China Railway CR200J
{{Short description|Chinese higher-speed trainset}}
{{Update|date=May 2021}}
{{Infobox train
| background = darkgreen;color:white
| box_width =
| label_width =
| name = China Railway CR200J
| image = FXD1-J0010 at Guangqumen (20190203093259).jpg
| imagealt =
| imagesize =
| caption = FXD1-J0010 as service D712 on Beijing-Shanghai railway
| interiorimage =
| interiorimagealt =
| interiorcaption =
| service =
| manufacturer = CRRC Nanjing Puzhen
CRRC Qingdao Sifang
CRRC Tangshan
CRRC Zhuzhou Locomotive
CRRC Datong
CRRC Dalian
| designer =
| assembly =
| ordernumber =
| factory =
| family = Fuxing
| replaced =
| yearconstruction = 2017–present
| yearservice = January 2019
| refurbishment =
| yearscrapped =
| numberconstruction =
| numberbuilt = 144 sets (101 short, 40 long)
195 power cars, 1483 trailer cars
| numberservice =
| numberpreserved =
| numberscrapped =
| predecessor =
| successor =
| formation = {{ubl|Mc+7T+Tc|Mc+16T+Mc|Mc+9~16T+Mc}}
| diagram =
| code =
| fleetnumbers =
| capacity = {{ubl|Short sets: 720|Long sets: 1102}}
| operator = China Railway
Laos–China Railway Company Limited
| depots =
| lines =
| carbody =
| trainlength = {{ubl|Short sets:{{convert|234|m|ftin|abbr=on}}|Long sets: {{convert|518|m|ftin|abbr=on}}}}
| carlength = {{ubl|Power car: {{convert|20|m|ftin|abbr=on}}|Intermediate car: {{convert|25.5|m|ftin|abbr=on}}|Control car:{{convert|27,955|mm|ftin|abbr=on}}}}
| width = {{convert|3105|mm|ftin|abbr=on}}
| height = {{convert|4433|mm|ftin|abbr=on}}
| lowfloor =
| floorheight =
| platformheight =
| entrylevelorstep =
| doors =
| art-sections =
| wheeldiameter =
| wheelbase = {{convert|2.8|m|ftin|abbr=on}}
| maxspeed = {{convert|160|km/h|0|abbr=on}} (Service)
{{convert|180|km/h|0|abbr=on}} (Design)
{{convert|210|km/h|0|abbr=on}} (Power car only)
| weight = 445t (7T formation)
1164t (16T formation)
| axleload =
| steep gradient =
| traction = FXD1-J:Zhuzhou CRRC Times Electric or CRRC Yongji Electric water-cooled IGBT–VVVF
FXD3-J:Toshiba/CRRC Yongji Electric water-cooled IEGT–VVVF
| engine =
| enginetype =
| cylindercount =
| cylindersize =
| traction motors = FXD1-J, HXD1D-J:CRRC Zhuzhou Electric permanent magnet synchronous motor
FXD3-J:Toshiba/CRRC Yongji Electric YJ-277B/YJ-277C open inner-fan cooled 3-phase AC induction motor
| poweroutput = Powercars: {{convert|5600|kW|hp|abbr=on|0}}
| tractiveeffort =
| transmission =
| acceleration =
| deceleration =
| aux =
| powersupply =
| hvac =
| electricsystem = {{25 kV 50 Hz}} (nominal) from overhead catenary
| collectionmethod =
| uicclass =
| aarwheels =
| wheels driven =
| bogies = Bolsterless air spring
SW-220K (Tangshan trailer)
CL-242K (Puzhen trailer)
| minimum curve =
| brakes = Regenerative braking, electro-pneumatic composite braking system
| safety = CTCS2-200H/C
| coupling =
| multipleworking =
| light =
| gauge = {{track gauge|sg|allk=on}}
| notes = {{cite web|url=http://china-emu.cn/EMUs/Series/?detail-77-30-30.html|title=中国动车组-复兴号CR200J型电力动车组|website=china-emu.cn|access-date=2018-03-12|archive-url=https://web.archive.org/web/20180323155414/http://china-emu.cn/EMUs/Series/?detail-77-30-30.html|archive-date=2018-03-23|url-status=dead}}{{cite web|url=http://www.crrcgc.cc/dl/g8425/s16345/t288871.aspx|title=时速160公里动力集中动车组动力车_产品中心_机车_中车大连机车车辆有限公司|website=www.crrcgc.cc}}
| seating =
| stocktype =
}}
The CR200J Fuxing ({{lang-zh|s=复兴号|p=Fùxīng Hào}}) is a Chinese trainset consisting of a power car paired with unpowered passenger cars operated by China Railway. It is the slowest member of the Fuxing series, and only member of Fuxing series designed for existing railways under 200km/h rather than newer high-speed railways.{{Cite web|title=Three New Types of Fuxing Bullet Trains Unveiled_Media_news Details_CRRC|url=https://www.crrcgc.cc/en/g7389/s14333/t298458.aspx|access-date=2020-06-10|website=www.crrcgc.cc}} The train was jointly designed and produced by six companies under CRRC.
These units are nicknamed Green EMU{{Cite web|title=好消息!西安-旬阳6日起开行"绿动车" 运行时间2小时左右 - 西部网(陕西新闻网)|url=http://www.cnwest.com/tszx/a/2020/12/04/19342301.html|access-date=2020-12-04|website=www.cnwest.com |language=Chinese}} or Hulk by the Chinese media,{{cite web|title=探访时速160公里动力集中动车组"绿巨人"|url=http://www.dzwww.com/xinwen/guoneixinwen/201901/t20190105_18259146.htm|author1=新华网-张晨霖|language=Chinese|access-date=2021-06-25|archive-date=2019-01-05|archive-url=https://web.archive.org/web/20190105200927/http://www.dzwww.com/xinwen/guoneixinwen/201901/t20190105_18259146.htm|url-status=dead}} or "trash cans" among the railfan community due to its green appearance.
Design and development
File:CR200J-3 002@BCR (20170927152741).jpg
File:CR200J-1009 at Chongqingbei Railway Station.jpg]]
The development of CR200J is initiated by China Railway Corporation to create an affordable, economical, efficient higher-speed rail. The development started on 28 August 2015. First prototype started testing on 27 April 2017. Multiple trainset was sent to China Railway Chengdu Group for dynamic test on Chengdu–Chongqing railway, Chongqing–Lanzhou railway, and Chongqing–Guiyang high-speed railway between 17 December 2017 and 4 January 2018.{{cite web|url=http://www.rw-tk.com/newsitem/278086892|title=CR200J动力集中型动车组,已经到成都铁路局开展实验-北京瑞威铁科高铁技术有限公司 江西瑞威铁科铁路工程有限公司|website=www.rw-tk.com|language=Chinese}} There are multiple variants of the CR200J series made by different subsidiaries of the state-owned China Railway, and these variants are required to follow the China Standardized EMU design philosophy, thus ensuring every variants of CR200J can be compatible to each other. Another round of testing was finished on 5 August 2018.{{cite web|url=http://www.gaoloumi.com/forum.php?mod=viewthread&tid=3118622|title=高楼迷论坛-首列CR200J动力集中型动车组抵达兰州西站开展实验|website=gaoloumi.com|access-date=2018-04-04|archive-url=https://web.archive.org/web/20180405024259/http://www.gaoloumi.com/forum.php?mod=viewthread&tid=3118622|archive-date=2018-04-05|url-status=dead}} On 5 January 2019, China Railway announced several new service lines, and the CR200J was formally put into service.{{cite web|title=探访时速160公里动力集中动车组"绿巨人"|url=http://www.dzwww.com/xinwen/guoneixinwen/201901/t20190105_18259146.htm|author1=新华网-张晨霖|access-date=2021-06-25|archive-date=2019-01-05|archive-url=https://web.archive.org/web/20190105200927/http://www.dzwww.com/xinwen/guoneixinwen/201901/t20190105_18259146.htm|url-status=dead}}
CR200J shares similar transmission and motor system with other Fuxing series trainset despite the lower operating speed.{{cite web|title=时速160公里动力集中动车组动力车|url=http://www.crrcgc.cc/dl/g8425/s16249/t288871.aspx|publisher=中车大连机车}}{{cite journal|title=新型动力集中动车组DC 600V列车供电装置|journal=机车电传动|issue=5|issn=1000-128X|pages=44–47|date=2017|url=http://www.cnki.net/kcms/doi/10.13890/j.issn.1000-128x.2017.05.011.html|accessdate=2019-04-29|author= 蔡杰;陈湘;李自然;黄庆;高峻|doi=10.13890/j.issn.1000-128x.2017.05.011}} All CR200J trainset is painted in green colors, reminiscent of China's previous generation green-skinned train.{{cite news|title=探营复兴号新型动车组:色彩谱系更丰富,超长列车拟下月投用|url=https://www.thepaper.cn/newsDetail_forward_2769125|publisher=澎湃新闻|date=2018-12-24}} The interior design follows the design language of CR400 Fuxing EMU trains, and it's fitted with individual power outlet, Wi-Fi connection, and larger legroom.{{cite news|title=5月1日起,开化站始发"绿巨人"动车组列车|url=http://news.qz828.com/system/2019/04/21/011508236.shtml|publisher=衢州新闻网|date=2019-04-21 |language=Chinese}}
On Sichuan–Tibet railway, the plateau variant of China Railway CR200J was used. It's a type of bi-mode locomotive specifically designed for plateau operations with weather resistance.{{cite news |last1=Morant |first1=Sue |title=Bridging the Sichuan-Tibet gap |url=https://www.railjournal.com/in_depth/bridging-the-sichuan-tibet-gap |work=International Railway Journal |date=August 16, 2017}} A combination of diffusion and distributed oxygen systems are installed to help alleviate altitude sickness for passengers on the trip.{{cite web|url=https://www.railjournal.com/passenger/main-line/tibet-railway-among-new-lines-to-open-in-china/ |title=Tibet railway among new lines to open in China |website=international rail journal |date=28 June 2021}}
Variant
File:FXD1-J0280@HLC (20240115093352).jpg
- FXD1-J:Electric locomotive with two-axle bogies manufactured by CRRC Zhuzhou Locomotive and CRRC Datong.
- FXD3-J:Electric locomotive with two-axle bogies manufactured by CRRC Dalian.
- HXD1D-J:Electric locomotive with three-axle bogies manufactured by CRRC Zhuzhou Locomotive for plateau operation as part of electro-diesel multiple unit CR200JS-G and electric multiple unit CR200J1-D
- FXN3-J:Diesel-electric two-unit locomotive with three-axle bogies manufactured by CRRC Dalian for plateau operation as part of electro-diesel multiple unit CR200JS-G.{{cite web|url=https://china-emu.cn/EMUs/Series/?detail-138-101-33.html|title=CR200JS-G|website=china-emu.cn|lang=Chinese}}{{cite web|url=https://www.bilibili.com/video/BV1rN411Z7zU/|title=CR200JS-G (video)|website=bilibili.com}}
- 25TB coaches: Specially designed 25T coaches with driver-controlled doors.
Equipment issues
In the initial operation period, the CR200J variant manufactured by CRRC Dalian had a high rate of failure. A malfunction in the engine system caused the train to slow down and stop. Out of the 23 EMUs produced by CRRC Dalian, 12 of them have broken down before 1 June 2019. According to a China Business Journal, the maintenance department of the manufacturer was held accountable for the failures. In response, CRRC Dalian cut salaries by 20 percent and recalled their trainset for repair and upgrade.{{Cite web|last=Chan|first=D. M.|date=2019-07-05|title=Salaries cut 20% as train builder's failure rate higher than 90%|url=https://asiatimes.com/2019/07/salaries-cut-20-as-train-builders-failure-rate-higher-than-90/|access-date=2021-03-05|website=Asia Times|language=en-US}}
Gallery
File:400101@BCR (20170927153007).jpg|Exterior of the 25T coaches
File:Interiors of CR200J first class coach 20190218.jpg|First class interior
File:CR200J二等座.jpg|CR200J second class seats
File:Interiors of CR200J second class coach 20190218.jpg|Second class interior
File:Center part of CR200J second class coach 20190218.jpg|The table seats located at the center of second class cars
File:Washstands_in_the_second_class_coach_of_CR200J_20190218.jpg|Washbasin and automatic door
File:CR200J二等卧下鋪.jpg|CR200J Second class sleeper
File:CR200J動卧.jpg|CR200J sleeper train at Beijing South railway station
File:D727-728 CR200J Train, Dongguandong Station.jpg|CR200J trainset at Dongguan East railway station
File:2021-12-03 China-Laos-Eisenbahn.jpg|Laos-China Railway CR200J for service on the Boten–Vientiane railway
See also
References
{{reflist}}
{{commons category|China Railway CR200J}}
{{Multiple units of China Railway}}
{{High-speed rail in the People's Republic of China}}
{{High-speed rail}}
{{DEFAULTSORT:China Standardized EMU}}
Category:Electric multiple units with locomotive-like power cars
Category:High-speed trains of China