Golden Line (Delhi Metro)
{{Short description|Future line of the metro in Delhi, India}}
{{Use Indian English|date=January 2024}}
{{Use dmy dates|date=January 2024}}
{{Infobox rail line
| box_width =
| name = Golden Line
| other_name = Line 10, Line 11
| color = {{rcr|Delhi Metro|golden}}
| image =
| image_width =
| caption =
| type = Rapid transit
| system = Delhi Metro
| status = Under construction
| locale = Delhi
| start = Terminal 1-IGI Airport / Lajpat Nagar
| end = Tughlakabad
| stations = 16
Elevated: 4
Underground: 12
| daily_ridership =
| planopen = {{start date and age|2026|03||df=y|p=n|br=n}}{{cite news|title=Silver to Gold — Why Delhi Metro changed the colour code of this much awaited line|url=https://indianexpress.com/article/cities/delhi/delhi-metro-changed-the-colour-code-of-this-much-awaited-line-9133199/|work=The Indian Express|date=29 January 2024|access-date=29 January 2024|language=en}}
| open =
| close =
| owner = Delhi Metro
| operator = Delhi Metro Rail Corporation
| character = Underground and Elevated
| stock =
| linelength = {{convert|25.82|km|mi|abbr=on}}
| tracklength =
| tracks =
| gauge = {{Track gauge|1435mm|lk=on}} standard gauge
| electrification = {{25 kV 50 Hz}} overhead catenary
| speed =
| elevation =
| map = {{Delhi Metro Golden Line Route}}{{Delhi Metro Brown Line Route}}
| map_state = Show
}}
The Golden Line (Line 10 and Line 11) is a rapid transit line of the Delhi Metro currently under-construction. It will connect southern Delhi directly with Indira Gandhi International Airport to relieve the increasing traffic, congestion and pollution on roads. It will start from Terminal 1-IGI Airport, which was previously planned from Delhi Aerocity, and end in Tughlakabad.{{cite news|title=Delhi's Airport Metro set for silver line extension to terminal 1|url=https://www.constructionworld.in/policy-updates-and-economic-news/delhis-airport-metro-set-for-silver-line-extension-to-terminal-1/48426|work=Construction World|date=12 January 2024|access-date=14 January 2024|language=en}} It will be {{cvt|25.82|km}} long with 16 stations, out of which four will be elevated and 12 will be underground. Construction began on the line in June 2022, as part of the fourth phase of the Delhi Metro's development, and is expected to be completed by March 2026.{{Cite web |date=14 June 2022 |title=Delhi: Covid, green concerns put Phase-IV in low gear; push targets back |url=https://timesofindia.indiatimes.com/city/delhi/delhi-covid-green-concerns-put-phase-iv-in-low-gear-push-targets-back/articleshow/92190010.cms |access-date=16 June 2022 |website=The Times of India |language=en}}{{cite news|title=Afcons Begins Work on Delhi Metro Silver Line's Underground Section|url=https://themetrorailguy.com/2022/06/15/afcons-begins-work-on-delhi-metro-silver-lines-underground-section/|work=The Metro Rail Guy|date=15 June 2022|access-date=29 January 2024|language=en}}{{cite news|title=DMRC changes colour code of upcoming Delhi Aerocity–Tughlakabad Metro corridor|url=https://www.thestatesman.com/cities/delhi/dmrc-changes-colour-code-of-upcoming-delhi-aerocity-tughlakabad-metro-corridor-1503264541.html|work=The Statesman|date=29 January 2024|access-date=29 January 2024|language=en}}
History
The Golden Line, initially named as Silver Line, was conceptualized by the Delhi Metro Rail Corporation (DMRC) under the Phase IV of Delhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about {{cvt|104|km}} have been planned to be added to the metro network, out of which the Golden Line would cover southern Delhi at a length of {{cvt|20.2|km}}. The plans were finalized for implementation by the Government of Delhi in December 2018; this time the length of the Golden Line increased to {{cvt|23.6|km}}.{{cite news|title=Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024|url=https://www.news18.com/news/india/delhi-metros-much-awaited-phase-4-gets-aap-govts-nod-likely-to-be-ready-by-2024-1978485.html|work=News18|date=20 December 2018|access-date=29 January 2024|language=en}} In March 2019, the plans were approved for construction by the Government of India. Thus, land acquisition for Phase IV and Golden Line began from April 2019, and was completed by three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to the COVID-19 pandemic. Hence, construction was started by Afcons Infrastructure and Larsen & Toubro in June 2022. It was expected to be completed by 2024/25, which has been extended to March 2026, as of January 2024.
In November 2020, the DMRC changed the alignment of the Golden Line as per the instructions of the Archaeological Survey of India (ASI) to circumvent the Qutb Minar and the Mehrauli Archaeological Park, so to avoid any harm to these critical historical sites during construction and operation. As per the initial plan, the line was proposed to be extended to Terminal 1 of Indira Gandhi International Airport, in order to provide commuters a faster and direct link to the airport's premises. The proposal was approved by the Government of Delhi after the DMRC created and showed a Detailed Project Report (DPR) in December 2023, thereby increasing the line's length to {{cvt|25.82|km}}.{{cite news|title=Delhi Metro's Silver Line to Aerocity may be extended to terminal 1|url=https://timesofindia.indiatimes.com/city/delhi/metros-silver-line-to-aerocity-may-be-extended-to-terminal-1/articleshow/106107166.cms|work=The Times of India|date=19 December 2023|access-date=19 December 2023|issn=0971-8257|language=en}}{{cite news|title=Good News For Air Travellers! Delhi Metro's Silver Line To Aerocity To Be Extended To Terminal 1|url=https://www.timesnownews.com/delhi/delhi-metros-silver-line-to-aerocity-to-be-extended-to-terminal-1-article-106115639|work=Times Now|date=19 December 2023|access-date=19 December 2023|language=en}} The name of the line was changed from 'Silver Line' to 'Golden Line' in January 2024.{{cite web|title=Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates|url=https://themetrorailguy.com/delhi-metro-phase-4-information-map/|website=The Metro Rail Guy|access-date=29 January 2024}}
Stations
{{main|List of Delhi Metro stations}}
The stations being built on the Golden Line are:{{Cite news |date=2020-12-02 |title=Delhi Metro steers clear of Qutub Minar |work=The Times of India |url=https://timesofindia.indiatimes.com/city/delhi/metro-steers-clear-of-qutub-minar/articleshow/79518484.cms |access-date=2023-12-20 |issn=0971-8257}}{{Cite web |title=Delhi Metro map |url=https://www.delhimetrorail.com/network_map |access-date=21 April 2022 |website=www.delhimetrorail.com}}
=Main Line=
class="wikitable" style="text-align:center; width:100%;"
! colspan="10" style="background:#{{rail color|Delhi Metro|golden}};" |Golden Line | ||||||
rowspan="2" |#
! colspan="2" |Station Name ! rowspan="2" |Opening ! rowspan="2" |Interchange Connection ! rowspan="2" |Station Layout ! rowspan="2" |Platform Level Type | ||||||
---|---|---|---|---|---|---|
English | ||||||
1 | {{stl|Delhi Metro|Terminal 1 - IGI Airport}} | आईजीआई एयरपोर्ट - टर्मिनल 1 | 2026 | {{rcb|Delhi Metro|Magenta|croute}} | Underground | Island |
2 | {{stl|Delhi Metro|Delhi Aerocity}} | दिल्ली एरोसिटी
|2026 | {{rcb|Delhi Metro|Airport Express|croute}}
|Underground |Island | |||
3 | Mahipalpur | महिपालपुर
|2026 | None
|Underground | Side | ||
4 | Vasant Kunj | वसंत कुंज
|2026 |None |Underground |Side | ||||
5 | Kishangarh | किशनगढ़
|2026 |None |Underground |Side | ||||
6 | {{stl|Delhi Metro|Chhatarpur Chowk}} | छत्तरपुर
|2026 | {{rcb|Delhi Metro|Yellow|croute}}
|Underground |Side | |||
7 | Chhatarpur | छत्तरपुर मंदिर
|2026 | None
|Underground | Island | ||
8 | IGNOU | इग्नू
|2026 |None |Underground |Island | ||||
9 | Neb Sarai | नेब सराय
|2026 |None |Underground |Island | ||||
10 | Saket East | साकेत जी-ब्लॉक
|2026 | {{rcb|Delhi Metro|Golden|croute}} (Phase 4 - Proposed Branch) | Elevated | Side | |
11 | Ambedkar Nagar | अम्बेडकर नगर
|2026 | None
|Elevated |Side | |||
12 | Khanpur | ख़ानपुर
|2026 |None |Elevated |Side | ||||
13 | Sangam Vihar - Tigri | संगम विहार - तिगड़ी
|2026 |None |Elevated |Side | ||||
14 | Maa Anandmayee Marg | आनंदमयी मार्ग
|2026 |None | Underground | Side | ||
15 | Pul Pehladpur | पुल पहलादपुर
|2026 |None |Underground |Island | ||||
16 | {{stl|Delhi Metro|Tughlakabad Station}} | तुग़लक़ाबाद स्टेशन
|2026 | {{rcb|Delhi Metro|Violet|croute}}
|Underground |Island |
=Branch Line (formerly the [[Brown Line (Delhi Metro)|Brown Line]])=
class="wikitable" style="text-align:center; width=100%"
! colspan="10" style="background:#{{rail color|Delhi Metro|golden}};" |Golden Line Branch | ||||||
rowspan="2" |#
! colspan="2" |Station Name ! rowspan="2" |Opening ! rowspan="2" |Interchange Connection ! rowspan="2" |Station Layout ! rowspan="2" |Platform Level Type | ||||||
---|---|---|---|---|---|---|
English || Hindi | ||||||
1 | Saket East | साकेत पूर्व | Approved | {{rcb|Delhi Metro|Golden|croute}} (Phase 4 - Under Construction) | Elevated | Side |
2 | Pushp Vihar | पुष्प विहार | Approved | None
|Elevated |Side | ||
3 | Saket District Centre | साकेत जिला केंद्र
|Approved |None |Elevated |Side | ||||
4 | Sheikh Sarai | शेख सराय
|Approved |None |Elevated |Side | ||||
5 | Chirag Delhi | चिराग दिल्ली
|Approved | {{rcb|Delhi Metro|Magenta|croute}}
|Elevated |Side | |||
6 | Greater Kailash-1 | ग्रेटर कैलाश-१
|Approved | None
|Elevated |Side | |||
7 | Andrews Ganj | एंड्रयूज़ गंज
|Approved |None |Elevated |Side | ||||
8 | Lajpat Nagar | लाजपत नगर
|Approved | {{rcb|Delhi Metro|Pink|croute}} {{rcb|Delhi Metro|Violet|croute}} |Elevated |Side |
Project timeline
- July 2016: The Phase IV plan consisting of six new lines, including the Golden Line (then Silver Line) was created by the Delhi Metro Rail Corporation (DMRC).
- December 2018: The Phase IV and the Golden Line were approved by the Government of Delhi.
- March 2019: Both the Phase IV and the Golden Line were approved by the Government of India.
- November 2020: The alignment of the line was changed as per the advice of the Archaeological Survey of India (ASI) to avoid possible impacts to the Qutb Minar and the Mehrauli Archaeological Park.
- June 2022: Construction on the line started by Afcons Infrastructure and Larsen & Toubro.
- December 2023: The proposal to extend the line to Terminal 1 of Indira Gandhi International Airport was approved by the Government of Delhi.
Train Info
class="wikitable" style="text-align:center"
! colspan="2" style="background:#{{rail color|Delhi Metro|golden}};" |Golden Line |
Rakes |
---|
Train Length
|6 coaches |
Train Gauge
|{{Track gauge|4 ft8 1/2in|lk=on}} standard gauge |
Electrification
|25 kV 50 Hz AC through overhead catenary (OHE) |
Train's Maximum Speed
|100 km/h |
Train Operation |
See also
- List of Delhi Metro stations
- Transport in Delhi
- Delhi Metro Rail Corporation
- Delhi Suburban Railway
- Delhi Transport Corporation
- National Capital Region (India)
{{Clear}}
{{Portal bar|Trains|Transport|Engineering}}
References
{{Reflist}}
{{Delhi Metro}}
{{Delhi & NCR Metro stations|golden line=yes}}
{{Rapid transit in India}}
{{Rapid transit in Asia}}
{{Railways in Northern India}}