Wind power in the Netherlands

{{Short description|None}}

{{Use dmy dates|date=September 2019}}

File:Windpark Krammer aerial.jpg

{{As of|2025|January}}, wind power in the Netherlands has an installed capacity of 11,714 MW, 40.5% of which is offshore.{{Cite web |title=WindStats |url=https://windstats.nl/statistieken/#data_results |access-date=2 January 2025 |publisher=Bosch and van Rijn}} In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.Blunt, Elizabeth. "Exploiting wind power in Holland." BBC News. N.p., 13 November 2000. Web. 14 October 2009. .

In March 2022, the Dutch government announced that by 2030 offshore wind was to become the Netherlands' biggest power source, aiming at 21 GW of installed capacity.{{cite web|url=https://renews.biz/76489/netherlands-adds-three-new-offshore-wind-areas-to-reach-21gw-by-2030/ |title=Dutch government supercharges offshore wind target|date=21 March 2022 }}

Since 2015 there has been a trend towards the deployment and planning for large wind farms, both onshore and offshore, with a view to the approximate tripling wind power capacity from 2015 levels by 2023. The first of these, the 429 MW Noordoostpolder wind farm was already partially deployed by year end 2015 whilst the 600 MW Gemini offshore wind farm was commissioned in 2017. These newer and larger wind farms are making use of some of the largest wind turbines available, in particular in the case of Noordoostpolder the Enercon E-126 7500 kW wind turbine, the largest onshore turbine available at that time. The Netherlands is also well prepared for a significant rise in the production of intermittent power from wind energy by good interconnectors to its neighbours via high voltage cables enabling power to be imported or exported according to supply and demand. These include the 580 km NorNed submarine cable (700 MW) link to Norway, the 1,000 MW BritNed cable link to the United Kingdom and the COBRA cable link to Denmark (700 MW).

Many of the numerous smaller and older wind farms in the Netherlands consist of much smaller turbines compared to those typically deployed today. These were often manufactured by lesser known wind turbine manufacturers, sometimes producing innovative products such as the Nedwind 2 blade turbine. Many of these smaller companies were eventually acquired by the larger wind turbine manufactures such as Vestas, Siemens and Lagerwey.

Installed capacity

File:Wind power installed capacity in NL MW.svg

{{Image frame

|width =360

|align=right

|pos=bottom

|content={{Graph:Chart

| width=280

| height=180

| xAxisTitle=Year

| xAxisAngle = -55

| yAxisTitle=Installed capacity (MW)

| type=stackedrect

| x = 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022

| y1 = 0, 0, 0, 0, 0, 0, 108, 108, 228, 228, 228, 228, 228, 228, 228, 357, 957, 957, 957, 957, 2460, 2460, 2460

| y2 = 447, 485, 672, 905, 1075, 1224, 1453, 1641, 1921, 1994, 2009, 2088, 2205, 2485, 2637, 3034, 3300, 3245, 3436, 3527, 4159, 5341, 6228

| colors=darkslateblue,dodgerblue

| y1Title=Sea-based capacity

| y2Title=Land-based capacity

| ygrid=

}}

|caption={{legend|darkslateblue|Cumulative sea-based wind capacity (MW)}}{{legend|dodgerblue|Cumulative land-based wind capacity (MW)}}

}}

{{Image frame

|align=left

|pos=bottom

|content={{Graph:Chart

| width=100

| height=100

| type=pie

| legend=Province

| x=Flevoland,Groningen,South Holland,North Holland,Friesland,Zeeland,North Brabant,Drenthe,Gelderland,Limburg,Overijssel,Utrecht

| y1=1584,838,772,724,617,563,389,271,234,120,80,34

| showValues=

}}

|caption=Installed land-based wind capacity (MW) by province in 2022{{Cite web|title=Statistieken|access-date=2023-01-03|url=https://windstats.nl/statistieken|website=windstats.nl}}

}}

class="wikitable" style="text-align: right"

|+Cumulative wind capacity in The Netherlands{{Cite web|title=Windvermogen in Nederland, 1990-2019 {{!}} Compendium voor de Leefomgeving|url=https://www.clo.nl/indicatoren/nl0386-windvermogen-in-nederland|access-date=2021-02-24|website=www.clo.nl}}{{Cite web|last=Diest|first=Erik Van|date=2021-01-20|title=Windenergie maakt forse inhaalslag in 2020|url=https://www.nwea.nl/windenergie-maakt-forse-inhaalslag-in-2020/|access-date=2021-02-24|website=NWEA|language=nl-NL}}{{Cite web |title=Renewable electricity; production and capacity |url=https://opendata.cbs.nl/statline/#/CBS/nl/dataset/82610NED/table?ts=1617545569760 |access-date=2023-06-05 |website=opendata.cbs.nl |language=nl}}

!Year

!1990

!1991

!1992

!1993

!1994

!1995

!1996

!1997

!1998

!1999

Installed capacity (MW)

|50

|83

|101

|131

|152

|250

|296

|324

|363

|410

Electricity generated (GWh)

|56

|88

|137

|173

|221

|314

|435

|489

|571

|642

% of electricity consumption

|0.07

|0.11

|0.16

|0.20

|0.24

|0.34

|0.45

|0.49

|0.55

|0.61

Capacity factor in percent{{efn|name= capacity factor|Calculated value from total installed nameplate capacity and actual electricity generation. Statistical artifacts possible if new capacity was added late in the year }}

|12.79

|12.10

|15.48

|15.08

|16.60

|14.34

|16.78

|17.23

|17.96

|17.88

colspan="11" |
Year

!2000

!2001

!2002

!2003

!2004

!2005

!2006

!2007

!2008

!2009

Sea-based capacity (MW)

|

|

|

|

|

|

|108

|108

|228

|228

Land-based capacity (MW)

|447

|485

|672

|905

|1,075

|1,224

|1,453

|1,641

|1,921

|1,994

Installed capacity (MW)

|447

|485

|672

|905

|1,075

|1,224

|1,561

|1,749

|2,149

|2,222

Electricity generated (GWh)

|744

|822

|1,020

|1,359

|1,763

|2,034

|2,540

|3,166

|3,925

|4,481

% of electricity consumption

|0.69

|0.74

|0.91

|1.19

|1.50

|1.72

|2.11

|2.58

|3.18

|3.78

Capacity factor in percent{{efn|name=capacity factor}}

|19.00

|19.35

|17.33

|17.14

|18.72

|18.97

|18.57

|20.66

|20.85

|23.02

colspan="11" |
Year

!2010

!2011

!2012

!2013

!2014

!2015

!2016

!2017

!2018

!2019

Sea-based capacity (MW)

|228

|228

|228

|228

|228

|357

|957

|957

|957

|957

Land-based capacity (MW)

|2,009

|2,088

|2,205

|2,485

|2,637

|3,034

|3,300

|3,245

|3,436

|3,527

Installed capacity (MW)

|2,237

|2,316

|2,433

|2,713

|2,865

|3,391

|4,257

|4,202

|4,393

|4,484

Electricity generated (GWh)

|4,503

|4,725

|4,939

|5,368

|5,810

|6,917

|8,364

|9,642

|10,030

|10,774

% of electricity consumption

|3.69

|3.84

|4.10

|4.47

|4.92

|5.81

|6.97

|7.98

|8.22

|8.82

Capacity factor in percent{{efn|name=capacity factor}}

|22.98

|23.29

|23.17

|22.59

|23.15

|23.29

|22.43

|26.19

|26.06

|27.43

colspan="11" |
Year

!2020

!2021

!2022

!2023

!2024

!2025

!2026

!2027

!2028

!2029

Sea-based capacity (MW)

|2,460

|2,460

|2,570

|3,978

|

|

|

|

|

|

Land-based capacity (MW)

|4,188

|5,214

|6,185

|6,771

|

|

|

|

|

|

Installed capacity (MW)

|6,648

|7,674

|8,755

|10,749

|

|

|

|

|

|

Electricity generated (GWh)

|13,949

|18,960

|21,360

|26,594

|

|

|

|

|

|

% of electricity consumption

|11.54

|15.51

|18.17

|22.79

|

|

|

|

|

|

Capacity factor in percent{{efn|name=capacity factor}}

|23.95

|28.01

|27.87

|28.24

|

|

|

|

|

|

Future targets

The Dutch government has set a target of 6,000 MW nameplate capacity of onshore wind power by 2020 and 4,450 MW of offshore wind power by 2023, neither of which were met.{{Cite web|url=http://www.gwec.net/publications/global-wind-report-2/global-wind-report-2015-annual-market-update/|title=Global Wind Report 2015, 61}} This will contribute towards the Dutch target of 14% renewable energy use out of total energy use by 2020{{usurped|1=[https://web.archive.org/web/20180704182708/https://www.energievergelijking.net/groene-energie/windenergie/rijksoverheid-doelen/ Goals Dutch Government 2020]}}, and 16% by 2023. In 2020 wind power provided 11.54% of Dutch electricity generation (see table above) while solar power provided an additional 7.25%, for a combined 18.79%

For offshore wind a new system of tendering is under development. New wind farm deployment is based on the SER agreement that describes a plan for five years of tendering 700 MW per year. Under this system the government chooses locations and organizes tenders for projects of 350 MW, and project developers can offer bids for each farm. These sites are also surveyed centrally by the government, allowing developers to avoid costly and multiple surveys.{{Cite web|url=https://www.ieawind.org/annual_reports_PDF/2015.html|title=IEA Wind Annual Report for 2015 (Netherlands)}}

class="wikitable"

|+Offshore wind energy targets defined in the 2015 SER agreement

!Call for tender (year)

!Capacity (MW)

!Expected commissioning

! rowspan="7" |

!Wind farms

!Capacity (MW)

!Commissioning

2016 (early)

| align="right" |700

| align="right" |2019–2020

|Borssele I–II

| align="right" |752

| align="right" |2021

2016 (late)

| align="right" |700

| align="right" |2020

|Borssele III–V

| align="right" |750.5

| align="right" |2021

2017

| align="right" |700

| align="right" |2021

|Hollandse Kust (Zuid) I–II

| align="right" |759

| align="right" |2024 (planned)

2018

| align="right" |700

| align="right" |2022

|Hollandse Kust (Zuid) III–IV

| align="right" |770

| align="right" |2024 (planned)

2019

| align="right" |700

| align="right" |2023

|Hollandse Kust (Noord) V

| align="right" |759

| align="right" |2023 (planned)

Total

| align="right" |3,500

| align="right" |by 2023

|Total

| align="right" |3,790.5

| align="right" |by 2024

Turbine manufacturers and repowering

Many small scale wind farms exist throughout the Netherlands which bear testament to earlier models of wind turbines and lesser known manufacturers which provided a range of niche products, ranging in size and power output. There are several Dutch turbine manufacturers that continue to manufacture both large and small installations for domestic and international clients. Smaller turbines are often used for off grid, bespoke and community power internationally.

class="wikitable"

|+Selected Dutch wind turbine manufacturers{{Cite web|url=http://www.thewindpower.net/country_en_10_netherlands.php|title=The Windpower, Netherlands, Manufacturers}}

!Manufacturer/ model

!Notes

[https://www.lagerwey.com/ Lagerwey]

|Started operations in 1979. Produced at least 19 models at 250, 750, 1500, 2000, 2300, 2500, 2600, 3000, 3600, 3800, 4000 and 4500 kW. Active 2020.

[http://www.windenergysolutions.nl WES]

|Established 1983. Produced at least 3 models of outputs 100, 200, 250 kW. Two of the models are still under production.

NedWind

|Began operating in 1990. Produced at least 8 models with power outputs of 100, 250, 500, 1000 kW.

Acquired by Neg Micon 1998

Windmaster

|Produced at least 14 models of 100. 150, 200, 225, 300, 500, 750, 850 and 1300 kW. Acquired by Lagerway in 1998.

[http://2benergy.com/ 2-B Energy]

|Started operation in 2001 and is developing a 6,000 kW two blade downwind turbine. Active 2016.

[http://www.ewtdirectwind.com EWT]

|Founded in 2004, Produced at least 12 models at 250, 500, 750, 900 and 2000 kW. Active 2020.

[http://www.xemc-darwind.com XEMC-Darwind]

|Started operations 2009. Produced at least 12 models of 2000, 4000, 4500, and 5000 kW. Active 2016.

Some of the newer larger wind farms currently under construction are replacing smaller turbines previously installed at given locations. One such example is the largest wind farm in the Netherlands, Noordoostpolder, which is installing industrial scale wind turbines such as the new Enercon onshore wind turbines, at the time the largest onshore turbines in the world rated at 7500 kW nameplate capacity. The turbines have a hub height of {{convert|135|m}} and each new turbine can generate as much electricity as all 50 turbines of the old wind farm combined.{{Cite web|url=http://www.windparknoordoostpolder.nl/en/windpark/|title=Noordoostpolder wind farm|date=19 June 2018 }} The wind farm demonstrates the growth in scale in wind power as between 1987 and 1991 it was the largest of its kind in Europe with 50 turbines and a total nameplate capacity of 15 MW. The new Zuidwester site at the wind farm will have just 12 turbines and a total nameplate capacity of 90 MW.{{Cite web|url=http://www.sunwindenergy.com/wind-energy/first-75-mw-turbine-zuidwester-wind-farm-operation|title=Sun and Wind Energy|date=9 November 2015}} A second hand market for turbines also exists, which could grow as older turbines are replaced by larger newer ones.{{Cite web|url=http://dutchwind.com/products/|title=Dutchwind}}

Timeline of developments

2022

In February 2022 the Netherlands announced it increased its offshore wind target to 21 GW by 2030. That would meet approximately 75% of the countries electricity needs. With this, offshore wind energy makes an important contribution to achieving the increased climate target of 55% less {{CO2}}-emissions.{{cite web | url=https://english.rvo.nl/information/offshore-wind-energy/new-offshore-wind-energy-roadmap | title=New Offshore Wind Energy Roadmap | RVO.nl }}

2018

In March 2018 the Dutch government announced that it will build between 2023 and 2030 several new windfarms with a total installed capacity of 7 gigawatt.{{cite web|url=https://nos.nl/artikel/2224502-drie-nieuwe-windparken-in-de-noordzee.html|title=Drie nieuwe windparken in de Noordzee|language=nl |work=nos.nl |date=27 March 2018 | access-date=1 April 2018}} Where the parks will come and how they will be built is still being discussed. However, the government wants 40% of the total electricity used in 2030 in the Netherlands to be supplied by wind.{{cite web|url=https://www.rijksoverheid.nl/onderwerpen/duurzame-energie/windenergie-op-zee|title=Windenergie op zee|language=nl |work=rijksoverheid.nl |date= 11 August 2016| access-date=1 April 2018}}

2016

In the first week of December 2016, all 150 turbines of the new 600 MW Gemini offshore windfarm began producing power, and the project is expected to be fully commissioned by mid 2017.4C Offshore, Key project dates for Gemini [http://www.4coffshore.com/windfarms/project-dates-for-gemini-nl18.html [2]], accessed 22 January 2017 In July 2016, the first two stages of offshore wind farm development for a combined 700 MegaWatt capacity in a water area near Borssele was awarded to DONG Energy at a price of 7.27 Euro cent per kilowatt hour for 15 years. Transmission costs of 1.4 eurocent/kWh is to be added as TenneT is required to take power from sea to shore.https://www.government.nl/latest/news/2016/07/05/netherlands-offshore-wind-farm-borssele-cheapest-world-wide {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #10 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}}http://www.windpoweroffshore.com/article/1401396/updated-dong-wins-borssele-tender-%e2%82%ac7270-mwh {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #11 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}}http://www.bakermckenzie.com/en/insight/publications/2016/07/dong-energy-wins-first-borssele-offshore-wind/ {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #12 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}}

2015

2015 was a record year for new installations in the Netherlands with 586 MW added of which 180 MW were offshore. This record was immediately beaten the following year with another 766 MW being added.

The Dutch government has expressed the aspiration to build 4.450 MW of offshore wind power by 2023 which will have a considerable impact on the Dutch electricity grid, operated by TenneT.[http://www.we-at-sea.org/index.php?keuze=r13 Offshore Wind Power Research], WE@Sea, accessed December 28th 2009. {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #9 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}} As a first step, the government has determined 65 sites for offshore wind farms in the North Sea and IJsselmeer.{{cite web|title=Offshore wind farm opens off the coast of the Netherlands|work=The New York Times|date=18 April 2007|accessdate=14 October 2009|url=http://www.nytimes.com/2007/04/18/business/worldbusiness/18iht-wind.4.5338427.html}} {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #1 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}}

2013

By December 2013, 1,975 wind turbines were operational on land in the Netherlands, with an aggregate capacity of 2,479 MW.{{cite web|url=http://statline.cbs.nl/StatWeb/publication/?DM=SLNL&PA=70960NED&D1=0-1,6,9&D2=a&D3=22-23&VW=T|title=Windenergie op land; productie en capaciteit per provincie Windenergy on land; production and capacity per province|access-date=16 November 2014}} An additional 228 MW of capacity was installed at sea.{{cite web|url=http://statline.cbs.nl/Statweb/publication/?DM=SLNL&PA=70802ned&D1=0,3&D2=0,2&D3=152,169,186-189,191-193,195-197,199-201,203-206,208-210,212-214&VW=T|title=Windenergie; elektriciteitsproductie, capaciteit en windaanbod per maand (Windenergy; electricity production, capacity and wind per month)|publisher=CBS StatLine|access-date=16 November 2014}}

2011

In November 2011, the Dutch government decided to no longer fund €6 billion per year to maintain subsidized wind kWh at €0.18. It sharply cut subsidies down to €1.5 billion, leaving private sector to carry over wind turbine investments should these be beneficial.Hudson, Alexandra. "Dutch build towering wind turbines out at sea." Reuters. {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #6 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}}

Onshore wind power

Whilst there are a growing number of large onshore wind farms in the Netherlands, most of the onshore farms in 2015 consisted of a large number of small wind farms, including many single installation turbines as well as farms of between 1–10 turbines. In total there were 3,004 MW of onshore wind power at the end of 2015. Most wind power is produced in the province of Flevoland. A few of the larger wind farms are listed here.

class="wikitable"

|+Selection of larger onshore wind farms in the Netherlands, March 2023

!Wind farm

!Province

!Capacity (MW)

!Turbines

!Commissioning

!Notes/ref

Windplan Groen

|Flevoland

|500

|26 × GE Cypress 6MW{{br}}15 × Nordex N163 6MW{{br}}37 × Vestas V162 6.2MW{{Br}}8 × Vestas V126 3.45MW

|2024

|{{Cite web|title=Werken aan een nieuwe toekomst met windenergie|url=https://www.windplangroen.nl/|access-date=2021-03-02|website=Windkoepel|language=nl}}{{Cite web |title=GE Renewable Energy's Cypress onshore wind turbine selected for repowering project in the Netherlands {{!}} GE News |url=https://www.ge.com/news/press-releases/ge-renewable-energy-cypress-onshore-wind-turbine-selected-for-repowering-project-in-netherlands |access-date=2023-07-24 |website=www.ge.com |language=en}}{{Cite web |title=Vestas adds 257 MW order in Netherlands at Windplan Groen complex |url=https://www.vestas.com/en/media/company-news/2021/vestas-adds-257-mw-order-in-netherlands-at-windplan-gro-c3480198 |access-date=2023-07-24 |website=www.vestas.com |language=en}}{{Cite web |last=Elzo |date=2024-03-29 |title=Windplan Groen officieel in gebruik als grootste windpark op land in Nederland |url=https://www.windplangroen.nl/2024/03/29/windplan-groen-officieel-in-gebruik-als-grootste-windpark-op-land-in-nederland/ |access-date=2024-05-02 |website=Windplan Groen |language=nl-NL}}

Noordoostpolder

|Flevoland

|429

|38 × Enercon E-126 7.5MW{{br}}48 × Siemens 3.0DD-108 3MW

|2017

|{{Cite web|title=Feiten & cijfers|url=https://www.windparknoordoostpolder.nl/achtergrondinformatie/feiten-en-cijfers/|access-date=2021-02-24|website=Windpark Noordoostpolder|language=nl-NL}}

Princess Ariane Windpark

|North Holland

|360

|82 × Nordex N117 3.6MW{{Br}}8 × Vestas V126 3.6MW{{Br}}9 × Other

|2020

|{{Cite web|title=Home|url=https://windparkwieringermeer.nl/|access-date=2021-02-25|website=Windpark Wieringermeer|language=nl}}

Windplan Blauw

|Flevoland

|339.2

|37 × EnVentus V162-5.6MW{{br}}24 × GE Cypress 5.5MW

|Planned 2024

|{{Cite web|title=Home|url=https://windplanblauw.nl/|access-date=2021-03-02|website=Windplanblauw|language=nl}}

Zeewolde

|Flevoland

|321.5

|9 × Vestas 2.2MW{{br}}33 × Vestas 3.8MW{{br}}41 × Vestas 4.3MW

|2022

|{{Cite web|title=Windpark Zeewolde – Windpark Zeewolde|url=https://windparkzeewolde.nl/|access-date=2021-03-02|website=windparkzeewolde.nl}}

De Drentse Monden en Oostermoer

|Drenthe

|175.5

|45 × Nordex N131 3.9MW

|2021

|{{Cite web|title=Windpark De Drentse Monden en Oostermoer - Home|url=https://www.drentsemondenoostermoer.nl/|access-date=2021-02-25|website=De Drentse Monden en Oostermoer|language=nl}}

Westereems

|Groningen

|171

|50 × Enercon E82 3MW{{br}}2 × Senvion M6 6.15MW{{br}}2 × Lagerwey L136 4.5MW

|2009/2012/2020

|{{Cite web|last=RWE|title=Windpark Westereems|url=https://www.group.rwe/nl-NL/ons-portfolio/onze-vestigingen/onshore-windpark-westereems|access-date=2021-02-24|website=www.group.rwe|language=nl-NL}}

Windpark N33

|Groningen

|147

|35 × Siemens Gamesa DD-230 R19 4.2MW

|2021

|{{Cite web|title=Windpark N33|url=https://www.windparkn33.nl/|access-date=2021-02-24|website=www.windparkn33.nl}}

Princess Alexia Windpark

|Flevoland

|122.4

|36 × Senvion 3.4M104

|2013

|{{Cite web|url=http://www.thewindpower.net/windfarms_list_en.php|title=The Windpower, List of wind farms}}

Windpark Maasvlakte 2

|South Holland

|116.7

|13 × Vestas V162 6.0MW{{br}}9 × Vestas V117 4.3MW

|2023

|{{Cite web|last=Eneco|title=Windpark Maasvlakte 2|url=https://windparkmaasvlakte2.nl/|access-date=2022-02-22|website=Windpark Maasvlakte 2|language=nl}}

Windpark Krammer

|Zeeland

|102

|34 × Enercon E-115 3MW

|2018/2019

|{{Cite web | url=https://www.windparkkrammer.nl/ |title = Home}}

Windpark Oostpolder

|Groningen

|97.6

|21 × Enercon E-136 4.65MW

|2021

|

Windpark Kreekraksluis

|Zeeland

|82.5

|33 × Nordex 2.5MW

|2013

|

Windpark Kroningswind

|South Holland

|79.8

|19 × Vestas 4.2MW

|2022

|{{Cite web|title=Windpark Kroningswind|url=https://kroningswind.nl/}}

Windpark Oosterhorn

|Groningen

|77.4

|18 × Vestas V136 4.3MW

|2021

|

Windpark Delfzijl Zuid

|Groningen

|75

|34 × Enercon E70

|2006

|

Windpark Delfzijl Zuid Uitbreiding

|Groningen

|65

|16

|Planned 2024

|

GroWind

|Groningen

|63

|21 × Vestas

|2008

|

Windpark Delfzijl Noord

|Groningen

|62.7

|19 × Nordex 3.3MW

|2015

|

Windpark Geefsweer

|Groningen

|60.2

|14 × Vestas V136 4.3MW

|2021

|

Windpark Slufterdam

|South Holland

|50.4

|14 × Vestas V112 3.6MW

|2018

|{{Cite web|date=2019-02-12|title=Eneco en Vattenfall openen Windpark Slufterdam 2.0 met dubbel zoveel vermogen|url=https://www.portofrotterdam.com/nl/nieuws-en-persberichten/eneco-en-vattenfall-openen-windpark-slufterdam-20-met-dubbel-zoveel-vermogen|access-date=2021-02-25|website=Haven van Rotterdam|language=nl}}

Energiepark Pottendijk

|Drenthe

|50.4

|14 × 3.6MW

|2023

|

Windpark Deil

|Gelderland

|46

|11 × Vestas V136 4.2MW

|2020

|{{Cite web|title=Windpark Deil – Duurzame voorsprong in Deil|url=https://windparkdeil.nl/|access-date=2021-02-24|language=nl}}

Windpark Koegorspolder

|Zeeland

|42

|21 × Vestas V80/2000

|2007

|

Windpark Nij Hiddum-Houw

|Friesland

|41.8

|9 × Enercon E-136 4.65MW

|2022

|{{Cite web |title=Windpark Nij Hiddum-Houw |url=https://www.nijhiddumhouw.nl/ |access-date=2023-03-03 |website=Nij Hiddum-Houw |language=nl}}

= Noordoostpolder =

The largest wind farm in the Netherlands is Noordoostpolder with a capacity of 429 MW. The farm consists of three smaller wind farms owned by separate organisations with local community links. The wind farm's 86 wind turbines will produce 1.4 billion kWh of electricity, enough. power for over 400,000 households every day, a figure roughly equivalent to the number of households in the Northern Netherlands.

= Westereems =

File:Wind farm Westereems.JPG

The next largest onshore wind farm is the Westereems wind farm located in Eemshaven in Groningen, in the north of the Netherlands.

= Princess Alexia =

Up until the Westereems Wind Park was commissioned the largest onshore wind farm was the Princess Alexia Windpark in Zeewolde (122MW),{{cite web|url= http://www.power-technology.com/projects/princess-alexia-zuidlob-wind-farm/ |title=Princess Alexia (Zuidlob) Wind Farm|access-date=14 March 2017}} consisting of 36 REpower turbines and a 3.2MW/33MWh battery storage power station of BMW i3 batteries.{{cite web|url= http://renews.biz/106268/bmw-drives-vattenfall-storage/ |title=BMW drives Vattenfall storage|date=14 March 2017|access-date=14 March 2017}}

= Eemmeerdijk =

The Eemmeerdijk wind farm consists of wind turbines with just 2 blades, manufactured by Nedwind. The 19 turbines have a combined nominal power of 18 MW. The wind farm was built in 1998.

In 2006 the tower of one of the turbines had buckled. The damaged wind turbine could be safely dismantled.{{Cite web| title = Knak in windmolen 'wereldwijd eerste'| work = De Stentor| access-date = 2023-11-10| date = 2006-02-13| url = https://www.destentor.nl/noordoostpolder/knak-in-windmolen-wereldwijd-eerste~ae3b4b06/| language = nl}} A second wind turbine was also dismantled. In January 2023 another wind turbine collapsed due to strong winds, leaving the farm with only 16 turbines.{{Cite web |last=Lankhorst |first=Sabine |date=2023-01-04 |title=Eemmeerdijk Wind Farm turbine collapses |url=https://windpowernl.com/2023/01/04/eemmeerdijk-wind-farm-turbine-collapses/ |access-date=2023-04-11 |website=Windpowernl |language=en-GB}}

Offshore wind power

{{See also|List of offshore wind farms in the North Sea}}

= Current offshore wind farms =

class="wikitable sortable"
Wind farm

! Nameplate capacity
(MW)

! Turbines

! Commissioned

! Depth
range (m)

! km to
shore

! Owner

! Refs.

colspan="8" |Wind farms in the North Sea
Egmond aan Zee

| 108

| 36 × Vestas V90-3MW

| 2007

| 15–18

| 13

| Shell

| [http://www.noordzeewind.nl/ NoordzeeWind] (Egmond aan Zee){{Cite web |title=Shell NoordzeeWind |url=https://www.shell.nl/energie-en-innovatie/wind/noordzeewind.html |access-date=2023-04-02 |website=www.shell.nl |language=nl}}OWEZ (Netherlands) offshore wind farm 4C . Retrieved: 24 August 2010.

Princess Amalia

| 120

| 60 × Vestas V80-2MW

| 2008

| 19–24

| 26

| Eneco

| [http://projecten.eneco.nl/prinses-amaliawindpark Prinses Amaliawindpark]Princess Amalia (Netherlands) offshore wind farm 4C . Retrieved: 24 August 2010.

Luchterduinen

| 129

| 43 × Vestas V112/3000

| 2015

| 18–24

| 24

| Eneco, Mitsubishi

| [http://projecten.eneco.nl/eneco-luchterduinen/ Eneco project Luchterduinen]

Gemini

| 600

| 150 × Siemens SWT-4.0-130

| 2017

| 28–36

| 55

| Northland Power, Siemens, Van Oord, HVC Groep

| [http://geminiwindpark.nl/e_home.html Gemini Offshore Wind Park]{{cite web | url=http://www.4coffshore.com/windfarms/gemini-netherlands-nl18.html | title=Gemini Offshore Wind Farm - Fully Commissioned - Netherlands | 4C Offshore }}

Borssele I–II

| 752

| 94 × Siemens SWT-8.0-154

| 2020

| 14–40

| 22

| Ørsted

| [https://orsted.com/en/media/newsroom/news/2020/04/149516122883845 Borssele 1 & 2 generates first power]. Retrieved: 1. August 2020.

Borssele III–IV

|731.5

|77 × MHI Vestas V164 9.5MW

|2021

|14–38

|22

|Shell, Van Oord, Eneco, Partners Group, DGE

|{{Cite web|title=Homepage|url=https://www.blauwwind.nl/ |access-date=2021-02-23|website=Blauwwind|language=nl}}

Borssele V

|19

|2 × MHI Vestas V164 9.5MW

|2021

|

|

|Green Giraffe Holding, Investri Offshore, Van Oord

|{{Cite web|title=Innovation site Borssele Wind Farm Site V fully commissioned {{!}} Van Oord/|url=https://www.vanoord.com/en/updates/innovation-site-borssele-wind-farm-site-v-fully-commissioned/|access-date=2022-02-21|website=www.vanoord.com|language=en}}

Hollandse Kust (Zuid) I–IV

|1529

|139 × Siemens Gamesa 11.0-200 DD

|2024

|18–28

|18–36

|Vattenfall, BASF, Allianz

|{{Cite web|title=Vattenfall Hollandse Kust - Windpark op de Noordzee|url=https://vattenfall-hollandsekust.nl/ |access-date=2021-02-23|website=Windpark Hollandse Kust Zuid|language=nl-NL}}{{cite web |title=BASF to pay €1.6Bn for green power from offshore windfarm |url=https://www.rivieramm.com/news-content-hub/chemicals-giant-basf-to-pay-euro16bn-for-half-of-dutch-windfarm-66194 |website=Riviera |language=En}}

Hollandse Kust (Noord) V

|759

|69 × Siemens Gamesa 11.0-200 DD

|2023

|15–28

|18.5

|Shell, Eneco

|{{Cite web|title=Homepage|url=https://www.crosswindhkn.nl/ |access-date=2021-02-23|website=Crosswind Hollandse Kust Noord|language=nl}}

Hollandse Kust (West) VI

|760

|52 × Vestas V236 15MW

|Planned 2026

|

|53

|Shell, Eneco

|{{Cite web |title=Ecowende chooses Vestas wind turbines for Hollandse Kust West wind farm - Ecowende |url=https://ecowende.nl/en/news/ecowende-chooses-vestas-wind-turbines-for-hollandse-kust-west-wind-farm/ |access-date=2023-12-22 |website=ecowende.nl |language=en}}

Hollandse Kust (West) VII

|760

|53 × Vestas V236 15MW

|Planned 2028

|

|53

|RWE, TotalEnergies

|{{Cite web |title=Wind energy in Europe in 2019 - Trends and statistics |url=https://windeurope.org/data-and-analysis/product/wind-energy-in-europe-in-2019-trends-and-statistics/ |access-date=12 October 2020 |publisher=WindEurope}}{{Cite web |last=Buljan |first=Adrijana |date=2024-07-24 |title=TotalEnergies Buys Into RWE's Dutch Offshore Wind Farm to Produce Green Hydrogen; Contracts Signed with Main Suppliers |url=https://www.offshorewind.biz/2024/07/24/totalenergies-buys-into-rwes-dutch-offshore-wind-farm-to-produce-green-hydrogen-contracts-signed-with-main-suppliers/ |access-date=2024-08-14 |website=Offshore Wind |language=en-US}}

IJmuiden Ver Alpha

|2000

|

|Planned 2029

|

|62

|ABP, APG, SSE Renewables

|{{Cite web |title=Noordzeker and Zeevonk II receive permits for the largest Dutch wind farms in the North Sea |url=https://english.rvo.nl/en/news/permit-results-ijmuiden-ver-alpha-en-beta |access-date=2024-06-12 |website=RVO.nl |language=en}}
constructed by Smulders{{cite web | url=https://www.youtube.com/watch?v=h6q6vQ5yE4M | title=Sail away of TenneT's Hollandse Kust (West Alpha) substation | website=YouTube | date=6 September 2023 }}{{cite web | url=https://www.youtube.com/watch?v=wWR-itSWc7M | title=Load out of TenneT's Hollandse Kust (West Alpha) | website=YouTube | date=10 August 2023 }}

IJmuiden Ver Beta

|2000

|

|Planned 2029

|

|62

|Vattenfall, Copenhagen Infrastructure Partners

|

colspan="8" |Wind farms in the IJsselmeer
Lely (decommissioned 2016)

| 2

| 4 × Nedwind 500 kW/41

| 1994

| 3–4

| 0.8

| Nuon

| Lely (Netherlands) offshore wind farm 4C . Retrieved: 24 August 2010.

Irene Vorrink (decommissioned 2022)

| 16.8

| 28 × Nordtank NTK600/43

| 1996

| 2–3

| 0.1

| Vattenfall

| {{Cite web|title=Irene Vorrink: a nearshore wind farm|url=https://powerplants.vattenfall.com/irene-vorrink/ |access-date=2022-02-28|website=Vattenfall Power Plants|language=en}}{{cite web |title=Nearshore Wind Farm to Be Dismantled |url=https://www.offshorewind.biz/2022/03/08/nearshore-wind-farm-to-be-dismantled/ |website=Offshore Wind |date=8 March 2022}}

Westermeerwind (Noordoostpolder)

|144

|48 × Siemens SWT-3.0-DD

|2016

|4–7

|0.7–1.2

|Westermeerwind BV

|{{Cite web|title=Feiten, cijfers en planning – Westermeerwind|url=https://www.westermeerwind.nl/project/feiten-cijfers-en-planning/ |access-date=2021-02-23|language=nl-NL}}

Friesland

| 380

| 89 × Siemens SWT-4.3–130

| 2021

| 3–6

| 2

| Windpark Fryslân B.V.

| {{cite web|title=Netherlands' Friesland province to invest in 320-MW wind park|url=https://renewablesnow.com/news/netherlands-friesland-province-to-invest-in-320-mw-wind-park-560610/ |website=Renewables Now|access-date=27 March 2017}}{{cite web|title=Homepage|url=http://windparkfryslan.nl/ |website=Windpark Fryslân (Dutch)|access-date=27 March 2017}}{{cite web |title=Largest Freshwater Offshore Wind Farm At Full Tilt |url=https://www.offshorewind.biz/2021/12/08/largest-freshwater-offshore-wind-farm-at-full-tilt/ |website=Offshore Wind |date=8 December 2021}}{{cite web |title=Fryslan Wind Farm, a near-shore wind project in Netherlands |url=https://www.nsenergybusiness.com/projects/fryslan-wind-farm-friesland-netherlands/ |archive-url= https://web.archive.org/web/20210512175741/https://www.nsenergybusiness.com/projects/fryslan-wind-farm-friesland-netherlands/ |archive-date=12 May 2021 |url-status=live}}

IJsselmeer Buitendijks (Windplan Blauw)

|132

|24 × GE Cypress 5.5 MW

|2024

|

|0.5–1.5

|SwifterwinT, Vattenfall

|{{Cite web|title=Waar komt het windpark?|url=https://windplanblauw.nl/windplanblauw/waar-komt-het-windpark/ |access-date=2021-04-04|website=Windplanblauw|language=nl}}

{{Maplink

|frame=yes

|frame-width=480

|frame-height=600

|frame-long=4.8

|frame-lat=52.6

|zoom=7

|text=Offshore wind farm locations (interactive map)

|type=point |coord={{coord|52.6036|4.4255}}|title=Egmond aan Zee|description=108 MW

|type2=shape|id2=Q2188208 |stroke-width2=3 |title2=Egmond aan Zee|description2=108 MW

|type3=point|coord3={{coord|52.5883|4.2245}}|title3=Prinses Amalia|description3=120 MW

|type4=shape|id4=Q2617494 |stroke-width4=3 |title4=Prinses Amalia|description4=120 MW

|type5=point|coord5={{coord|52.4035|4.1648}}|title5=Luchterduinen|description5=129 MW

|type6=shape|id6=Q2843728 |stroke-width6=3 |title6=Luchterduinen|description6=129 MW

|type7=point|coord7={{coord|54.0362|5.9611}}|title7=Gemini|description7=600 MW

|type8=shape|id8=Q2443063 |stroke-width8=3 |title8=Gemini|description8=600 MW

|type9 =point|coord9 ={{coord|51.7474|3.0510}}|title9 =Borssele I |description9 =376 MW

|type10=point|coord10={{coord|51.6343|3.0733}}|title10=Borssele II |description10=376 MW

|type11=point|coord11={{coord|51.6628|2.9615}}|title11=Borssele III|description11=351.5 MW

|type12=point|coord12={{coord|51.7341|2.8864}}|title12=Borssele IV |description12=380 MW

|type13=point|coord13={{coord|51.7092|3.0033}}|title13=Borssele V |description13=19 MW

|type14=shape|id14=Q27926301 |stroke-width14=3|title14=Borssele I–V|description14=1502,5 MW

|type15=point|coord15={{coord|52.3815|4.0472}}|title15=Hollandse Kust (Zuid) I |description15=385 MW

|type16=point|coord16={{coord|52.2880|3.9848}}|title16=Hollandse Kust (Zuid) II |description16=385 MW

|type17=point|coord17={{coord|52.2212|4.0268}}|title17=Hollandse Kust (Zuid) III |description17=385 MW

|type18=point|coord18={{coord|52.3404|4.1554}}|title18=Hollandse Kust (Zuid) IV |description18=385 MW

|type19=shape|id19=Q65938799 |stroke-width19=3|title19=Hollandse Kust (Zuid) I–IV|description19=1540 MW

|type20=point|coord20={{coord|52.7151|4.2510}}|title20=Hollandse Kust (Noord) V |description20=759 MW

|type21=shape|id21=Q101627508|stroke-width21=3|title21=Hollandse Kust (Noord) V |description21=759 MW

|type22=point|coord22={{coord|52.7246|3.8065}}|title22=Hollandse Kust (West) VI |description22=756 MW

|type23=point|coord23={{coord|52.6504|3.6972}}|title23=Hollandse Kust (West) VII |description23=760 MW

|type24=shape|id24=Q114092255|stroke-width24=3|title24=Hollandse Kust (West) VI–VII|description24=1516 MW

|type25=point|coord25={{coord|52.8106|3.4710}}|title25=IJmuiden Ver Alpha|description25=2000 MW

|type26=point|coord26={{coord|52.9145|3.5718}}|title26=IJmuiden Ver Beta |description26=2000 MW

|type27=point|coord27={{coord|52.7970|5.1192}}|marker-color27=AAAAAA|title27=Lely (decommissioned)|description27=2 MW

|type28=point|coord28={{coord|52.5985|5.5854}}|marker-color28=AAAAAA|title28=Irene Vorrink (decommissioned)|description28=16.8 MW

|type29=point|coord29={{coord|53.0026|5.2613}}|marker-color29=E78F3F|title29=Fryslân |description29=382.7 MW

|type30=shape|id30=Q56194813 |stroke-width30=3|title30=Fryslân |description30=382.7 MW

|type31=point|coord31={{coord|52.7582|5.5783}}|marker-color31=E78F3F|title31=Westermeerwind |description31=144 MW

|type32=point|coord32={{coord|52.6043|5.5677}}|marker-color32=E78F3F|title32=IJsselmeer Buitendijks |description32=132 MW

}}

= Future offshore wind farms =

class="wikitable"

|+

!Wind farm{{Cite web |last=Klimaat |first=Ministerie van Economische Zaken en |date=2024-04-25 |title=Kamerbrief over update aanvullende routekaart wind op zee - Kamerstuk - Rijksoverheid.nl |url=https://www.rijksoverheid.nl/documenten/kamerstukken/2024/04/25/update-aanvullende-routekaart-wind-op-zee |access-date=2024-05-02 |website=www.rijksoverheid.nl |language=nl-NL}}

!Capacity (MW)

!Tender

!Planned commissioning

IJmuiden Ver Gamma

|2000

|2025

|2031

Nederwiek (Zuid) I

|2000

|2025

|2030

Nederwiek (Noord) II

|2000

|2026

|2032

Nederwiek (Noord) III

|2000

|2026

|2031

Doordewind I

|2000

|2027

|2032

Ten noorden van de Waddeneilanden I

|700

|2027

|2033

Hollandse Kust (West) VIII

|700

| -

| -

= Offshore grid =

Early offshore wind farms were responsible for installing their own offshore grid infrastructure to connect their wind farm to the main electricity grid. From 2016 onwards, the national grid operator TenneT has been designated as the offshore grid operator and is responsible for the construction of transmission infrastructure at sea.

Wind farms are connected via standardised connections of 700 megawatts (MW) AC or 2 gigawatts (GW) HVDC for larger wind farms located further offshore. Through the standardisation of these offshore platforms, the government hopes to significantly reduce the overall development, construction and maintenance costs.{{Cite web |title=Offshore Grid |url=https://www.noordzeeloket.nl/en/functions-and-use/offshore-wind-energy/offshore-grid/ |access-date=2023-03-17 |website=Noordzeeloket UK |language=en}}{{Cite web |title=Offshore projects Netherlands |url=https://www.tennet.eu/projects/offshore-projects-netherlands |access-date=2023-03-17 |website=TenneT |language=en}}

= Luchterduinen =

File:Prinses Amalia windmolenpark 4.jpg in the North Sea]]The Eneco Luchterduinen wind farm was officially opened in September 2015 and is a 50/50 joint venture between Dutch energy company Eneco and Japan's Mitsubishi corporation. The 129 MW Eneco Luchterduinen wind farm is located 23 km off the coast between Zandvoort and Noordwijk cities in the Netherlands. The farm consists of 43 Vestas V112 turbines of 3 MW capacity each.{{Cite news|url=http://www.power-technology.com/projects/eneco-luchterduinen-offshore-wind-farm-noordwijk/ |title=Power Technology.com|newspaper=Power Technology }}

= Princess Amalia =

In 2008, a second, somewhat larger offshore wind farm was built: the Princess Amalia Wind Farm, consisting of 60 Vestas V80 2MW turbines totaling 120 MW, sufficient to power 125,000 homes and help the Netherlands cut 225,000 tonnes of carbon dioxide emissions.{{cite web|url=http://statline.cbs.nl/StatWeb/publication/?DM=SLNL&PA=70960NED&D1=0-1,6,9&D2=a&D3=22-23&VW=T|title=Windenergie op land; productie en capaciteit per provincie (Windenergy on land; production and capacity per province|accessdate=16 November 2014}} {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #2 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}} The wind park was developed off the coast of IJmuiden by Econcern and Eneco Energie, at a total cost of $522.3 million.

= Egmond aan Zee (OWEZ) =

In 2006, the Egmond aan Zee Offshore Wind Farm was built, consisting of 36 Vestas V90 3MW turbines, totaling 108 MW, sufficient to light 100,000 houses.The Select Committee for Energy Independence and Global Warming. "In the sea, the Netherlands finds threats, hope." The Select Committee for Energy Independence and Global Warming. N.p., n.d. Web. 14 Oct.Q7 doesn't exist 2009.. {{verify source |date=September 2023 |reason=This ref was deleted Special:Diff/762423256 by a bug in VisualEditor and later restored by a bot from the original cite located at Special:Permalink/754951924 cite #7 - verify the cite is accurate and delete this template. User:GreenC_bot/Job_18}} The project cost $272 million and is cooperatively owned by Royal Dutch Shell and the Dutch utility company Nuon.

= Lely =

File:Windmolens_in_het_IJsselmeer_nabij_Medemblik_en_de_Wieringermeer.jpg

Lely was the first offshore wind farm in the Netherlands. Construction began in 1992 and the farm was completed in 1994. The nearshore wind farm had 4 Nedwind 500 KW turbines located 1 km to shore.

In 2014 one of the turbines lost its rotor with both blades due to metal fatigue.{{Cite web |last=annevisser |date=2014-12-30 |title=Lely Shut Down as Nuon Investigates Turbine Malfunction |url=https://www.offshorewind.biz/2014/12/30/lely-shut-down-as-nuon-investigates-turbine-malfunction/ |access-date=2023-04-11 |website=Offshore Wind |language=en-US}} The 4 wind turbines were eventually dismantled in 2016, after 22 years of service.{{Cite web|url=http://www.offshorewind.biz/2016/09/28/lely-offshore-wind-farm-is-no-more/ |title=offshoreWIND.biz|date=28 September 2016 }}