Approach and Landing Tests#Crews

{{Short description|Trials of the prototype Space Shuttle Enterprise}}

{{Use American English|date=January 2014}}

{{Use mdy dates|date=July 2024}}

{{Multiple image

| header = Approach and Landing Tests

| align = right

| direction = vertical

| width = 240

| image1 = OV-101 first flight.jpg

| width1 = 240

| alt1 =

| caption1 = Enterprise separates from the SCA on its first solo flight as part of ALT, August 12, 1977

| image2 = Space Shuttle Approach and Landing Tests crews - cropped.jpg

| width2 = 240

| alt2 =

| caption2 = (L-R) C. Gordon Fullerton, Fred Haise, Joe Engle and Richard Truly

| image3 = Enterprise 1977 Approach and Landing Test mission patch.png

| width3 = 200

| alt3 =

| caption3 =

}}

The Approach and Landing Tests were a series of sixteen taxi and flight trials of the prototype Space Shuttle Enterprise that took place between February and October 1977 to test the vehicle's flight characteristics. Of the sixteen taxi-tests and flights, eleven saw Enterprise remain mated to the Shuttle Carrier Aircraft (SCA), while the final five had the shuttle jettisoned from the SCA, with the on-board crew flying and landing the spacecraft.

Background

{{Main|Space Shuttle program}}

The Space Shuttle program originated in the late 1960s as an attempt to reduce the cost of spaceflight by introducing a reusable spacecraft. The final agreed design would feature a reusable spaceplane, a disposable external tank and reusable solid-fuel rocket boosters. The contract to build the spaceplane, which eventually came to be known as the "orbiter", was awarded to North American Rockwell (later Rockwell International), with the first complete orbiter rolled out in 1976. Originally planned to be named Constitution (due to its completion being in the year of the United States Bicentennial), a letter-writing campaign by Star Trek fans persuaded President Gerald Ford to change the name of the prototype to Enterprise.{{cite news |url=https://news.google.com/newspapers?id=gGdYAAAAIBAJ&sjid=COgDAAAAIBAJ&pg=6774%2C4233342 |newspaper=Eugene Register-Guard |title=Real life 'Enterprise' ready for space |agency=Associated Press |date=September 18, 1976 |page=3A }} It was unveiled to the public on September 17, 1976, with several members of the Star Trek cast in attendance.

Test program

Upon the orbiter's entry into service, NASA began an extensive program of tests using Enterprise to ensure all of the systems it had put in place for the Shuttle program functioned as designed.{{cite news |url=https://news.google.com/newspapers?id=4boqAAAAIBAJ&sjid=O2cEAAAAIBAJ&pg=6713%2C4345012 |newspaper=Sarasota Herald-Tribune |agency=UPI |title=Space shuttle rocket plane to fly soon |date=September 12, 1976 |page=11A }} These tests would encompass not only the flight tests planned to test the flight characteristics of the orbiter, but also ground-based testing of the launch pad systems and procedures. In January 1977, Enterprise was taken by road from the Rockwell plant at Palmdale, California to the Dryden Flight Research Center at Edwards Air Force Base to begin the flight test phase of the program, which had been christened by NASA as the Approach and Landing Tests (ALT).

Crews

{{multiple image

| align = right

| direction = vertical

| width = 200

| header =

| image1 = Haise and Fullerton ALT crew.jpg

| alt1 = Crew 1

| caption1 = Crew 1 - Haise and Fullerton

| image2 = Engle and Truly ALT crew.jpg

| alt2 =

| caption2 = Crew 2 - Engle and Truly

}}

The program lasted from February until October 1977, with a pair of two-man crews assigned to the orbiter:

=Crew 1=

{{Spaceflight crew

|terminology = Astronaut

|position1 = Commander

|crew1_up = Fred W. Haise, Jr.

|position2 = Pilot

|crew2_up = C. Gordon Fullerton

}}

Haise had previously flown as the Lunar Module pilot of Apollo 13, and was named as the commander of the original STS-2 mission.{{efn|name=Haise|group=note|Haise was named the commander of the original STS-2 mission, with Jack Lousma as the pilot, which was scheduled for launch in July 1979, and was to carry the Teleoperator Retrieval System intended to boost the Skylab space station into a higher orbit. Due to the delays in getting the system operational, this mission was scrubbed, and Haise left NASA in June 1979.{{cite web |url=https://space.nss.org/the-last-hurrah-skylabs-1978-1979-unmanned-mission/ |title=The Last Hurrah: Skylab's 1978-1979 Unmanned Mission |last=Carney |first=Emily |date=May 14, 2017 |website=National Space Society |publisher= |access-date=March 9, 2021 |quote=}}}} Fullerton later flew as the pilot of STS-3 and commanded STS-51-F.

=Crew 2=

{{Spaceflight crew

|terminology = Astronaut

|position1 = Commander

|crew1_up = Joe H. Engle

|position2 = Pilot

|crew2_up = Richard H. Truly

}}

This crew later flew on STS-2. Engle was originally a USAF pilot on the X-15, and had already gained Astronaut wings by the time he joined NASA. He flew his second Shuttle mission on STS-51-I.{{efn|name=Engle|group=note|Engle had been scheduled to fly as Lunar Module Pilot of Apollo 17, but was bumped from the flight in favor of Harrison Schmitt; Schmitt, a trained geologist, had been scheduled to fly on Apollo 18, but this mission was cancelled due to budget cuts in September 1970. As a result of pressure from the scientific community to have a trained scientist go to the Moon, Engle was removed from the crew of Apollo 17 to be replaced by Schmitt}} Truly flew his second Shuttle mission as commander of STS-8.

=Shuttle carrier aircraft=

File:Shuttle Carrier Aircraft crew in front of SCA and Columbia.jpg

In addition to the two assigned Shuttle crews, who would alternate crewing the orbiter, a flight crew was attached to the Boeing 747 Shuttle Carrier Aircraft (SCA) for the entire program. This consisted of a captain and co-pilot, plus a pair of flight engineers:

class="wikitable"
Position

! Crew member

Captain

| Fitzhugh L. Fulton, Jr.

Co-pilot

| Thomas C. McMurtry

Flight engineer

| Louis E. Guidry, Jr.

Flight engineer

| Victor W. Horton

Flight engineer

| Vincent A. Alvarez

Flight engineer

| William R. Young

ALT

{{multiple image

| align = right

| direction = vertical

| width = 250

| header =

| image1 = OV-101-CaptiveFlights.jpg

| alt1 = Space Shuttle Enterprise attached to Shuttle Carrier Aircraft during test flight

| caption1 =

| image2 = NASA Boeing 747 + Space Shuttle Enterprise Haafke-1.jpg

| alt2 = Space Shuttle Enterprise attached to Shuttle Carrier Aircraft for ferry flight

| caption2 =

| footer = Enterprise mated to the Shuttle Carrier Aircraft for one of the ALT captive flights (top) and a ferry flight (bottom). Note the higher nose position during the captive flight

}}

The ALT program was divided into three distinct phases.

[http://spaceline.org/shuttlechron/shuttletest.html Space Shuttle Approach and Landing Tests Fact Sheet] {{Webarchive|url=https://web.archive.org/web/20090917073624/http://www.spaceline.org/shuttlechron/shuttletest.html |date=September 17, 2009 }} From "Space Shuttle Chronology"; Accessed 11/03/08

The first phase was designated as the "taxi-test" phase, which involved the SCA and orbiter in a mated formation conducting taxi tests at Edwards Air Force Base to verify the taxiing characteristics of the aircraft while carrying the orbiter. These tests did not involve the orbiter in any way beyond it being mated to the aircraft, so consequently it remained powered down and uncrewed. A total of three taxi-tests were performed on February 15, 1977. Following this, the program moved into its next phase.

=Captive flights=

The captive flight phase of ALT saw the SCA/orbiter combination in flight as a test of the SCA's flying characteristics while mated to the orbiter, and as an initial test of the orbiter systems in flight. This was subdivided into two phases:

==Captive – inert==

There were a total of five captive-inert flights designed to test the flight and handling characteristics of the aircraft while it was mated to the orbiter. As with the taxi tests, this did not involve the orbiter beyond it being mated to the SCA, so it remained unpowered and uncrewed.

==Captive – active==

The captive-active flights were intended to determine the optimum profile required for Enterprise to separate from the SCA during the orbiter's free-flights. These were also intended to refine and test the orbiter crew procedures and to ensure the operational readiness of the orbiter's systems. For these three flights, although Enterprise remained mated to the SCA, it was powered and crewed.

=Free-flight=

{{see also|List of Space Shuttle landing sites}}

Image:Enterprise free flight.jpg

The final phase of flight testing involved free-flights. These saw Enterprise mated to the SCA and carried to a launch altitude, before being released to glide to a landing on the runways at Edwards AFB. The intention of these flights was to test the flight characteristics of the orbiter itself, on a typical approach and landing profile from orbit.{{cite news |url=https://news.google.com/newspapers?id=tBIfAAAAIBAJ&sjid=TGcEAAAAIBAJ&pg=6832%2C5337846 |newspaper=Sarasota Herald-Tribune |agency=(Washington Post / L.A. Times) |title=Space flight milestone to be reached in July |date=April 11, 1977 |page=13A }}{{cite news |url=https://news.google.com/newspapers?id=4AwvAAAAIBAJ&sjid=7doFAAAAIBAJ&pg=2690%2C2535673 |newspaper=Beaver County Times |agency=UPI |title=Shuttle's maiden solo flight Friday |date=August 11, 1977 |page=A2 }}{{cite news |url=https://news.google.com/newspapers?id=g45QAAAAIBAJ&sjid=5BEEAAAAIBAJ&pg=6966%2C2336786 |newspaper=Milwaukee Sentinel |agency=(Los Angeles Times) |title=Space Shuttle solo is soaring success |date=August 13, 1977 |page=3, part 1 }}

For the approach and landing tests, a nose strut longer than those employed in later ferry flights increased the shuttle's angle of attack relative to the 747. Prior to the orbiter being released, the 747 engines were set to full power and the paired aircraft entered a shallow dive. Increased air speed combined with the shuttle's higher angle of attack generated enough differential lift so that the shuttle was effectively supporting the 747. Load cells on the three attachment points monitored the forces, informing the crew when the attachments were in sufficient tension. The mechanical connection between the two aircraft was then severed by the use of explosive bolts and the shuttle essentially dropped the 747.{{cite book |author = Approach and Landing Test Evaluation Team |date = February 1978 |title = Space Shuttle Orbiter Approach and Landing Test: Final Evaluation Report |url = http://www.klabs.org/DEI/References/general/alt_final_report.pdf |location = Houston |publisher = National Aeronautics and Space Administration Lyndon B. Johnson Space Center |access-date = February 19, 2021 }} The shuttle crew reported feeling an upward lurch on separation. The two aircraft then turned in opposite directions to maximize separation. The shuttle executed some more turns to evaluate its handling and glided to a landing.{{cite news|url=https://www.nytimes.com/1977/08/13/archives/space-shuttle-glides-to-a-landing-passing-its-first-solo-flight.html|title=Space Shuttle Glides to a Landing, Passing Its First Solo Flight Test|first=John Noble |last= Wilford|work=The New York Times|date=August 13, 1977|accessdate=February 21, 2021}}

There were a total of five free-flights between August and October; the first three saw Enterprise remain fitted with its aerodynamic tail cone, intended to reduce drag when mounted on the SCA during flight. The final two had the tail cone removed, with the orbiter in its full operational configuration, with dummy main engines and OMS pods. Enterprise used an air data probe mounted on its nose for these flights. These five flights were to be the only time Enterprise flew alone.{{cite news |url=https://news.google.com/newspapers?id=a99NAAAAIBAJ&sjid=BIsDAAAAIBAJ&pg=7046%2C3954925 |newspaper=Free Lance-Star |location=Fredericksburg, Virginia |agency=Associated Press |title=Test bumpy, but shuttle lands safely |date=October 27, 1977 |page=15 }}{{cite news |url=https://news.google.com/newspapers?id=D2YzAAAAIBAJ&sjid=NTIHAAAAIBAJ&pg=6895%2C5918815 |newspaper=Lodi News-Sentinel |agency=UPI |title=Space shuttle landing rough |date=October 27, 1977 |page=22 }}

After flying missions on Columbia (STS-2) and Discovery (STS-51-I), Engle reported that the flight and handling characteristics of the operational orbiters were similar to those of Enterprise, except that he had to fly a steeper profile with the prototype, as it was much lighter than the operational spacecraft."[http://www.jsc.nasa.gov/history/oral_histories/EngleJH/EngleJH_6-3-04.pdf Joe H. Engle]", NASA Johnson Space Center Oral History Project, June 3, 2004.

=Ferry flights=

Following the free-flight tests, Enterprise was prepared for ferry flight tests, which were intended to ensure that the SCA/orbiter configuration was viable for flights of the duration between landing and launch sites.[http://www.astronautix.com/craft/entprise.htm Astronautix.com] {{webarchive|url=https://web.archive.org/web/20100122092413/http://www.astronautix.com/craft/entprise.htm |date=January 22, 2010 }} Accessed 11/03/08

{{clear}}

List of ALT flights

File:Enterprise Separates from 747 SCA for First Tailcone off Free Flight.jpg

File:Enterprise flies free without tail cone.jpg

File:Enterprise landing.jpg

class="wikitable"
rowspan=2 | Mission

! rowspan=2 | Test flight{{cite web |url=http://grin.hq.nasa.gov/ABSTRACTS/GPN-2000-000218.html |title=Shuttle Enterprise Free Flight |access-date=November 28, 2007 |publisher=NASA |year=1977 |author=NASA – Dryden Flight Research Center |archive-url=https://web.archive.org/web/20130307094536/http://grin.hq.nasa.gov/ABSTRACTS/GPN-2000-000218.html |archive-date=March 7, 2013 }}

! rowspan=2 | Date

! rowspan=2 | Speed

! rowspan=2 | Altitude

! rowspan=2 | Shuttle crew{{cite web |url=https://ntrs.nasa.gov/api/citations/19780011246/downloads/19780011246.pdf |title=Space Shuttle Orbiter Approach and Landing Test Final Evaluation Report |date=February 1978 |website=NASA Technical Reports Server |publisher=NASA |access-date=April 12, 2024 }}

! rowspan=2 | SCA crew

! colspan=2 align=center| Duration

! rowspan=2 | Comment

Full flight

! Shuttle flight

ALT-1

| Taxi test #1

| rowspan=3|February 15, 1977

| {{convert|89|mph|km/h|abbr=on}}

| rowspan=3 align=center| Taxi

| rowspan=8 align=center| None

| rowspan=9 align=center|Fulton, McMurtry,
Horton, Guidry

| rowspan=3 colspan=2 align=center| Taxi

| rowspan=3 align=center| Concrete runway,
tailcone on

ALT-2

| Taxi test #2

| {{convert|140|mph|km/h|0|abbr=on}}

ALT-3

| Taxi test #3

| {{convert|157|mph|km/h|abbr=on}}

ALT-4

| Captive-inert flight #1

| February 18, 1977

| {{convert|287|mph|km/h|abbr=on}}

| align=right|16,000 ft
4,877 m

| 2 h 5 min

| rowspan=8 align=center|N/A

| rowspan=8 align=center|Tailcone on,
landed with 747

ALT-5

| Captive-inert flight #2

| February 22, 1977

| {{convert|328|mph|km/h|abbr=on}}

| align=right|22,600 ft
6,888 m

| 3 h 13 min

ALT-6

| Captive-inert flight #3

| February 25, 1977

| {{convert|425|mph|km/h|abbr=on}}

| align=right|26,600 ft
8,108 m

| 2 h 28 min

ALT-7

| Captive-inert flight #4

| February 28, 1977

| {{convert|425|mph|km/h|abbr=on}}

| align=right|28,565 ft
8,707 m

| 2 h 11 min

ALT-8

| Captive-inert flight #5

| March 2, 1977

| {{convert|474|mph|km/h|abbr=on}}

| align=right|30,000 ft
9,144 m

| 1 h 39 min

ALT-9
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Captive-active flight #1A

| June 18, 1977

| {{convert|208|mph|km/h|abbr=on}}

| align=right|14,970 ft
4,563 m

| Haise, Fullerton

| 55 min 46 s

ALT-10
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Captive-active flight #1

| June 28, 1977

| {{convert|310|mph|km/h|0|abbr=on}}

| align=right|22,030 ft
6,715 m

| Engle, Truly

| align=center|Fulton, McMurtry,
Guidry, Young

| 62 min 0 s

ALT-11
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Captive-active flight #3

| July 26, 1977

| {{convert|311|mph|km/h|abbr=on}}

| align=right|30,292 ft
9,233 m

| Haise, Fullerton

| align=center|Fulton, McMurtry,
Horton, Alvarez

| 59 min 53 s

ALT-12
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Free flight #1

| August 12, 1977

| {{convert|310|mph|km/h|0|abbr=on}}

| align=right|24,100 ft
7,346 m

| Haise, Fullerton

| rowspan=5 align=center|Fulton, McMurtry,
Horton, Guidry

| 53 min 51 s

| 5 min 21 s

| rowspan=3 align=center|Tailcone on,
lakebed landing

ALT-13
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Free flight #2

| September 13, 1977

| {{convert|310|mph|km/h|0|abbr=on}}

| align=right|26,000 ft
7,925 m

| Engle, Truly

| 54 min 55s

| 5 min 28 s

ALT-14
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Free flight #3

| September 23, 1977

| {{convert|290|mph|km/h|0|abbr=on}}

| align=right|24,700 ft
7,529 m

| Haise, Fullerton

| 51 min 12 s

| 5 min 34 s

ALT-15
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Free flight #4

| October 12, 1977

| {{convert|278|mph|km/h|abbr=on}}

| align=right|22,400 ft
6,828 m

| Engle, Truly

| 67 min 48 s

| 2 min 34 s

| align=center|Tailcone off,
lakebed landing

ALT-16
File:Enterprise 1977 Approach and Landing Test mission patch.png

| Free flight #5

| October 26, 1977

| {{convert|283|mph|km/h|abbr=on}}

| align=right|19,000 ft
5,791 m

| Haise, Fullerton

| 54 min 42 s

| 2 min 1 s

| align=center|Tailcone off,
runway landing

After ALT

File:Space Shuttle Enterprise on LC39A.jpg and dummy SRBs stands on Kennedy Space Center Pad 39A during fit check tests twenty months prior to STS-1.]]

Following the end of the flight test program, Enterprise was taken for testing with the external tank and SRBs in full-up launch configuration, to test both the structural responses of the "stack" itself and the launch procedures prior to the entry into service and first launch of the first operational orbiter. These tests first saw Enterprise taken to the Dynamic Structural Test Facility, located at the Marshall Space Flight Center in Huntsville, Alabama, where the complete stack was subjected to vertical ground vibration tests, assessing the structural responses to a number of scenarios. Then, the orbiter was flown to the Kennedy Space Center in Florida, to test the procedures of assembling the stack in the Vehicle Assembly Building, transporting it from the VAB to the launch pad, and to fit check the facilities and procedures at LC-39 to be used in launching the Shuttle.

Notes

{{Reflist|group=note}}

References

{{Reflist}}

{{Space Shuttle Enterprise}}

{{Space Shuttle}}

{{All U.S. Space Shuttle Missions}}

{{DEFAULTSORT:Approach And Landing Tests}}

Category:1977 in aviation

Category:1977 in the United States

Category:Space Shuttle missions

Category:Edwards Air Force Base

Category:Articles containing video clips

Category:Fred Haise