |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=8 July 2020}} There was a minor dispute between the city council and the newly formed West Midlands County Council regarding the attendees at the ceremony. The latter authority had been given responsibility for transport across the county in April 1974 and supervised the final few months of the work, which meant they were responsible for the opening. But representatives of the city council, which had managed the ring-road project for most of its 25-year duration, felt that they should be leading the occasion.{{cite news |title=Ring road row over Metro 'takeover' |date=6 September 1974 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19610502/366/0028 |page=11 |edition=Last |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=8 July 2020}} The Lord Mayor of Coventry, Dennis Berry, cut a length of tape across the junction 6 underpass to declare it open. In his speech, he congratulated officials from the council who had overseen the project since its inception, but also lamented the "frustration and delay" which had lengthened the work from its original six-year timetable.{{sfn|Redknap|2004|p=40}} There were also speeches by two officials from the county council. After 14 years the ring road was complete, with a final overall cost of £14.5 million ({{Inflation|UK|14500000|1974|fmt=eq|cursign=£|r=-5}}).

=Later developments=

File:Coventry ring road (A4053).jpg

In 2004, Coventry's city council developed an urban renewal plan centred around the Swanswell area, which lies north east of the city centre and is bisected by the ring road.{{sfn|Urban Initiatives|2004|p=7}} The initial draft, written by the Urban Initiatives organisation, described the ring road as having a "barrier effect" on the area and contained proposals to reduce or eliminate this.{{sfn|Urban Initiatives|2004|p=8}} Four options were proposed: to remove junction 2 of the road, to replace the elevated road between junctions 1 and 3 with a surface street, to replace the elevated section with a tunnel or to keep the road more-or-less as it was. The 2004 draft labelled the surface-street option as its preferred solution,{{sfn|Urban Initiatives|2004|pp=15–17}} but a 2007 public report on the initiative stated that the council preferred the removal of junction 2, with leaving the road unchanged as the preferred option if removing the junction proved infeasible.{{Cite web |title=Public Report: Swanswell Initiative – Masterplanning |author= |publisher=Coventry City Council |pages=1–2 |date=19 March 2007 |access-date=25 June 2022 |url= https://edemocracy.coventry.gov.uk/Data/Cabinet/200703201400/Agenda/12%20-%20Swanswell%20Initiative%20-%20Masterplanning.pdf}} In 2017, the council produced an action plan for the city centre which continued to note the obstructive effect of the road and retained removal of junction 2's slip roads as an "opportunity" which existed,{{Cite web |title=City Centre Area Action Plan |publisher=Coventry City Council |date=6 December 2017 |page=97 |access-date=25 June 2022 |url= https://www.coventry.gov.uk/downloads/file/25900/final-area-action-plan-aap-december-2017}} but {{as of|2022|lc=y}} the road around Swanswell remained in its original configuration.{{Cite web |title='Welcome to Coventry' sign was installed 'to cheer people up' |last=Kaur |first=Jaspreet |work=Coventry Telegraph |date=8 March 2022 |access-date=25 June 2022 |url= https://www.coventrytelegraph.net/news/coventry-news/welcome-coventry-sign-costing-thousands-23317492}} In 2017 and 2020, the council undertook major refurbishment of the Swanswell section and added signage saying "Welcome to Coventry" on the viaduct there.{{cite news |date=29 June 2017 |title=Permanent lane closures on ring road to cause more misery for drivers |url=https://www.coventrytelegraph.net/news/permanent-lane-closures-ring-road-13258364 |first=Laura |last=Hartley |access-date=30 August 2020 |work=Coventry Telegraph}}{{Cite web |title=Ring Road improvement scheme set to go ahead |last=Stretton |first=Rachel |work=Coventry Telegraph |date=27 August 2020 |access-date=25 June 2022 |url= https://www.coventrytelegraph.net/news/coventry-news/coventry-ring-road-5m-improvement-18837003}}

In 2014–15, the council carried out a major redevelopment of junction 6. In the biggest alteration to the ring road's layout since it opened, the roundabout and pedestrian bridges at the junction were removed and replaced with a {{convert|100|m|yards|adj=on|order=flip}} wide deck, the ring road running underneath. The scheme, part of a wider development creating the Friargate business district, cost £14.9 million to complete. Once built, the deck was landscaped to provide a link to Greyfriars Green to the north, a pedestrian walkway providing a continuous link between Coventry railway station to the south and the city centre to the north.{{Cite web |title=Coventry's £14.9million Friargate bridge deck will be opened on Thursday |last=Eccleston |first=Ben |work=Coventry Telegraph |date=26 May 2015 |access-date=25 June 2022 |url= https://www.coventrytelegraph.net/news/coventry-news/coventrys-149million-friargate-bridge-deck-9332286}} The redeveloped junction retained three of the four movements on and off the ring road from Warwick Road, but the ability to join the eastbound carriageway was removed.{{Cite AV media| url = https://www.youtube.com/watch?v=AC88PvJpbH8 | via = YouTube | publisher = Coventry City Council| access-date = 25 June 2022 | title = Changes to the road layout at Ring Road Junction 6 | date = 21 March 2014 }} Two days after the development was officially opened, the ring road was temporarily closed underneath the new deck, hosting a racing circuit as part of the Coventry MotoFest.{{Cite web |title=2015 Coventry Motofest show gallery |last=Smith |first=Aaron |work=Autocar |date=1 June 2015 |access-date=25 June 2022 |url= https://www.autocar.co.uk/car-news/motorsport/2015-coventry-motofest-show-gallery}}

In 2021, the UK government mandated the city council to improve Coventry's air quality as part of efforts to reduce nitrogen dioxide ({{chem|NO|2}}) levels. The area with the highest {{chem|NO|2}} was around Spon End and Holyhead Road, and the government said it would impose a Clean Air Zone in that area if the council failed to make improvements.{{Cite web |title=Clean air charging zones for Coventry if council fails to make changes |last=Johnson |first=Morgan |work=Coventry Telegraph |date=15 December 2021 |access-date=4 August 2022 |url= https://www.coventrytelegraph.net/news/coventry-news/clean-air-charging-zones-introduced-22449104}} In response, the council proposed changes affecting the ring road, including a redesign of junction 7 and a new link between the junction 8 clockwise exit slip road and Upper Hill Street.{{Cite web |title=Improving Air Quality – changes to the road network |author= |work=Let's Talk Coventry |publisher=Coventry City Council |date=10 February 2022 |access-date=4 August 2022 |url= https://letstalk.coventry.gov.uk/improvingaq}} The goal of the latter change was to avoid a bottleneck on Holyhead Road for ring-road traffic destined for Coundon Road, but {{asof|June 2022|lc=y}} this was in doubt due to the need to acquire land and opposition from a primary school on the route.{{Cite web |title='Ridiculous' highway plan next to Cov primary school faces the axe |last=Brown |first=Ellie |work=Coventry Telegraph |date=10 June 2022 |access-date=4 August 2022 |url= https://www.coventrytelegraph.net/news/local-news/ridiculous-plans-highway-next-coventry-24186379}} The junction 7 work began in April 2022, involving removal of the roundabout at that junction and its replacement with a direct route under the flyover from the Butts radial into the city centre.{{Cite web |title=Coventry Ring Road works to last until 2023 |last=Johnson |first=Morgan |work=Coventry Telegraph |date=28 April 2022 |access-date=4 August 2022 |url= https://www.coventrytelegraph.net/news/coventry-news/coventry-ring-road-works-last-23797648}}{{Cite web |title=Confusion amid major change to Coventry Ring Road junction |last=Johnson |first=Morgan |work=Coventry Telegraph |date=28 July 2022 |access-date=4 August 2022 |url= https://www.coventrytelegraph.net/news/coventry-news/confusion-amid-major-change-coventry-24611549}} This work is expected to be complete in 2023.

Design and construction

File:Moat street flyover 2.jpg

The ring road forms a complete loop around Coventry city centre and is entirely grade separated with the exception of junction 1.{{sfn|Gould|Gould|2015|p=58}} The weaving distance between junctions is only {{convert|300|ft|m|sigfig=1}} in places and research by Brian Redknap, city engineer during the construction of the road, indicated that it was it was the first urban road in the world to use grade separation and weaving at such a small scale.{{sfn|Redknap|2004|pp=37–38}} The Ringway St Nicholas section, between junctions 9 and 1, retains pavements on both sides as well as the cycle track on the anti-clockwise side, per the stage two specification.{{sfn|Coventry City Council|2011|p=41}} Following the junction 6 redesign, a {{convert|100|m|yards|adj=on|order=flip}}-wide walkway crosses over the ring road underpass to link the railway station and the city centre.{{cite web |archive-url=https://web.archive.org/web/20200622000000/https://webcache.googleusercontent.com/search?q=cache:frj1KXpEd18J:https://www.coventry.gov.uk/directory_record/29942/ring_road_junction_6_bridge_deck%3FacceptCookies%3D1+&cd=1&hl=en&ct=clnk&gl=uk |url=https://www.coventry.gov.uk/directory_record/29942/ring_road_junction_6_bridge_deck?acceptCookies=1 |work=Coventry City Council |title=Coventry City Centre regeneration – Ring Road Junction 6 Bridge Deck |access-date=10 July 2020 |archive-date=22 June 2020}} On all other sections pedestrian areas are segregated from the road by fences and walls, with foot access between the inside and outside achieved via a series of bridges and subways.{{sfn|Rayman|Redknap|1970|p=188}} The road is not an official motorway and it is legal for cyclists to use it, but after the decision in the early 1960s to drop the road's cycle lanes and convert it to a full grade-separated dual carriageway, most cyclists consider it too dangerous.{{cite news |date=2 January 2019 |url=https://www.forbes.com/sites/carltonreid/2019/01/02/coventry-had-12-foot-wide-cycleways-in-the-1950s-why-did-britains-detroit-destroy-them/#f0831527eb2c |work=Forbes |title=Coventry Had 12-Foot Wide Cycleways in the 1950s – Why Did Britain's Detroit Destroy Them? |first=Carlton |last=Reid |access-date=10 July 2020}}

The ring road features a number of different junction designs, reflecting the nature of the road in the area concerned as well as the dates at which the stages were completed.{{sfn|Aizlewood|Heathcote|1970|p=201}} The two elevated junctions constructed during stages three and four – Moat Street and Hill Cross – utilise a roundabout with slip roads and a flyover. The designers chose a viaduct structure rather than an embankment at these junctions and positioned the abutments some distance from the roundabouts and slip roads, to maximise visibility. The close spacing of all nine junctions necessitated a trade-off between the gradient of the slip roads and the length of the weaving space between the junctions. The designers gave the latter consideration relatively more importance than the former, with the result that the slip lanes are all quite steep, ranging from 5.5 to 7.1 per cent gradient.{{sfn|Aizlewood|Heathcote|1970|pp=199–200}} The junction 2 slip roads have an unusual design – the proximity to the Foleshill Road junction led the designers to position all of the lanes to the south of White Street, the north-facing lanes forming curved loops underneath the main carriageway.{{sfn|Aizlewood|Heathcote|1970|p=203}}

In the early 1960s it was planned for there to be direct links between the ring road and rooftop car parks in the central shopping area via a series of bridges, to reduce traffic on surface roads. This plan, which would have involved further demolition of properties,{{cite news |title=Queen Victoria Road bridge approved |date=4 November 1964 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19641104/118/0013 |page=13 |edition=Lunch |work=Coventry Evening Telegraph |via=British Newspaper Archive |access-date=9 July 2020}} was later abandoned on the grounds of cost and practicality with access to car parks instead provided via the inner circulatory road. A number of new car parks were built, with space for 10,000 vehicles arranged such that long-stay parking was close to the ring road and short-stay closer to the shopping areas. Several of the car parks are situated directly underneath the elevated sections of the road itself, including under the long stretch in the east built during stage five and, until the 2020s junction 7 rebuild, inside the roundabout under the Moat Street flyover.{{sfn|Rayman|Redknap|1970|p=188}} The latter was initially reserved on weekdays for employees of the General Electric Company factory in Spon Street but it later became a full-time public car park.{{cite news |via=British Newspaper Archive |title=Fly-over car park |edition=Last |work=Coventry Evening Telegraph |date=3 August 1965 |access-date=9 July 2020 |page=8 |url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000769/19650803/336/0026}}{{cite web |url=https://www.coventry.gov.uk/directory_record/11451/moat_street |archive-url=https://web.archive.org/web/20111120191945/http://www.coventry.gov.uk/directory_record/11451/moat_street |url-status=dead |archive-date=20 November 2011 |work=Coventry City Council |title=Parking – Moat Street car park |access-date=9 July 2020 }} Junction 2 has a coach park, constructed in the spaces enclosed by the junction's curved slip lanes.

Junctions

class="plainrowheaders wikitable"
scope=col|{{abbr|mi|Distance from junction 1 in miles}}

!scope=col|{{abbr|km|Distance from junction 1 in kilometres}}

!scope=col|Junction

!scope=col|Destinations

!scope=col|Coordinates

!scope=col|Refs

scope="row" style="text-align: right;"|0.0

|style="text-align:right;background-color:#eaecf0"|0.0

|align="center" |1

|{{jct|country=GBR|B|4113}} – M6 north, Coventry Building Society Arena

|{{coord|52.4131|N|1.5091|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 1}}

|

scope="row" style="text-align: right;"|0.2

|style="text-align:right;background-color:#eaecf0"|0.3

|align="center" |2

|{{jct|country=GBR|B|4109}} – Pool Meadow Bus Station, White Street

|{{coord|52.4114|N|1.5063|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 2}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4112641,-1.5058982/@52.4119316,-1.5088449,17.46z/data=!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 2, clockwise |access-date=12 July 2022}}

scope="row" style="text-align: right;"|0.5

|style="text-align:right;background-color:#eaecf0"|0.8

|align="center" |3

|{{jct|country=GBR|A|4600}} – M1 north, M69 to Leicester, A428 to Rugby

|{{coord|52.4080|N|1.5021|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 3}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4081365,-1.502228/@52.4107232,-1.5078389,17z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 3, clockwise |access-date=12 July 2022}}

scope="row" style="text-align: right;"|0.7

|style="text-align:right;background-color:#eaecf0"|1.1

|align="center" |4

|{{jct|country=GBR|A|4114}} – M1 to London, M40 to Oxford, A423 to Banbury, A46 to Warwick, A45 to Northampton, Coventry Airport

|{{coord|52.4048|N|1.5023|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 4}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4047802,-1.5024318/@52.4090491,-1.5099535,16z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 4, clockwise |access-date=12 July 2022}}

scope="row" style="text-align: right;"|1.0

|style="text-align:right;background-color:#eaecf0"|1.6

|align="center" |5

|Quinton Road, Mile Lane

|{{coord|52.4037|N|1.5083|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 5}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4036721,-1.5082253/@52.4084818,-1.5099535,16z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 5, clockwise |access-date=12 July 2022}}

scope="row" style="text-align: right;"|1.3

|style="text-align:right;background-color:#eaecf0"|2.0

|align="center" |6

|File:UK secondary road A429.svg – Kenilworth, War Memorial Park, Coventry railway station

|{{coord|52.4032|N|1.5146|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 6}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4030975,-1.5146562/@52.4080906,-1.5127548,16z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 6, clockwise |access-date=12 July 2022}}

scope="row" style="text-align: right;"|1.5

|style="text-align:right;background-color:#eaecf0"|2.5

|align="center" |7

|{{jct|country=GBR|B|4101}} – Earlsdon, Coventry Skydome

|{{coord|52.4060|N|1.5188|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 7}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4059695,-1.5188988/@52.4080906,-1.5148646,16z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 7, clockwise |access-date=12 July 2022}}

scope="row" style="text-align: right;"|1.8

|style="text-align:right;background-color:#eaecf0"|2.9

|align="center" |8

|{{jct|country=GBR|A|4114}} – A45 to Birmingham

|{{coord|52.4096|N|1.5187|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 8}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4029371,-1.5139462/52.4096343,-1.5186962/@52.4080971,-1.5153142,16z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 8, clockwise via junction 6 |access-date=12 July 2022}}

scope="row" style="text-align: right;"|2.0

|style="text-align:right;background-color:#eaecf0"|3.2

|align="center" |9

|{{jct|country=GBR|B|4098}} – Tamworth, Belgrade Theatre

|{{coord|52.4116|N|1.5149|W|dim:2000_region:GB|display=inline|name=Coventry ring road, Junction 9}}

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4030019,-1.5143284/52.4116497,-1.5149763/@52.4080906,-1.5153142,16z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 9, clockwise via junction 6 |access-date=12 July 2022}}

scope="row" style="text-align: right;"|2.3

|style="text-align:right;background-color:#eaecf0"|3.7

|colspan="3"; align="center" |Continues back to junction 1

|{{Google maps |url=https://www.google.co.uk/maps/dir/52.4132904,-1.5090793/52.4030019,-1.5143284/52.4116497,-1.5149763/52.4133112,-1.5090874/@52.408094,-1.5153142,16z/data=!3m1!4b1!4m2!4m1!3e0 |title=Driving directions from Coventry ring road junction 1 to junction 1, clockwise via junction 6 |access-date=12 July 2022}}

Notes

{{notelist}}

References

{{Reflist}}

=Bibliography=

  • {{cite book |title=The Everyday Experiences of Reconstruction and Regeneration: From Vision to Reality in Birmingham and Coventry |first1=David |last1=Adams |first2=Peter |last2=Larkham |year=2019 |publisher=Routledge |isbn=978-1-31703-258-8 |url=https://books.google.com/books?id=Ds-SDwAAQBAJ }}
  • {{cite journal |publisher=Institution of Civil Engineers |journal=Proceedings |volume=45 |date=April 1970 |pages=199–230 |title=Coventry inner ring road: design and construction |first1=H. |last1=Aizlewood |first2=N. B. |last2=Heathcote |url=https://books.google.com/books?id=DKzgAAAAMAAJ }}
  • {{cite book |title=1966 Review of the Development Plan: Analysis and Statement |publisher=Coventry City Council |year=1966 |url=https://books.google.com/books?id=twDuAAAAMAAJ |ref={{sfnRef|Coventry City Council|1966}}}}
  • {{cite book |publisher=Coventry City Council |title=Application OUT/2011/0326: Planning Committee Report 6 |url=https://edemocracy.coventry.gov.uk/Data/Planning%20Committee/201106021400/Agenda/06%20-%20Application%20OUT%202011%200326%20-%20Ringway%20St%20Nicholas,%20Tower%20Street,%20Bishop%20Street.pdf |date=2 June 2011 |access-date=10 July 2020 |ref = {{sfnRef|Coventry City Council|2011}} }}
  • {{cite book |title=Coventry Planned: The Architecture of the Plan for Coventry, 1940–1978 |first1=Jeremy |last1=Gould |first2=Caroline |last2=Gould |year=2009 |publisher=Gould & Gould Architects |url=https://www.coventry.gov.uk/downloads/file/19166/gould_report_coventry_planned_april_2009_revision }}
  • {{cite book |title=Coventry: The making of a modern city 1939–1973 |first1=Jeremy |last1=Gould |first2=Caroline |last2=Gould |year=2015 |publisher=English Heritage |isbn=978-1-84802-341-3 |url=https://books.google.com/books?id=1WkpDwAAQBAJ }}
  • {{cite book |url=https://books.google.com/books?id=phoXAQAAIAAJ |title=A history of Coventry |first=David |last=McGrory |publisher=Phillimore |year=2003|isbn=978-1-86077-264-1 }}
  • {{cite map |url=https://shop.ordnancesurvey.co.uk/map-of-coventry-warwick/ |publisher=Ordnance Survey |isbn=978-0-319-24414-2 |title=Explorer 221: Coventry & Warwick |year=2015 |ref = {{sfnRef|Ordnance Survey|2015}}}}
  • {{cite map |isbn=978-0-319-26238-2 |year=2016 |title=Landranger 140: Leicester, Coventry & Rugby |publisher=Ordnance Survey |url=https://books.google.com/books?id=MrqGjgEACAAJ |ref = {{sfnRef|Ordnance Survey|2016}}}}
  • {{cite journal |publisher=Institution of Civil Engineers |journal=Proceedings |volume=45 |date=April 1970 |pages=181–198 |title=Coventry inner ring road: planning and traffic |first1=N. |last1=Rayman |first2=Brian |last2=Redknap |url=https://books.google.com/books?id=DKzgAAAAMAAJ }}
  • {{cite book |title=Engineering the development of Coventry |first=Brian |last=Redknap |year=2004 |publisher=Coventry Branch of the Historical Association |isbn=978-1-87320-626-3 |url=https://books.google.com/books?id=H_wWAQAAIAAJ }}
  • {{cite journal |publisher=Institution of Highway Engineers |journal=Proceedings |volume=18 |number=7 |date=July 1971 |title=The Construction of Stage V of the Coventry Inner Ring Road |pages=3–13 |first=G. M. |last=Senior |url=https://books.google.com/books?id=MsErAQAAMAAJ }}
  • {{cite web |url=http://www.covcollege.ac.uk/swanswell/downloads/masterplan.pdf |title=Swanswell Regeneration Masterplan: Draft Supplementary Planning Document |date=August 2004 |publisher=Urban Initiatives |via=Coventry College |archive-url=https://web.archive.org/web/20051108061048/http://www.covcollege.ac.uk/swanswell/downloads/masterplan.pdf |archive-date=8 November 2005 |ref = {{sfnRef|Urban Initiatives|2004}}}}
  • {{cite book |url=https://books.google.com/books?id=gqp-DwAAQBAJ&pg=PT76 |pages= |title=Reconstruction, Affluence and Labour Politics: Coventry, 1945–1960 |first=Nick |last=Tiratsoo |publisher=Routledge |year=2018 |isbn=978-0-429-83198-0}}
  • {{cite book |url=https://books.google.com/books?id=RoSNAgAAQBAJ&pg=PA36 |title=Building Democracy |first=Graham |last=Towers |publisher=Routledge |year=2003|isbn=978-1-13537-074-9 }}