Line 3 (Chennai Metro)

{{Short description|Transit line in Chennai, India}}

{{Use dmy dates|date=June 2021}}

{{Use Indian English|date=June 2021}}

{{Infobox rail line

| name = Purple Line (Line 3)

| native_name =

| native_name_lang =

| color = 800080

| image =

| image_width =

| caption =

| type = Rapid transit

| system = Chennai Metro

| status = Under construction

| locale =

| start = Madhavaram Milk Colony

| end = Siruseri SIPCOT

| connectinglines = Operational (5):
{{rcb|Chennai Metro|Blue|croute}} {{rcb|Chennai Metro|Green|croute}} {{rbox|Chennai MRTS|Chennai Mass Rapid Transit System|#{{rail color|Chennai MRTS|1}}}}, {{rbox|Chennai Suburban West Line|West Line, Chennai Suburban|#{{rail color|Chennai Suburban|West}}}}, {{rbox|Chennai Suburban South Line|South Line, Chennai Suburban|#{{rail color|Chennai Suburban|South}}}}
Upcoming (2):
{{rcb|Chennai Metro|Red|croute}} {{rcb|Chennai Metro|Yellow|croute}}

| stations = 47

| daily_ridership =

| open =

| close =

| operator = Delhi Metro Rail Corporation (DMRC){{cite news|last=Sampath|first=Nirupa|title=Chennai Metro Rail outsources phase 2 to Delhi Metro|url=https://www.dtnext.in/news/chennai/cmrl-outsources-phase-2-to-delhi-metro-tamil-quota-to-go-828697|publisher=DT Next|date=3 April 2025|access-date=18 April 2025}}

| character = {{cvt|26.3|km}} Underground
{{cvt|19.1|km}} Elevated

| stock =

| linelength_km = 45.4

| tracklength =

| tracks = 2

| gauge = {{Track gauge|sg|allk=on}}

| electrification = {{25 kV 50 Hz}} overhead catenary

| speed_km/h = 80

| elevation =

| map_state = collapsed

| map = {{Chennai Metro Purple Line Route}}

}}

The Purple Line or Line 3 is one of the under construction lines of Chennai Metro Phase-II stretching from Madhavaram Milk Colony to Siruseri SIPCOT. The {{cvt|45.4|km}} long line will consist of 47 stations, out of which 28 will be underground and 19 will be at grade or elevated.

Planning and construction

= Phase II =

The construction of the first phase of Chennai Metro started in June 2009.{{cite news|url=https://www.projectstoday.com/News/Work-commences-on-Chennai-metro|title=Work commences on Chennai Metro|publisher=Projects Today|date=11 June 2009|access-date=16 August 2010|archive-date=25 August 2017|archive-url=https://web.archive.org/web/20170825214006/http://www.projectstoday.com/News/Work-commences-on-Chennai-metro|url-status=live}} Commercial operations started on the green line in June 2015.{{cite news|url=https://www.deccanchronicle.com/140904/nation-current-affairs/article/chennai-metro-one-stop-short-dream-run|title=Chennai Metro one stop short of dream run|newspaper=Deccan Chronicle|date=31 August 2014|access-date=6 June 2016|archive-date=4 March 2016|archive-url=https://web.archive.org/web/20160304035707/http://www.deccanchronicle.com/140904/nation-current-affairs/article/chennai-metro-one-stop-short-dream-run|url-status=live}}{{cite news|url=http://www.thehindu.com/news/cities/chennai/conditional-clearance-for-metro-rail/article7155672.ece|title=Conditional clearance for Metro Rail|newspaper=The Hindu|date=28 April 2015|access-date=7 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/chennai/conditional-clearance-for-metro-rail/article7155672.ece|url-status=live}}{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/CMRL-l-Newsletter-l-Aug-2015-l-Final-PDF.pdf|title=Chennai Metro Newsletter - August 2015|publisher=Chennai Metro|date=29 June 2015|access-date=7 June 2023|archive-date=20 October 2023|archive-url=https://web.archive.org/web/20231020114202/https://chennaimetrorail.org/wp-content/uploads/2015/11/CMRL-l-Newsletter-l-Aug-2015-l-Final-PDF.pdf|url-status=live}} On 10 February 2019, the extension of blue line was opened, completing the first phase of the metro.{{cite news|url=https://www.thehindubusinessline.com/news/national/pm-modi-inaugurates-chennai-metro-rails-final-leg/article26229980.ece|title=PM Modi inaugurates Chennai Metro Rail's final leg|last=Simhan|first=TE Raja|work=The Hindu Businessline|date=10 February 2019|access-date=13 February 2019|archive-date=26 October 2020|archive-url=https://web.archive.org/web/20201026014616/https://www.thehindubusinessline.com/news/national/pm-modi-inaugurates-chennai-metro-rails-final-leg/article26229980.ece|url-status=live}}

In July 2016, Government of Tamil Nadu announced that the second phase would have three lines totaling {{cvt|104|km}} in length with 104 stations.{{cite news|url=http://www.thehindu.com/news/cities/chennai/104-km-104-stations-Unveiling-Phase-II-of-Metro/article14549167.ece|title=1800 km, 180 stations: Unveiling Phase II of Metro|last=Sekar|first=Sunitha|date=2 August 2016|newspaper=The Hindu|access-date=24 January 2017|archive-date=26 December 2016|archive-url=https://web.archive.org/web/20161226164406/http://www.thehindu.com/news/cities/chennai/104-km-104-stations-Unveiling-Phase-II-of-Metro/article14549167.ece|url-status=live}}{{cite news|url=http://www.thehindu.com/news/cities/chennai/Detailed-project-report-for-Phase-II-of-Metro-Rail-ready/article16947271.ece|title=Detailed project report for Phase II of Metro Rail ready|last=Sekar|first=Sunitha|newspaper=The Hindu|access-date=24 January 2017|archive-date=27 December 2016|archive-url=https://web.archive.org/web/20161227130634/http://www.thehindu.com/news/cities/chennai/Detailed-project-report-for-Phase-II-of-Metro-Rail-ready/article16947271.ece|url-status=live}} Two corridors would extend from Madhavaram connecting with Siruseri and Sholinganallur respectively (lines 3 and 5) with the third corridor connecting Koyambedu with Lighthouse (line 4). The third line connecting Madhavaram Milk Colony and Siruseri SIPCOT will extend to {{cvt|45.8|km}} of which {{cvt|19.1|km}} would be elevated and {{cvt|26.7|km}} underground. It will consist of 50 stations including 30 undergrounds stations.{{cite web|url=https://chennaimetrorail.org/project-status/|title=Project status of Chennai Metro|publisher=Chennai Metro Rail Limited|access-date=16 August 2010|archive-date=26 September 2016|archive-url=https://web.archive.org/web/20160926171710/http://chennaimetrorail.org/project-status/|url-status=live}}{{cite news|title=Metro's second phase to go up to Poonamallee|newspaper=The Hindu|date=20 July 2017|url=http://www.thehindu.com/news/cities/chennai/metros-second-phase-to-go-up-to-poonamallee/article19310471.ece|access-date=1 October 2017|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226092631/http://www.thehindu.com/news/cities/chennai/metros-second-phase-to-go-up-to-poonamallee/article19310471.ece|url-status=live}} The stations for the second phase were designed to be smaller than the existing stations operational in the first phase.{{cite news|last=U|first=Tejonmayam|url=http://timesofindia.indiatimes.com/city/chennai/chennai-metro-rail-to-trim-stations-under-phase-2/articleshow/56226400.cms|title=Chennai: Metro rail to trim stations under phase 2|newspaper=The Times of India|date=28 December 2016|access-date=24 January 2017|archive-date=8 February 2017|archive-url=https://web.archive.org/web/20170208051107/http://timesofindia.indiatimes.com/city/chennai/chennai-metro-rail-to-trim-stations-under-phase-2/articleshow/56226400.cms|url-status=live}}

On 20 November 2020, foundation stone for the second phase was laid and construction commenced.{{cite news|url=https://www.thehindu.com/news/national/tamil-nadu/amit-shah-to-lay-foundation-for-chennai-metros-phase-ii-project/article33111023.ece|title=Amit Shah to lay foundation for Chennai Metro's phase II project|date=17 November 2020|access-date=1 December 2023|newspaper=The Hindu|archive-date=28 April 2024|archive-url=https://web.archive.org/web/20240428064943/https://www.thehindu.com/news/national/tamil-nadu/amit-shah-to-lay-foundation-for-chennai-metros-phase-ii-project/article33111023.ece|url-status=live}} In November 2022, Alstom was awarded the contract to supply metro coaches for the phase II expansion.{{cite press release|url=https://www.alstom.com/press-releases-news/2022/11/alstom-wins-eu98-million-contract-design-and-manufacture-78-metro-coaches-chennai-metro-phase-ii|title=Alstom wins €98 million contract to design and manufacture 78 metro coaches for Chennai Metro Phase-II|date=11 November 2022|publisher=Alstom|access-date=1 December 2023|archive-date=16 December 2023|archive-url=https://web.archive.org/web/20231216121324/https://www.alstom.com/press-releases-news/2022/11/alstom-wins-eu98-million-contract-design-and-manufacture-78-metro-coaches-chennai-metro-phase-ii|url-status=live}} In May 2023, CMRL announced a revised plan for the second phase revising the station count on the third line to 47.{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/chennai-metro-scraps-nine-stations-in-phase-2/articleshow/100219302.cms|title=Chennai metro scraps nine stations in phase 2|date=14 May 2023|newspaper=The Times of India|access-date=1 May 2024}} As per the final plan, the fourth line will extend for {{cvt|45.4|km}}.{{cite press release|url=https://chennaimetrorail.org/wp-content/uploads/2023/06/Press-Release-07.06.2023-English.pdf|title=Phase II– S98 (Anaimalai) TBM Breakthrough at Venugopal Nagar Shaft|date=7 June 2023|publisher=Chennai Metro Rail Limited|access-date=1 May 2024}}

class="wikitable sortable" style="font-size:90%;"

|+Chennai Metro - Phase II{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/Phase-II-Updated-Map.pdf|title=Chennai Metro rail phase II|publisher=Chennai Metro Rail Limited|access-date=1 May 2024}}

Line Name

!colspan="2"|Terminals

!Length (km)

!Stations

!Status

style="background:#{{rail color|Chennai Metro|Purple}};|Purple Line

|Madhavaram

|Siruseri

|style="text-align:center;"|45.4

|style="text-align:center"|46

|Under construction

The second phase is estimated to cost {{INRconvert|63246|c}} of which initially {{INRconvert|4710|c}} was loaned by JICA.{{cite news|url=https://www.business-standard.com/article/current-affairs/phase-ii-chennai-metro-project-to-cost-rs-36-000-cr-114022800932_1.html|title=Phase-II Chennai metro project to cost Rs 36,000 cr|date=2 March 2014|access-date=1 December 2023|newspaper=Business Standard|archive-date=16 December 2023|archive-url=https://web.archive.org/web/20231216121325/https://www.business-standard.com/article/current-affairs/phase-ii-chennai-metro-project-to-cost-rs-36-000-cr-114022800932_1.html|url-status=live}}{{cite news|url=https://www.jica.go.jp/Resource/india/english/office/topics/press220331_03.html|title=JICA extends ODA Loan of INR 4710 Cr for Chennai Metro Rail Project Phase 2 (II)|date=21 June 2022|access-date=1 December 2023|publisher=JICA|archive-date=16 December 2023|archive-url=https://web.archive.org/web/20231216121327/https://www.jica.go.jp/Resource/india/english/office/topics/press220331_03.html|url-status=live}} On 14 February 2021, Prime Minister of India announced that the government has set aside {{INRconvert|63000|c}} for the construction of phase II and further extension.{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/ground-work-for-chennai-metro-rail-phase-2-hit/articleshow/80918239.cms|title=Ground work for Chennai metro rail phase-2 hit|last=Dipak K|first=Dash|newspaper=Times of India|access-date=19 February 2021|archive-date=18 February 2021|archive-url=https://web.archive.org/web/20210218192218/http://timesofindia.indiatimes.com/city/chennai/ground-work-for-chennai-metro-rail-phase-2-hit/articleshow/80918239.cms|url-status=live}}

= Phase II extension =

In 2022, the state government proposed an extension plan for the third line from Siruseri to Kilambakkam, covering an approximate {{cvt|25|km}}.{{cite news|url=https://www.thehindu.com/news/cities/chennai/detailed-feasibility-report-for-chennai-metro-rails-phase-2-extension-to-be-ready-in-three-months/article66664484.ece|title=Detailed feasibility report for Chennai Metro Rail's Phase 2 extension to be ready in three months|date=26 March 2023|newspaper=The Hindu|access-date=1 December 2023|archive-date=28 April 2024|archive-url=https://web.archive.org/web/20240428075613/https://www.thehindu.com/news/cities/chennai/detailed-feasibility-report-for-chennai-metro-rails-phase-2-extension-to-be-ready-in-three-months/article66664484.ece|url-status=live}} In September 2023, feasibility report was submitted by CMRL for the proposed expansion of the line, green lighting the same.{{cite news|url=https://www.financialexpress.com/business/infrastructure-chennai-metro-cmrl-submits-detailed-feasibility-reports-for-phase-ii-project-extension-a-progress-report-3251256/|title=CMRL submits Detailed Feasibility Reports for Phase II project extension|newspaper=The Financial Express|date=22 September 2023|access-date=30 April 2024|archive-date=29 April 2024|archive-url=https://web.archive.org/web/20240429192946/https://www.financialexpress.com/business/infrastructure-chennai-metro-cmrl-submits-detailed-feasibility-reports-for-phase-ii-project-extension-a-progress-report-3251256/|url-status=live}} The extension was scrapped due to patronage and profitability concerns.{{cite news|url=https://www.timesnownews.com/chennai/chennai-siruseri-kilambakkam-bus-terminus-metro-plans-dropped-deemed-non-feasible-article-109979552|title=Metro from Siruseri- Kilambakkam Bus Terminus Metro Plans Dropped, deemed non-feasible|newspaper=Times Now|date=9 May 2024|access-date=11 May 2024|archive-date=11 May 2024|archive-url=https://web.archive.org/web/20240511082443/https://www.timesnownews.com/chennai/chennai-siruseri-kilambakkam-bus-terminus-metro-plans-dropped-deemed-non-feasible-article-109979552|url-status=live}}

class="wikitable sortable" style="text-align:left; font-size:90%;"

|+Chennai Metro - Phase II Extension

Line

! colspan="2"|Terminals

! Length

! Stations

! Status

style="background:#800080;|Purple Line

|Siruseri

|Kilambakkam

|style="text-align:center;"|{{convert|25|km|abbr=on}}

|style="text-align:center;"|TBD

|{{tooltip|DFR|Detailed Feasibility Report}} submitted; Proposal dropped

Tendering

class="wikitable"style="text-align:center;margin:auto;

!colspan="6" align="center" style="background:#{{rcr|Chennai Metro|Purple}};" | Purple Line (Line 3)

colspan="6" align="center" style="background:#{{rcr|Chennai Metro|Purple}};" | Civil Work
Tendering

! colspan="2" |Section

!Successful Bid /Cost

!Contractor

!Award

colspan="6" |Elevated Viaduct and StationWork
CP08/EV-01/RT-01

| colspan="2" |Nehru Nagar – Sholinganallur

|{{INRConvert|963.00|c}}

|L&T

|June 15 2023

C3-ECV-01/RT-01

| colspan="2" |Sholinganallur – SIPCOT 2

|{{INRConvert|901.15|c}}

|RVNL

|Jan 21 2023

colspan="6" |Underground Tunneling
TU-01

| colspan="2" |Venugopal Nagar – Kellys

|{{INRConvert|1999.00|c}}

|Tata Projects

|May 12 2021

TU-02

| colspan="2" |Kellys – Taramani Road

|{{INRConvert|2385.00|c}}

|L&T

|May 12 2021

colspan="6" |Underground Station Work
UG-1-RT01

| colspan="2" |Madhavaram – Perambur

|{{INRConvert|792.00|c}}

|DRA – Soma JV

|June 15 2023

UG-2-RT01

| colspan="2" |Ayanavaram – Kellys

|{{INRConvert|929.62|c}}

|Tata Projects

|June 15 2023

UG-3-RT01

| colspan="2" |KMC – Royapettah

|{{INRConvert|1328.89|c}}

|RVNL

|June 15 2023

UG-4-RT01

| colspan="2" |Radhakrishnan – Adyar Junction

|{{INRConvert|1151.41|c}}

|RVNL

|June 15 2023

UG-5-RT01

| colspan="2" |Adyar Depot – Taramani Link Road

|{{INRConvert|665.99|c}}

|RVNL

|June 15 2023

colspan="3" |Civil Work Cost

|{{INRConvert|11116.06|c}}

! colspan="2" |

colspan="6" align="center" style="background:#{{rcr|Chennai Metro|Purple}};" | Miscellaneous
Tendering

!Contract

!Section

!Successful Bid /Cost

!Contractor

!Award

BC-3,5/TRK-02The cost for Line 3 was averaged out from the total contract value

|Track Work

|Sholinganallur – SIPCOT 2

|{{INRConvert|81.83|c}}

|L&T

|Jul 29 2022

CORR-3/CP18A-ATW-09/2022

|Track Work

|Madhavaram Milk Colony – Sholinganallur

|{{INRConvert|299.46|c}}

|L&T

|Dec 12 2022

CP19/HHRAILS/2021

| colspan="2" |Head-Hardened Rails

|{{INRConvert|82.38|c}}

|Mitsui & Co

|Jan 11 2023

SYS/C3&5/PS&OHE-10/2021

|RSS, ASS and SCADA

|Sholinganallur – SIPCOT 2

|{{INRConvert|87.03|c}}

|Linxon India

|Jan 10 2023

PHASE-II/CP20.1-PS-06/2021

|RSS, ASS and SCADA

|Madhavaram Milk Colony – Sholinganallur

|{{INRConvert|366.53|c}}

|L&T

|May 24 2023

PHASE-II/CP20.2-OHE-07/2021

|OHE

|Madhavaram Milk Colony – Sholinganallur

|{{INRConvert|164.34

|c}}

|L&T

|May 24 2023

To Be Awarded

|OHE

|Sholinganallur – SIPCOT 2

| colspan="3" |To Be Awarded

ASA-04

| colspan="2" |Signalling and Train Control and Video Management Systems

|{{INRConvert|1620.00|c}}

|Hitachi Rail

|Mar 15 2023

ASA-07

| colspan="2" |Telecom Contract

|{{INRConvert|45.37|c}}

|Consort Digital

|Fev 09 2023

colspan="3" |Miscellaneous Cost

|{{INRConvert|2746.94|c}}

! colspan="2" |

colspan="3" |Total Cost

|{{INRConvert|13863.00|c}}

! colspan="2" |

Stations

class="wikitable"style="text-align:center;margin:auto;
align="center" colspan="6" style="background:Purple;" | Purple Line
rowspan="2"|S.No

! colspan="2"|Station Name

! rowspan="2" |Expected Opening

! rowspan="2" |Connections

! rowspan="2"|Station Layout

English

!Tamil

1{{stl|Chennai Metro|Madhavaram Milk Colony}}மாதவரம் பால் பண்ணை2027{{RouteBox|Red Line|Line 5 (Chennai Metro)|#ff0000|white}} (Under Construction)Underground
2{{stl|Chennai Metro|Madhavaram High Road}}மாதவரம் நெடுஞ்சாலை

|2027

|Underground
3{{stl|Chennai Metro|Moolakadai}}மூலக்கடை

|2027

|Underground
4{{stl|Chennai Metro|Sembiyum}}செம்பியம்

|2027

|Underground
5{{stl|Chennai Metro|Perambur Market}}பெரம்பூர் அங்காடி

|2027

|Underground
6{{stl|Chennai Metro|Perambur}}பெரம்பூர்

|2027

{{rint|rail}} West Line, Chennai Suburban (Perambur)

|Underground

7{{stl|Chennai Metro|Ayanavaram}}அயனாவரம்

|2027

Ayanavaram MTC Bus Depot

|Underground

8{{stl|Chennai Metro|Otteri}}ஓட்டேரி

|2027

|Underground
9{{stl|Chennai Metro|Pattalam}}பட்டாளம்

|2027

|Underground
10{{stl|Chennai Metro|Perambur Barracks Road}}பெரம்பூர் பேரக்ஸ் சாலை

|2027

|Underground
11{{stl|Chennai Metro|Purasaiwakkam}}புரசைவாக்கம்

|2027

|Underground
12{{stl|Chennai Metro|Kellys}}கெல்லீஸ்

|2027

|Underground
13{{stl|Chennai Metro|Kilpauk}}கீழ்ப்பாக்கம்

|2027

{{RouteBox|Green Line|Green Line (Chennai Metro)|#{{rail color|Chennai Metro|Green}}|white}}

|Underground

14{{stl|Chennai Metro|Chetpet}}சேத்துப்பட்டு

|2027

{{rint|rail}} South Line, Chennai Suburban (Chetpet)

|Underground

15{{stl|Chennai Metro|Sterling Road}}ஸ்டெர்லிங் சாலை

|2027

|Underground
16{{stl|Chennai Metro|Nungambakkam}}நுங்கம்பாக்கம்

|2027

|Underground
17{{stl|Chennai Metro|Anna Flyover}}அண்ணா மேம்பாலம்

|2027

|Underground
18{{stl|Chennai Metro|Thousand Lights}}ஆயிரம் விளக்கு

|2027

{{RouteBox|Blue Line|Blue Line (Chennai Metro)|#{{rail color|Chennai Metro|Blue}}|white}}

|Underground

19{{stl|Chennai Metro|Royapettah}}ராயப்பேட்டை

|2027

|Underground
20{{stl|Chennai Metro|Dr. Radhakrishnan Salai}}டாக்டர் ராதாகிருஷ்ணன் சாலை

|2027

|Underground
21{{stl|Chennai Metro|Thirumayilai}}திருமயிலை

|2027

{{rint|rail}} Chennai MRTS (Thirumayilai)
{{RouteBox|Yellow Line|Line 4 (Chennai Metro)|#f7ff0a|black}} (Under Construction)

|Underground

22{{stl|Chennai Metro|Mandaiveli}}மந்தைவெளி

|2027

{{rint|rail}} Chennai MRTS (Mandaveli)

|Underground

23{{stl|Chennai Metro|Greenways Road}}பசுமைவழிச் சாலை

|2027

{{rint|rail}} Chennai MRTS (Greenways Road)

|Underground

24{{stl|Chennai Metro|Adyar Junction}}அடையாறு சந்திப்பு

|2027

|Underground
25{{stl|Chennai Metro|Adyar Depot}}அடையாறு பணிமனை

|2027

|Underground
26Indira Nagarஇந்திரா நகர்

|2027

{{rint|rail}} Chennai MRTS (Indira Nagar)

|Underground

27{{stl|Chennai Metro|Thiruvanmiyur}}திருவான்மியூர்

|2027

{{rint|rail}} Chennai MRTS (Thiruvanmiyur)

|Underground

28{{stl|Chennai Metro|Taramani}}தரமணி

|2027

{{rint|rail}} Chennai MRTS (Taramani)

|Underground

29{{stl|Chennai Metro|Nehru Nagar}}நேரு நகர்

|2026

Elevated
30{{stl|Chennai Metro|Kandanchavadi}}கந்தன்சாவடி

|2026

|Elevated
31{{stl|Chennai Metro|Perungudi}}பெருங்குடி

|2026

|Elevated
32{{stl|Chennai Metro|Thoraipakkam}}துரைப்பாக்கம்

|2026

|Elevated
33{{stl|Chennai Metro|Mettukuppam}}மேட்டுக்குப்பம்

|2026

|Elevated
34{{stl|Chennai Metro|PTC Colony}}பி.டி.சி. காலனி

|2026

|Elevated
35{{stl|Chennai Metro|Okkiyampet}}ஒக்கியம்பேட்டை

|2026

|Elevated
36{{stl|Chennai Metro|Karapakkam}}காரப்பாக்கம்

|2026

|Elevated
37{{stl|Chennai Metro|Okkiyam Thoraipakkam}}ஒக்கியம் துரைப்பாக்கம்

|2026

|Elevated
38{{stl|Chennai Metro|Sholinganallur}}சோழிங்கநல்லூர்

|2026

{{RouteBox|Red Line|Line 5 (Chennai Metro)|#ff0000|white}} (Under Construction)

|Elevated

39{{stl|Chennai Metro|Sholinganallur Lake I}}சோழிங்கநல்லூர் ஏரி I

|2026

|Elevated
40{{stl|Chennai Metro|Sholinganallur Lake II}}சோழிங்கநல்லூர் ஏரி II

|2026

|Elevated
41{{stl|Chennai Metro|Nookampalayam Depot}}நூகம்பாளையம் பணிமனை

|2026

|Elevated
42{{stl|Chennai Metro|Semmancheri I}}செம்மஞ்சேரி I

|2026

|Elevated
43{{stl|Chennai Metro|Semmancheri II}}செம்மஞ்சேரி II

|2026

|Elevated
44{{stl|Chennai Metro|Gandhi Nagar}}காந்தி நகர்

|2026

|Elevated
45{{stl|Chennai Metro|Navallur}}நாவலூர்

|2026

|Elevated
46{{stl|Chennai Metro|Siruseri}}சிறுசேரி

|2026

|Elevated
47{{stl|Chennai Metro|SIPCOT 1}}சிப்காட் 1

|2026

|Elevated
48{{stl|Chennai Metro|SIPCOT 2}}சிப்காட் 2

|2026

|Elevated

{{note label|§|§|§}} under construction

See also

References

{{reflist}}

{{Chennai Metro|line 3=yes}}

{{Portal bar|India|Transport|Engineering}}

{{DEFAULTSORT:Chennai Metro - Line 3}}

Category:Chennai Metro lines