Line 12 (Shanghai Metro)
{{Short description|Metro line of the Shanghai Metro}}
{{use dmy dates|date=June 2018}}
{{Infobox rail line
| name =
| native_name = 上海地铁12号线
| native_name_lang = zh
| other_name = M2 (planned name);
Minpu line
| logo = SHM Line 12 icon.svg
| logo_width = 100px
| color = {{rcr|SHM|12}}
| image = Jinhai Road Station AC09B Train.jpg
| image_width = 300px
| image_alt =
| caption = Jinhai Road station line 12 platform
| type = {{rint|cn|metro}} Rapid transit
| system = {{rint|shanghai|metro}} Shanghai Metro
| status = Operational
| locale = Pudong; Yangpu, Hongkou, Jing'an, Huangpu, Xuhui, and Minhang districts, Shanghai, China
| start = {{stl|SHM|Qixin Road}}
| end = {{stl|SHM|Jinhai Road}}
| connectinglines =
| stations = 32
| routes = Mainline: {{stl|SHM|Qixin Road}} ↔ {{stl|SHM|Jinhai Road}}; Partial Mainline: Hongmei Road ↔ {{stl|SHM|Jufeng Road}}
| daily_ridership = 826,000 (2019 Peak){{Cite web |url=http://dy.163.com/v2/article/detail/E9QP84820514BTST.html |title=Metro breaks records |access-date=2019-03-09 |publisher=Shanghai Metro |date=2019-03-09 |language=zh }}
| yearcommenced = {{Start date and age|df=yes|2008|12|30}}
| open = {{Start date and age|df=yes|2013|12|29}}
| lastextension = {{Start date and age|df=yes|2015|12|19}}
| close =
| owner = Shanghai Rail Transit Line 12 Development Co., Ltd.
| operator = Shanghai No. 4 Metro Operation Co. Ltd.
| character = Underground
| depot = Zhongchun Road Yard
Jinqiao Yard
| stock = 75 Class A 6-car trains
| linelength = {{convert|40.4|km|mi|2|abbr=on}}
| tracklength =
| tracks = 2
| gauge = {{RailGauge|sg}}
| electrification = Overhead lines (1500 volts)
| speed = {{convert|80|km/h|mph|0|abbr=on}}
Average speed: {{convert|28.5|km/h|mph|0|abbr=on}}
| signalling = ALSTOM Urbalis CBTC
| elevation =
| website =
| map = {{Collapsible list
|titlestyle=background: #{{rcr|SHM|12}}; text-align:center;
|framestyle=border:none; padding:0;
|expand=true
|title={{ font color | white| To scale geographic map:}}
|1=File:Shanghai_Metro_Line_12.svg}}
{{unbulleted list
|item_style =background: #{{rcr|SHM|12}};
|{{Shanghai Metro/Line 12}}}}
| map_state =
}}
Line 12 is an east–west line of the Shanghai Metro network. It runs from {{stl|SHM|Jinhai Road}} in Pudong to {{stl|SHM|Qixin Road}} in Minhang District. The first section from {{stl|SHM|Tiantong Road}} to Jinhai Road opened on 29 December 2013,{{cite news| url=http://english.eastday.com/e/131218/u1a7837447.html| title=Eye-catching stations highlight of Metro Line 12| newspaper=Eastday| date=18 December 2013| access-date=22 December 2013| url-status=dead| archive-url=https://web.archive.org/web/20131224105619/http://english.eastday.com/e/131218/u1a7837447.html| archive-date=24 December 2013}} and additional stations up to Qufu Road were in operation by 10 May 2014.{{cite web|url= http://service.shmetro.com/en/dtxw/912.htm|title= Qufu Rd. Station of Metro Line 12 Opens on May 10|last= Xu|first= Huili|others= Graphics by Zuo Rongliang|publisher= Shanghai Shentong Metro Group|date= 2014-05-23|access-date= 2015-11-12}} The remaining stations opened on 19 December 2015.{{Cite news|last= Chen|first= Lydia|title= Metro Line 12 to connect Minhang and Pudong|newspaper= Shanghai Daily|url= http://www.shanghaidaily.com/sp/article/2008/200812/20081230/article_386459.htm |archive-url= https://web.archive.org/web/20091213203037/http://www.shanghaidaily.com/sp/article/2008/200812/20081230/article_386459.htm |archive-date= 2009-12-13|date= 2008-12-30|access-date= 2009-12-27 }}{{cite web|url= http://service.shmetro.com/en/yygg/979.htm|title= Metro Lines 12, 13 Adjust Departure Time of First, Last Trains from Oct. 24|last1= Xu|first1= Huili|last2= Qu|first2= Chunliang|others= Graphics by Ji Zhoujie|publisher= Shanghai Shentong Metro Group|date= 2015-11-02|access-date= 2015-11-12}} Since the opening of the extension in December 2015, Line 12 has the most interchanges with other metro lines in the Shanghai Metro.{{cite news|url= http://www.shanghaidaily.com/metro/public-services/Metro-network-adds-27-stations/shdaily.shtml |last= Zhang|first= Ningniing|title= Metro network adds 27 stations|newspaper= Shanghai Daily|date= 2015-12-18|access-date= 2016-01-11}} The line is colored forest green on system maps.
History
border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible"
|
bgcolor=#cccccc
!Segment!!Commencement!!Opened!!Length!!Station(s)!!Name!!Investment |
bgcolor=#00a27d
|style="text-align: left;"| Tiantong Road — Jinhai Road | 30 Dec 2008 | 29 Dec 2013 | {{convert|17.5|km|mi|2|abbr=on}} | 15 |style="text-align: left;"|Initial phase (1st section) |rowspan=3|¥23.399 billion |
bgcolor=#00a27d
|style="text-align: left;"| Qufu Road — Tiantong Road | 30 Dec 2008 | 10 May 2014 | {{convert|1.1|km|mi|2|abbr=on}} | 1 |style="text-align: left;"|Initial phase (1st section) |
bgcolor=#00a27d
|style="text-align: left;"| Qixin Road — Qufu Road | 30 Dec 2008 | 19 Dec 2015 | {{convert|21.8|km|mi|2|abbr=on}} | 16 |style="text-align: left;"| Initial phase (2nd section) |
bgcolor=#00a27d
|style="text-align: left;"| Dongjing — Qixin Road | 16 Dec 2022 | exp 2027 | {{convert|17.2|km|mi|2|abbr=on}} | 6 |style="text-align: left;"| Western extension |
style= "background:#{{rcr|SHM|12}}; height: 2pt"
| colspan = "7" | |
=Construction accident=
On 31 December 2012, the ground maintenance warehouse of Jinqiao Parking Lot collapsed during the construction process, resulting in 5 deaths and 18 injuries.[https://web.archive.org/web/20200522163537/http://news.ifeng.com/mainland/detail_2013_01/01/20713425_0.shtml The collapse of the construction site of Shanghai Metro Line 12 by a tower crane has caused 5 deaths and 18 injuries.] 2013-02-09
Stations
{{Further|List of Shanghai Metro stations}}
=Service routes=
border=1 style="border-collapse: collapse;" class="mw-collapsible"
! colspan="11" style="text-align: center" bgcolor=#{{rcr|SHM|12}} | {{ font color | white|Shanghai metro line 12 service routes}} | |
colspan="11" style="text-align: left" |
| |
bgcolor=#{{rcr|SHM|12}}
! rowspan="1" colspan="2" |{{ font color | white|Routes}} ! colspan="2" | {{ font color | white|Station name}} ! rowspan="2" | {{ font color | white|Connections}} ! colspan="3" rowspan="1" | {{ font color | white|Distance}} ! rowspan="2" | {{ font color | white|Location}} ! rowspan="2" | {{ font color | white|Open- ! rowspan="2" | {{ font color | white|Plat- | |
bgcolor=#{{rcr|SHM|12}}
! rowspan="1" | {{ font color | white|M}} ! rowspan="1" | {{ font color | white|P}} ! {{ font color | white|{{small|English}}}} ! {{ font color | white|{{small|Chinese}}}} ! colspan="2" |{{ font color | white|{{small|km}}}} ! {{ font color | white|{{small|min}}}} | |
bgcolor="lightgrey"
|align="center"| | align="center"|
|{{stl|SHM|Dongjing}} |{{large|{{lang|zh-cn|洞泾}}}} |{{rint|shanghai|9}} | 0.00 | 0.00 | |rowspan=6|Songjiang |rowspan=6|West extension under construction |rowspan=6| |
bgcolor="lightgrey"
|align="center"| | align="center"|
|{{stl|SHM|Liuwu Highway}} |{{large|{{lang|zh-cn|刘五公路}}}} | | 1.91 | 1.91 | |
bgcolor="lightgrey"
|align="center"| | align="center"|
|Husong Highway |{{large|{{lang|zh-cn|沪松公路}}}} | | 1.96 | 3.87 | |
bgcolor="lightgrey"
|align="center"| | align="center"|
|Hi-tech Park |{{large|{{lang|zh-cn|科技园}}}} | | 5.36 | 9.23 | |
bgcolor="lightgrey"
|align="center"| | align="center"|
|{{stl|SHM|Changxi Road}} |{{large|{{lang|zh-cn|场西路}}}} | | 1.44 | 10.67 | |
bgcolor="lightgrey"
|align="center"| | align="center"|
|{{stl|SHM|Changdong Road}} |{{large|{{lang|zh-cn|场东路}}}} | | 1.78 | 12.45 | |
align="center"|● | align="center"|
|{{stl|SHM|Qixin Road}} |{{large|{{lang|zh-cn|七莘路}}}} | |4.73 |17.18 |0 |rowspan=5|Minhang |rowspan=16|19 Dec |rowspan=10|Underground Island |
align="center"|● | align="center"|
|{{stl|SHM|Hongxin Road}} |{{large|{{lang|zh-cn|虹莘路}}}} | |1.73 |18.91 |4 |
align="center"|● | align="center"|
|{{stl|SHM|Gudai Road}} |{{large|{{lang|zh-cn|顾戴路}}}} | |1.23 |20.14 |6 |
align="center"|● | align="center"|
|{{stl|SHM|Donglan Road}} |{{large|{{lang|zh-cn|东兰路}}}} | |1.87 |22.01 |9 |
align="center"|● | align="center"|●
|{{stl|SHM|Hongmei Road}} |{{large|{{lang|zh-cn|虹梅路}}}} | |0.69 |22.70 |11 |
align="center"|● | align="center"|●
|{{stl|SHM|Hongcao Road}} |{{large|{{lang|zh-cn|虹漕路}}}} | |1.42 |24.12 |14 |rowspan=8|Xuhui |
align="center"|● | align="center"|●
|{{stl|SHM|Guilin Park}} |{{large|{{lang|zh-cn|桂林公园}}}} |{{rint|shanghai|15}} |0.83 |24.95 |16 |
align="center"|● | align="center"|●
|{{stl|SHM|Caobao Road}} |{{large|{{lang|zh-cn|漕宝路}}}} |{{rint|shanghai|1}} |1.55 |26.50 |19 |
align="center"|● | align="center"|●
|{{stl|SHM|Longcao Road}} |{{large|{{lang|zh-cn|龙漕路}}}} |{{rint|shanghai|3}} |0.84 |27.34 |21 |
align="center"|● | align="center"|●
|{{stl|SHM|Longhua}} |{{large|{{lang|zh-cn|龙华}}}} |{{rint|shanghai|11}} |1.04 |28.38 |24 |
align="center"|● | align="center"|●
|{{stl|SHM|Middle Longhua Road}} |{{large|{{lang|zh-cn|龙华中路}}}} |{{rint|shanghai|7}} |1.35 |29.73 |26 |Underground Side |
align="center"|● | align="center"|●
|{{stl|SHM|Damuqiao Road}} |{{large|{{lang|zh-cn|大木桥路}}}} |{{rint|shanghai|4}} |1.57 |31.30 |29 |rowspan=6|Underground Island |
align="center"|● | align="center"|●
|{{stl|SHM|Jiashan Road}} |{{large|{{lang|zh-cn|嘉善路}}}} |{{rint|shanghai|9}} |1.01 |32.31 |31 |
align="center"|● | align="center"|●
|{{stl|SHM|South Shaanxi Road}} |{{large|{{lang|zh-cn|陕西南路}}}} |{{rint|shanghai|1}} {{rint|shanghai|10}} |1.49 |33.80 |34 |rowspan=1|Huangpu |
align="center"|● | align="center"|●
|{{stl|SHM|West Nanjing Road}} |{{large|{{lang|zh-cn|南京西路}}}} |{{rint|shanghai|2}} {{rint|shanghai|13}}{{efn-lr|Virtual transfer with line 2 or line 13 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.}} |1.40 |35.20 |37 |rowspan=4|Jing'an |
align="center"|● | align="center"|●
|{{stl|SHM|Hanzhong Road}} |{{large|{{lang|zh-cn|汉中路}}}} |{{rint|shanghai|1}} {{rint|shanghai|13}} |1.48 |36.68 |40 |
align="center"|● | align="center"|●
|{{stl|SHM|Qufu Road}} |{{large|{{lang|zh-cn|曲阜路}}}} |{{rint|shanghai|8}} |1.24 |37.92 |43 |
align="center"|● | align="center"|●
|{{stl|SHM|Tiantong Road}} |{{large|{{lang|zh-cn|天潼路}}}} |{{rint|shanghai|10}} |1.04 |38.96 |45 |rowspan=15|29 Dec |rowspan=2|Underground Side |
align="center"|● | align="center"|●
|{{stl|SHM|International Cruise Terminal}} |{{large|{{lang|zh-cn|国际客运中心}}}} | |1.69 |40.65 |49 |rowspan=2|Hongkou |
align="center"|● | align="center"|●
|{{stl|SHM|Tilanqiao}} |{{large|{{lang|zh-cn|提篮桥}}}} | |0.98 |41.63 |51 |rowspan=4|Underground Island |
align="center"|● | align="center"|●
|{{stl|SHM|Dalian Road}} |{{large|{{lang|zh-cn|大连路}}}} |{{rint|shanghai|4}} |0.79 |42.42 |53 |rowspan=6|Yangpu |
align="center"|● | align="center"|●
|{{stl|SHM|Jiangpu Park}} |{{large|{{lang|zh-cn|江浦公园}}}} |{{rint|shanghai|18}} |1.29 |43.71 |55 |
align="center"|● | align="center"|●
|{{stl|SHM|Ningguo Road}} |{{large|{{lang|zh-cn|宁国路}}}} | |0.91 |44.62 |58 |
align="center"|● | align="center"|●
|{{stl|SHM|Longchang Road}} |{{large|{{lang|zh-cn|隆昌路}}}} | |1.42 |46.04 |61 |Underground Side |
align="center"|● | align="center"|●
|{{stl|SHM|Aiguo Road}} |{{large|{{lang|zh-cn|爱国路}}}} | |0.92 |46.96 |63 |rowspan=7|Underground Island |
align="center"|● | align="center"|●
|{{stl|SHM|Fuxing Island}} |{{large|{{lang|zh-cn|复兴岛}}}} | |0.82 |47.78 |65 |
align="center"|● | align="center"|●
|{{stl|SHM|Donglu Road}} |{{large|{{lang|zh-cn|东陆路}}}} | |1.70 |49.48 |68 |rowspan=6|Pudong |
align="center"|● | align="center"|●
|{{stl|SHM|Jufeng Road}} |{{large|{{lang|zh-cn|巨峰路}}}} |{{rint|shanghai|6}} |1.09 |50.57 |71 |
align="center"|● | align="center"|
|{{stl|SHM|North Yanggao Road}} |{{large|{{lang|zh-cn|杨高北路}}}} | |1.27 |51.84 |74 |
align="center"|● | align="center"|
|{{stl|SHM|Jinjing Road}} |{{large|{{lang|zh-cn|金京路}}}} | |1.16 |53.00 |76 |
align="center"|● | align="center"|
|{{stl|SHM|Shenjiang Road}} |{{large|{{lang|zh-cn|申江路}}}} | |1.14 |54.14 |78 |
align="center"|● | align="center"|
|{{stl|SHM|Jinhai Road}} |{{large|{{lang|zh-cn|金海路}}}} |{{rint|shanghai|9}} |2.53 |56.67 |83 |Underground Side |
style = "background:#{{rcr|SHM|12}}; height: 2pt"
| colspan = "11" | | |
colspan = "11" |{{notelist-lr}} | |
style = "background: #{{rcr|SHM|12}}; height: 2pt;"
| colspan = "11" | |
=Important Stations=
- Hanzhong Road – a major interchange station with lines 1 and 13.
- {{stl|SHM|South Shaanxi Road}} – a major interchange station with lines 1 and 10.
- {{stl|SHM|West Nanjing Road}} – located under the busy Nanjing Road, and an interchange station with lines 2 and 13.
=Future expansion=
==West extension==
In June 2021 Songjiang's Party secretary announced that a five station {{Cvt|17.3|km}} west extension to {{stl|SHM|Dongjing}} on line 9 will start construction within the year.[https://www.shine.cn/news/metro/2106210922 Songjiang's development full steam ahead] Construction began on 16 December 2022 with six stations planned on the extension, all in Shanghai's Songjiang District.{{cite web |title=设6站、全长17.27公里!轨道交通12号线西延伸工程正式开工建设 |url=https://mp.weixin.qq.com/s/pcXlVcAZypM5kh6Huplkfg |publisher=Information Office of Shanghai Municipality |access-date=2022-12-16}}
=Station name change=
- On 6 June 2012, Chuanchang Road was renamed {{stl|SHM|Middle Longhua Road}} (before line 12 began serving the station).
Headways
border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible"
| ||||
bgcolor=#{{rcr|SHM|12}}
| colspan=2|{{ font color | white|Time}} | {{stl|SHM|Qixin Road}} - {{stl|SHM|Hongmei Road}} | {{stl|SHM|Hongmei Road}} - {{stl|SHM|Jufeng Road}} | {{stl|SHM|Jufeng Road}} - {{stl|SHM|Jinhai Road}} | |
bgcolor=#cccccc
! colspan=5; align=center|Monday - Friday (Working Days) | ||||
{{nowrap|AM peak}} | 7:30–9:30 | About 5 min | About 2 min and 30 sec | About 5 min |
bgcolor=#EFEFEF
|Off-peak | 9:30–16:30 | colspan="3" align="center"|About 6 min | ||
PM peak | 16:30–20:00 | About 7 min and 30 sec | About 3 min and 45 sec | About 7 min and 30 sec |
bgcolor=#EFEFEF
|Other | {| | |||
{{nowrap|Before 7:30}} | ||||
After 20:00 |
| colspan="3" align="center"|About 6 - 8 min
|-bgcolor=#cccccc
! colspan=5 align=center|Saturday and Sunday (Weekends)
|-
|Peak||8:00–19:00|| colspan="3" align="center"| 6 min
|-bgcolor=#EFEFEF
|Other
hours||
Before 8:00 |
After 19:00 |
| colspan="3" align="center"|8 - 10 min
|-
|- style= "background:#{{rcr|SHM|12}}; height: 2pt"
| colspan = "5" |
|}
Technology
=Rolling Stock=
The trains of Line 12 are composed of 6-carriage of Class A cars, with a design speed of {{Cvt|80|km/h}}, VVVF AC drive, and a design life of 30 years.
border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible sortable"
! colspan="9" style="text-align: center" bgcolor=#{{rcr|SHM|12}} | {{ font color | white|Shanghai metro Line 12 Rolling stock}} | |||||||||
bgcolor=#cccccc
! Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | class="unsortable" | Assembly{{efn-lr|Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.}} | Rolling stock | Number | class="unsortable" | Notes
| |
bgcolor=#00a27d
| 246 | Bombardier Movia 456 | 2011-2013 | A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}} | 6 | Tc+Mp+M+M+Mp+Tc | 12A01 | 1201-1241 (120011-122461) | Line 12 (Shanghai Metro) | Original name: AC09B. Same as 07A01 and 09A02 (but different painting). |
bgcolor=#00c89b
| 90 | Bombardier Movia 456 | 2017-2018 | A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}} | 6 | Tc+Mp+M+M+Mp+Tc | 12A02 | 1242-1256 (122471-123361) | Line 12 (Shanghai Metro) | |
bgcolor=#00a27d
| 114 | CNR Changchun Railway Vehicles Co., Ltd. | 2018-2020 | A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}} | 6 | Tc+Mp+M+M+Mp+Tc | 12A03 | 12057-12075 (123371-124501) | Line 12 (Shanghai Metro) | USB charging ports (concealed design). |
style= "background:#{{rcr|SHM|12}}; height: 2pt"
| colspan="9" | | |||||||||
colspan = "9" |{{notelist-lr}} | |||||||||
style = "background: #{{rcr|SHM|12}}; height: 2pt;"
| colspan = "9" | |
=Future Rolling Stock=
class="mw-collapsible sortable" border="0" style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" | ||||||||
style="background: #{{rcr|SHM|1}}; height: 2pt"
! colspan="10" style="text-align: center" bgcolor="#{{rcr|SHM|12}}" | {{font color | white|Shanghai Metro Line 12 future rolling stock}} | ||||||||
bgcolor="#cccccc"
! Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | class="unsortable" | Assembly{{efn-lr|Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.}} | Rolling stock | Number | class="unsortable" | Notes |
bgcolor="#00c89b"
| 108 | TBA | 2026-2027 | A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}} | 6 | Tc+Mp+M+M+Mp+Tc | 12A04 | 12076-12093 (124511-125581) | |
bgcolor="#ffcad4" | ||||||||
style="background:#{{rcr|SHM|12}}; height: 2pt"
| colspan="9" | | ||||||||
colspan="7" |{{notelist-lr}} | ||||||||
style="background: #{{rcr|SHM|12}}; height: 2pt;"
| colspan="9" | |
File:201603 AC09-1219 enters Longcao Road Station.JPG|12A01 train
File:20171125停靠于北郊站的12A02型列车.jpg|12A02 train being hauled
References
{{reflist}}
{{Shanghai Metro lines}}
{{Shanghai Metro
|line12=yes}}
{{DEFAULTSORT:Shanghai Metro, Line 12}}
Category:Railway lines opened in 2013