Intercity Express

{{short description|German state-owned high-speed rail system}}

{{redirect|Ice Train|the professional wrestler|Ice Train (wrestler)|other uses|Intercity-Express (disambiguation)}}

{{Use dmy dates|date=July 2020}}

{{Infobox rail

| railroad_name = Intercity Express

| logo_filename = ICE-Logo.svg

| logo_size = 100

| system_map =

| map_caption =

| map_size =

| marks =

| image = ICE 3 Oberhaider-Wald-Tunnel.jpg

| image_size = 250

| image_caption = A German ICE 3 trainset exiting a tunnel

| locale = Germany, Netherlands, Belgium, Austria, Switzerland and France. Formerly Denmark.

| start_year = 1985

| end_year = present

| predecessor_line = See History

| successor_line =

| gauge = {{Track gauge|sg|allk=on}}

| length =

| hq_city =

| website = {{official URL}}

}}

Intercity Express (commonly known as ICE ({{IPA|de|iːtseːˈʔeː|-|De-ICE.ogg}}) and running under this category) is a high-speed rail system in Germany. It also serves destinations in Austria, France, Belgium, Switzerland and the Netherlands as part of cross-border services. It is the flagship of the German state railway, Deutsche Bahn. ICE fares are fixed for station-to-station connections, on the grounds that the trains have a higher level of comfort. Travelling at speeds up to {{convert|300|km/h|abbr=on}} within Germany and {{convert|320|km/h|abbr=on}} when in France, they are aimed at business travellers and long-distance commuters and marketed by Deutsche Bahn as an alternative to flights.

The ICE 3 also has been the development base for the Siemens Velaro family of trainsets which has subsequently been exported to RENFE in Spain (AVE Class 103), which are certified to run at speeds up to {{convert|350|km/h|abbr=on}},{{cite press release|url=http://www.transportation.siemens.com/ts/en/pub/newsline/newsline/presse_2001/2001/04_03_2001.htm |title=International breakthrough for Siemens high-speed train technology |publisher=Siemens |date=3 April 2001 |access-date=12 February 2007 |archive-url=https://web.archive.org/web/20061016173437/http://www.transportation.siemens.com/ts/en/pub/newsline/newsline/presse_2001/2001/04_03_2001.htm |archive-date=16 October 2006 |url-status=dead }} as well as versions ordered by China for the Beijing–Tianjin intercity railway link (CRH 3) and by Russia for the Moscow–Saint Petersburg and Moscow–Nizhny Novgorod routes (Velaro RUS){{cite press release|url=http://www.siemens.ru/siemens.sbs?res=ru/press/releases/RZD_contact |script-title=ru:Новый международный успех высокоскоростных поездов "Сименс" |publisher=Siemens |date=19 March 2006 |access-date=12 February 2007 |archive-url=https://web.archive.org/web/20070927023012/http://www.siemens.ru/siemens.sbs?res=ru%2Fpress%2Freleases%2FRZD_contact |archive-date=27 September 2007 |language=ru |url-status=dead }} with further customers being Eurostar as well as Turkey and Egypt.

History

{{see also|InterCityExperimental}}

The Deutsche Bundesbahn started a series of trials in 1985 using the InterCityExperimental (also called ICE-V) test train. The IC Experimental was used as a showcase train and for high-speed trials, setting a new world speed record at 406.9 km/h (253 mph) on 1 May 1988.{{cite book|title=Transrapid und Rad-Schiene-Hochgeschwindigkeitsbahn: Ein gesamtheitlicher Systemvergleich|author1=Peter Jehle |author2=René Naumann |author3=Rainer Schach |language=de|year=2006|publisher=Springer|page=20|isbn=3-540-28334-X}}

The train was retired in 1996 and replaced with a new trial unit, called the ICE S.

After extensive discussion between the Bundesbahn and the Ministry of Transport regarding onboard equipment, length and width of the train and the number of trainsets required, a first batch of 41 units was ordered in 1988. The order was extended to 60 units in 1990, with German reunification in mind. However, not all trains could be delivered in time.

The ICE network was officially inaugurated on 29 May 1991 with several vehicles converging on the newly built station Kassel-Wilhelmshöhe from different directions.{{cite web|language=de |url=http://www.caritas-stuttgart.de/19563.html |publisher=Caritasverband Stuttgart e. V. |title=Die neuen Wohlfahrtsmarken |access-date=12 February 2007 |archive-url=https://web.archive.org/web/20070204004024/http://www.caritas-stuttgart.de/19563.html |archive-date=4 February 2007 |url-status=dead}}

In 2007, a line between Paris and Frankfurt/Stuttgart opened, jointly operated by ICE and SNCF's TGV.Deutsche Bahn. [http://www.bahn.com/i/view/GBR/en/about/overview/ice-in-london.shtml Planned highspeed service from London to Amsterdam and Frankfurt] {{Webarchive|url=https://web.archive.org/web/20110810041313/http://www.bahn.com/i/view/GBR/en/about/overview/ice-in-london.shtml |date=10 August 2011 }}{{cite news|title=Germany's Frankfurt-London high-speed rail link put on ice|url=https://www.reuters.com/article/germany-rail-idUSL6N0LN2QK20140218|access-date=22 July 2015|publisher=Reuters|date=18 February 2014}}{{cite web|url=http://www.db.de/site/bahn/de/unternehmen/konzern/im__blickpunkt/deutsch__franzoesische__hgv/deutsch__franzoesische__hgv.html |publisher=Deutsche Bahn |access-date=6 December 2007 |title=Premiernfahrt nach Paris |archive-url=https://web.archive.org/web/20070710050851/http://www.db.de/site/bahn/de/unternehmen/konzern/im__blickpunkt/deutsch__franzoesische__hgv/deutsch__franzoesische__hgv.html |archive-date=10 July 2007 |language=de |url-status=dead }}{{cite book|title=Die Bahn am Ball |publisher=Deutsche Bahn |page=96 |year=2006|language=de}}

Equipment

= Overview =

class="wikitable sortable" style="font-size: 85%; width: 95%"

! Branding type

!Class!! Production !! Numbers built !! vmax [km/h] !! In service !! Status

!Image

InterCityExperimental (also ICE/V)

|410.0

1983–198513501985–2000 (measurement and test drives)retired

|frameless

ICE 1

|401

1989–199360280since 199058 in service

|frameless

ICE 2

|402/801

1995–199746280since 1996ca. 40 in service

|frameless

ICE S (also ICE R)

|410.1

19961data-sort-value="330"| 280 / 330since 1997in service for measurement and test drives

|frameless

ICE T

|411

1996–200571230DB: since 1999
ÖBB: 2006–2020
70 in service

|frameless

ICE 3

|403

1997–200650330since 200049 in service

| rowspan="2" |frameless

ICE 3M / ICE 3MF

|406

1998–2001173302000-2025retired[https://eisenbahn.de/eisenbahn-magazin/letzte-fahrt-fuer-den-mehrsystem-ice-abschied-von-der-baureihe-406_6868 eisenbahn.de - "farewell-journey for BR 406 - multisystem-ICE says good bye"] (German) 20 March 2025
Metropolitan

|

1998–19992220"ICE" branded: 2004–06/2005, 12/2005–2006, 2009–2021retired

|frameless

ICE TD

|605

1998–2000202002001–2003, 2006–2017retired, 1 remaining for tests as Advanced Train Lab

|frameless

ICE 3MS (Siemens Velaro D)

|407

2009–201217320since 2013all in service

|frameless

ICE 4

|412/812

2014–2023/24137data-sort-value="265"| 250 / 265since 2017all in service

|frameless

ICE 3neo (Siemens Velaro MS) André Werske(11 Jan. 2021): [https://www.hochgeschwindigkeitszuege.com/deutschland/ice-3-408.php ICE 3neo – Velaro D Hochgeschwindigkeitszug in Deutschland], retrieved 11 Oct. 2021

|408

2020–2026 (planned)≥23 (of 90 ordered)320since 202223 in service

|frameless

ICE L

|105

since 20191+ (of 79 on order){{cite web |url=https://www.railwaygazette.com/traction-and-rolling-stock/deutsche-bahn-orders-73-ice-trainsets/64139.article |title= Deutsche Bahn orders 73 ICE trainsets |date= 17 May 2023 |website=Railway Gazette |publisher= |access-date= 2023-07-31}}230planned from 2026undergoing testing

|frameless

= First generation =

{{main|ICE 1}}

The first ICE trains were the trainsets of ICE 1 (power cars: Class 401), which came into service in 1989. The first regularly scheduled ICE trains ran from 2 June 1991 from Hamburg-Altona via Hamburg HbfHannover HbfKassel-WilhelmshöheFuldaFrankfurt HbfMannheim Hbf and Stuttgart Hbf toward München Hbf at hourly intervals{{cite news |title=Im Zug der Zeit |trans-title=In the train of the times |url= http://www.zeit.de/1991/23/im-zug-der-zeit/komplettansicht|access-date=6 April 2013 |newspaper=Die Zeit |location= Hamburg |date=31 May 1991 |last=Loppow |first=Bernd |language=de}} on the new ICE line 6. The Hanover-Würzburg line and the Mannheim-Stuttgart line, which had both opened the same year, were hence integrated into the ICE network from the very beginning.

Due to the lack of trainsets in 1991 and early 1992, the ICE line 4 (Bremen HbfHannover HbfKassel-WilhelmshöheFuldaWürzburg HbfNürnberg HbfMünchen Hbf) could not start operating until 1 June 1992. Prior to that date, ICE trainsets were used when available and were integrated in the Intercity network and with IC tariffs.

In 1993, the ICE line 6's terminus was moved from Hamburg to Berlin (later, in 1998, via the Hanover-Berlin line and the former IC line 3 from Hamburg-Altona via Hannover HbfKassel-WilhelmshöheFuldaFrankfurt HbfMannheim HbfKarlsruhe HbfFreiburg Hbf to Basel SBB was upgraded to ICE standards as a replacement).

= Second generation =

{{main|ICE 2}}

File:ICE2 Hilpodrom.jpg]]

From 1997, the successor, the ICE 2 trains pulled by Class 402 powerheads, was put into service. One of the goals of the ICE 2 was to improve load balancing by building smaller train units which could be coupled or detached as needed.

These trainsets were used on the ICE line 10 Berlin-Cologne/Bonn. However, since the driving van trailers of the trains were still awaiting approval, the DB joined two portions (with one powerhead each) to form a long train, similar to the ICE 1. Only from 24 May 1998 were the ICE 2 units fully equipped with driving van trailers and could be portioned on their run from Hamm via either Dortmund HbfEssen HbfDuisburg HbfDüsseldorf Hbf or Hagen HbfWuppertal HbfSolingen-Ohligs.

In late 1998, the Hanover–Berlin high-speed railway was opened as the third high-speed line in Germany, cutting travel time on line 10 (between Berlin and the Ruhr valley) by 2½ hours.

The ICE 1 and ICE 2 trains' loading gauge exceeds that recommended by the international railway organisation UIC. Even though the trains were originally to be used only domestically, some units are licensed to run in Switzerland and Austria. Some ICE 1 units have been equipped with an additional smaller pantograph to be able to run on the different Swiss overhead wire geometry.

All ICE 1 and ICE 2 trains are single-voltage 15 kV AC, which restricts their radius of operation largely to the German-speaking countries of Europe. ICE 2 trains can run at a top speed of 280 km/h (174 mph).

= Third generation =

{{Main|ICE 3}}

File:ICE3 Euerwangtunnel.jpg

File:SiemensVelaroD-InnoTrans2010.jpg at InnoTrans 2010, after handover of first train to DB. These trains have been designated The New ICE 3.]]

To overcome the restrictions imposed on the ICE 1 and ICE 2, their successor, the ICE 3, was built to a smaller loading gauge to permit usability throughout the entire European standard gauge network, with the sole exception being the UK's domestic railway network. Unlike their predecessors, the ICE 3 units are built not as trains with separate passenger and power cars, but as electric multiple units with underfloor motors throughout. This also reduced the load per axle and enabled the ICE 3 to comply with the pertinent UIC standard.

Initially two different classes were developed: the Class 403 (domestic ICE 3) and the Class 406 (ICE 3M), the M standing for Mehrsystem (multi-system). Later came Class 407 and Class 408. The trains were labelled and marketed as the Velaro by their manufacturer, Siemens.

Just like the ICE 2, the ICE 3 and the ICE 3M were developed as short trains (when compared to an ICE 1), and are able to travel in a system where individual units run on different lines, then being coupled to travel together. Since the ICE 3 trains are the only ones able to run on the Köln-Frankfurt high-speed line with its 4.0% incline at the allowed maximum speed of 300 km/h, they are used predominantly on services that utilise this line.

In 2009 Deutsche Bahn ordered another 16 units – worth 495 million – for international traffic, especially to France.

The Erfurt–Leipzig/Halle high-speed railway, which opened in December 2015, is one of three lines in Germany (the others being the Nuremberg-Ingolstadt high-speed rail line and Cologne–Frankfurt high-speed rail line) that are equipped for a line speed of {{convert|300|km/h|abbr=on}}. Since only 3rd generation ICE trains can travel at this speed, the ICE line 41, formerly running from Essen Hbf via Duisburg HbfFrankfurt Südbf to Nürnberg Hbf, was extended over the Nuremberg-Ingolstadt high-speed rail line and today the service run is Oberhausen HbfDuisburg HbfFrankfurt HbfNürnberg HbfIngolstadt HbfMünchen Hbf.

The ICE 3 runs at speeds up to {{convert|320|km/h|abbr=on}} on the LGV Est railway StrasbourgParis in France.

A new generation ICE 3, Class 407, is part of the Siemens Velaro family with the model designation Velaro D. It currently runs on many services in Germany and through to other countries like France. Initially this train type was meant to execute the planned Deutsche Bahn services through the Channel Tunnel to London. As the trains had not received a certification for running in Belgium and due to the competition of budget airlines the London service was cancelled.{{cite web |url= https://www.independent.co.uk/news/uk/politics/london-frankfurt-cologne-train-deutsche-bahn-db-eurostar-cancelled-shelved-a8394806.html |last=Stane |first= Jon |title= Plans for UK-Germany high speed rail services shelved due to 'significantly changed economic environment' |date= 17 June 2018 |work=The Independent |access-date= 2022-02-01}}DB confirms London services not likely for many years, if ever. In: Today's railways Europe. Nr. 272, 2018, ISSN 1354-2753, p. 9.

In 2020 Deutsche Bahn placed an order with Siemens for 30 trains, and options for another 60, of the Velaro design and based on the previously procured ICE Class 407.{{cite web |url=https://www.railwaygazette.com/traction-and-rolling-stock/deutsche-bahn-orders-320-km/h-velaro-derivatives/56963.article |title= Deutsche Bahn orders 320 km/h Velaro derivatives |date= 15 July 2020 |website=Railway Gazette |publisher= |access-date= 2022-02-01}}. Referenced by Siemens as Velaro MS ("multi-system"), these trains are called ICE 3neo by Deutsche Bahn and classified as 408. The trains are designed for operation at 320 km/h and were deployed at the end of 2022 on routes that use the Cologne – Frankfurt high speed line which is designed for operation at 300 km/h. After a production time of only 12 months including trial runs the first train was presented to journalists in February of 2022. At that occasion the order was increased by 43 trainsets, with all 73 trains supposed to be in service by early 2029.{{cite web |url=https://www.railwaygazette.com/traction-and-rolling-stock/db-orders-more-ice3neo-sets-as-first-unit-is-unveiled/60850.article |title= DB orders more ICE3neo sets as first unit is unveiled |date= 1 February 2022 |website=Railway Gazette |publisher= |access-date= 2022-02-01}} In May of 2023 Deutsche Bahn announced that it was calling the last 17 trains from the option, bringing the total order up to 90 trains.

In April 2025, the multisystem Class 406 trainsets were retired from service due to ongoing maintenance and reliability issues. They were already relegated to domestic services beforehand and replaced with Class 407 on international routes.[https://eisenbahn.de/eisenbahn-magazin/letzte-fahrt-fuer-den-mehrsystem-ice-abschied-von-der-baureihe-406_6868 eisenbahn.de - "farewell-journey for BR 406 - multisystem-ICE says good bye"] (German) 20 March 2025

=Fourth generation=

{{main|ICE 4 (Deutsche Bahn)}}

File:ICE 4 at Nuremberg Hbf.jpg]]

Procurement of ICx trainsets started c. 2008 as replacements for locomotive hauled InterCity and EuroCity train services - the scope was later expanded to include replacements for ICE 1 and ICE 2 trainsets. In 2011 Siemens was awarded the contract for 130 seven car intercity train replacements, and 90 ten car ICE train replacements, plus further options - the contract for the ten car sets was modified in 2013 to expand the trainset length to twelve vehicles. The name ICx was used for the trains during the initial stages of the procurement; in late 2015 the trains were rebranded ICE 4, at the unveiling of the first trainset, and given the class designation 412 by Deutsche Bahn.

Two pre-production trainsets were manufactured and used for testing prior to the introduction of the main series.

= ICE T and ICE TD =

File:ICE-T bei Steinbach am Wald.jpg

Simultaneously with the ICE 3, Siemens developed trains with tilting technology, using much of the ICE 3 technical design. The class 411 (seven cars) and 415 (five cars) ICE T EMUs and class 605 ICE TD DMUs (four cars) were built with a similar interior and exterior design. They were specially designed for older railway lines not suitable for high speeds, for example the twisting lines in Thuringia. ICE-TD has diesel traction. ICE-T and ICE-TD could have be operated jointly, but this has not been done routinely.

== ICE T ==

{{main|ICE T}}

A total of 60 class 411 and 11 class 415 have been built so far (units built after 2004 belong to the modified second generation ICE-T2 batch). Both classes work reliably. Austria's ÖBB purchased three units in 2007, operating them jointly with DB. Even though DB assigned the name ICE-T to class 411/415, the T originally did not stand for tilting, but for Triebwagen (railcar), as DB's marketing department at first deemed the top speed too low for assignment of the InterCityExpress brand and therefore planned to refer to this class as IC-T (InterCity-Triebwagen).

The trainsets of the T series were manufactured in 1999. The tilting system has been provided by Fiat Ferroviaria, now part of Alstom. ICE T trains can run at speeds of up to 230 km/h (143 mph).

In April 2025, Deutsche Bahn announced the gradual retirement of the 5-car Class 415 from June 2025.[https://eisenbahn.de/eisenbahn-magazin/deutsche-bahn-stellt-baureihe-415-ab-auswirkungen-auf-verbindungen-dresden-frankfurt-main_7824 eisenbahn.de - "Deutsche Bahn parks Class 415"] (German) 16 April 2025

== ICE TD ==

File:BahnRatekau.jpg

{{main|ICE TD}}

Deutsche Bahn ordered 20 units of ICE-T with diesel engines in 2001, called Class 605 ICE-TD. The ICE-TD was intended for certain routes without electric overhead cables such as Dresden-Munich and Munich-Zürich lines. However, the Class 605 trains (ICE-TD) experienced many technical issues and unanticipated escalation in operating cost due to the diesel fuel being fully taxed in Germany. They were taken off revenue service shortly after delivery. During the 2006 FIFA World Cup, the ICE-TD trains were pressed temporarily into supplementary service for transporting fans between cities in Germany.

At the end of 2007, ICE-TD trains were put into revenue service for the lines between Hamburg and Copenhagen as well as Hamburg and Aarhus. A large part of the Danish railway network had not been electrified so DSB (Danish State Railways) used the diesel-powered trains. When DSB ordered the new IC4 train sets, the company did not anticipate the long delay with the delivery and the technical issues with the train sets. To compensate for the shortage of available trains, DSB leased the ICE-TD while the delivery and technical issues with IC4 were being addressed. The operating cost was much lower due to the lower fuel tax in Denmark. After the issues with IC4 were resolved, the ICE-TD fleet was removed from revenue service and stored.

Deutsche Bahn retired the entire ICE TD fleet in 2018.{{cite web|url=https://www.mdr.de/sachsen/dresden/diesel-ice-geht-in-rente-100.html |title=Deutsche Bahn schickt Diesel-ICE endgültig in Rente |date=29 September 2017 |lang=de |work=MDR Sachsen}}

= Differences in train layouts =

File:ICE 1 Frankfurt am Main Flughafen Fernbahnhof.jpg

File:Heidelberg Hbf - ICE 3 2.jpg

File:Geisberg Nord.jpg

File:Fst ICE 3MF.jpg

style="width:120px;"|

! |

valign="top"

| ICE (generally):

Pale grey livery with red stripe and convoluted rubber gaiters between carriages (distinctive from all other DB trains)
Black window band with oval door windows except in ICE 4 (distinctive from Intercity / Metropolitan cars)
Wheels-on-rails technology (distinctive from the Transrapid)
valign="top"

| colspan=2 |

----

valign="top"

| ICE 1:

two power heads and up to 14 intermediate cars; restaurant car with high roof; nose with DB logo that interrupts red stripe (unique to the ICE 1); maximum speed is 280 km/h (174 mph).{{citation needed|date=September 2012}}
valign="top"

| colspan=2 |

----

valign="top"

| ICE 2:

one power head and one driving van trailer accessible to passengers; BordRestaurant/Bistro car has same height as other cars; contrary to ICE 1: nose is vertically divisible, parts of the coupler protruding to the outside; maximum speed is 280 km/h (174 mph).[http://www.hochgeschwindigkeitszuege.com/deutschland/ice-2.php?vorgaengerdir=deutschland hochgeschwindigkeitszuege.com - ICE 2 der Baureihe 402] (German) retrieved 28 June 2015
valign="top"

| colspan=2 |

----

valign="top"

| ICE 3:

no power heads, but an EMU: end cars with rounded windshield and passenger lounge, unpowered transformer car with pantograph; maximum speed of 320 km/h (199 mph){{citation needed|date=September 2012}}; red stripe is interrupted at the end cars by ICE logo, then runs downwards and across the nose lid; window band becomes narrow and ends near the windshield.
valign="top"

| colspan=2 |

----

valign="top"

| ICE 4:

no power heads, unpowered transformer car with pantograph; maximum speed of 265 km/h (165 mph);{{Cite web |title=Der ICE 4: das Rückgrat der DB-Fernverkehrsflotte |url=https://www.deutschebahn.com/de/presse/suche_Medienpakete/medienpaket_ice4-6854650 |access-date=2023-01-08 |website=deutschebahn.com |language=de}} no oval door windows; red stripe running downwards and across the nose lid; window band becomes narrow and ends near the windshield.
valign="top"

| colspan=2 |

----

valign="top"

| ICE T/ICE TD:

similar to ICE 3, except: steeper front; pantograph; maximum speed of 230 km/h (143 mph); no ICE logo on end coaches (ICE T)/ aerodynamic cover on end cars; maximum speed of 200 km/h (124 mph);[http://www.hochgeschwindigkeitszuege.com/deutschland/ice-td.php hochgeschwindigkeitszuege.com - ICE-TD] retrieved 28 June 2015 ICE logo on the left side of the end coaches (ICE TD); red stripe stays straight; red stripe ends near the lamps; windows narrows to a point instead of a flat end as on the ICE 3
valign="top"

| colspan=2 |

----

valign="top"

| ICE T2:

like ICE T series 1, except: painted sheet metal instead of glass between windows, front lamps with LEDs
valign="top"

| colspan=2 |

----

valign="top"

| ICE V:

violet, wide stripe runs deeper than on newer stock and does not continue over the nose lid; Deutsche Bundesbahn logo and preliminary ICE logo; clad rubber gaiters; power heads larger than intermediate cars and with rounder front; front hedge ICE 2-like since 1995
valign="top"

| colspan=2 |

----

valign="top"

| ICE S:

ICE logo with additional letter "S" in white; most have only one intermediate coach; high-voltage lines between carriages; maximum speed is 330 km/h (205 mph){{citation needed|date=September 2012}}

= Livery =

A notable characteristic of the ICE trains is their colour design, which has been registered by the DB as an aesthetic model and hence is protected as intellectual property.{{cite web|url=http://www.bff.de/publish/viewfull.cfm?objectid=a6e33a4e_20ed_76a6_2c6e3454da69a89b&m_id=1|archive-url=https://archive.today/20120526200952/http://www.bff.de/publish/viewfull.cfm?objectid=a6e33a4e_20ed_76a6_2c6e3454da69a89b&m_id=1|url-status=dead|archive-date=26 May 2012|publisher=Bund Freischaffender Foto-Designer e. V.|title=Frei von Rechten Dritter...|author=Wolfgang Maaßen|access-date=13 February 2007|language=de}} The trains are painted in Pale Grey (RAL 7035) with a Traffic Red (RAL 3020) stripe on the lower part of the vehicle. The continuous black band of windows and their oval door windows differentiate the ICEs from any other DB train.

The ICE 1 and ICE 2 units originally had an Orient Red (RAL 3031) stripe, accompanied by a Pastel Violet stripe below (RAL 4009, 26 cm wide). These stripes were repainted with the current Traffic Red between 1998 and 2000, when all ICE units were being checked and repainted in anticipation of the EXPO 2000.

The "ICE" lettering uses the colour Agate Grey (RAL 7038), the frame is painted in Quartz Grey (RAL 7039). The plastic platings in the interior all utilise the Pale Grey (RAL 7035) colour tone.

Originally, the ICE 1 interior was designed in pastel tones with an emphasis on mint, following the DB colour scheme of the day. However, ICE 1 trains were refurbished in the mid-2000s and now follow the same design as the ICE 3, which makes heavy usage of indirect lighting and wooden furnishings.

The distinctive ICE design was developed by a team of designers around Alexander Neumeister in the early 1980s and first used on the InterCityExperimental (ICE V). The team around Neumeister then designed the ICE 1, ICE 2, and ICE 3/T/TD. The interior of the trains was designed by Jens Peters working for BPR-Design in Stuttgart. Among others, he was responsible for the heightened roof in the restaurant car and the special lighting. The same team also developed the design for the now discontinued InterRegio trains in the mid-1980s.

= Trainset numbers =

While every car in an ICE train has its own unique registration number, the trains usually remain coupled as fixed trainsets for several years. For easier reference, each has been assigned a trainset number that is printed over each bogie of every car. These numbers usually correspond with the registration numbers of the powerheads or cab cars.

File:ICE 4653 Nederlandse Spoorwegen at Brussels Zuid.jpg at Brussels-South railway station]]

style="width:120px;"|

! |

valign="top"

| ICE 1:

Tz 01 to 20traction motors use thyristor frequency converters
Tz 51 to 71traction motors use GTO frequency converters
Tz 72 to 90GTO control, fitted for service into Switzerland
valign="top"

| colspan=3 |

----

valign="top"

| ICE 2:

Tz 201 to 244
valign="top"

| colspan=3 |

----

valign="top"

| ICE 3:

Tz 301 to 337first series
Tz 351 to 367second series
valign="top"

| colspan=3 |

----

ICE 3M:Tz 4601 to 46137 trainsets, numbers intermittent
Tz 4651 to 4654owned by Nederlandse Spoorwegen (NS)
ICE 3MF:Tz 4680 to 4684refitted for service into France
ICE 3MF:Tz 4685refitted for service into France, and the United Kingdom via the Channel Tunnel
valign="top"

| colspan=3 |

----

valign="top"

| ICE T:

Tz 1101 to 1132first series
7 carsTz 1151 to 1178second series
Tz 1180 to 1184refitted for service into Switzerland
Tz 1190 to 1192sold to ÖBB
valign="top"

| colspan=3 |

----

ICE T:Tz 1501 to 1506
5 carsTz 1520 to 1524originally fitted for service into Switzerland, cab cars switched with Tz 1180 to 1184
valign="top"

| colspan=3 |

----

valign="top"

| ICE TD:

Tz 5501 to 5520

= Interior equipment =

File:First class on a German ICE train to Munich - Flickr - TeaMeister.jpg

File:2. Klasse des ICE 3 (nach Redesign).jpg

The ICE trains adhere to a high standard of technology: all cars are fully air-conditioned and nearly every seat features a headphone jack which enables the passenger to listen to several on-board music and voice programmes as well as several radio stations. Some seats in the 1st class section (in some trains also in 2nd class) are equipped with video displays showing movies and pre-recorded infotainment programmes. Each train is equipped with special cars that feature in-train repeaters for improved mobile phone reception as well as designated quiet zones where the use of mobile phones is discouraged. The newer ICE 3 trains also have larger digital displays in all coaches, displaying, among other things, Deutsche Bahn advertising, the predicted arrival time at the next destination and the current speed of the train.

The ICE 1 was originally equipped with a passenger information system based on BTX, however this system was eventually taped over and removed in the later refurbishment. The ICE 3 trains feature touch screen terminals in some carriages, enabling travellers to print train timetables. The system is also located in the restaurant car of the ICE 2.

The ICE 1 fleet saw a major overhaul between 2005 and 2008, supposed to extend the lifetime of the trains by another 15 to 20 years. Seats and the interior design were adapted to the ICE 3 design, electric sockets were added to every seat, the audio and video entertainment systems were removed and electronic seat reservation indicators were added above the seats. The ICE 2 trains have been undergoing the same procedure since 2010.

ICE 2 trains feature electric sockets at selected seats, ICE 3 and ICE T trains have sockets at nearly every seat.

The ICE 3 and ICE T are similar in their interior design, but the other ICE types differ in their original design. The ICE 1, the ICE 2 and seven-car ICE T (Class 411) are equipped with a full restaurant car. The five-car ICE T (Class 415) and ICE 3 however, have been designed without a restaurant, they feature a bistro coach instead. Since 1 October 2006, smoking is prohibited in the bistro coaches, similar to the restaurant cars, which have always been non-smoking.

All trains feature a toilet for disabled passengers and wheelchair spaces. The ICE 1 and ICE 2 have a special conference compartment whilst the ICE 3 features a compartment suitable for small children. The ICE 3 and ICE T omit the usual train manager's compartment and have an open counter named "ServicePoint" instead.

An electronic display above each seat indicates the locations between which the seat has been reserved. Passengers without reservations are permitted to take seats with a blank display or seats with no reservation on the current section.

= Maintenance =

The maintenance schedule of the trains is divided into seven steps:

  1. Every 4,000 kilometres, an inspection taking about 1½ hours is undertaken. The waste collection tanks are emptied and fresh water tanks are refilled. Acute defects (e.g. malfunctioning doors) are rectified. Safety tests are also conducted. These include checking the pantograph pressure, cleaning and checking for fissures in the rooftop insulators, inspecting transformers and checking the pantograph's current collector for wear. The wheels are also checked in this inspection.
  2. Every 20,000 kilometres, a 2½ hour inspection is conducted, called Nachschau. In this inspection, the brakes, the Linienzugbeeinflussung systems and the anti-lock brakes are checked.
  3. After 80,000 kilometres, the train undergoes the Inspektionsstufe 1. During the two modules, each lasting eight hours, the brakes receive a thorough check, as well as the air conditioning and the kitchen equipment. The batteries are checked, as well as the seats and the passenger information system.
  4. Once the train has reached 240,000 kilometres, the Inspektionsstufe 2 mandates a check of the electric motors, the bearings and the driveshafts of the bogies and the couplers. This inspection is usually carried out in two modules taking eight hours each.
  5. About once a year (when reaching 480,000 km), the Inspektionsstufe 3 takes place, at three times eight hours each. In addition to the other checkup phases, it includes checks on the pneumatics systems, and the transformer cooling. Maintenance work is performed inside the passenger compartment.
  6. The 1st Revision is carried out after 1.2 million km. It includes a thorough check of all components of the train and is carried out in two five-day segments.
  7. The seventh and final step is the 2nd Revision, which happens when reaching 2.4 million kilometres. The bogies are exchanged for new ones and many components of the train are disassembled and checked. This step also takes two five-day segments.

Maintenance on the ICE trains is carried out in special ICE workshops located in Basel, Berlin, Cologne, Dortmund, Frankfurt, Hamburg, Leipzig{{cite web|url=http://www.mdr.de/sachsen/6905909.html|title=Neues ICE-Instandhaltungswerk in Leipzig in Betrieb|publisher=mdr|access-date=10 December 2009|language=de}}{{dead link|date=December 2017 |bot=InternetArchiveBot |fix-attempted=yes }} and Munich. The train is worked upon at up to four levels at a time and fault reports are sent to the workshops in advance by the on-board computer system to minimize maintenance time.

Lines in operation

File:Dunkeltalbrücke-2018-02.jpg]]

File:Bartelsgrabentalbruecke.jpg]]

class="wikitable"
rowspan=2|Line

!rowspan=2|Section

!rowspan=2|Stations

!colspan=2|Length

!rowspan=2|Top speed

!rowspan=2|Opened

!rowspan=2|Rolling stock

km

!mi

Hanover–Würzburg high-speed railway

|

|

|327

|203

|280 km/h

|1991

|

Mannheim–Stuttgart high-speed railway

|

|

|99

|62

|280 km/h

|9 May 1991

|

Karlsruhe–Basel high-speed railway

|

|

|182

|113

|250 km/h

|March 1993

|

Hanover–Berlin high-speed railway

|

|

|258

|160

|250 km/h

|15 September 1998

|

Cologne–Frankfurt high-speed rail line

|

|Frankfurt · Frankfurt Airport · Siegburg/Bonn

|180

|110

|300 km/h

|30 May 1999

|

Cologne–Aachen high-speed railway

|

|Cologne · Köln-Ehrenfeld · Horrem · Aachen Hbf

|70

|43

|250 km/h

|May 2002

|

Nuremberg–Ingolstadt high-speed railway

|

|Nürnberg · Allersberg · Kinding · Ingolstadt

|78

|48

|300 km/h

|2 September 2006

|

Erfurt–Leipzig/Halle high-speed railway

|

|

|123

|77

|300 km/h

|9 December 2015

|

Nuremberg–Erfurt high-speed railway

|

|

|107

|66

|300 km/h

|10 December 2017

|

Vogelfluglinie

|Copenhagen–Ringsted Line

|

|60

|

|200 km/h

|31 May 2019

|

Wendlingen–Ulm high-speed railway

|

|Wendlingen · Merklingen · Ulm

|59.575

|37.018

|250 km/h

|9 December 2022

|

=Lines under construction=

  • Stuttgart–Wendlingen high-speed railway (new line, 250 km/h, under construction)
  • Vogelfluglinie (partially new line, partially being upgraded)
  • Lübeck–Hamburg railway (German part, to be upgraded to reach 200 km/h)
  • Lübeck–Puttgarden railway (German part, to be electrified{{Cite news |url=https://www.railjournal.com/rolling-stock/danish-parliament-approves-dkr-11bn-rolling-stock-purchase/ |title=Danish parliament approves DKr 11bn rolling stock purchase |author=Denis Bowers |work=International Railway Journal |date=15 June 2018 |access-date=26 June 2020}} to reach 200 km/h up from the current 160 km/h,{{Cite news |url=https://taz.de/Transeuropaeisches-Verkehrsprojekt/!5690024/ |title=Klatsche für Fehmarnbelt-Querung |author=Gernot Knödler |work=Die Tageszeitung |date=18 June 2020 |access-date=26 June 2020 |language=de}} under construction)
  • Fehmarn Belt Fixed Link (tunnel part, will replace the Rødby–Puttgarden ferry, 200 km/h, under construction, completion expected in 2028){{Cite news |url=https://www.railjournal.com/infrastructure/fehmarnbelt-fixed-link-rail-consultancy-contract-awarded/ |title=Fehmarnbelt Fixed Link rail consultancy contract awarded |author=David Burroughs |work=International Railway Journal |date=7 February 2020 |access-date=26 June 2020}}
  • Sydbanen (Danish part, new tracks to be laid by 2021, to be electrified to reach 200 km/h by 2024, under construction){{Cite web |url=https://www.bane.dk/Borger/Baneprojekter/Ringsted_Femern-Banen/Tidsplan |title=Faser i arbejdet |publisher=Banedanmark |date=22 May 2017 |access-date=26 June 2020 |language=da}}

=Lines planned=

Route planning and network layout

File:ICE TrainTrack.JPG

[[File:ICE Network.png|thumb|ICE network {{legend|#C20000|High-speed lines for 300 km/h (186 mph)}}

{{legend|#C28800|High-speed lines for 250 km/h (155 mph) or more}}

{{legend|#000080|Upgraded lines for 200–230 km/h (124–143 mph)}}

{{legend|#888888|Conventional lines, often upgraded for 160 km/h (100 mph)}}]]

File:Germany - ICE line network, train frequencies and top speeds.svg

The ICE system is a polycentric network. Connections are offered in either 30-minute, hourly or bi-hourly intervals. Furthermore, additional services run during peak times, and some services call at lesser stations during off-peak times.

Unlike the French TGV or the Japanese Shinkansen systems, the vehicles, tracks and operations were not designed as an integrated whole; rather, the ICE system has been integrated into Germany's pre-existing system of railway lines instead. One of the effects of this is that the ICE 3 trains can reach a speed of 300 km/h (186 mph) only on some stretches of line and cannot currently reach their maximum allowed speed of 330 km/h on German railway lines (though a speed of 320 km/h is reached by ICE 3 in France).

The line most heavily utilised by ICE trains is the Mannheim–Frankfurt railway between Frankfurt and Mannheim due to the bundling of many ICE lines in that region. When considering all traffic (freight, local and long-distance passenger), the busiest line carrying ICE traffic is the Munich–Augsburg line, carrying about 300 trains per day.

{{see also|List of Intercity-Express lines}}

= North–south connections =

The network's main backbone consists of six north–south lines:

  1. from Hamburg-Altona via Hamburg, Hannover, Kassel, Fulda, Frankfurt, Mannheim, Karlsruhe and Freiburg to Basel (line 20) or continuing from Mannheim to Stuttgart (line 22)
  2. from Hamburg-Altona and Hamburg and from Bremen to Hannover (where portions are joined) and via Kassel, Fulda and Würzburg to Nuremberg and via Ingolstadt to Munich (line 25)
  3. from Hamburg-Altona via Hamburg, Berlin-Spandau, Berlin, Berlin Südkreuz, Leipzig or Halle, Erfurt to Nuremberg and via Augsburg or Ingolstadt to Munich (lines 18, 28 and 29) or continuing from Erfurt via Fulda, Frankfurt, Stuttgart, Ulm and Augsburg to Munich (line 11)
  4. from Berlin via Berlin-Spandau, Braunschweig, Kassel, Fulda, Frankfurt, Mannheim, Karlsruhe and Freiburg to Basel (line 12) or via Fulda and Frankfurt Süd to Frankfurt Airport (line 13)
  5. from Amsterdam or Dortmund via Duisburg, Düsseldorf, Cologne and Frankfurt Airport to Mannheim and either via Karlsruhe and Freiburg to Basel (line 43) or via Stuttgart, Ulm and Augsburg to Munich (lines 42 and 47)
  6. from Essen via Cologne, Frankfurt, Würzburg, Nuremberg and Ingolstadt to Munich (line 41)

(Also applies to trains in the opposite directions, taken from 2024 network map)

= East–west connections =

Furthermore, the network has three main east–west thoroughfares:

  1. from Berlin Gesundbrunnen via Berlin, Hannover, Bielefeld to Hamm (where train portions are split) and continuing either via Dortmund, Essen, Duisburg and Düsseldorf to Cologne/Bonn Airport or via Hagen and Wuppertal to Cologne (10, 19)
  2. from Dresden via Leipzig, Erfurt, Fulda, Frankfurt, Frankfurt Airport and Mainz to Wiesbaden (50)
  3. from Karlsruhe via Stuttgart, Ulm, and Augsburg to Munich (60)

(Also applies to trains in the opposite directions, taken from 2023 network map)

= German branch lines =

Some train lines extend past the core network and branch off to serve the following connections:

  1. from Berlin to Rostock (line 28, individual services)
  2. from Berlin to Stralsund (line 28, individual services)
  3. from Hamburg to Lübeck (line 25, individual services)
  4. from Hamburg to Kiel (lines 20, 22, 28 and 31, individual services)
  5. from Bremen to Oldenburg (lines 10, 22 and 25, individual services)
  6. from Leipzig via Hanover to Cologne (line 50, individual services)
  7. from Leipzig via Kassel to Düsseldorf (line 50, individual services)
  8. from Würzburg via Kassel to Essen (line 41, individual services)
  9. from Munich to Garmisch-Partenkirchen (lines 25, 28 and 41, individual services)
  10. from Nuremberg via Regensburg to Passau (line 91, every two hours)

(Also applies to trains in the opposite directions)

= ICE Sprinter =

The "ICE Sprinter" trains are trains with fewer stops between Germany's major cities running in the morning and evening hours. They are tailored for business travellers or long-distance commuters and are marketed by DB as an alternative to domestic flights. Some of the Sprinter services continue as normal ICE services after reaching their destination. The service is usually half an hour faster than a standard ICE between the same cities.

A reservation was mandatory on the ICE Sprinter until December 2015.

The first Sprinter service was established between Munich and Frankfurt in 1992. Frankfurt-Hamburg followed in 1993 and Cologne-Hamburg in 1994. This service ran as a Metropolitan service between December 1996 and December 2004. In 1998, a Berlin-Frankfurt service was introduced and a service between Cologne and Stuttgart ran between December 2005 and October 2006.

Until December 2006, a morning Sprinter service ran between Frankfurt and Munich (with an intermediate stop at Mannheim), taking 3:25 hours for the journey. This has been since replaced by a normal ICE connection taking only 3:21 hours.

Starting with the December 2017 schedule change, a new Sprinter line links Berlin main station and Munich main station in less than four hours.

{{As of|2018|07}}, the individual ICE Sprinter lines are:

class="wikitable"
No. || Departure station || Intermediate stops || Destination || Travel time (hh:mm) || Time of day
11
13
17
19
121
123
125
127
129
211
215
221
Köln HbfFrankfurt AirportFrankfurt (Main) Hbfstyle="text-align:right;"| 1:01
1:02
1:03
1:06
Morning
Noon
Afternoon
Evening
Night
14
16
120
124
126
128
210
220
Frankfurt (Main) HbfFrankfurt AirportKöln Hbfstyle="text-align:right;"| 1:06
1:04
1:10
Morning
Noon
Evening
591
593
595
597
599
691
695
Frankfurt (Main) HbfMannheim HbfStuttgart Hbfstyle="text-align:right;"| 1:18Morning
Noon
Afternoon
Evening
590
592
594
598
690
692
694
Stuttgart HbfMannheim HbfFrankfurt (Main) Hbfstyle="text-align:right;"| 1:17Morning
Noon
Afternoon
Evening
1000
1004
1008
München HbfNuremberg Hbf, Erfurt Hbf, Halle (Saale) Hbf, Berlin SüdkreuzBerlin Hbfstyle="text-align:right;"| 3:55Morning
Noon
Evening
1001
1005
1009
Berlin HbfBerlin Südkreuz, Halle (Saale) Hbf, Erfurt Hbf, Nuremberg HbfMünchen Hbfstyle="text-align:right;"| 4:02
3:58
Morning
Noon
Evening
1031Hamburg HbfEssen Hbf, Duisburg Hbf, Düsseldorf HbfKöln Hbfstyle="text-align:right;"| 3:35Morning
1038Köln HbfDüsseldorf Hbf, Duisburg Hbf, Essen HbfHamburg Hbfstyle="text-align:right;"| 3:38Morning
1094Frankfurt HbfHannover HbfHamburg Hbfstyle="text-align:right;"| 3:26Afternoon
1097Hamburg-AltonaHamburg Hbf, Hamburg Dammtor, Hannover HbfFrankfurt Hbfstyle="text-align:right;"| 3:20Morning
1533
1535
1598
1631
1633
Frankfurt (Main) HbfErfurt Hbf, Halle (Saale) Hbf, Berlin SüdkreuzBerlin Hbfstyle="text-align:right;"| 3:56
3:53
Morning
Noon
Afternoon
Evening
1536
1538
1636
1638
Berlin HbfBerlin Südkreuz, Halle (Saale) Hbf, Erfurt HbfFrankfurt (Main) Hbfstyle="text-align:right;"| 3:52
3:54
Morning
Noon
Afternoon
Evening

(Source: Deutsche Bahn AG{{cite web |url=http://www.bahn.de/p/view/international/englisch/trains/sprinter.shtml |title=ICE Sprinter, long-distance services |publisher=Deutsche Bahn AG |access-date=2 June 2018 |archive-url=https://web.archive.org/web/20070210004729/http://www.bahn.de/p/view/international/englisch/trains/sprinter.shtml |archive-date=10 February 2007 |url-status=dead }})

= Line segments abroad =

File:ICE train at Amsterdam Centraal station.jpg

File:Networks of Major High Speed Rail Operators in Europe.gif

File:ICE-Linien in Österreich.png

Some ICE trains also run on services abroad – sometimes diverting from their original lines.

  1. from Frankfurt Hbf to Amsterdam Centraal (Netherlands) via Köln Hbf, Duisburg Hbf and Arnhem Centraal (lines 120, 122, 128, 126, 220, 222/121, 123, 127, 129, 221)
  2. from Frankfurt Hbf to Bruxelles-Midi/Brussel-Zuid (Belgium) via Köln Hbf, Aachen Hbf and Liège-Guillemins (lines 10, 12, 14, 18, 16, 314, 316/11, 13, 15, 17, 19, 315, 317)
  3. from Frankfurt Hbf and Stuttgart Hbf to Paris Est (France) via Karlsruhe Hbf and Strasbourg-Ville (lines 9568, 9572, 9574/9563, 9567, 9571, 9573)
  4. from Frankfurt Hbf to Paris Est via Saarbrücken Hbf (lines 9550, 9556, 9558/9553, 9555)
  5. from Hamburg-Altona, Kiel Hbf and Ostseebad Binz to Basel SBB and Zürich HB (Switzerland) via Frankfurt Hbf and Karlsruhe (lines 73, 75, 77, 79, 203, 205/72, 74, 76, 78, 272)
  6. from Frankfurt Hbf and Hamburg-Altona to Chur (Switzerland) via Karlsruhe, Basel SBB and Zürich HB (lines 271, 1271/70)
  7. from Frankfurt Hbf, Berlin Hbf and Hamburg-Altona station to Interlaken (Switzerland) via Karlsruhe and Basel SBB (lines 275, 373/278, 376)
  8. from Frankfurt Hbf and Dortmund Hbf to Wien Hbf (Austria) via Nürnberg Hbf, Passau Hbf and Linz Hbf (lines 21, 23, 27, 29, 229/20, 22, 26, 28, 228)
  9. from Hamburg-Altona to Wien Hbf (Austria) via Berlin Hbf, Nürnberg Hbf, Passau Hbf and Linz Hbf (lines 93, 95/92, 94)
  10. from Dortmund Hbf to Innsbruck Hbf (Austria) via Köln Hbf, Stuttgart Hbf, {{stn|Lindau-Reutin}} and Bregenz Hbf (line 119), return schedule terminates at Münster Hbf (line 118)
  11. from Berlin Hbf to Paris Est (France) via Frankfurt, Karlsruhe and Strasbourg (line 9590/ 9591)
  12. from Berlin Hbf to Innsbruck Hbf (Austria) via Würzburg Hbf, Stuttgart Hbf, Lindau-Reutin and Bregenz Hbf (alternative route for lines 118/119){{cite news |url= https://www.suedkurier.de/region/bodenseekreis/friedrichshafen/bahnhof-friedrichshafen-fernzuege-direkt-wien-basel-innsbruck-koeln;art372474,11591934 |title=Vom Bahnhof Friedrichshafen mit dem Zug ohne Umstieg nach Wien, Basel, Innsbruck oder Berlin |first=Simon |last=Conrads|work =www.suedkurier.de |date=1 October 2024 |access-date=19 October 2024}}
  13. from Münster Hbf to Klagenfurt Hbf (Austria) via Köln, Stuttgart, Munich Hbf and Salzburg Hbf (line 115), return schedule terminates at Dortmund Hbf (line 114)
  14. from Berlin Hbf to Innsbruck Hbf (Austria) via Frankfurt, Stuttgart and Munich (line 1211/1218)
  15. from Amsterdam Centraal (Netherlands) to Basel SBB (Switzerland) via Frankfurt Hbf (line 105/104)
  16. from Munich to Zürich via Lindau-Reutin (operated by Swiss Federal Railways as EuroCity-Express)

(Also applies to the opposite directions)

Since December 2006, Stuttgart Hbf and Zürich HB have been connected by a bi-hourly service. This service however has been replaced by a daily Intercity service since March 2010.{{cite news |url= http://www.stuttgarter-zeitung.de/inhalt.bahnlinie-von-stuttgart-nach-zuerich-gaeubahn-erfuellt-hoffnungen-nicht.0d418f31-3e36-4576-8b5a-2b0ede226d2b.html |title=Gäubahn erfüllt Hoffnungen nicht |date=4 October 2012 |work =stuttgarter-zeitung.de |author1=Messner, Wolfgang |author2=Petersen, Michael|access-date=8 June 2016 }}

The ÖBB in Austria also uses two ICE T trainsets (classified as ÖBB Class 4011) between Wien Hauptbahnhof, Innsbruck Hauptbahnhof and Bregenz (without stops in Germany), although they do not use tilting technology. Since December 2007 ÖBB and DB offer a bi-hourly connection between Wien Westbf and Frankfurt Hbf. On 12 December 2021 a new Railjet schedule was introduced by ÖBB between Frankfurt and Vienna on a different route via Stuttgart, Ulm, Biberach, Friedrichshafen, Lindau, Bregenz and Innsbruck.{{cite news |url= https://wochenblatt-online.de/ein-railjet-auf-der-schwaebischen-eisenbahn-biberach-und-oberschwaben-erhalten-neue-fernverkehrsverbindung-nach-frankfurt-und-wien/ |title=Ein 'Railjet' auf der Schwäbischen Eisenbahn: Biberach und Oberschwaben erhalten neue Fernverkehrsverbindung nach Frankfurt und Wien |date=7 October 2021 |access-date=11 October 2021}} Since 11 June 2023 a new ICE service is operated by Deutsche Bahn via the same route between Dortmund and Innsbruck on ICE 4 trains replacing the IC 118/119 service.{{cite news |url= https://www.schwaebische.de/regional/bodensee/friedrichshafen/ice-haelt-ab-juni-in-friedrichshafen-und-lindau-1557855 |title=ICE hält ab Juni in Friedrichshafen und Lindau |work =www.schwaebische.de |date=21 April 2023 |access-date=3 May 2023}}

Since June 2007 ICE 3M trains had been running between Frankfurt Hbf and Paris Est via Saarbrücken and Kaiserslautern. Together with the TGV-operated service between Paris Est and München Hbf via Stuttgart Hbf (TGV 9576/9577), this ICE line was part of the "LGV Est européenne", also called "Paris-Ostfrankreich-Süddeutschland" (or POS) for short, a pan-European high-speed line between France and Germany. This service now co-exists with a direct TGV service (TGV 9551/9552).

From late 2007, ICE TD trains linked Berlin Hbf with Copenhagen and Aarhus via Hamburg Hbf. These services have been operated since December 2017 by Danish IC3 sets as EuroCity services.

A EuroCity-Express service was introduced between Munich and Zürich in December 2020 with the completion of the electrification of the line in Germany, replacing a EuroCity service. Six pairs of trains run every two hours and are operated by Swiss Federal Railways with Alstom ETR 610 (Astoro) sets.

Since December 2024 direct ICE trains are running between Berlin Hbf and Paris Est via Frankfurt Hbf, Karlsruhe Hbf and Strasbourg-Ville.{{cite news |url= https://www.aviation24.be/railways/new-direct-high-speed-rail-link-between-paris-and-berlin-from-december-2024/ |title=New direct high-speed rail link between Paris and Berlin from December 2024 |first=Bart |last=Noëth |work =www.aviation24.be |date=25 September 2024 |access-date=13 March 2025}}

In addition, ICE Trains to London via the Channel Tunnel are on the horizon. Unique safety and security requirements for the tunnel (such as airport-style checks at stations) as well as hold-ups in the production of the Velaro-D trains to be used on the route{{cite news |url= https://www.bloomberg.com/news/2011-12-08/deutsche-bahn-london-route-delayed-to-2015-as-trains-arrive-late.html |title=Deutsche Bahn London Route Delayed to 2015 as Trains Held Up |date=8 December 2011 |work =Bloomberg |location =New York |author=Webb, Alex}} have delayed these plans.

= Intra-Swiss ICE trains =

To avoid empty runs or excess waits, several services exist that operate exclusively inside Switzerland:

These trains, despite being officially notated as ICEs, are more comparable to a Swiss InterRegio or RegioExpress train, calling at small stations like {{rws|Möhlin}} or {{rws|Sissach}}. As common in Switzerland, these trains can be used without paying a supplement.

Travel times

{{ICE travel times}}

Accidents

There have been several accidents involving ICE trains. The Eschede disaster was the only accident with fatalities inside the train, but other accidents have resulted in major damage to the trainsets involved.

= Eschede disaster =

{{Main|Eschede train disaster}}

File:Ice eschede 1.jpg

The ICE accident near Eschede that happened on 3 June 1998 was a severe railway accident. Trainset 51, travelling as ICE 884 Wilhelm Conrad Röntgen from Munich to Hamburg, derailed at 200 km/h (124 mph), killing 101 people and injuring 88. It remains the world's worst high-speed rail disaster.

The cause of the accident was a wheel rim which broke and damaged the train six kilometres south of the accident site. The wheel rim penetrated the carriage floor and lifted the check rail of a set of points close to Eschede station. This guide rail also penetrated the floor of the car, becoming embedded in the vehicle and lifting the nearby wheels off the rails. One of the now-derailed wheels struck the points lever of the following set of points to change direction, and the rear cars of the trainset were diverted to a different track. They hit the pillars of a street overpass, which then collapsed onto the tracks. Only three cars and the front powerhead passed under the bridge, the rest of the 14-car train jack-knifed into the collapsed bridge.

= Other accidents =

File:4011592 Unfall.jpg

On 27 September 2001, trainset 5509 fell off a work platform at the Hof maintenance facility and was written off.

On 22 November 2001, powerhead 401 020 caught fire. The train was stopped at the station in Offenbach am Main near Frankfurt a.M. No passengers were harmed, but the fire caused the powerhead to be written off.

On 6 January 2004, ICE TD trainset 1106 caught fire while it was parked at Leipzig. Two cars were written off, and the others are now used as spares.

On 1 April 2004, trainset 321 collided with a tractor that had fallen onto the track at a tunnel entrance near Istein, and was derailed. No-one was injured. Trainset 321 was temporarily taken apart, its cars being switched with cars from other ICE 3 trainsets.

Powerhead 401 553 suffered major damage in a collision with a car on the Mannheim–Frankfurt railway in April 2006.

On 28 April 2006, trainset 73 collided head-on with two BLS Re 465 locomotives at Thun in Switzerland. The driver of the Swiss locomotives was unfamiliar with the new layout of the station, which had been recently changed. He did not see a shunting signal ordering him to stop. The locomotives automatically engaged the emergency brakes when he passed the signal, but came to a stop on the same track as the approaching ICE. The ICE was travelling at a speed of 74 km/h. The emergency brake slowed the train to 56 km/h at the point of collision. 30 passengers and the driver of the ICE suffered minor injuries, the driver of the Swiss locomotives having jumped to safety. Both trains suffered major damage. The powerhead 401 573 had to be rebuilt using components from three damaged powerheads (401 573, 401 020 and 401 551).

On 1 March 2008, trainset 1192, travelling as ICE 23, collided with a tree which had fallen onto the track near Brühl after being blown down by Cyclone Emma. The driver suffered severe injuries. The trainset is back in service, its driving-car having been replaced with that from trainset 1106.

On 26 April 2008, trainset 11, travelling as ICE 885, collided with a herd of sheep on the Hanover-Würzburg high-speed rail line near Fulda. Both powerheads and ten of the 12 cars derailed. The train came to a stop 1300 metres into the Landrückentunnel. 19 of the 130 passengers suffered mostly minor injuries, four of them needing hospital treatment.[http://www.wecowi.org/view/ICE-Unfall_bei_Fulda Wecowi.org] {{Webarchive|url=https://web.archive.org/web/20080601063525/http://www.wecowi.org/view/ICE-Unfall_bei_Fulda |date=1 June 2008 }}, ICE-Unfall bei Fulda (map)

A cracked axle was blamed for a low-speed derailment of a third-generation ICE in Cologne in July 2008. The accident, in which no-one was hurt, caused DB to recall its newest ICEs as a safety measure.{{cite news |url= http://www.spiegel.de/international/germany/0,1518,565278,00.html |title=Prosecutors Open Investigation into Derailed Train |author= Schmid, Barbara |author2= Dohmen, Frank |work=Der Spiegel |location =Hamburg |date=11 July 2008}} In October 2008, the company recalled its ICE-T trains after a further crack was found."[http://www.dw-world.de/dw/article/0,2144,3737473,00.html Deutsche Bahn to Recall Part of High-Speed Train Fleet]". Deutsche Welle. 24 October 2008.

On 17 April 2010, ICE 105 Amsterdam - Basel lost a door while travelling at high speed near Montabaur. The door slammed into the side of ICE 612 on the adjacent track. Six people travelling on ICE 612 were injured.{{cite news |url= http://www.spiegel.de/panorama/gesellschaft/bahn-ice-verliert-tuer-bei-voller-fahrt-a-689600.html |title=ICE verliert Tür bei voller Fahrt |date=17 April 2010 |work=Der Spiegel |access-date=31 July 2013}}

On 17 August 2010, the ICE from Frankfurt to Paris hit a truck that had slid from an embankment on to the rail near Lambrecht. The first two carriages derailed and ten people were injured, one seriously.{{cite web |url=http://www.vosizneias.com/62364/2010/08/17/lambrecht-charedi-man-amongst-rescued-in-germanys-high-speed-train-crash |work=Vos Iz Neias?| title=Lambrecht – Charedi Man Amongst Rescued in Germany's High Speed Train Crash |location =New York |date=17 August 2010 |access-date=18 August 2010}}

On 11 January 2011, trainset 4654 partly derailed during a side-on collision with a freight train near Zevenaar in the Netherlands.{{cite news|url=http://www.suntimes.com/news/world/3255816-418/story.html|agency=Associated Press|title=2 trains collide in the Netherlands|date=11 January 2011|work=Chicago Sun-Times|access-date=14 November 2012|archive-url=https://web.archive.org/web/20130629155837/http://www.suntimes.com/news/world/3255816-418/story.html|archive-date=29 June 2013|url-status=dead}} There were no injuries.

On 2 May 2017, a trainset was derailed at Dortmund Hauptbahnhof. Two people were injured.{{cite web |url=https://www.thelocal.de/20170502/high-speed-train-derails-in-dortmund-disrupting-travel-for-days |title=High speed train derails in Dortmund, disrupting travel for days |publisher=The Local Europe Ab |location=Stockholm |date=2 May 2017 |access-date=3 May 2017}}

On 12 October 2018, two cars of a trainset caught fire while it was traveling from Cologne to Munich on the Cologne-Frankfurt line. Five people suffered minor injuries during the evacuation.{{Cite web |title=Fire on German high-speed train forces evacuation|url=https://www.dw.com/en/fire-on-german-high-speed-train-forces-evacuation/a-45865116 |access-date=2022-07-27|date=2018-10-12|publisher=Deutsche Welle|website=dw.com}}

Fare structure

= Germany =

ICE trains are the highest category (Class A) trains in the fare system of the Deutsche Bahn. Their fares are not calculated on a fixed per-kilometre table as with other trains, but instead have fixed prices for station-to-station connections, depending on a multitude of factors including the railway line category and the general demand on the line. Even on lines where the ICE is not faster than an ordinary IC or EC train (for example Hamburg to Dortmund), an additional surcharge will be levied on the ground that the ICE trains have a higher comfort level than IC/EC trains.

= Austria =

File:ICE OeBB.jpgOn the intra-Austrian lines (Vienna-Innsbruck-Bregenz, Vienna-Salzburg(-Munich), Vienna-Passau(-Hamburg) and Innsbruck-Kufstein(-Berlin)) no additional fees are charged.{{Cite web|title=ÖBB Intercity-Express|url=https://www.oebb.at/en/reiseplanung-services/im-zug/unsere-zuege/ice|access-date=2021-12-12|website=ÖBB}}

= Switzerland =

Likewise, the trains running to and from Zürich, Interlaken and Chur, as well as those on the intra-Swiss ICE trains (see above) can be used without any surcharge.

= Netherlands =

On ICE trains between Amsterdam and Cologne, passengers travelling nationally within the Netherlands (between Amsterdam Centraal and Arnhem Centraal) can use the national OV-chipkaart scheme but have to purchase a supplement.{{Cite web|title=ICE supplement {{!}} Individual tickets|url=https://www.ns.nl/producten/en/toeslagen/p/toeslag-ice|access-date=2021-12-12|website=ns.nl}} Passengers travelling into/from Germany have to buy an international ticket.

= France =

On ICE trains between Paris Est and Frankfurt or Stuttgart, only the fare system from SNCF Voyageurs is used for national trips to Forbach and Strasbourg. Reservation is compulsory for trips to/from and within France.

Scale models

Various ICE train scale models in several scales have been produced by Märklin, Fleischmann{{in lang|de}} [http://www.fleischmann.de/produkte/spur_h0/triebwagen.html Fleischmann.de] {{webarchive|url=https://web.archive.org/web/20090810032437/http://www.fleischmann.de/produkte/spur_h0/triebwagen.html |date=10 August 2009 }}, Fleischmann H0 range{{primary source inline|date=October 2013}}, Roco{{in lang|de}} [http://www.roco.cc/index.php?id=16&Anfangsposition=27&artikelnummer=51130 Roco.cc] {{webarchive|url=https://web.archive.org/web/20110706220921/http://www.roco.cc/index.php?id=16&Anfangsposition=27&artikelnummer=51130 |date=6 July 2011 }}, Roco ICE 1{{primary source inline|date=October 2013}}, Trix, Mehano, PIKO.[http://www.piko.de/produkt_db/check.php?page=detail&grand_id=3&parent_id=2&child_id=0&id=57195 Piko.de], Piko ICE 3{{primary source inline|date=October 2013}} and Lima[http://de.lima.hornbyinternational.com/all-products/zugsets/hl-1009/ HornbyInternational.com]{{dead link|date=December 2017 |bot=InternetArchiveBot |fix-attempted=yes }}, Lima ICE T{{primary source inline|date=October 2013}}.

Possible future service to London

In January 2010, the European railway network was opened to a liberalisation intended to allow greater competition.{{cite web

|url=http://www.euractiv.com/en/transport/eu-agrees-liberalise-rail-2010/article-164880|title=EU agrees to liberalise rail by 2010|work=Euractiv|access-date=11 May 2009|archive-date=11 December 2008|archive-url=https://web.archive.org/web/20081211090136/http://euractiv.com/en/transport/eu-agrees-liberalise-rail-2010/article-164880|url-status=dead}} Both Air France-KLM and Deutsche Bahn have indicated their desire to take advantage of the new laws to run new services via the Channel Tunnel and the High Speed 1 route that terminates at London St Pancras International.{{cite news |url= http://www.redorbit.com/news/business/1551131/air_france_to_launch_quicker_train_to_paris_as_eurostar|title= Air France to launch 'quicker' train to Paris as Eurostar monopoly ends|website =redorbit.com|publisher= The Independent |location= London |access-date=11 May 2009|first= Michael |last=Savage|date= 11 September 2008}}{{cite news|url= http://www.railwayherald.co.uk/magazine/pdf/RHUK/Issue179.pdf|title= £5.2 billion state aid plan to make Eurostar profitable|page= 3|date= 1 June 2009|work= Railway Herald|location= Scunthorpe|access-date= 28 January 2012}}{{dead link|date=December 2017 |bot=InternetArchiveBot |fix-attempted=yes }}{{cite news |url=http://www.thisislondon.co.uk/standard/article-23419061-german-rival-for-eurostar.do |title=German rival for Eurostar |last=Murray |first=Dick |date=19 December 2007 |work=London Evening Standard |access-date=7 February 2010 |url-status=dead |archive-url=https://web.archive.org/web/20110605063102/http://www.thisislondon.co.uk/standard/article-23419061-german-rival-for-eurostar.do |archive-date=5 June 2011 }}{{cite news |url= http://www.dw-world.de/dw/article/0,,5018915,00.html |title= Deutsche Bahn gets access to Channel Tunnel |date=16 December 2009 |work=Deutsche Welle |access-date=22 December 2009}}{{cite news |url= http://news.asiaone.com/News/AsiaOne%2BNews/World/Story/A1Story20091216-186274.html |archive-url= https://web.archive.org/web/20091222132337/http://news.asiaone.com/News/AsiaOne+News/World/Story/A1Story20091216-186274.html |url-status= dead |archive-date= 22 December 2009 |title=Deutsche Bahn gets green light for Eurotunnel use |agency =AFP |work=Asia One |location =Singapore |date=16 December 2009 |access-date=22 December 2009}} File:ICE at St Pancras.JPG A test run of an ICE train through the Channel Tunnel took place on 19 October 2010.{{cite news |url=http://www.railwaygazette.com/news/single-view/view/10/deutsche-bahn-to-run-ice3-to-britain-this-year.html |title=Deutsche Bahn to run ICE3 to Britain this year |work=Railway Gazette International |location=London |date=29 July 2010 |access-date=21 August 2010 |archive-date=1 December 2020 |archive-url=https://web.archive.org/web/20201201082947/https://www.railwaygazette.com/news/single-view/view/10/deutsche-bahn-to-run-ice3-to-britain-this-year.html |url-status=dead }} Passenger-carrying ICE trains, however, will have to meet safety requirements in order to transit the Channel Tunnel. Although the requirement for splittable trains was lifted, concerns remain over the shorter length of ICE trainsets,ICE is too short to ensure sufficient proximity to tunnel emergency exits, but DB claims that a Tunnel safety exercise on 18 October 2010 had been "highly successful". fire safety,The DB Class 406 ICE3M/F sets used for the demonstration run do not meet the specialized fire safety requirements for the carriage of passengers through the Channel Tunnel, but the later Siemens Velaro ICE-3D DB Class 407 sets, which also entered service with Eurostar as the e320, include the necessary additional fire-proofing. and the ICE's distributed power arrangements. There have been suggestions that French interests have advocated stringent enforcement to delay a competitor on the route.{{cite news |first= Robert |last= Wright |title= Alstom heads for court over Eurostar trains |work= Financial Times |location =London |date= 20 October 2010 |url= http://www.ft.com/cms/s/0/d9258852-db64-11df-ae99-00144feabdc0.html |archive-url=https://ghostarchive.org/archive/20221210/http://www.ft.com/cms/s/0/d9258852-db64-11df-ae99-00144feabdc0.html |archive-date=10 December 2022 |url-access=subscription |access-date=20 October 2010}} Eurostar also recently chose Siemens Velaro-based rolling stock; there were concerns that Alstom (builders of the passenger trains that already use the Tunnel) and the French Government would take the matter to court.{{cite web |title= Chunnel trains safety dispute 'is moving to courts' |work= RailNews |date= 20 October 2010 |url= http://www.railnews.co.uk/news/general/2010/10/20-chunnel-trains-safety-dispute-is.html |access-date=20 October 2010 |location =Stevenage}} In October 2010, the French transport minister suggested that the European Railway Agency (based in France) should arbitrate.{{cite news |url= http://www.railjournal.com/newsflash/bussereau-wants-channel-tunnel-dispute-to-go-to-arbitration.html |access-date= 30 October 2010 |title= Bussereau wants Channel Tunnel dispute to go to arbitration |work= International Railway Journal |location= London |date= 30 October 2010 |url-status= dead |archive-url= https://web.archive.org/web/20101101061234/http://www.railjournal.com/newsflash/bussereau-wants-channel-tunnel-dispute-to-go-to-arbitration.html |archive-date= 1 November 2010 |df= dmy-all }} After safety rule changes which might permit the use of Siemens Velaro rolling stock, the French government dismissed their delegate to the Channel Tunnel Safety Authority, and brought in a replacement.{{cite news |url= http://www.railjournal.com/newsflash/eurostar-train-procurement-row-heads-for-court.html |access-date= 30 October 2010 |title= Eurostar train procurement row heads for court |work= International Railway Journal |date= 30 October 2010 |url-status= dead |archive-url= https://web.archive.org/web/20101029014834/http://www.railjournal.com/newsflash/eurostar-train-procurement-row-heads-for-court.html |archive-date= 29 October 2010 |df= dmy-all }}{{cite news |url= https://www.bloomberg.com/news/2010-10-21/france-s-top-channel-tunnel-safety-adviser-loses-job-ft-reports.html |access-date=30 October 2010 |title= French Tunnel Adviser Loses Job After Dispute Over German Trains, FT Says |work= Bloomberg |location =New York |date=21 October 2010}}

In March 2011, a European Rail Agency report authorized trains with distributed traction for use in the Channel Tunnel. This means that the ICE class 407 trains which DB intends to use for its London services will be able to run through the tunnel. In February 2014, however, Deutsche Bahn announced further difficulties with launching the route, and reports make it seem unlikely that service will start anytime this decade.{{cite news|last1=Fender|first1=Keith|title=DB puts London - Frankfurt plans on ice|url=https://www.independent.co.uk/news/uk/politics/london-frankfurt-cologne-train-deutsche-bahn-db-eurostar-cancelled-shelved-a8394806.html|access-date=6 January 2020|work=The Independent|date=19 February 2014}}

In June 2018, Deutsche Bahn announced that it was shelving plans to revive a potential London-Frankfurt ICE connection. The service would take around 5 hours and could rival airlines and become the first competitor for Eurostar.{{cite web|url=https://www.independent.co.uk/news/uk/politics/london-frankfurt-cologne-train-deutsche-bahn-db-eurostar-cancelled-shelved-a8394806.html|title=Plans for UK-Germany high speed rail services shelved due to 'significantly changed economic environment'|first=Jon|last=Stone|website=Independent.co.uk|date=16 June 2018}}

{{clear}}

Ridership

{{Historical populations

| title= Ridership

| percentages = pagr

| align = right

| pop_name= million riders

| cols = 1

| source={{cite web |url=http://whhh.fc2web.com/ktx/hikaku.html |title=KTX vs 新幹線 徹底比較 |publisher=Whhh.fc2web.com |access-date=12 October 2015 |archive-date=9 October 2019 |archive-url=https://web.archive.org/web/20191009122921/http://whhh.fc2web.com/ktx/hikaku.html |url-status=dead }}{{cite web|url=http://www.siemens.com/press/en/presspicture/?press=/en/presspicture/2016/mobility/2016-06-ICE/im2016060735moen.htm|title=Press Pictures|website=siemens.com}}

| 1991 |5.1

| 1992 |10.2

| 1993 |14.6

| 1994 |21.3

| 1995 |27.2

| 2000 |41.6

| 2005 |66.8

| 2010 |77.8

| 2015 |80

| 2018 |94

| 2019 |99.2}}

From its inception in July 1991 to 2006, ICE has transported roughly 550 million passengers, including 67 million in 2005.{{cite web |url=http://www.deutschebahn.com/site/hochgeschwindigkeit/de/ice/auslastung/auslastung.html |title=15 Jahre Hochgeschwindigkeit - Auslastung |access-date=14 September 2010 |url-status=dead |archive-url=https://web.archive.org/web/20110518034058/http://www.deutschebahn.com/site/hochgeschwindigkeit/de/ice/auslastung/auslastung.html |archive-date=18 May 2011 }} The cumulative sum of passengers is roughly 1.25 billion in 2015.

Legacy

On 5 October 2006, the Deutsche Post AG released a series of stamps, among them a stamp picturing an ICE 3, at 55+25 euro cents.{{Citation needed|date=October 2013}}

In 2006, Lego modelled one of its train sets after the ICE.{{cite web|url=http://shop.lego.com/product/?p=B7897|title=LEGO Store – Passenger Train|publisher=LEGO|access-date=12 February 2007|url-status=dead|archive-url=https://web.archive.org/web/20070526210423/http://shop.lego.com/Product/?p=B7897|archive-date=26 May 2007}} A Railworks add on is available for Train Simulator 2018 accurately reflecting the original 1991 version of the ICE on German tracks (Siegen to Hagen).{{cite web|url=http://store.steampowered.com/app/65245/|title=RailWorks 3 Intercity-Express Add-On|publisher=Railwords|access-date=7 June 2012|url-status=dead|archive-url=https://web.archive.org/web/20120614004326/http://store.steampowered.com/app/65245|archive-date=14 June 2012}} There is also an addon utilising the Munich - Augsburg line using ICE 3 trainsets.{{cite web|url=http://store.steampowered.com/app/208288/?snr=1_7_15__13|title=Train Simulator: Munich-Augsburg Route Add-On on Steam|website=store.steampowered.com}} The ICE 3 can also be used in Career scenarios on the Mannheim-Karlsruhe route (including the extension to Frankfurt), and Cologne-Düsseldorf. The ICE T, ICE 2, and ICE TD are also available for purchase as separate vehicles.

See also

Notes

{{reflist|group=note}}

References

{{reflist|2}}