BU 11 LRT station
{{Short description|Metro station in Malaysia}}
{{Infobox station
| style = Rapid KL
| style2 = Shah Alam
| name = {{KLRT color code|SA|03|bgcolor=white}} BU11
| type = File:Rapid KL Logo.svg {{!}} Future LRT station
| native_name =
| logo =
| logo_size =
| image =File:SA03 BU 11 LRT Exterior 20240303 111115.jpg
| image_size =
| image_caption =
| address = Tropicana, Selangor
| country = Malaysia
| coordinates =
| line = {{rint|my|rapidkl}} {{rint|my|11}} {{rcb|KLRT|11|xroute}}
| other =
| platform = 1 island platform
| tracks = 2
| structure = Elevated
| parking = Available
| bicycle =
| baggage_check =
| passengers =
| pass_year =
| pass_percent =
| pass_system =
| opened =
| rebuilt =
| electrified =
| accessible =
| status = Under construction
| code = {{KLRT color code2|SA|03}}
| owned = Prasarana Malaysia
| operator = Rapid Rail
| zone =
| services = {{Adjacent stations|system=Rapid KL|line=Shah Alam|left=Kayu Ara|right=Tropicana}}
| mpassengers =
}}
The Bandar Utama 11 LRT station (shortened as BU 11 station) is a Light Rapid Transit (LRT) station that serve the suburb of BU11 Bandar Utama, Petaling Jaya Malaysia serves as one of the stations on the Shah Alam line. The station is located next to SPRINT Highway Damansara Toll Plaza.The station is an elevated rapid transit station in forming part of the Klang Valley Integrated Transit System.{{cite web |url=http://lrt3.com.my/v14/index.php/2015-02-13-03-29-33/pelan-setiap-stesen |title=Pelan Setiap Stesen |publisher=Prasarana Malaysia |access-date=2015-05-17 |archive-url=https://web.archive.org/web/20150522013509/http://lrt3.com.my/v14/index.php/2015-02-13-03-29-33/pelan-setiap-stesen |archive-date=2015-05-22 |url-status=dead }}
The station is marked as Station No. 3 along with the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang. Originally this LRT station was expected to be operational in February 2024, however the operational date for the entire Shah Alam Line has been delayed and expected to be operational by third quarter of 2025 as mentioned by Transport Minister Anthony Loke. (previously expected to be operational by March 2025 as announced in 2023){{Cite web |date=2024-07-29 |title=LRT3 Expected To Be Operational In Q3 Of 2025 - Loke |url=https://www.bernama.com/en/news.php?id=2323118 |access-date=2024-07-29 |website=BERNAMA |language=en}} It will have facilities such as a multi-story park and ride, kiosks, restrooms, elevators, taxi stand, and feeder bus among others.{{cite web |url=http://lrt3.com.my/v14/index.php/mengenai-lrt3/jangka-masa-projek |title=Jangka Masa Projek LRT3 |publisher=Prasarana Malaysia |access-date=2015-05-17 |archive-url=https://web.archive.org/web/20150527001609/http://lrt3.com.my/v14/index.php/mengenai-lrt3/jangka-masa-projek |archive-date=2015-05-27 |url-status=dead }}
Surrounding Area
- BU11 residential, Bandar Utama
- The British International School of Kuala Lumpur
- First City University College
- SJK(T) Effingham
- Kuarters Institusi Pendidikan Bandar Utama
- Tropicana Landscape & Nursery
- Merchant Square Comercial Area
- Centerpoint Bandar Utama
- Bayu Puteri Apartment
- Pangsapuri Permai
- Pangsapuri Damai
- SMK Tropicana
References
{{reflist}}
External links
- [http://www.lrt3.com.my LRT3 website]
{{Klang Valley train stations|state=collapsed}}
{{coord|3.1331549|101.6058634|display=title}}
Category:Rapid transit stations in Selangor
{{Malaysia-metro-stub}}