List of oil pipelines#North America

{{Short description|none}}

This is a list of oil pipelines.

Africa

Asia

Europe<!-- Update -->

Americas

= Northern America =

{{Unreferenced section|date=November 2019}}

== Canada ==

class="wikitable sortable mw-collapsible"

|+Canada

!Name

!Status

!Capacity (bpd)

!Receipt Point(s)

!Crossing

!Delivery Point(s)

!Owner(s)

!Length (km)

!Regulator

!Notes

Aurora

|operating

|45,000

|Rangeland Pipeline

|Carway

|Glacier Pipeline

|Plains Midstream

|0.75

|AER

|

Cochin

|operating

|

|Explorer, TEPPCO, Wabash pipelines at Kankakee, IL

|Elmore, SK

|Fort Saskatchewan, AB

|

|

|

|Moves condensate westward from 2014; from 1979 it moved product eastward.

Enbridge Bakken

|operating

|145,000

|Steelman, SK, & Berthold, ND

|Portal

|Enbridge Mainline at Cromer

|Enbridge Bakken Pipeline Co

|132

|

|

Enbridge Pipeline System

|operating

|

|Kerrobert & Regina, SK; Cromer, MB; Clearbrook, MB

|Gretna, MB

|

|Enbridge

|

|

|

Enbridge Norman Wells

|suspended

|

|Norman Well, NWT

|

|Zama, AB

|Enbridge Pipelines (NW) Inc.

|869 c

|

|Shut down after

2016

Express Pipeline

|operating

|280,000

|Hardisty, AB

|Wild Horse, AB

|Casper, WY

|Express Pipeline Ltd

|439 c

|

|

Keystone Pipeline 1,2,3

|operating

|300,000

|Alberta (Hardisty)

|Haskett, AB

|Steele City, NB & Cushing, OK

|TransCanada

|

|

|Crosses South Dakota to Steele City, where it branches east through Kansas and Missouri to delivery points at Wood River and Patoka, Illinois, and south to delivery points at Cushing, Oklahoma and Houston and Port Arthur, Texas. Along the way at Patoka, Keystone delivers crude oil to the Plains terminal which facilitates delivery to local refineries via third party pipelines.

Keystone XL Pipeline

|cancelled

|

|

|

|

|TransCanada

|

|

|Project cancelled in June 2021 as a result of US President Biden revoking permits for the project on January 20, 2021, due to opposition from Native American tribes, climate activists, and the Democratic Party, as the Keystone XL pipeline will worsen pollution and climate change.

Milk River Pipeline

|operating

|97,900

|Bow River Pipeline, Milk River, AB

|Sweetgrass, MT

|Front Range Pipeline, Coutts, AB

|Plains Midstream

|69 c

|AER

|

Portland-Montreal Pipe Line

|part operation

|223,000

|South Portland, ME

|

|Montreal, QC

|Montreal Pipe Line Ltd

|236 c

|

|This is the NEB-regulated segment of the Portland-Montreal pipeline system. Moves crude from Atlantic to Suncor refinery at Montreal. Two of 3 pipelines decommissioned (12 & 18 inch). Only 24-inch in operation

Southern Lights

|operating

|180,000

|Manhattan, IL

|

|Edmonton, AB

|Enbridge Southern Lights GP Inc.

|1529 c

|

|Moves diluent north; formed in 2010 by reversing 1465 km of former Enbridge Line 13 and constructing 1091 km of new pipeline in the U.S. It shares the Enbridge Mainline right-of-way.

Trans Mountain Pipeline System

|operating

|

|Edmonton, AB, & Kamloops, BC.

|

|Burnaby & Burrard Inlet, BC, & Sumas, WA

|Government of Canada

|

|

|Moves crude oil & petroleum products to Parkland Burnaby refinery & Suncor Burrard products terminal; moves crude oil to four refineries in Washington via connection at Sumas to Puget Sound Pipeline; moves crude oil to Asia and U.S. West coast via Westridge Marine Terminal in Burnaby. One of few to ship crude & products in one pipe

Trans-Northern

|operating

|132,000

|Montreal & Nanticoke

|

|Toronto, Oakville, Ottawa, Maitland, Belleville, Cornwall, Kingston, Montreal, Dorval

|

|

|

|RPPs delivery at points including Oakville, Toronto, Ottawa, Maitland, Belleville, Cornwall, Kingston, Montreal, Dorval; operates bi-directionally between Toronto & Oakville. Three other petroleum products pipelines (two Sun-Canadian and Enbridge's Line 8) transport gasoline, diesel, heating oil and jet fuel to Toronto and other cities along the route.

Utopia / Cochin Eastern

|operating

|50,000

|Harrison County, OH

|

|Windsor, ON

|

|

|

|Formerly the eastern part of Cochin. Moves ethane from new pipeline from a point in Harrison County to a connection with existing Kinder Morgan pipeline and facilities near Riga, Michigan.

Wascana

|operating

|40,000

|Raymond Station, MT

|

|Plains Terminal, Regina

|Plains Midstream

|173 c

|

|Moves light crude from Bakken north to connect to Enbridge Mainline at Regina; prior to 2012 it was southbound

Westspur

|operating

|247,400

|Alida, Steelman, Bryant, Midale, SK

|

|Enbridge Mainline near Cromer, MB

|TEML

|511 c

|Saskatchewan

|Tundra Energy Marketing; Moves crude oil & condensate to Mainline; until Dec. 2106 owned by Enbridge

== United States ==

class="wikitable"

|+

!Name

!Status

!Capacity

!Starting Point

!Crossing

!Ending Point

!Owners

!Length (mi)

!Regulator

!Notes

ATEX Pipeline

|operating

|

|Washington County, PA

|

|

|Enterprise Production Partners

|1,230

|

|

Big Inch

|operating

|

|

|

|

|Spectra Energy Partners

Enterprise Production Partners

|

|

|

|

|Buckeye Partners

|

|

|

|

|

|

|

|

|

Calnev Pipeline

|operating

|128,000

|Los Angeles, CA

|

|Las Vegas, NV

|Kinder Morgan Energy Partners

|550

|

|

Chaparral NGL Pipeline

|

|

|

|

|

|Enterprise Production Partners

|

|

|

Colonial Pipeline

|operating

|3 million

|

|

|

|Colonial Pipeline Company

|5,500

|

|

Dakota Access Pipeline

|operating

|750,000

|

|

|

|

|1,172

|

|

Dixie Pipeline

|

|

|

|

|

|Enterprise Production Partners

|1,307

|

|

Double H Pipeline

|

|

|

|

|

|Kinder Morgan Energy Partners

|

|

|

Dow Pipeline Company

|

|

|

|

|

|

|

|

|

Enbridge Pipeline System

|

|

|

|

|

|Enbridge

|

|

|

[https://www.chsinc.com/pipelines/our-pipelines Jayhawk and Kaw Pipelines]

|

|

|

|

|

|

|

|

|

Keystone Pipeline

|

|

|

|

|

|TC Energy

Government of Alberta

|

|

|XL phase halted in January 2021, XL phase terminated in June 2021

Lakehead Pipeline

|

|

|

|

|

|Enbridge

|

|

|

Line 3 pipeline

|operating

|

|

|

|

|Enbridge

|

|

|

Longhorn Pipeline

|

|

|

|

|

|Longhorn Partners

|

|

|

Magellan Midstream Partners

|

|

|

|

|

|

|

|

|

Mahadeva Pipeline

|

|

|

|

|

|

|

|

|

Mariner East Pipelines

|

|

|

|

|

|

|

|

|

Mid-America Pipeline System

|

|

|

|

|

|

|

|

|

Minnesota Pipeline

|

|

|

|

|

|Minnesota Pipe Line Company, LLC

Koch Pipeline Company (operator)

|

|

|

North Dakota Pipeline

|

|

|

|

|

|

|950

|

|

Olympic Pipeline

|

|

|

|

|

|

|

|

|

Plantation Pipeline

|

|

|

|

|

|

|3,100

|

|

Pilgrim Pipeline

|cancelled

|

|

|

|

|

|

|

|

Pony Express Pipeline

|

|

|

|

|

|Tallgrass Energy Partners

|760

|

|

Seaway Pipeline

|

|180,000

|

|

|

|

|760

|

|

Seminole Pipeline

|

|

|

|

|

|Enterprise Production Partners

|

|

|

Trans-Alaska Pipeline System

|operating

|2,136,000

|Prudhoe Bay, Alaska

|

|Valdez, Alaska

|Alyeska Pipeline Service Company

|800.3

|

|

Trans Mountain Pipeline

|

|

|

|

|

|

|

|

|

Unev Pipeline

|

|

|

|

|

|

|399

|

|

Yellowstone Pipeline

|

|

|

|

|

|

|

|

== Other pipelines ==

  • Sand Hills Pipeline: This pipeline is being developed by DCP Midstream. It will extend for 700 miles from West to East Texas and have an initial capacity of approximately 120,000 barrels per day.[http://www.pipelineandgasjournal.com/2012-worldwide-pipeline-construction-report "2012 Worldwide Pipeline Construction Report] {{Webarchive|url=https://web.archive.org/web/20130325081749/http://www.pipelineandgasjournal.com/2012-worldwide-pipeline-construction-report |date=2013-03-25 }}," Pipeline and Gas Journal 239 (1). January 2012. The first segment of the pipeline opened in October 2012.[http://www.businesswire.com/news/home/20121024006533/en/DCP-Midstream-Announces-Opening-Sand-Hills-Pipeline "DCP Midstream Announces Opening of Sand Hills Pipeline Providing NGL Access from the Eagle Ford Shale]," October 24, 2012, Business Wire.
  • Pecos River Pipeline: Developed by Bridger Group and Advantage Pipeline, the Pecos River Pipeline will provide a link from the Delaware Basin to the Gulf Coast. The pipeline will run from the Pecos, Texas, to Crane, Texas, where it will connect to the Longhorn Pipeline. The Pecos River Pipeline will have an initial capacity of 150,000 barrels per day.[http://www.pipelineandgasjournal.com/bridger-joins-advantage-pipeline-development-pecos-river-project "Bridger Joins Advantage Pipeline in Development of Pecos River Pipeline]," Pipeline and Gas Journal 239 (11). November 2012.
  • Sterling III Pipeline: Under development from Oneok Partners, the Sterling III Pipeline will extend from parts of Texas and Oklahoma in the Mid-Continent Region to the Gulf Coast, and have a capacity of approximately 193,000 barrels per day.Walton, Rod. [http://www.tulsaworld.com/business/article.aspx?subjectid=49&articleid=20110503_49_E1_ONEOKP776284 "ONEOK plans new pipeline]," May 3, 2011, The Tulsa World.

= Latin America =

See also

References

{{Reflist}}