Line 11 (Shanghai Metro)

{{Short description|Line of Shanghai Metro}}

{{Infobox rail line

| name =

| native_name = 上海地铁11号线

| native_name_lang = zh

| other_name = R3 (planned name);
Shenjia line ({{zh|s=申嘉线}})

| logo = SHM Line 11 icon.svg

| logo_width = 100px

| color = {{rcr|SHM|11}}

| image = Qilianshan Road Station.JPG

| image_width = 300px

| image_alt =

| caption = Qilianshan Road Station

| type = {{rint|cn|metro}} Rapid transit

| system = {{rint|shanghai|metro}} Shanghai Metro

| status = Operational

| locale = Pudong; Xuhui, Changning, Putuo, and Jiading districts, Shanghai, China

Kunshan, Jiangsu, China

| start = {{stl|SHM|North Jiading}} / {{stl|SHM|Huaqiao}}

| end = {{stl|SHM|Disney Resort}}

| connectinglines =

| stations = 40

| routes = Mainline: {{stl|SHM|Disney Resort}} ↔ {{stl|SHM|North Jiading}}
Branchline: {{stl|SHM|Disney Resort}} ↔ {{stl|SHM|Huaqiao}}

| daily_ridership = 1.012 million (2019 peak){{Cite web |url=http://dy.163.com/v2/article/detail/E9QP84820514BTST.html |script-title=zh:【 1329.4万人次】3月8日上海地铁客流创历史新高 |access-date=2019-03-09 |publisher=Shanghai Metro |date=2019-03-09 |language=zh |archive-date=2020-05-22 |archive-url=https://web.archive.org/web/20200522160532/https://dy.163.com/v2/article/detail/E9QP84820514BTST.html |url-status=live }}

| yearcommenced = {{Start date and age|2005|12|30}}

| open = {{Start date and age|2009|12|31}}

| lastextension = {{Start date and age|2016|04|26}}

| close =

| owner = Shanghai Rail Transit Shenjia Line Development Co., Ltd. (Shanghai segment)
Kunshan Rail Transit Investment Development Co., Ltd. (Kunshan segment)

| operator = Shanghai No. 2 Metro Operation Co. Ltd.

| character = Underground, open cut + elevated

| depot = Shanghai Circuit Depot
North Jiading Yard
Chuanyang River Yard

| stock = 82 Class A 6-car trains

| linelength = {{convert|82.4|km|mi|2|abbr=on}}

| tracklength =

| tracks = 2

| gauge = {{RailGauge|sg}}

| electrification = Overhead lines (1500 volts DC)

| speed = {{convert|100|km/h|mph|0|abbr=on}}
Average speed: {{convert|40.3|km/h|mph|0|abbr=on}}{{cn|date=August 2023}} (mainline) {{convert|38.8|km/h|mph|0|abbr=on}}{{cn|date=August 2023}} (branchline)

| signalling = Thales’ SelTracTM CBTC

| elevation =

| website =

| map = {{Collapsible list

|titlestyle=background: #{{rcr|SHM|11}}; text-align:center;

|framestyle=border:none; padding:0;

|expand=true

|title={{ font color | white| Route on the Shanghai map:}}

|1=File:Shanghai Metro Line11 Map.png}}

{{Collapsible list

|titlestyle=background: #{{rcr|SHM|11}}; text-align:center;

|framestyle=border:none; padding:0;

|expand=true

|title={{ font color | white| To scale geographic map:}}

|1=File:Shanghai_Metro_Line_11.svg}}

{{unbulleted list

|item_style =background: #{{rcr|SHM|11}};

|{{Shanghai Metro/Line 11}}}}

| map_state =

}}

Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013, Line 11 serves Kunshan city, making it the second intercity metro in China, after the Guangfo Metro, and the first that crosses a provincial boundary.{{Cn|date=April 2023}} With a single-line mileage of {{convert|82.386|km}}, it is the third-longest single-line subway line in China, after Line 6 in Chongqing, which is {{Cvt|85.6|km}} long, and Line 7 in Wuhan, which is {{Cvt|83.6|km}} long. The line is colored brown on system maps.

History

The line 11 was originally planned to be from Jiading to Nanhui New City, with a total length of {{convert|120|km}}, the south part of the line has been transferred to line 16.

The 1st phase of line 11, which runs from {{stl|SHM|North Jiading}} to {{stl|SHM|Jiangsu Road}}, opened on 31 December 2009.{{cite web|url=http://www.railjournal.com/altworldmarket.shtml |title=International Railway Journal - Rail and Rapid Transit Industry News Worldwide |access-date=2008-11-11 |url-status=dead |archive-url=https://web.archive.org/web/20090122215159/http://railjournal.com/altworldmarket.shtml |archive-date=2009-01-22 }}{{cite web|url=http://sh.eastday.com/qtmt/20091227/u1a674397.html|title=沪轨交9号线二期、11号线北段一期31日开通试运营}} A branch line from {{stl|SHM|Anting}} opened on 29 March 2010.[http://news.163.com/10/0326/09/62MLSSQE000146BB.html 11号线支线下周一试运营] {{Webarchive|url=https://web.archive.org/web/20140103165620/http://news.163.com/10/0326/09/62MLSSQE000146BB.html |date=2014-01-03 }}, news.163.com. Retrieved 28 March 2010.

The 2nd phase runs from Jiangsu Road to {{stl|SHM|Luoshan Road}}. It opened on 31 August 2013.{{cite web|url=http://www.shanghaidaily.com/nsp/Metro/2012/08/17/Metro%2Bextension%2Bto%2Bopen%2Bnext%2Byear/|title=Metro extension to open next year}}

The 3rd phase connects Luoshan Road and the {{stl|SHM|Disney Resort}}. This section is {{convert|9.4|km}} long with three stations. All new stations except for the Disney Resort station opened on December 19, 2015.{{cite web|url=http://www.envir.gov.cn/info/2009/2009421347.htm |script-title=zh:上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 |language=zh |access-date=2009-04-06 |url-status=dead |archive-url=https://web.archive.org/web/20090405174458/http://www.envir.gov.cn/info/2009/2009421347.htm |archive-date=April 5, 2009 }} The Disney Resort started to trial operation on April 26, 2016.{{Cite web | title = 上海地铁迪士尼站下周二开站 末班车最晚22:30 | url = http://shanghai.xinmin.cn/msrx/2016/04/21/29883675.html | publisher = Xinmin.cn | date = 2016-04-21 | access-date = 2016-04-21 | archive-date = 2016-05-09 | archive-url = https://web.archive.org/web/20160509152150/http://shanghai.xinmin.cn/msrx/2016/04/21/29883675.html | url-status = live }}

From January 26, 2020 until March 24,{{cite news |title=24日起上海轨交11号线恢复跨省运营 |url=https://news.sina.com.cn/c/2020-03-23/doc-iimxxsth1236276.shtml |access-date=2020-03-24 |work=CCTV |date=2020-03-23 |archive-date=2020-03-23 |archive-url=https://web.archive.org/web/20200323131318/https://news.sina.com.cn/c/2020-03-23/doc-iimxxsth1236276.shtml |url-status=live }} the Kunshan section of line 11 ({{stl|SHM|Anting}} to {{stl|SHM|Huaqiao}}) was suspended due to the COVID-19 pandemic.{{cite news |author1=Yihong, Dong |title=为阻断疫情传播,上海轨交11号线花桥站至安亭站区段停运_新民社会_新民网 |url=http://shanghai.xinmin.cn/xmsq/2020/01/26/31640286.html |access-date=2020-01-26 |work=Xinmin.cn |date=2020-01-27 |archive-date=2020-01-26 |archive-url=https://web.archive.org/web/20200126070230/http://shanghai.xinmin.cn/xmsq/2020/01/26/31640286.html |url-status=live }}

On August 25, 2020, an infill station at {{stl|SHM|Chenxiang Highway}} was opened.{{cite web|url=http://sh.people.com.cn/n2/2020/0823/c134768-34244959.html|date=2020-08-23|title=上海轨道交通11号线陈翔公路站将于8月25日开通|access-date=2020-08-24|archive-date=2021-05-07|archive-url=https://web.archive.org/web/20210507132955/https://sh.people.com.cn/n2/2020/0823/c134768-34244959.html|url-status=live}}

On February 14, 2022, the Kunshan section of line 11 was again suspended due to the COVID-19 pandemic.{{Cite web |last=Hui |first=Liu |date=2022-02-14 |title=上海轨交11号线昆山段3站暂停运营 |url=https://j.021east.com/p/1644811613030322 |access-date=2022-04-28 |website=eastday.com |archive-date=2022-02-19 |archive-url=https://web.archive.org/web/20220219110948/https://j.021east.com/p/1644811613030322 |url-status=live }} It was reopened on July 4, 2022. {{Cite web |title="又可以乘地铁上班了!"上海轨交11号线昆山段今起恢复运营 |url=https://www.yzwb.net/zncontent/2319055.html |access-date=2024-04-16 |website=www.yzwb.net |archive-date=2024-05-21 |archive-url=https://web.archive.org/web/20240521155402/https://www.yzwb.net/zncontent/2319055.html |url-status=live }}

On September 28, 2024, an infill station {{stl|SHM|Kangheng Road}} was opened.{{Cite web|url= https://mp.weixin.qq.com/s/gIXR4v0RIz7SAkvoz2gv9g |script-title=zh: 轨道交通11号线康恒路站9月28日起开通初期运营 |date=2024-09-25|website=Shanghai Metro official WeChat account |language=zh-CN}}

border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible"

! colspan="7" style="text-align: center" bgcolor=#{{rcr|SHM|11}} | {{font color | white|Shanghai Metro Line 11 opening history}}

bgcolor=#cccccc

!Segment!!Commencement!!Opened!!Length!!Station(s)!!Name!!Investment

bgcolor=#eec7cd

|style="text-align: left;"| Jiangsu Road — North Jiading

| 30 Dec 2005

| 31 Dec 2009

| {{convert|33.0|km|mi|2|abbr=on}}

| 16

|style="text-align: left;"| Phase 1 (main section)

|rowspan=3| ¥18.95 billion

bgcolor=#eec7cd

|style="text-align: left;"| Jiading Xincheng — Anting

| 30 Dec 2005

| 29 Mar 2010

| {{convert|12.8|km|mi|2|abbr=on}}

| 3

|style="text-align: left;"| Phase 1 (branch section)

bgcolor=#eec7cd

|style="text-align: left;"| East Changji Road

|

| 26 Apr 2011

| Infill station

| 1

|style="text-align: left;"|

bgcolor=#de909c

|style="text-align: left;"| Luoshan Road — Jiangsu Road

| 19 Dec 2008

| 31 Aug 2013

| {{convert|19.2|km|mi|2|abbr=on}}

| 12

|style="text-align: left;"| Phase 2

| ¥12.965 billion

bgcolor=#eec7cd

|style="text-align: left;"| Anting — Huaqiao

| 27 Oct 2010

| 16 Oct 2013

| {{convert|7.0|km|mi|2|abbr=on}}

| 3

|style="text-align: left;"| Huaqiao extension

| ¥1.849 billion

bgcolor=#de909c

|style="text-align: left;"| Kangxin Highway — Luoshan Road

| 28 May 2013

| 19 Dec 2015

| {{convert|4.10|km|mi|2|abbr=on}}

| 2

|style="text-align: left;"| Disney extension (1st section)

|rowspan=2| ¥4.371 billion

bgcolor=#de909c

|style="text-align: left;"| Disney Resort — Kangxin Highway

| 28 May 2013

| 26 Apr 2016

| {{convert|5.08|km|mi|2|abbr=on}}

| 1

|style="text-align: left;"| Disney extension (2nd section)

bgcolor=#de909c

|style="text-align: left;"| Chenxiang Highway

|

| 25 Aug 2020

| Infill station

| 1

|style="text-align: left;"|

|

bgcolor=#de909c

|style="text-align: left;"| Kangheng Road

|

| 28 Sep 2024

| Infill station

| 1

|style="text-align: left;"|

|

style= "background:#{{rcr|SHM|11}}; height: 2pt"

| colspan = "7" |

=Controversy=

Due to the long length of line 11 and high passenger volumes, it is common for line 11 passengers to be forced to stand on the train for their entire trip. In response to this, in 2014, some passengers who travelled long distances between the urban area and the suburban areas of Jiading or Sanlin who could not bear standing for a long time started bringing their own folding seats into the carriages. Shanghai Metro said there is a safety hazard when sitting on personal benches. In the following years, the official Weibo of Shanghai Metro also reminded passengers of the phenomenon of "bench tribe" to be safe and civilized. Beginning in 2019, Line 11 posted relevant reminders in the carriages, and reminded passengers not to use their own benches in the carriages through the carriage broadcast.[https://web.archive.org/web/20201103165702/https://sh.qq.com/a/20190220/003128.htm Shanghai line 11 warns the "bench family" for the first time: Do not use your own small bench in the carriage.] Xinmin Evening News. 2019-02-20Xiong Yingqi. [https://web.archive.org/web/20201103125521/http://sh.sina.com.cn/news/s/2019-02-21/detail-ihrfqzka7709041.shtml Passengers of Shanghai Metro Line 11 board the train with a bench and become a unique warning.] Beijing Youth Daily. 2019-02-21.

Stations

{{Further|List of Shanghai Metro stations}}

=Service routes=

{{Sticky header}}

class="wikitable mw-collapsible sortable sticky-header" border="1" style="border-collapse: collapse;"

! colspan="11" style="text-align: center" bgcolor=#{{rcr|SHM|11}} | {{font color | black|Shanghai Metro Line 11 service routes}}

colspan="11" style="text-align: left" |

  • M - Mainline: {{stl|SHM|Disney Resort}} ↔ {{stl|SHM|North Jiading}}
  • B - Branch line: {{stl|SHM|Disney Resort}} ↔ {{stl|SHM|Huaqiao}}
  • P - Partial mainline: {{stl|SHM|Jiading Xincheng}} ↔ {{stl|SHM|Luoshan Road}} (operates only during working day peak)
  • C - Core: {{stl|SHM|Nanxiang}} ↔ {{stl|SHM|Luoshan Road}} (operates only during AM peak)
bgcolor=#{{rcr|SHM|11}}

! rowspan="1" colspan="2" |{{ font color | black|Routes}}

! colspan="2" | {{ font color | black|Station name}}

! rowspan="2" | {{ font color | black|Connections}}

! colspan="3" rowspan="1" | {{ font color | black|Distance}}

! rowspan="2" | {{ font color | black|Location}}

! rowspan="2" | {{ font color | black|Opening}}

! rowspan="2" | {{ font color | black|Platform{{cite web|url=http://service.shmetro.com/czxx/index.htm|script-title=zh:乘车指南 > Station信息|work=Shanghai Metro Official Site|access-date=2015-12-17|archive-date=2014-06-12|archive-url=https://web.archive.org/web/20140612041859/http://service.shmetro.com/czxx/index.htm|url-status=dead}} Instructions: {{lang|zh-hans|点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。}}}}

bgcolor=#{{rcr|SHM|11}}

! rowspan="1" | {{ font color | black|M}}

! rowspan="1" | {{ font color | black|P}}

! {{ font color | black|{{small|English}}}}

! {{ font color | black|{{small|Chinese}}}}

! colspan="2" |{{ font color | black|{{small|km}}}}

! {{ font color | black|{{small|min}}}}

style=height:.25pt

|colspan=11|

style=background:#{{rcr|SHM|11}};height:2pt

!colspan=11 style=background:#{{rcr|SHM|11}}|{{ font color | white|Mainline}}

align="center"|{{resize|70%|◕}}align="center"|{{resize|70%|◕}}

|{{stl|SHM|Disney Resort}}

|{{large|{{lang|zh-cn|迪士尼}}}}

|

|0.00

|0.00

|0

|rowspan=10|Pudong

|26 April 2016{{cite web|url=http://shanghai.xinmin.cn/msrx/2016/04/21/29883675.html|script-title=zh:上海地铁迪士尼站下周二开站 末班车最晚22:30|date=2016-04-21|work=新民网|access-date=2016-04-21|archive-date=2016-05-09|archive-url=https://web.archive.org/web/20160509152150/http://shanghai.xinmin.cn/msrx/2016/04/21/29883675.html|url-status=live}}

|Underground island{{cite news|url=http://sh.eastday.com/m/20141210/u1ai8484718.html|script-title=zh:11号线迪士尼段正式命名 地铁"迪士尼"站亮相|date=2014-12-10|work=东方网|access-date=2021-07-12|archive-date=2017-02-20|archive-url=https://web.archive.org/web/20170220130642/http://sh.eastday.com/m/20141210/u1ai8484718.html|url-status=dead}}

align="center"|{{resize|70%|◕}}align="center"|{{resize|70%|◕}}

|{{stl|SHM|Kangxin Highway}}

|{{large|{{lang|zh-cn|康新公路}}}}

|

|5.08

|5.08

|5

|rowspan=2|19 Dec 2015{{Cite web|url=http://shmetro.com/node49/201512/con114518.htm|script-title=zh:12月19日起 11、12、13号线新延伸段建成试运营|date=2015-12-17|website=Shanghai Metro Official Site|author=上海地铁运管中心|access-date=2015-12-17|archive-date=2015-12-21|archive-url=https://web.archive.org/web/20151221104743/http://www.shmetro.com/node49/201512/con114518.htm|url-status=dead}}

|rowspan=2|Elevated side

align="center"|{{resize|70%|◕}}align="center"|{{resize|70%|◕}}

|{{stl|SHM|Xiuyan Road}}

|{{large|{{lang|zh-cn|秀沿路}}}}

|

|2.32

|7.40

|8

align="center"|{{resize|70%|◐}}align="center"|{{resize|70%|◐}}

|{{stl|SHM|Luoshan Road}}

|{{large|{{lang|zh-cn|罗山路}}}}

|{{rint|shanghai|16}}

|1.78

|9.18

|11

|rowspan=2|31 Aug 2013{{Cite web|url=http://www.shmetro.com/node49/201308/con113351.htm|script-title=zh:11号线二期8月31日起通车试运营|author=上海地铁运管中心|date=2013-08-29|access-date=2013-08-29|archive-date=2013-09-01|archive-url=https://web.archive.org/web/20130901032846/http://www.shmetro.com/node49/201308/con113351.htm|url-status=live}}

|Elevated island

align="center"|{{resize|70%|◐}}align="center"|{{resize|70%|◐}}

|{{stl|SHM|Yuqiao}}

|{{large|{{lang|zh-cn|御桥}}}}

|{{rint|shanghai|18}}

|2.51

|11.69

|14

|rowspan=2|Underground island

align="center"|{{resize|70%|◐}}align="center"|{{resize|70%|◐}}

|{{stl|SHM|Kangheng Road}}

|{{large|{{lang|zh-cn|康恒路}}}}

|

|1.73

|13.42

|17

|28 Sep 2024

align="center"|{{resize|70%|◐}}align="center"|{{resize|70%|◐}}

|{{stl|SHM|Pusan Road}}

|{{large|{{lang|zh-cn|浦三路}}}}

|

|1.46

|14.88

|19

|rowspan=10|31 Aug 2013

|Underground side

align="center"|{{resize|70%|◐}}align="center"|{{resize|70%|◐}}

|{{stl|SHM|East Sanlin}}

|{{large|{{lang|zh-cn|三林东}}}}

|

|1.58

|16.46

|21

|Underground island

align="center"|●align="center"|●

|{{stl|SHM|Sanlin}}

|{{large|{{lang|zh-cn|三林}}}}

|

|1.21

|17.67

|23

|rowspan=1|Underground double island

align="center"|●align="center"|●

|{{stl|SHM|Oriental Sports Center}}

|{{large|{{lang|zh-cn|东方体育中心}}}}

|{{rint|shanghai|6}} {{rint|shanghai|8}}

|3.13

|20.8

|28

|Underground double island (shared with {{rint|shanghai|6}})

align="center"|●align="center"|●

|{{stl|SHM|Longyao Road}}

|{{large|{{lang|zh-cn|龙耀路}}}}

|

|2.14

|22.94

|31

|rowspan=5|Xuhui

|rowspan=8|Underground island

align="center"|●align="center"|●

|{{stl|SHM|Yunjin Road}}

|{{large|{{lang|zh-cn|云锦路}}}}

|

|0.76

|23.70

|33

align="center"|●align="center"|●

|{{stl|SHM|Longhua}}

|{{large|{{lang|zh-cn|龙华}}}}

|{{rint|shanghai|12}}

|1.01

|24.71

|35

align="center"|●align="center"|●

|{{stl|SHM|Shanghai Swimming Center}}

|{{large|{{lang|zh-cn|上海游泳馆}}}}

|

|1.39

|26.10

|38

align="center"|●align="center"|●

|{{stl|SHM|Xujiahui}}

|{{large|{{lang|zh-cn|徐家汇}}}}

|{{rint|shanghai|1}} {{rint|shanghai|9}}

|1.85

|27.95

|41

align="center"|●align="center"|●

|{{stl|SHM|Jiao Tong University}}

|{{large|{{lang|zh-cn|交通大学}}}}

|{{rint|shanghai|10}}

|0.88

|28.83

|43

|rowspan=2|Changning

align="center"|●align="center"|●

|{{stl|SHM|Jiangsu Road}}

|{{large|{{lang|zh-cn|江苏路}}}}

|{{rint|shanghai|2}}

|2.08

|30.91

|46

|rowspan=11|31 Dec 2009{{cite web|url=http://news.qq.com/a/20091228/002084.htm|script-title=zh:上海轨交9号线2期11号线北段1期12月31日开通|date=2009-12-28|publisher=Tencent (QQ) News|access-date=2021-07-12|archive-date=2015-12-22|archive-url=https://web.archive.org/web/20151222141550/http://news.qq.com/a/20091228/002084.htm|url-status=live}}

align="center"|●align="center"|●

|{{stl|SHM|Longde Road}}

|{{large|{{lang|zh-cn|隆德路}}}}

|{{rint|shanghai|13}}

|1.35

|32.26

|49

|rowspan=9|Putuo

align="center"|●align="center"|●

|{{stl|SHM|Caoyang Road}}

|{{large|{{lang|zh-cn|曹杨路}}}}

|{{rint|shanghai|3}} {{rint|shanghai|4}} {{rint|shanghai|14}}{{efn-lr|Virtual transfer with line 14 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.}}

|0.98

|33.24

|51

|Underground double island{{efn-lr|The platform in the direction of {{stl|SHM|Disney Resort}} is on the B2 floor, and the platform in the direction of {{stl|SHM|North Jiading}} and {{stl|SHM|Huaqiao}} is on the B3 floor. It was originally planned that line 14 would transfer at this station on the same station as this line. Later, because line 14 adopted the {{stl|SHM|Wuning Road}} plan, the reserved platform was abandoned. Therefore, the actual use of this station is a side stacking platform.}}

align="center"|●align="center"|●

|{{stl|SHM|Fengqiao Road}}

|{{large|{{lang|zh-cn|枫桥路}}}}

|

|0.81

|34.05

|53

|Underground island

align="center"|●align="center"|●

|{{stl|SHM|Zhenru}}

|{{large|{{lang|zh-cn|真如}}}}

|{{rint|shanghai|14}}

|1.05

|35.10

|55

|Underground side & island

align="center"|●align="center"|●

|{{stl|SHM|Shanghai West}}

|{{large|{{lang|zh-cn|上海西站}}}}

|{{rint|shanghai|15}} {{nowrap|{{rint|cn|rail|link=Shanghai West railway station}} SXH}}

|1.35

|36.45

|57

|rowspan=5|Underground island

align="center"|●align="center"|●

|{{stl|SHM|Liziyuan}}

|{{large|{{lang|zh-cn|李子园}}}}

|

|1.45

|37.90

|60

align="center"|●align="center"|●

|{{stl|SHM|Qilianshan Road}}

|{{large|{{lang|zh-cn|祁连山路}}}}

|

|1.35

|39.25

|62

align="center"|●align="center"|●

|{{stl|SHM|Wuwei Road}}

|{{large|{{lang|zh-cn|武威路}}}}

|

|1.32

|40.57

|65

align="center"|●align="center"|●

|{{stl|SHM|Taopu Xincun}}

|{{large|{{lang|zh-cn|桃浦新村}}}}

|

|1.59

|42.16

|67

align="center"|●align="center"|●

|{{stl|SHM|Nanxiang}}

|{{large|{{lang|zh-cn|南翔}}}}

|

|3.13

|45.29

|71

|rowspan=4|Jiading

|Elevated side & island

align="center"|{{resize|70%|◑}}align="center"|{{resize|70%|◑}}

|{{stl|SHM|Chenxiang Highway}}

|{{large|{{lang|zh-cn|陈翔公路}}}}

|

|2.36

|47.65

|74

|25 Aug 2020

|rowspan=2|Elevated side

align="center"|{{resize|70%|◑}}align="center"|{{resize|70%|◑}}

|{{stl|SHM|Malu}}

|{{large|{{lang|zh-cn|马陆}}}}

|

|3.40

|51.05

|78

|rowspan=2|31 De 2009

align="center"|{{resize|70%|◑}}align="center"|{{resize|70%|◑}}

|{{stl|SHM|Jiading Xincheng}}

|{{large|{{lang|zh-cn|嘉定新城}}}}

|

|2.90

|53.95

|82

|Elevated side & island

style=background:#{{rcr|SHM|11}};height:2pt

!colspan=11 style=background:#{{rcr|SHM|11}}|{{ font color | white|Mainline}}

align="center"|{{resize|70%|◔}}align="center"||

|{{stl|SHM|Baiyin Road}}

|{{large|{{lang|zh-cn|白银路}}}}

|

|1.89

|55.84

|84

|rowspan=3|Jiading

|rowspan=3|31 Dec 2009

|Elevated side

align="center"|{{resize|70%|◔}}align="center"||

|{{stl|SHM|West Jiading}}

|{{large|{{lang|zh-cn|嘉定西}}}}

|

|3.29

|59.13

|88

|Elevated island

align="center"|{{resize|70%|◔}}align="center"||

|{{stl|SHM|North Jiading}}

|{{large|{{lang|zh-cn|嘉定北}}}}

|

|1.94

|61.07

|91

|Elevated side

style=background:#{{rcr|SHM|11}};height:2pt

!colspan=11 style=background:#{{rcr|SHM|11}}|{{ font color | white|Branchline}}

align="center"|align="center"|{{resize|70%|◔}}

|{{stl|SHM|Shanghai Circuit}}

|{{large|{{lang|zh-cn|上海赛车场}}}}

|

|3.15

|64.22

|86

|rowspan=4|Jiading

|29 March 2010{{cite web|url=http://www.shmetro.com/node49/201003/con103437.htm|script-title=zh:3月29日11号线支线嘉定新城—安亭通车试运营 11号线"Y型"线路运营同步覆盖早晚高峰|date=2010-03-26|publisher=Shanghai Metro Official Site|access-date=2021-07-12|archive-date=2015-09-24|archive-url=https://web.archive.org/web/20150924101619/http://www.shmetro.com/node49/201003/con103437.htm|url-status=dead}}

|Open-cut side

align="center"|align="center"|{{resize|70%|◔}}

|{{stl|SHM|East Changji Road}}

|{{large|{{lang|zh-cn|昌吉东路}}}}

|

|5.27

|69.49

|91

|26 April 2011{{cite web|url=http://www.shmetro.com/node49/201104/con107882.htm|script-title=zh:11号线昌吉东路站开通 方便周边乘客|date=2011-04-28|publisher=Shanghai Metro Official Site|access-date=2021-07-12|archive-date=2016-08-06|archive-url=https://web.archive.org/web/20160806235455/http://www.shmetro.com/node49/201104/con107882.htm|url-status=dead}}

|At-grade side

align="center"|align="center"|{{resize|70%|◔}}

|{{stl|SHM|Shanghai Automobile City}}

|{{large|{{lang|zh-cn|上海汽车城}}}}

|

|2.25

|71.74

|94

|rowspan=2|29 March 2010

|Elevated side

align="center"|align="center"|{{resize|70%|◔}}

|{{stl|SHM|Anting}}

|{{large|{{lang|zh-cn|安亭}}}}

|

|1.84

|73.58

|97

|rowspan=2|Elevated island

align="center"|align="center"|{{resize|70%|◔}}

|{{stl|SHM|Zhaofeng Road}}

|{{large|{{lang|zh-cn|兆丰路}}}}

|

|1.12

|74.70

|100

|rowspan=3|Kunshan, JS

|rowspan=3|16 Oct 2013{{cite web|url=http://sh.eastday.com/m/20131016/u1a7716668.html|script-title=zh:上海地铁11号线今开通花桥段 安亭到花桥仅10分钟|publisher=东方网|access-date=2013-10-17|archive-date=2013-10-19|archive-url=https://web.archive.org/web/20131019005631/http://sh.eastday.com/m/20131016/u1a7716668.html|url-status=dead}}

align="center"|align="center"|{{resize|70%|◔}}

|{{stl|SHM|Guangming Road}}

|{{large|{{lang|zh-cn|光明路}}}}

|

|3.29

|77.99

|104

|rowspan=2|Elevated side

align="center"|align="center"|{{resize|70%|◔}}

|{{stl|SHM|Huaqiao}}

|{{large|{{lang|zh-cn|花桥}}}}

|{{rint|suzhou|metro}} {{rint|suzhou|11}} (Suzhou Rail Transit)

|1.27

|79.26

|107

style = "background:#{{rcr|SHM|11}}; height: 2pt"

| colspan = "11" |

colspan = "11" |Passengers going to Huaqiao at Disney Resort Station, Kangxin Highway Station and Xiuyan Road Station during rush hour have to transfer at Jiading Xincheng Station.
{{notelist-lr}}
style = "background: #{{rcr|SHM|11}}; height: 2pt;"

| colspan = "11" |

=Future expansions=

==Kangheng Road station==

Although {{stl|SHM|Kangheng Road}} station is part of the second phase of Line 11, it did not open with the other stations on August 31, 2013.{{Cite web |url= http://www.shmetro.com/node49/201308/con113351.htm |script-title= zh:11号线二期8月31日起通车试运营 |author= Shanghai Metro |date= 2013-08-29 |language= zh |access-date= 2013-08-29 |archive-date= 2013-09-01 |archive-url= https://web.archive.org/web/20130901032846/http://www.shmetro.com/node49/201308/con113351.htm |url-status= live }} Instead, it has been left as a reserved station under construction that will open in the future pending development in the area.{{Cite web|url=http://sh.eastday.com/m/20120805/u1a6759793.html|script-title=zh:途经5个区可换乘11条轨交 11号线北段二期今年内完工|date=2012-08-05|website=Eastday|language=zh-CN|access-date=2021-07-07|archive-date=2012-08-09|archive-url=https://web.archive.org/web/20120809014625/http://sh.eastday.com/m/20120805/u1a6759793.html|url-status=live}}[http://www.envir.gov.cn/info/2008/2008110646.htm 上海市轨道交通11号线北段工程补充环境影响评价公示] {{Webarchive|url=https://web.archive.org/web/20130320021815/http://www.envir.gov.cn/info/2008/2008110646.htm |date=2013-03-20 }} {{in lang|zh}} It opened on 28 September 2024.{{Cite web |date=2024-09-25 |script-title=zh: 轨道交通11号线康恒路站9月28日起开通初期运营 |url=https://mp.weixin.qq.com/s/gIXR4v0RIz7SAkvoz2gv9g |website=Shanghai Metro official WeChat account |language=zh-CN}}

=Station name change=

  • On May 7, 2011, Jiyang Road was renamed {{stl|SHM|Oriental Sports Center}} (before line 11 began serving the station).

Headways

border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible"

! colspan="6" style="text-align: center" bgcolor=#{{rcr|SHM|11}} | {{font color | white|Shanghai Metro Line 11 headway{{cite web|date=2021-07-07|title=Schedule|url=http://service.shmetro.com/hcskb/index.htm|access-date=2021-07-07|publisher=Shanghai Metro|language=zh|archive-date=2017-11-13|archive-url=https://web.archive.org/web/20171113100804/http://service.shmetro.com/hcskb/index.htm|url-status=dead}}}}

bgcolor=#{{rcr|SHM|11}}

| colspan=2|{{font color | white|Time}}

{{stl|SHM|North Jiading}} -
{{stl|SHM|Jiading Xincheng}}
& {{stl|SHM|Huaqiao}} - {{stl|SHM|Jiading Xincheng}}
{{stl|SHM|Jiading Xincheng}} -
{{stl|SHM|Nanxiang}}
{{stl|SHM|Nanxiang}} -
{{stl|SHM|Luoshan Road}}
{{stl|SHM|Luoshan Road}} -
{{stl|SHM|Disney Resort}}
bgcolor=#cccccc

! colspan=6 align=center|Monday - Friday (working days)

{{nowrap|AM peak}}7:30-9:00Southbound: 6 - 10 min
Northbound: 7 min and 30 sec - 10 min
Southbound: 3 min
Northbound: 3 min and 45 sec
Southbound: 2 min
Northbound: 2 min and 30 sec
Southbound: 6 min
Northbound: 7 min and 30 sec
bgcolor=#EFEFEF

|Off-peak

9:00–17:00About 12 mincolspan=3 align=center|About 6 min
PM peak17:00–19:00Southbound: 7 min
Northbound: 6 min
colspan=2 align=center|Southbound: 3 min and 30 sec
Northbound: 2 min and 30 sec
Southbound: 7 min
Northbound: 6 min
bgcolor=#EFEFEF

|Other
hours

{|
{{nowrap|Before 7:30}}
After 19:00

| About 12-18 min || colspan=3 align=center|About 5 – 7 min

|-bgcolor=#cccccc

! colspan=6 align=center|Saturday and Sunday (weekends)

|-

|Peak||8:00–20:00|| 10 min|| colspan=3 align=center|About 5 min

|-bgcolor=#EFEFEF

|Other
hours||

Before 8:00
After 20:00

| About 10-12 min|| colspan=3 align=center|About 6-8 min

|- style= "background:#{{rcr|SHM|11}}; height: 2pt"

| colspan = "6" |

|}

Technology

=Rolling stock=

border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible sortable"

! colspan="9" style="text-align: center" bgcolor="#{{rcr|SHM|11}}" | {{font color | white|Shanghai Metro Line 11 rolling stock}}

bgcolor=#cccccc

! Fleet numbers

ManufacturerTime of
manufac-
turing
ClassNo
of
car
class="unsortable" | Assembly{{efn-lr|Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.}}Rolling stockNumberclass="unsortable" | Notes

bgcolor=#eec7cd

| 396

CRRC Zhuzhou Locomotive Co., Ltd.2008-2011A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}}6Tc+Mp+M+M+Mp+Tc11A011101-1166
(110011-113961)
Line 11 (Shanghai Metro){{Cite web|url=https://www.crrcgc.cc/zj/g1573/s4142/t61502.aspx|script-title=zh:上海市轨道交通十一号线北段车辆 |language=zh |date=2013-11-24|script-website=zh:中车株洲电力机车有限公司|access-date=2020-03-20}} Some of the trains are Disney-themed, and their inside and outside are packaged with Disney cartoon elements.
Original name: AC16.
bgcolor=#de909c

| 36

CRRC Changchun Railway Vehicles Co., Ltd.2015-2016A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}}6Tc+Mp+M+M+Mp+Tc11A021167-1172
(113971-114321)
Line 11 (Shanghai Metro)
bgcolor=#eec7cd

| 60

CRRC Zhuzhou Locomotive Co., Ltd.2015-2016A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}}6Tc+Mp+M+M+Mp+Tc11A031173-1182
(114331-114921)
Line 11 (Shanghai Metro)114381 was wrecked on December 22, 2024.{{Cite web |last=腾讯网 |date=2024-12-22 |title=上海地铁一列车撞上“侵入”的塔吊,事发现场曝光,官方通报_腾讯新闻 |url=https://news.qq.com/rain/a/20241222A033TJ00?suid=&media_id= |access-date=2024-12-22 |website=news.qq.com |language=zh-CN}}
style= "background:#{{rcr|SHM|11}}; height: 2pt"

| colspan="9" |

colspan = "9" |{{notelist-lr}}
style = "background: #{{rcr|SHM|11}}; height: 2pt;"

| colspan = "9" |

File:Shanghai Metoro Line 11 AC11 Huaqiao.JPG|11A01 train

Accident

On 22 December 2024, a northbound train (set 1173) hit the lifting arm of a tower crane which collapsed and fell towards the track between Chenxiang Highway station and Malu station. The train's head suffered serious damages and the train stopped. Shanghai Metro announced the service suspended between Wuwei Road station and Malu station.{{cite web|url=https://news.cctv.com/2024/12/22/ARTIjhn6XnGzqKNGQBY6jRDF241222.shtml|title=上海地铁11号线遭吊车侵入 应急管理部派出工作组赶赴现场|website=央视网|date=2024-12-22|accessdate=2024-12-22}}

References

{{reflist}}

{{Shanghai Metro lines}}

{{Shanghai Metro

|line11=yes

}}

{{DEFAULTSORT:Shanghai Metro, Line 11}}

Category:Shanghai Metro lines

Category:Railway lines opened in 2009

Category:2009 establishments in Shanghai

Category:1500 V DC railway electrification