Line 7 (Shanghai Metro)
{{Short description|Metro line of the Shanghai Metro}}
{{Infobox rail line
| name =
| native_name = 上海地铁7号线
| native_name_lang = zh
| other_name = M7 (planned name)
| logo = SHM Line 7 icon.svg
| logo_width = 100px
| color = {{rcr|SHM|7}}
| image = Zhenping Road Station Line 7 Platform.jpg
| image_width = 300px
| image_alt =
| caption = A view of station Zhenping Road
| type = {{rint|cn|metro}} Rapid transit
| system = {{rint|shanghai|metro}} Shanghai Metro
| status = Operational
| locale = Pudong; Xuhui, Jing'an, Putuo, and Baoshan districts, Shanghai, China
| start = {{stl|SHM|Meilan Lake}}
| end = {{stl|SHM|Huamu Road}}
| connectinglines =
| stations = 33
| routes =
| daily_ridership = 958,000 (2019 Peak){{Cite web |url=http://dy.163.com/v2/article/detail/E9QP84820514BTST.html |title=Metro breaks records |access-date=2019-03-09 |publisher=Shanghai Metro 163 Official |date=2019-03-09 |language=zh }}
| yearcommenced = {{Start date and age|2005|11|24}}
| open = {{Start date and age|2009|12|05}}
| lastextension = {{Start date and age|2010|12|28}}
| close =
| owner = Shanghai Rail Transit Line 7 Development Co., Ltd.
| operator = Shanghai No. 3 Metro Operation Co. Ltd.
| character = Underground
Elevated (Luonan Xincun and Meilan Lake)
| depot = Chentai Road Depot
Longyang Road Yard
| stock = 79 Class A 6-car trains
| linelength = {{convert|44.2|km|mi|1|abbr=on}}
| tracklength =
| tracks = 2
| gauge = {{RailGauge|sg}}
| electrification = Overhead lines (1500 volts)
| speed = {{convert|80|km/h|mph|0|abbr=on}}
Average speed: {{convert|30.3|km/h|mph|0|abbr=on}}
| signalling = Thales’ SelTracTM CBTC
| elevation =
| website =
| map = {{Collapsible list
|titlestyle=background: #{{rcr|SHM|7}}; text-align:center;
|framestyle=border:none; padding:0;
|expand=true
|title={{ font color | black| Route on the Shanghai map:}}
|1=File:Shanghai Metro Line7 Map.png}}
{{Collapsible list
|titlestyle=background: #{{rcr|SHM|7}}; text-align:center;
|framestyle=border:none; padding:0;
|expand=true
|title={{ font color | black| To scale geographic map:}}
|1=File:Shanghai Metro Line 7.svg}}
{{unbulleted list
|item_style =background: #{{rcr|SHM|7}};
|{{Shanghai Metro/Line 7}}}}
| map_state =
}}
Line 7 is a northwest–southeast line of the Shanghai Metro network. It connects the Baoshan District of Shanghai with the downtown core as well as the Pudong New Area and the Expo 2010 site. It currently runs from {{stl|SHM|Meilan Lake}} in Baoshan District to {{stl|SHM|Huamu Road}} in Pudong, which is near Shanghai New International Expo Center. {{stl|SHM|Qihua Road}} serves as a terminus for trains returning to Chentai Road Depot. The line is colored orange on system maps.
History
- Construction began on November 24, 2005.
- The first section of the line from Huamu Road to Shanghai University opened to the public on December 5, 2009.http://www.shanghaidaily.com/article/?id=421856&type=Metro {{Dead link|date=August 2022}}{{Cite web|url=http://www.shmetro.com/node49/200912/con102423.htm|title = 上海地铁}}
- In the first few months of operation, the trains only operated from 9AM-4PM to allow for extended testing of the line.
- On February 20, 2010, operating hours have been extended to fall in line with the rest of the metro system afterwards.{{cite web |url=http://www.ce.cn/cysc/jtys/csjt/200909/08/t20090908_19666062.shtml |title=上海7号线月底首列车完成调试 有望11月通车_中国经济网――国家经济门户 |website=www.ce.cn |url-status=dead |archive-url=https://web.archive.org/web/20091120092407/http://www.ce.cn/cysc/jtys/csjt/200909/08/t20090908_19666062.shtml |archive-date=2009-11-20}}http://www.shanghaidaily.com/sp/article/2009/200912/20091203/article_421482.htm {{Dead link|date=August 2022}}
- On April 20, 2010, Houtan station entered operation.
- In December 2010, three stations on the northern extension of the line opens.
- In June 2011, two more stations on the northern extension of the line opens.
- In July 2014, Qihua Road station entered operation.
border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible"
! |
bgcolor=#cccccc
!Segment!!Commencement!!Opened!!Length!!Station(s)!!Name!!Investment |
bgcolor=#ffc399
|style="text-align: left;"| Shanghai University — Huamu Road | 24 Nov 2005 | 5 Dec 2009 | {{convert|34.4|km|mi|2|abbr=on}} | 26 |style="text-align: left;"| Initial phase | ¥18.7 billion |
bgcolor=#ffc399
|style="text-align: left;"| Houtan | | 20 Apr 2010 | Infill station | 1 |style="text-align: left;"| | |
bgcolor=#fee1cc
|style="text-align: left;"| Meilan Lake — Shanghai University | 24 Nov 2005 | 28 Dec 2010 | {{convert|9.8|km|mi|2|abbr=on}} | 3 |style="text-align: left;"| Northern extension | ¥3.157 billion |
bgcolor=#fee1cc
|style="text-align: left;"| Panguang Road, Liuhang | | 30 Jun 2011 | Infill stations | 2 |style="text-align: left;"| | |
bgcolor=#fee1cc
|style="text-align: left;"| Qihua Road | | 22 Jul 2014 | Infill station | 1 |style="text-align: left;"| | |
style= "background:#{{rcr|SHM|7}}; height: 2pt"
| colspan = "7" | |
Stations
{{Further|List of Shanghai Metro stations}}
=Service routes=
border=1 style="border-collapse: collapse;" class="mw-collapsible"
! colspan="11" style="text-align: center" bgcolor=#{{rcr|SHM|7}} | {{font color | black|Shanghai Metro Line 7 service routes}} | |
colspan="11" style="text-align: left" |
| |
bgcolor=#{{rcr|SHM|7}}
! rowspan="1" colspan="2" |{{ font color | black|Routes}} ! colspan="2" | {{ font color | black|Station name}} ! rowspan="2" | {{ font color | black|Connections}} ! colspan="3" rowspan="1" | {{ font color | black|Distance}} ! rowspan="2" | {{ font color | black|Location}} ! rowspan="2" | {{ font color | black|Open- ! rowspan="2" | {{ font color | black|Plat- | |
bgcolor=#{{rcr|SHM|7}}
! rowspan="1" | {{ font color | black|M}} ! rowspan="1" | {{ font color | black|P}} ! {{ font color | black|{{small|English}}}} ! {{ font color | black|{{small|Chinese}}}} ! colspan="2" |{{ font color | black|{{small|km}}}} ! {{ font color | black|{{small|min}}}} | |
align="center"|● | align="center"|
|{{stl|SHM|Meilan Lake}} |{{large|{{lang|zh-cn|美兰湖}}}} | |0.00 |0.00 |0 |rowspan=13|Baoshan |rowspan=2|Elevated Side |
align="center"|● | align="center"|
|Luonan Xincun |{{large|{{lang|zh-cn|罗南新村}}}} | |1.65 |1.65 |4 |
align="center"|● | align="center"|
|Panguang Road |{{large|{{lang|zh-cn|潘广路}}}} | |2.98 |4.63 |8 |rowspan=2|30 June |rowspan=6|Underground Island |
align="center"|● | align="center"|
|{{stl|SHM|Liuhang}} |{{large|{{lang|zh-cn|刘行}}}} | |0.97 |5.60 |10 |
align="center"|● | align="center"|
|{{stl|SHM|Gucun Park}} |{{large|{{lang|zh-cn|顾村公园}}}} |{{rint|shanghai|15}} |1.72 |7.32 |13 |
align="center"|● | align="center"|●
|{{stl|SHM|Qihua Road}} |{{large|{{lang|zh-cn|祁华路}}}} | |2.74 |10.06 |17 |
align="center"|● | align="center"|●
|{{stl|SHM|Shanghai University}} |{{large|{{lang|zh-cn|上海大学}}}} | |1.68 |11.74 |20 |
align="center"|● | align="center"|●
|{{stl|SHM|Nanchen Road}} |{{large|{{lang|zh-cn|南陈路}}}} | |0.95 |12.69 |22 |
align="center"|● | align="center"|●
|{{stl|SHM|Shangda Road}} |{{large|{{lang|zh-cn|上大路}}}} | |1.42 |14.11 |25 |
align="center"|● | align="center"|●
|Changzhong Road |{{large|{{lang|zh-cn|场中路}}}} | |1.41 |15.52 |27 |rowspan=8|Underground Island |
align="center"|● | align="center"|●
|{{stl|SHM|Dachang Town}} |{{large|{{lang|zh-cn|大场镇}}}} | |1.24 |16.76 |30 |
align="center"|● | align="center"|●
|{{stl|SHM|Xingzhi Road}} |{{large|{{lang|zh-cn|行知路}}}} | |1.04 |17.80 |32 |
align="center"|● | align="center"|●
|Dahuasan Road |{{large|{{lang|zh-cn|大华三路}}}} | |1.25 |19.05 |35 |
align="center"|● | align="center"|●
|{{stl|SHM|Xincun Road}} |{{large|{{lang|zh-cn|新村路}}}} | |1.06 |20.11 |37 |rowspan=4|Putuo |
align="center"|● | align="center"|●
|{{stl|SHM|Langao Road}} |{{large|{{lang|zh-cn|岚皋路}}}} | |0.81 |20.92 |39 |
align="center"|● | align="center"|●
|{{stl|SHM|Zhenping Road}} |{{large|{{lang|zh-cn|镇坪路}}}} |{{rint|shanghai|3}} {{rint|shanghai|4}} |1.53 |22.45 |42 |
align="center"|● | align="center"|●
|{{stl|SHM|Changshou Road}} |{{large|{{lang|zh-cn|长寿路}}}} |{{rint|shanghai|13}} |1.03 |23.48 |45 |
align="center"|● | align="center"|●
|{{stl|SHM|Changping Road}} |{{large|{{lang|zh-cn|昌平路}}}} | |0.75 |24.23 |47 |rowspan=2|Jing'an |Underground Side |
align="center"|● | align="center"|●
|{{stl|SHM|Jing'an Temple}} |{{large|{{lang|zh-cn|静安寺}}}} |{{rint|shanghai|2}} {{rint|shanghai|14}} {{rint|bus|rapid|link=Trolleybuses in Shanghai}} Yan'an BRT |1.38 |25.61 |50 |rowspan=10|Underground Island |
align="center"|● | align="center"|●
|{{stl|SHM|Changshu Road}} |{{large|{{lang|zh-cn|常熟路}}}} |{{rint|shanghai|1}} |1.09 |26.7 |52 |rowspan=4|Xuhui |
align="center"|● | align="center"|●
|{{stl|SHM|Zhaojiabang Road}} |{{large|{{lang|zh-cn|肇嘉浜路}}}} |{{rint|shanghai|9}} |1.66 |28.36 |55 |
align="center"|● | align="center"|●
|{{stl|SHM|Dong'an Road}} |{{large|{{lang|zh-cn|东安路}}}} |{{rint|shanghai|4}} |0.96 |29.32 |57 |
align="center"|● | align="center"|●
|{{stl|SHM|Middle Longhua Road}} |{{large|{{lang|zh-cn|龙华中路}}}} |{{rint|shanghai|12}} |0.75 |30.07 |59 |
align="center"|● | align="center"|●
|{{stl|SHM|Houtan}} |{{large|{{lang|zh-cn|后滩}}}} | |2.21 |32.28 |63 |rowspan=10|Pudong |
align="center"|● | align="center"|●
|{{stl|SHM|Changqing Road}} |{{large|{{lang|zh-cn|长清路}}}} |{{rint|shanghai|13}}{{efn-lr|Virtual transfer with line 13 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.}} |1.28 |33.56 |65 |
align="center"|● | align="center"|●
|{{stl|SHM|Yaohua Road}} |{{large|{{lang|zh-cn|耀华路}}}} |{{rint|shanghai|8}} |0.94 |34.50 |67 |
align="center"|● | align="center"|●
|{{stl|SHM|Yuntai Road}} |{{large|{{lang|zh-cn|云台路}}}} | |0.73 |35.23 |69 |
align="center"|● | align="center"|●
|{{stl|SHM|West Gaoke Road}} |{{large|{{lang|zh-cn|高科西路}}}} |{{rint|shanghai|6}} |0.97 |36.20 |72 |
align="center"|● | align="center"|●
|{{stl|SHM|South Yanggao Road}} |{{large|{{lang|zh-cn|杨高南路}}}} | |1.48 |37.68 |74 |Underground Double Island |
align="center"|● | align="center"|●
|{{stl|SHM|Jinxiu Road}} |{{large|{{lang|zh-cn|锦绣路}}}} | |1.44 |39.12 |77 |rowspan=4|Underground Island |
align="center"|● | align="center"|●
|{{stl|SHM|Fanghua Road}} |{{large|{{lang|zh-cn|芳华路}}}} | |1.45 |40.57 |80 |
align="center"|● | align="center"|●
|{{stl|SHM|Longyang Road}} |{{large|{{lang|zh-cn|龙阳路}}}} |{{rint|shanghai|2}} {{rint|shanghai|16}} {{rint|shanghai|18}} {{rint|shanghai|Maglev}}{{efn-lr|Out of system transfer with Shanghai Maglev Train.}} |1.69 |42.26 |83 |
align="center"|● | align="center"|●
|{{stl|SHM|Huamu Road}} |{{large|{{lang|zh-cn|花木路}}}} | |1.14 |43.40 |86 |
style = "background:#{{rcr|SHM|7}}; height: 2pt"
| colspan = "12" | | |
colspan = "12" |{{notelist-lr}} | |
style = "background: #{{rcr|SHM|7}}; height: 2pt;"
| colspan = "12" | |
=Important stations=
- {{stl|SHM|Shanghai University}} station, which serves the Shanghai University.
- {{stl|SHM|Zhenping Road}} station is a station where line 7 crosses lines 3 and 4.
- {{stl|SHM|Jing'an Temple}} station, located under the busy Nanjing Road, is an interchange with line 2.
=Future expansions=
There are no current extensions planned.
=Station name change=
- On June 6, 2012, Chuanchang Road was renamed {{stl|SHM|Middle Longhua Road}}.
Headways
border=0 style="border:1px solid #999;background-color:white;text-align:left;font-size:90%" class="mw-collapsible"
| ||||
bgcolor=#{{rcr|SHM|7}}
| colspan=2| {{font color | black|Time}} | {{stl|SHM|Meilan Lake}} - {{stl|SHM|Qihua Road}} | {{stl|SHM|Qihua Road}} - {{stl|SHM|South Yanggao Road}} | {{stl|SHM|South Yanggao Road}} - {{stl|SHM|Huamu Road}} | |
bgcolor=#cccccc
! colspan=5; align=center|Monday - Friday (Working Days) | ||||
{{nowrap|AM peak}} | 7:30–9:00 | About 3 min and 30 sec | Southbound:{{efn-lr|name=SouthYanggaoRoadSouthbound|Southbound to {{stl|SHM|South Yanggao Road}}.}} Average 1 min and 55 sec Northbound:{{efn-lr|name=QihuaRoad|Northbound to {{stl|SHM|Qihua Road}}.}} Average 3 min | Southbound:{{efn-lr|name=HuamuRoad|Southbound to {{stl|SHM|Huamu Road}}.}} Average 4 min Northbound:{{efn-lr|name=SouthYanggaoRoadNorthbound|Northbound to {{stl|SHM|South Yanggao Road}}.}} Average 3 – 6 min |
bgcolor=#EFEFEF
|Off-peak | 9:00–17:30 | About 11 min | colspan="2" align="center"|About 5 min and 30 sec | |
rowspan=2|PM peak | rowspan=2|17:30–20:30 | Southbound:{{efn-lr|name=QihuaRoadSouthbound|Southbound to {{stl|SHM|Qihua Road}}.}} Average 6 min and 55 sec | colspan="2" align="center"| Southbound:{{efn-lr|name=HuamuRoad}} Average 4 min and 40 sec | |
Northbound:{{efn-lr|name=MeilanLake|Northbound to {{stl|SHM|Meilan Lake}}.}} Average 3 min and 30 sec
| Northbound:{{efn-lr|name=QihuaRoad}} About 2 min and 44 sec | Northbound:{{efn-lr|name=SouthYanggaoRoadNorthbound}} Average 5 min and 30 sec | ||||
bgcolor=#EFEFEF
|Other | {| | |||
{{nowrap|Before 7:30}} | ||||
After 19:00 |
| |10 – 11 min || colspan="2" align="center"|5 – 8 min
|-bgcolor=#cccccc
! colspan=5 align=center|Saturday and Sunday (Weekends)
|-
|Peak||8:00–20:00|| About 10 min|| colspan="2" align="center"|About 5 min
|-bgcolor=#EFEFEF
|Other
hours||
Before 8:00 |
After 20:00 |
| |10 – 11 min || colspan="2" align="center"|5 – 8 min
|-bgcolor=#cccccc
! colspan=5 align=center|Extended operation (Friday and Saturday)
|-
| || After 22:30 || ||colspan="2" align="center"|Average 20 min
|- style= "background:#{{rcr|SHM|7}}; height: 2pt"
| colspan = "7" |
|-
| colspan = "5" |{{notelist-lr|colwidth=20em}}
|- style= "background:#{{rcr|SHM|7}}; height: 2pt"
| colspan = "5" |
|}
Technology
=Rolling Stock=
border=0 style="border:1px solid #{{rcr|SHM|7}};background-color:white;text-align:left;font-size:90%" class="mw-collapsible sortable"
! colspan="9" style="text-align: center" bgcolor="#{{rcr|SHM|7}}" | {{font color | black|Shanghai Metro Line 7 rolling stock}} | |||||||||
bgcolor=#cccccc
! Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | class="unsortable" | Assembly{{efn-lr|Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.}} | Rolling stock | Number | class="unsortable" | Notes
| |
bgcolor=#fee1cc
| 252 | Bombardier | 2008–2010 | A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}} | 6 | Tc+Mp+M+M+Mp+Tc | 07A01 | 0701-0742 (070011-072521) | Line 7 (Shanghai Metro) | Original name: AC10. Same as 09A02 and 12A01 (but different painting). |
bgcolor=#ffc399
| 180 | CRRC Changchun Railway Vehicles Co., Ltd. | 2016-2018 | A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}} | 6 | Tc+Mp+M+M+Mp+Tc | 07A02 | 0743-0772 (072531-074321) | Line 7 (Shanghai Metro) | Same as 09A03 (but different painting). |
bgcolor=#fee1cc
| 42 | CRRC Changchun Railway Vehicles Co., Ltd. | 2019-2020 | A{{efn-lr|name=ClassA|Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.}} | 6 | Tc+Mp+M+M+Mp+Tc | 07A03 | 07073-07079 (074331-074741) | Line 7 (Shanghai Metro) | |
style= "background:#{{rcr|SHM|7}}; height: 2pt"
| colspan="9" | | |||||||||
colspan = "9" |{{notelist-lr}} | |||||||||
style = "background: #{{rcr|SHM|7}}; height: 2pt;"
| colspan = "9" | |
File:Type 1 "Fanta" Train of Line 7 leaving Luonan Xincun Station, Aug 11 2023.jpg|07A01 train
File:SHM 07A02 in Meilan Lake Station.jpg|07A02 train
References
{{Portal|Trains}}
{{reflist|group=note}}
{{reflist}}
{{Shanghai Metro lines}}
{{Shanghai Metro
|line7=yes
}}
{{DEFAULTSORT:Shanghai Metro, Line 7}}