Mumbai Metro#Blue Line 1%5D%5D
{{Short description|Rapid transit system in Mumbai, India}}
{{Use Indian English|date=January 2016}}
{{Infobox Public transit|box_width = 25em
| name = Mumbai Metro
| image = Mmmocl-logo.svg
| imagesize = 150px
| image2 = Mumbai_Metro_2.jpg
| imagesize2 = 300px
| caption2 = A Yellow Line train at Andheri West metro station
| owner = {{ubl|
- Mumbai Metropolitan Region Development Authority
- Mumbai Metro One Pvt Ltd
- Mumbai Metro Rail Corporation Ltd}}
| area served = Mumbai Metropolitan Region
| locale = Mumbai
| transit_type = Rapid Transit
| began_operation = {{start date and age|2014|6|8|df=yes}}
| operator = {{ubl|
- Mumbai Metro One Pvt Ltd (Blue line)
- Delhi Metro Rail Corporation (Aqua line)
- Maha Mumbai Metro Operation Corporation Ltd (others)}}
| chief_executive = S.V.R Srinivas, CMD & Metropolitan Commissioner
| headquarters = NaMMTRI Building, Plot No. R-13, E-Block, Bandra-Kurla Complex, Bandra (E), Mumbai, Maharashtra 400051.
| lines = {{ubl|
- Operational: 4
- Under-construction: 9
- Approved: 4}}
| line_number = Operational{{ubl|
- {{rcb|Mumbai Metro|1|route}}
- {{rcb|Mumbai Metro|2A|route}}
- {{rcb|Mumbai Metro|3|route}}
- {{rcb|Mumbai Metro|7|route}}}}
Under Construction{{ubl|
- {{rcb|Mumbai Metro|2B|route}}
- {{rcb|Mumbai Metro|4A|route}}
- {{rcb|Mumbai Metro|4|route}}
- {{rcb|Mumbai Metro|5|route}}
- {{rcb|Mumbai Metro|6|route}}
- {{rcb|Mumbai Metro|7A|route}}
- {{rcb|Mumbai Metro|9|route}}
- {{rcb|Mumbai Metro|12|route}}}}
Approved{{ubl|
- {{rcb|Mumbai Metro|8|route}}
- {{rcb|Mumbai Metro|10|route}}
- {{rcb|Mumbai Metro|11|route}}
- {{rcb|Mumbai Metro|13|route}}
- {{rcb|Mumbai Metro|14|route}}}}
| character = {{bulleted list|Elevated (Blue, Yellow, Red lines)|Underground and At-Grade (Aqua line)}}
| annual_ridership = 27.3 crore (273 million){{Citation needed|date=February 2023}}
| ridership = 747000 (daily average, July 2024)
| website = {{bulleted list|{{URL|https://www.mmmocl.co.in/|MMMOCL}}|{{URL|https://mmrda.maharashtra.gov.in/mumbai-metro-rail-project|MMRDA}}}}
| train_length = {{bulleted list|4 (Blue line)|6 (Yellow, Red lines)|8 (Aqua line)}}
| headway = {{bulleted list|4 minutes (peak hours)|8 minutes (off-peak hours)}}
| system_length = {{cvt|68.93|km|mi}} (Operational)
{{cvt|132.45|km|mi}} (Under Construction)
{{cvt|138.92|km|mi}} (Approved and proposed)
| track_gauge = {{track gauge|sg|allk=on}}
| el = {{25 kV 50 Hz}} Overhead line{{cite news |url=http://www.hindustantimes.com/India-news/Mumbai/Overhead-Metro-wires-to-be-charged/Article1-1018028.aspx |title=Overhead Metro wires to be charged |newspaper=Hindustan Times |date=27 February 2014 |access-date=5 March 2013 |url-status=dead |archive-url=https://web.archive.org/web/20131223143403/http://www.hindustantimes.com/India-news/Mumbai/Overhead-Metro-wires-to-be-charged/Article1-1018028.aspx |archive-date=23 December 2013 }}
| average_speed = {{cvt|33|km/h}}
| map = {{Mumbai Metro}}
File:Mumbai Metro Schematic Map.svg
| map_state = collapsed
| stations = 57
}}
The Mumbai Metro is a rapid transit system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.
While the Maharashtra Metro Rail Corporation Limited is responsible for all metro rail projects being developed in Maharashtra, except for those in the Mumbai Metropolitan Area, the Mumbai Metropolitan Region Development Authority is the authority responsible for maintaining the metro system in the Greater Mumbai area.
The rapid transit metro system is designed to reduce traffic congestion in the city and supplement the overcrowded Mumbai Suburban Railway network. It is being built in three phases, over 15 years, with overall completion expected in October 2026. The Mumbai Metro is the fourth longest operational metro network in India with an operational length of {{cvt|68.93|km|mi}} as of May 2025. When completed, the core system will comprise sixteen high-capacity metro railway lines, spanning a total of more than {{convert|523|km|mi|1}} (25% underground, the rest elevated, with a minuscule portion built at-grade) and serviced by 350 stations.{{Cite web |date=2024-11-11 |title=Mumbai Metro: Route, Map, Metro Lines, Stations List and Latest Updates - Infra Info Hub |url=https://infrainfohub.com/mumbai-metro/ |access-date=2024-11-12 |language=en-US}}
Line 1 of the Mumbai Metro is operated by Mumbai Metro One Private Limited (MMOPL), a joint venture between Reliance Infrastructure (74%), Mumbai Metropolitan Region Development Authority, (26%) and formerly by RATP Dev Transdev Asia (5%).{{cite web|url=https://www.reliancemumbaimetro.com/web/reliance-mumbai-metro/overview|title=Mumbai Metro One Pvt. Ltd. (MMOPL)|publisher=MMOPL|access-date=4 March 2020|archive-date=21 April 2021|archive-url=https://web.archive.org/web/20210421053252/https://www.reliancemumbaimetro.com/web/reliance-mumbai-metro/overview|url-status=dead}} While lines 2, 4, 5, 6, 7 and their extensions will be built and operated by the Mumbai Metropolitan Region Development Authority (MMRDA), the completely underground Line 3 and Line 11 will be built by Mumbai Metro Railway Corporation Ltd (MMRC).
In June 2006, Prime Minister Manmohan Singh laid the foundation stone for the first phase of the Mumbai Metro project, although construction work began in February 2008.{{cite news|url= http://www.business-standard.com/india/news/mumbai-monorail-to-be-ready-by-dec-metro-by-march/174429/on|title=Mumbai monorail to be ready by Dec, Metro by March|work=Business Standard|date=12 June 2012|access-date=7 July 2013}}{{cite news|url=http://www.dnaindia.com/mumbai/report_mumbais-first-metro-may-chug-in-march-2013_1685026|title=Mumbai's first metro may chug in 2013|date=6 May 2012|newspaper=DNA India|access-date=8 May 2012}}{{cite news|url=http://www.indianexpress.com/news/metro-monorail-projects-could-miss-deadline/831682/|title=Metro, Monorail projects could miss deadline|newspaper=The Indian Express|date=14 August 2011|access-date=21 September 2011}} A successful trial run was conducted in May 2013,{{cite news|url=http://www.livemint.com/Politics/drJn4FpNSSy2mGpbR4B91K/Mumbai-The-connected-city.html|title=Mumbai: The connected city|publisher=Mint|date=20 June 2013|access-date=7 July 2013}}{{cite news|url=http://articles.timesofindia.indiatimes.com/2013-05-01/mumbai/38957142_1_versova-ghatkopar-mumbai-metro-metropolitan-region-development-authority |archive-url=https://archive.today/20130629124140/http://articles.timesofindia.indiatimes.com/2013-05-01/mumbai/38957142_1_versova-ghatkopar-mumbai-metro-metropolitan-region-development-authority|url-status=dead |archive-date=29 June 2013|title=Mumbai Metro trial run successful|date=1 May 2013|newspaper=Times of India |access-date=5 June 2013}}{{cite news|url=http://www.ndtv.com/article/cities/mumbai-metro-trial-run-with-train-draped-in-flowers-361185|title=Mumbai Metro: trial run with train draped in flowers|newspaper=NDTV|date=1 May 2013 |access-date=5 June 2013}} and the system's first line commenced operations on 8 June 2014. Many metro projects were delayed because of late environmental clearances, land acquisition troubles and protests.
After nearly eight years, two new metro corridors, 2A and 7, were inaugurated on 2 April 2022, and are now operational. On 5 October 2024, the {{Convert|12|km|abbr=on}} underground BKC to Aarey Jogeshwari-Vikhroli Link Road section of Aqua Line was inaugurated. The further extension of the line to Acharya Atre Chowk, consisting of 6 stations was officially inaugurated on May 10 2025.
Additionally, there are 8 other metro lines currently under construction in the city.
History
Being the capital of Maharashtra, Mumbai is among the largest cities in the world, with a total metropolitan area population of over 2 crore (20 million) as of 2011,[http://esa.un.org/unup/p2k0data.asp United Nations Population Division - City Population] {{webarchive|url=https://web.archive.org/web/20070310025702/http://esa.un.org/unup/p2k0data.asp |date=10 March 2007 }}. Retrieved 5 October 2011. and a population growth rate of around 2% per annum.[http://esa.un.org/unup/p2k0data.asp Average Annual Rate of Change] {{webarchive|url=https://web.archive.org/web/20070310025702/http://esa.un.org/unup/p2k0data.asp |date=10 March 2007 }}. United Nations Population Division. Retrieved 5 October 2011. Mumbai has the advantage of a high modal share of the public (88%) in favour of a public mass transport system.{{Cite web |date=25 June 2009 |title=Businessworld - 7 Questions You Wanted to Ask |url=http://www.businessworld.in/index.php/7-Questions-You-Wanted-to-Ask.html |access-date=8 April 2024 |archive-url=https://web.archive.org/web/20090625151715/http://www.businessworld.in/index.php/7-Questions-You-Wanted-to-Ask.html |archive-date=25 June 2009 }} The existing Mumbai Suburban Railway carries over 70 lakh (7 million) passengers per day,[http://www.wr.indianrailways.gov.in/view_section.jsp?lang=0&id=0,1,283 Mumbai Suburban Railway Network]. Western Railway – Indian Railways. Updated 9 April 2012. Retrieved 26 April 2012. and is supplemented by the Brihanmumbai Electric Supply and Transport (BEST) bus system, which provides feeder services to station-going passengers to allow them to complete their journeys. Until 1980s, transport in Mumbai was not a big problem. The discontinuation of trams resulted in a direct increase of passenger pressure on the suburban railway network. By 2010, the population of Mumbai doubled. However, due to the city's geographical constraints and rapid population growth, road and rail infrastructure development has not been able to keep pace with growing demand over the last 4-5 decades.{{cite web|url=http://202.54.119.40/projects_metro_rail.htm |title=Mmrda – Projects – Mumbai Metro Rail Project |publisher=Mmrdamumbai.org|access-date=12 March 2014|archive-url=https://web.archive.org/web/20120319164955/http://202.54.119.40/projects_metro_rail.htm|url-status=dead |archive-date=19 March 2012}} Moreover, the Mumbai Suburban Railway, though extensive, is not built to rapid transit specifications. The main objective of the Mumbai Metro is to provide mass rapid transit services to people within an approach distance of between {{Convert|1 and 2|km}}, and to serve the areas not connected by the existing Suburban Rail network.
The master plan unveiled by the MMRDA in 2004 encompassed a total of {{convert|146.5|km|mi|2}} of track, of which {{convert|32|km|mi|2}} would be underground.{{cite news |url=http://economictimes.indiatimes.com/news/news-by-industry/transportation/railways/metro-rail-i-to-be-operational-in-mumbai-in-2012/articleshow/9873315.cms |title=Metro Rail-I to be operational in Mumbai in 2012 |work=The Economic Times |date=5 September 2011 |access-date=24 October 2011 |archive-date=20 October 2012 |archive-url=https://web.archive.org/web/20121020042022/http://economictimes.indiatimes.com/news/news-by-industry/transportation/railways/metro-rail-i-to-be-operational-in-mumbai-in-2012/articleshow/9873315.cms |url-status=dead }} The Mumbai Metro was proposed to be built in three phases, at an estimated cost of {{INR}}19,525 crore. In September 2009, the proposed Hutatma Chowk – Ghatkopar was reduced to a line between Hutatma Chowk and Carnac Bunder.
In 2011, the MMRDA unveiled plans for an extended Colaba-Bandra-SEEPZ metro line. According to its earlier plans, a {{Cvt|20|km|2}} Colaba-to-Bandra metro line was to be constructed, running underground for {{convert|10|km|mi|2}} from Colaba to Mahalaxmi, and then on an elevated track from Mahalaxmi to Bandra. However, the MMRDA decided to increase ridership on the line by running it out past Bandra to Chhatrapati Shivaji Maharaj International Airport. The {{convert|33.5|km|mi|2|adj=on}} Colaba-Bandra-SEEPZ line will be built at a cost of {{INRConvert|21000|c}},[http://www.indianexpress.com/news/development-body-in-talks-with-csia/899608/1 "Development body in talks with CSIA"]. The Indian Express. 14 January 2012. Retrieved 16 January 2012. and will be the city's first underground metro line. It will have 27 stations.[http://www.dnaindia.com/mumbai/report_views-on-colaba-seepz-underground-metro-sought_1625495 "Views on Colaba-Seepz underground metro sought"]. DNA India. 14 December 2011. Retrieved 30 December 2011.File:Mumbai_Line_1_metro_rake.jpg trainset on Line 1 approaching Andheri station in 2019]] On 27 February 2012, the Union Government gave in-principle approval to the plan for Line 3. Money for the project is being borrowed from Japanese International Cooperation Agency (50%), the state government (16%), the central government (14%), and others.{{cite news|url=https://timesofindia.indiatimes.com/city/mumbai/Centre-paves-way-for-3rd-Metro-line/articleshow/12062872.cms |archive-url=https://web.archive.org/web/20140202094859/http://articles.timesofindia.indiatimes.com/2012-02-28/mumbai/31107110_1_colaba-bandra-underground-line-mmrda |url-status=live |archive-date=2 February 2014 |title=Centre paves way for 3rd Metro line |date=28 February 2012|work=The Times of India |access-date=28 March 2012}} In April 2012, the MMRDA announced plans to grant the Mumbai Metro Rail Company increased management autonomy, in an effort to enhance the project's operational efficiency.[http://www.dnaindia.com/mumbai/report_mumbai-metro-likely-to-get-autonomy-status-mmrda_1681205 "Mumbai Metro likely to get autonomy status: MMRDA"]. DNA India. 27 April 2012. Retrieved 3 May 2012. In July 2012, the MMRDA announced plans to add more metro lines to its existing plan, including a line parallel to the Western Express Highway from Bandra to Dahisar. This line is expected to reduce the passenger load on the Western Line and vehicle traffic on the highway. Another proposed route, the {{convert|30|km|mi|2|adj=on}}, 28-station Wadala–Kasarvadavali line, received in-principle approval from the state government in 2013.[http://www.hindustantimes.com/India-news/Mumbai/Soon-take-a-metro-from-south-Mumbai-to-Thane/Article1-1048837.aspx "Soon, take a metro from south Mumbai to Thane"] {{webarchive|url=https://web.archive.org/web/20130430164802/http://www.hindustantimes.com/India-news/Mumbai/Soon-take-a-metro-from-south-Mumbai-to-Thane/Article1-1048837.aspx |date=30 April 2013 }}. Hindustan Times. 23 April 2013. Retrieved 5 June 2013. The MMRDA also intends to convert the proposed Lokhandwala–SEEPZ–Kanjurmarg monorail route into a metro line.[http://www.dnaindia.com/mumbai/report_mmrda-to-add-more-lines-to-mumbai-metro-railway-project_1712139 "MMRDA to add more lines to Mumbai Metro railway project"]. DNA India. 8 July 2012. Retrieved 27 July 2012. The Mumbai Metro master plan was revised by the MMRDA in 2012, increasing the total length of the proposed network to {{Cvt|160.90|km}}.{{Cite web|url=https://www.thehindubusinessline.com/economy/logistics/Third-phase-of-metro-rail-inaugurated/article20852374.ece|title=Third phase of metro rail inaugurated|website=@businessline|date=26 August 2014 }} In June 2015, two new lines were proposed. A line from Andheri West to Dahisar West, and a line from BKC to Mankhurd.{{Cite web|url=https://indianexpress.com/article/cities/mumbai/over-130-km-of-metro-lines-to-criss-cross-city-by-2020/|title=Over 130 km of Metro lines to criss-cross city by 2020|date=16 June 2015}} The following table shows the updated master plan unveiled by the MMRDA:
class="wikitable" style="margin-right: 5px; font-size: x-small; float: left;"
|+ Original Mumbai Metro master plan ! Phase !! Line !! Name of the corridor !! Length (km) | |||
rowspan="3" | Phase I (2006–2011) | 1 | Versova – Andheri – Ghatkopar | 11.07 |
2 | Bandra – Kurla – Mankhurd | 13.37 | |
3 | Colaba – Bandra – Charkop | 38.24 | |
rowspan="2" | Phase II (2011–2016) | 4 | Charkop – Dahisar | 7.5 |
5 | Ghatkopar – Mulund | 12.4 | |
rowspan="4" | Phase III (2016–2021) | 6 | BKC – Kanjur Marg via Airport | 19.5 |
7 | Andheri (E) – Dahisar (E) | 16.5 | |
8 | Hutatma Chowk – Ghatkopar | 21.8 | |
9 | Sewri – Prabhadevi | 3.5 |
File:Azad Nagar Station.jpg in March 2012]]
File:SVR Srinivas, IAS, CMD-MMMOCL while announcing trip based passes on Mumbai 1 card.jpg
On 18 February 2013, the MMRDA signed a memorandum of understanding with Transport for London, the transit authority in Greater London. The arrangement will facilitate the exchange of information, personnel and technology in the transportation sector.[http://www.thehindubusinessline.com/industry-and-economy/logistics/mumbai-transport-body-london-counterpart-ink-mou/article4428664.ece "Mumbai transport body, London counterpart ink MoU"]. Business Line. 2 March 2013. Retrieved 5 June 2013.[http://www.indianexpress.com/news/mmrda-inks-pact-with-uk-transport-authority/1076275/ "MMRDA inks pact with UK transport authority"]. Indian Express. 19 February 2013. Retrieved 5 June 2013.[http://www.business-standard.com/article/economy-policy/mmrda-transport-for-london-ink-mou-for-under-ground-metro-in-mumbai-113021800620_1.html "MMRDA, Transport for London ink MoU for under ground metro in Mumbai"]. Business Standard. 18 February 2013. Retrieved 5 June 2013.[http://www.deccanherald.com/content/313125/mumbai-metro-run-150-km.html Mumbai metro to run 150 km] Deccan Herald 18 February 2013
The revised Mumbai Metro master plan had proposed a line along the Thane-Teen Haath Naka-Kapurbavadi-Ghodbunder Road route. The feasibility report concluded that the line was not feasible as most residents of Thane and its neighbouring areas travelled to Mumbai for work daily. On 14 June 2014, Chavan announced that the MMRDA was instead examining a proposal for a metro line along the new proposed route of Wadala-Ghatkopar-Teen Haat Naka route. RITES will prepare the detailed project report and is expected to submit it by August 2014. The preliminary report proposed a {{Cvt|32|km|2}} line with 29 stations, to be built at an estimated cost of {{INR}}22,000 crore.{{Cite news|url=https://economictimes.indiatimes.com/industry/transportation/railways/mumbai-metro-services-to-be-extended-till-thane-prithviraj-chavan/articleshow/36547492.cms|title=Mumbai Metro services to be extended till Thane: Prithviraj Chavan|date=14 June 2014|newspaper=The Economic Times}} This would be the fourth line of the metro, after the previously proposed Charkop-Dahisar route was merged with the Charkop-Bandra-Mankhurd route to form Line 2.{{Cite news|url=https://timesofindia.indiatimes.com/city/mumbai/First-Metro-line-to-be-extended-to-Wadala-and-Thane/articleshow/36565838.cms|title=First Metro line to be extended to Wadala and Thane|website=The Times of India|date=15 June 2014 }}
In May 2015, the MMRDA said that it had begun planning for the Andheri-Dahisar line and Seepz-Kanjurmarg. Both lines are expected to be elevated, although the latter could be constructed underground if a proposal to extend Line 3 to Kanjurmarg is undertaken. DPRs for both lines had been prepared in 2004, along with the master plan, and the MMRDA would now update the DPRs. The agency also intends to construct Line 9 of the metro as an underground corridor from Sewri to Worli. However, planning for the project will only begun after the construction of the proposed Mumbai Trans Harbour Link commences.{{Cite web|url=https://www.hindustantimes.com/mumbai/mmrda-plans-two-new-metro-lines-for-mumbai/story-s5zWVrm5HYn1dJhKdhUNjM.html|title=MMRDA plans two new Metro lines for Mumbai|date=20 May 2015|website=Hindustan Times}}
In a report on 14 November 2014 about the cancellation of the PPP agreement for Line 2, Mint quoted a senior MMRDA official: "as decided earlier, all future lines of Mumbai Metro will be constructed by the Mumbai Metro Railway Corp. Ltd (MMRCL), a joint venture between the state government and the Union government."{{Cite web|url=https://www.livemint.com/Companies/bKzM6yXoPKaxW1YelH9FBL/Reliance-Infra-pulls-out-of-Mumbai-Metro-Line-2.html|title=Reliance Infra pulls out of Mumbai Metro Line 2|date=13 November 2014|website=Mint}} On 20 May 2015, Chief Minister Devendra Fadnavis requested officials to consider constructing the Charkop-Bandra-Dahisar and the Wadala-Thane-Kasarvadavali lines as elevated corridors. Although both corridors had been planned as elevated lines in the Mumbai Metro master plan, the previous Congress-NCP had decided to construct all metro lines underground, after delays and difficulties caused by acquiring land for Line 1. However, Fadnavis believes that the two proposed lines can be constructed quicker and cheaper if they were elevated due to the proposed route of the alignment.{{Cite web|url=https://indianexpress.com/article/cities/mumbai/mumbai-metro-rail-state-considers-elevated-metro-route/|title=Mumbai metro rail: State considers elevated Metro route|date=21 May 2015}} The Government plans to implement all future metro lines (except Line 3) as elevated corridors.{{Cite web|url=https://www.hindustantimes.com/mumbai/metro-2-to-be-built-in-three-phases-2-other-routes-also-on-cards/story-6eaO58ams57i7DyDX15LNM.html|title=Metro 2 to be built in three phases, 2 other routes also on cards|date=16 June 2015|website=Hindustan Times}} On 15 June 2015, the MMRDA announced that it would implement Line 2 of the metro in three parts. The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line.
In June 2015, Fadnavis announced that he would request the Delhi Metro Rail Corporation (DMRC) to assist in the implementation of the Mumbai Metro. He said that he intends to expand the metro system by {{Cvt|109|km|2}} before the state assembly elections in October 2019.{{Cite web|url=http://www.financialexpress.com/article/economy/devendra-fadnavis-plans-to-ask-dmrc-team-to-assist-in-metro-expansion/82971/|title = Business News: Business News India, Business News Today, Latest Finance News, Business News Live| date=11 June 2015 }}{{Cite news|url=https://www.business-standard.com/article/economy-policy/mumbai-metro-seeks-delhi-counterpart-s-help-to-expedite-project-115061500504_1.html|title=Mumbai Metro seeks Delhi counterpart's help to expedite project|newspaper=Business Standard India|date=16 June 2015|via=Business Standard|last1=Jog|first1=Sanjay}}{{Cite web|url=https://indianexpress.com/article/business/business-others/pan-mumbai-metro-network-by-2019-targets-maharashtra/|title=Pan-Mumbai Metro network by 2019, targets Maharashtra|date=11 June 2015}} In July 2015, UPS Madan announced that the State Government formally appointed the DMRC to revise and update the Mumbai Metro master plan. The DMRC will prepare DPRs for the Andheri East to Dahisar East, Jogeshwari to Kanjur Marg, Andheri West to Dahisar West and Bandra Kurla Complex to Mankhurd lines.{{Cite web|url=https://www.dnaindia.com/mumbai/report-mumbai-metro-master-plan-maharashtra-government-nod-for-delhi-body-revise-and-update-blueprint-2100949|title=Mumbai Metro master plan: Maharashtra government nod for Delhi body revise and update blueprint|date=2 July 2015|website=dna}} The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line. All four lines are proposed to be elevated and constructed as cash contracts. The lines are estimated to cost a total of {{INRConvert|21000|c|nolink=yes}}, or about {{INRConvert|350|c|nolink=yes}} per km. In addition, the planned Line 3 and Wadala-Ghatkopar-Thane-Kasarvadavli line of the metro would also be constructed.
Fadnavis announced on 8 April 2017 that the government was considering a circular metro loop line along the Kalyan-Dombivli-Taloja route. The proposed {{Cvt|15|km|2}} line would link Kalyan and Shil Phata with 13 stations, bring metro connectivity to Kalyan East, Dombivli, Ambarnath and Diva.{{cite web|title=Metro loop to connect central suburbs, Navi Mumbai on cards|url=http://www.asianage.com/metros/mumbai/090417/metro-loop-to-connect-central-suburbs-navi-mumbai-on-cards.html|website=Asian Age|access-date=9 April 2017|date=9 April 2017}}{{cite news|title=Kalyan-Dombivli-Taloja metro under consideration: Devendra Fadnavis|url=http://economictimes.indiatimes.com/industry/transportation/railways/kalyan-dombivli-taloja-metro-under-consideration-devendra-fadnavis/articleshow/58082529.cms|website=The Economic Times|access-date=9 April 2017}}
The Mumbai Metro resumed services for general public on 19 October 2020, after being shut down since March 2020 due to the COVID-19 pandemic.{{Cite web|date=22 March 2020|title=Mumbai local services suspended till March 31 due to Covid-19: All you need to know|url=https://www.hindustantimes.com/india-news/mumbai-local-services-suspended-till-march-22-due-to-covid-19-all-you-need-to-know/story-YDrytVUldu4rsstKGTQWxM.html|access-date=10 August 2021|website=Hindustan Times|language=en}}{{Cite web|agency=ANI|date=19 October 2020|title=Mumbai Metro News: Mumbai Metro resumes operations with Covid protocols |url=https://timesofindia.indiatimes.com/city/mumbai/mumbai-metro-resumes-operations-with-covid-protocols/articleshow/78744863.cms|access-date=10 August 2021|website=The Times of India|language=en}}
Protests and delay
The project has faced significant and costly legal challenges.[https://infra.economictimes.indiatimes.com/news/urban-transportation/mumbai-litigations-delaying-metro-car-shed-project-and-causing-loss-of-public-money-hc-told/97978616 Mumbai: Litigations delaying metro car shed project and causing loss of public money, HC told.] Press Trust of India. Published on Economic Times. 16 February 2013. In 2018, protestors rallied to protect trees that were to be chopped down as part of construction plans. The central government first proposed the construction of a metro station at the forest area of Aarey colony.[https://scroll.in/article/937002/saving-aarey-why-a-city-with-a-weak-protest-culture-is-demonstrating-to-protect-mumbais-green-lung Saving Aarey: Why a city with a weak protest culture is demonstrating to protect Mumbai's green lung.] Aarefa Johari. Scroll. 15 September 2019. The protest resulted in several arrests.[https://timesofindia.indiatimes.com/city/mumbai/18-protesters-held-at-aarey-as-metro-yard-trees-get-axed/articleshow/66011604.cms 18 protesters held at Aarey as Metro yard trees get axed.] Times News Network. 30 September 2018. Protests again flared in 2022.[https://www.hindustantimes.com/cities/mumbai-news/finally-voices-of-aarey-protesters-fall-silent-101669749870675.html Finally, voices of Aarey protesters fall silent.] Prayag Arora-Desai. Hindustan Times. 30 November 2022.
Lines
={{rcb|Mumbai Metro|blue|route}}=
{{Main|Blue Line (Mumbai Metro)}}
{{Multiple image
| align = right
| direction = vertical
| image1 = Mumbai Metro train arriving at Ghatkopar.jpg
| image2 = Metro arriving at Sakinaka.jpg
| caption2 = Metro trains arriving
| image3 = Metro Pheri 1 route map.jpg
| caption3 =
| total_width = 300px
| alt1 =
}}
The Blue Line connects Versova in the Western Suburbs to Ghatkopar in the Central Suburbs, covering a distance of {{convert|11.4|km|mi}}.{{cite web |url=http://www.reliancemumbaimetro.com/features.html |title=Know Your Metro - Features |publisher=Reliance Mumbai Metro |access-date=8 June 2014 |archive-url=https://web.archive.org/web/20150924085903/http://www.reliancemumbaimetro.com/features.html |archive-date=24 September 2015 |url-status=dead }} It is fully elevated, and consists of 12 stations. Work on the Versova-Andheri-Ghatkopar corridor, a part of Phase I, began on 8 February 2008. A crucial bridge on the project was completed at the end of 2012.{{cite web |url=https://timesofindia.indiatimes.com/city/mumbai/Metro-ride-in-June-13-Work-on-crucial-bridge-completed/articleshow/17761691.cms |archive-url=https://web.archive.org/web/20130928194223/http://articles.timesofindia.indiatimes.com/2012-12-26/mumbai/36007202_1_metro-bridge-mumbai-metro-one-pvt-cable-stay-bridge |url-status=live |archive-date=28 September 2013 |title=Metro ride in June '13? Work on crucial bridge completed |newspaper=The Times of India |date=26 December 2012 |access-date=6 January 2013}} The line opened for service on 8 June 2014.{{cite news |url=http://timesofindia.indiatimes.com/city/mumbai/Maharashtra-CM-Prithivraj-Chavan-flags-off-Mumbai-Metro/articleshow/36238569.cms |title=Maharashtra CM Prithivraj Chavan flags off Mumbai Metro |newspaper=The Times of India |date=8 June 2014 |access-date=8 June 2014}}
={{rcb|Mumbai Metro|yellow|route}}=
{{Main|Yellow Line (Mumbai Metro)}}
This corridor is being executed in two phases.
Prime Minister Narendra Modi launched phase 2A in January 2023.[https://economictimes.indiatimes.com/news/india/pm-narendra-modi-to-launch-mumbai-metro-line-2a-line-7-all-you-need-to-know-about-these-lines/articleshow/97130932.cms PM Narendra Modi to launch Mumbai Metro Line 2A and Line 7, what you need to know about the new routes]. Economic Times. 19 January 2023. The {{convert|18.589|km|mi|abbr=on}}{{cite web|url=https://mmrda.maharashtra.gov.in/metro-line-2a|title=Mumbai Metro Line 2A (DAHISAR - D.N. NAGAR)|date=6 June 2017|access-date=6 June 2017}} long 2A corridor was executed by DMRC on behalf of MMRDA. The corridor has 17 stations (Dahisar (East) to D N Nagar), and cost {{INRConvert|6410|c|2|lk=|year=2017}}. The line had been partially operational since 2 April 2022 and became fully operational from 19 January 2023.
The 2B line will be {{convert|23.643|km|mi|abbr=on}} long, and is estimated to cost {{INRConvert|109.7|b|2|year=2017|to=USD}}, including land acquisition cost of {{INRConvert|1274|c|2|lk=|year=2017}}. This section will have 22 stations (D N Nagar to Mandale), work on which began in mid 2018.{{Cite news|url=http://www.asianage.com/metros/mumbai/040318/contractors-appointed-for-metro-2b-and-metro-4.html|title=Contractors appointed for Metro 2B and Metro 4|date=4 March 2018|work=asianage.com|access-date=6 March 2018}}
={{rcb|Mumbai Metro|aqua|route}}=
{{Main|Aqua Line (Mumbai Metro)}}
A fully underground section of the metro, Line 3 is planned to be {{cvt|33.50|km|mi}} long, and will have 27 stations once fully completed.{{cite web|url=http://timesofindia.indiatimes.com/business/india-business/Cabinet-clears-Mumbai-Metros-third-line/articleshow/20826251.cms|title=Cabinet clears Mumbai Metro's third line|work=The Times of India|date=29 June 2013|access-date=7 July 2013}} The metro line will connect the Cuffe Parade business district in the south of Mumbai with SEEPZ and Aarey in the north.{{cite news|url=http://www.business-standard.com/article/pti-stories/further-delay-in-colaba-seepz-metro-as-govt-tweaks-bid-norms-114020401319_1.html|title=Further delay in Colaba-Seepz metro as govt tweaks bid norms | Business Standard|newspaper=Business Standard India|date=4 February 2014|publisher=business-standard.com|access-date=3 April 2014|agency=Press Trust of India}} It will also pass through the Domestic and International airports of Mumbai, for which the airport operator (GVK) has promised an equity infusion of {{INRConvert|777|c|2|lk=|year=2015}}.
The cost of this corridor was estimated at {{INRConvert|23136|c|2|lk=|year=2017}}.{{cite web|url=http://www.mumbaimirror.com/mumbai/others/Mumbai-Metro-Line-3-plan-kicks-off/articleshow/20823732.cms|title=Mumbai Metro Line 3 plan kicks off|work=Mumbai Mirror|date=29 June 2013|access-date=7 July 2013}}{{cite web|url=http://zeenews.india.com/business/news/economy/cabinet-approves-mumbai-metro-line-3-fm_78850.html|title=Cabinet approves Mumbai Metro Line 3: FM|publisher=Zee News|date=28 June 2013|access-date=7 July 2013}} The original deadline for the project was 2016, but it was extended due to several delays including COVID.{{Cite web |date=23 November 2023 |title=Mumbai Metro Aqua Line (3): Connecting the unconnected |url=https://www.moneycontrol.com/news/opinion/mumbai-metro-aqua-line-3-connecting-the-unconnected-11797381.html |access-date=24 November 2023 |website=Moneycontrol |language=en}} A section of the corridor from Aarey Colony to BKC was opened on 5 October 2024. This section cost ₹14,120 crore, and consists of 10 stations in a {{Convert|12.44|km|abbr=on}} stretch. The stretch from BKC to Acharya Atre Chowk, consisting of six stations was opened on 10 May 2025.{{Cite news |date=2025-05-10 |title=Metro Line 3 (Aqua Line): Big relief for Mumbai commuters, BKC to Worli stretch now operational |url=https://timesofindia.indiatimes.com/city/mumbai/metro-line-3-aqua-line-big-relief-for-mumbai-commuters-bkc-to-worli-stretch-now-operational/articleshow/121051289.cms |access-date=2025-05-10 |work=The Times of India |issn=0971-8257}} The remaining section from Acharya Atre Chowk to Cuffe Parade is expected to be completed by August 2025.{{Cite web |date=4 March 2024 |title=Mumbai: Five New Metro Lines To Roll Out Next Year, Details Inside |url=https://www.lokmattimes.com/maharashtra/mumbai-five-new-metro-lines-to-roll-out-next-year-details-inside-a514/ |access-date=7 June 2024 |website=Lokmat Times |language=en}}{{Cite web |date=2024-10-07 |title=BKC to Aarey stretch of Mumbai Metro Line 3 opens today — Know timings, fare, speed - CNBC TV18 |url=https://www.cnbctv18.com/india/mumbai-metro-line-3-bkc-to-aarey-jvlr-stretch-opens-today-know-timings-fare-speed-key-details-19488162.htm |access-date=2024-10-12 |website=CNBCTV18 |language=en}}{{Cite web |date=2024-10-07 |title=Mumbai Metro-3 Second Phase On Track: Aarey-BKC Services Begin, Link To Cuffe Parade May Be Ready by 2025 |url=https://www.news18.com/india/mumbai-metro-3-second-phase-on-track-aarey-bkc-services-begin-bkc-to-cuffe-parade-link-may-be-ready-by-2025-9076938.html |access-date=2024-10-12 |website=News18 |language=en}}
The line will have interchanges with the Line 1 at Marol Naka, under-construction Line 6 at Aarey JVLR, under-construction Line 7A and proposed Line 8 at CSMI Airport T-2, under-construction Line 2B at BKC, Central Line & proposed Line 11 at Chhatrapati Shivaji Maharaj Terminus, Mumbai Monorail at Mahalaxmi (Sant Gadge Maharaj Chowk) and Western Line at Santacruz, Dadar, Mahalaxmi, Mumbai Central, Grant Road and Churchgate.
={{rcb|Mumbai Metro|green|route}}=
{{main|Green Line (Mumbai Metro)}}
The {{Cvt|60.409|km|}} long Mira Bhayandar-Gaimukh-Kasarvadavali-Wadala connection will be fully elevated and have 38 stations. During the construction, this main line was divided into 3 smaller lines - Line 4 ({{stl|Mumbai Metro|Kasarvadavali}} to {{stl|Mumbai Metro|Bhakti Park (Wadala)}}), Line 4A ({{stl|Mumbai Metro|Kasarvadavali}} to {{stl|Mumbai Metro|Gaimukh}}), and the northwestern extension Line 10 ({{stl|Mumbai Metro|Gaimukh}} to {{stl|Mumbai Metro|Shivaji Chowk (Mira Road)}}). After giving proposed southern extension Line 11 from MMRDA to MMRC, there was a new, more central alignment announced to be a spur line from {{stl|Mumbai Metro|Anik Nagar Bus Depot}} to {{stl|Mumbai Metro|SPM Circle}}. Construction of Line 4 started in October 2018 while the construction of Line 4A started in September 2019. Meanwhile, the proposed Line 10 is currently under environmental review. Line 11 started construction at Zakaria Bunder Rd, but is on hold now, while other sections are still undergoing soil testing. 34 of the 38 elevated stations of the main line are under construction. In addition, the proposed new spur Line 11 has 15 stations of which 13 are proposed to be underground and the remaining 2 are elevated.{{cite web|url=https://themetrorailguy.com/2024/07/28/mmrc-publishes-mumbai-metro-line-11s-revised-alignment-map/|title=MMRC Publishes Mumbai Metro Line 11’s Revised Alignment Map|publisher=TheMetroRailGuy|date=28 July 2024|access-date=2025-06-10}}
={{rcb|Mumbai Metro|orange|route}} =
{{Main|Orange Line (Mumbai Metro)}}
The {{Cvt|45.70|km|}}-long Thane-Bhiwandi-Kalyan-Taloja line will have 34 stations. During construction, the line was divided into 2 smaller lines - Line 5 ({{stl|Mumbai Metro|Kapurbawdi}} to {{stl|Mumbai Metro|Kalyan APMC}}) and Line 12 ({{stl|Mumbai Metro|Kalyan APMC}} to {{stl|Mumbai Metro|Taloja}}). Construction of Line 5 began in February 2020. However, the section from Bhiwandi to Kalyan APMC was put on hold by the State Government. Meanwhile, the construction of Line 12 started in March 2020. The line majorly elevated except for a small underground section in Bhiwandi. The line has a total of 34 stations of which 33 stations are elevated while the station in Bhiwandi is set to be the only underground station in the line.
The line was approved by Chief Minister Devendra Fadnavis on 19 October 2016. The {{Convert|12,.811|km|abbr=on}} Thane – Bhiwandi section is under construction. Bhiwandi – Kalyan is on-hold (route modification in progress).{{cite web|title=MMRDA seeks nod to take Mumbai's Metro Line 5 underground|url=https://www.constructionworld.in/transport-infrastructure/metro-rail-and-railways-infrastructure/mmrda-seeks-nod-to-take-mumbai---s-metro-line-5-underground/35810}} The corridor is being constructucted by Afcons in one package from Kalyan to Bhiwandi including 7 stations.
={{rcb|Mumbai Metro|pink|route}}=
{{main|Pink Line (Mumbai Metro)}}
The {{convert|14.47|km|mi|abbr=on}} long Lokhandwala-Jogeshwari-Vikhroli-Kanjur Marg Metro-VI corridor will have 13 stations and cost ₹6,672 crore. It will be an elevated corridor. It will connect Lokhandwala Complex in Andheri in the western suburbs to Vikhroli and Kanjur Marg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, JVLR, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjur Marg (West), Vikhroli-Eastern Express Highway.
Metro 6 will provide interchange with Metro 2 at Infinity Mall in Andheri, with Metro 3 at SEEPZ, with Metro 4 and the Mumbai Suburban Railway at Jogeshwari and Kanjur Marg, and with Metro 7 at JVLR.{{cite web|title=Mumbai's east-west connectivity to get a boost with another Metro corridor|url=http://www.hindustantimes.com/mumbai-news/mumbai-s-east-west-connectivity-to-get-a-boost-with-another-metro-corridor/story-TYqh3bLxtzHek6IJtjfYaM.html|website=hindustantimes.com|access-date=2 March 2017|language=en|date=2 March 2017}}
The line was approved by Chief Minister Devendra Fadnavis on 19 October 2016.{{cite news|title=New metro lines for Mumbai and Thane; project to cost Rs 15,000 crore|url=http://www.business-standard.com/article/economy-policy/new-metro-lines-for-mumbai-and-thane-project-to-cost-rs-15-000-crore-116101900847_1.html|website=Business Standard India|access-date=12 February 2017|date=19 October 2016}}{{cite web|title=Kalyan-Thane, Lokhandwala-Kanjurmarg metro lines get approval|url=http://www.dnaindia.com/mumbai/report-kalyan-thane-lokhandwala-kanjurmarg-metro-lines-get-approval-2265755|website=dna|access-date=12 February 2017|date=20 October 2016}} The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities will also be able to determine the location of trees along the alignment accuracy of up to 10 cm utilizing a differential GPS (DGPS), while a digital aerial triangulation system will help determine the types of trees, their heights and diameters.{{cite web|title=MMRDA to begin tree count for Metro 6|url=http://www.mid-day.com/articles/mmrda-to-begin-tree-count-for-metro-6/18142172|website=mid-day|date=6 April 2017|access-date=6 April 2017|language=en}} Line-6's first section is expected to open in 2025.
={{rcb|Mumbai Metro|red|route}}=
{{main|Red Line (Mumbai Metro)}}
This corridor is {{Cvt|31.045|km|}} long Mira Bhayandar-Dahisar East-Andheri East-Chhatrapati Shivaji Maharaj International Airport corridor will have 23 stations. During construction the line was divided into 3 smaller lines - Line 7 ({{stl|Mumbai Metro|Dahisar (East)}} to {{stl|Mumbai Metro|Gundavali}}), Line 7A ({{stl|Mumbai Metro|Gundavali}} to {{stl|Mumbai Metro|Chhatrapati Shivaji Maharaj International Airport - T2}}), and Line 9 ({{stl|Mumbai Metro|Subhash Chandra Bose Stadium}} to {{stl|Mumbai Metro|Dahisar (East)}}). Construction of Line 7 began in August 2016, meanwhile Line 7A and Line 9 started their construction in March 2020. The line is majorly elevated with the Airport section being the only section underground. There are a total of 22 stations in the line of which 21 are elevated and 1 underground.
A section of the line from Dahisar East to Aarey (along with the section of Yellow Line from Dahanukarwadi to Dahisar East) was opened on 2 April 2022, by the then CM Uddhav Thackeray. The next section of the line (along with the final section of Yellow Line 2A from Dahanukarwadi to Andheri West) was inaugurated on 19 January 2023 by Prime Minister Narendra Modi.
={{rcb|Mumbai Metro|gold|route}}=
{{main|Gold Line (Mumbai Metro)}}
This is a proposed metro line between the Chhatrapati Shivaji Maharaj International Airport and the under construction Navi Mumbai International Airport.{{Cite web|url=https://mmrda.maharashtra.gov.in/metro-line-8|title=Mumbai Metropolitan Region Development Authority - Metro Line - 8|website=mmrda.maharashtra.gov.in}}{{Dead link|date=September 2023 |bot=InternetArchiveBot |fix-attempted=yes }} It will connect Mumbai airport to upcoming Navi Mumbai airport and its length would be approx 32 km. The corridor was initially to be executed by MMRDA, however, as per a government resolution (GR), the City & Industrial Development Corporation (CIDCO) has been appointed as the nodal agency to execute it under a PPP Model.
It's expected to cost ₹15,000 crore and finish construction by October 2026. The line has an anticipated daily ridership of 3 lakh.https://mmrda.maharashtra.gov.in/documents/10180/11273712/62%2C943+cr+for+METRO+PROJECTS.pdf/cb92ba27-a1af-45d5-8047-7e145368e7cb{{Dead link|date=April 2020 |bot=InternetArchiveBot |fix-attempted=yes }}
={{rcb|Mumbai Metro|purple|route}}=
={{rcb|Mumbai Metro|magenta|route}}=
It is an approved metro project to connect Kanjur Marg to Ambarnath-Badlapur. It will have an intersection at Kanjurmarg with Line 6, the Pink Line. This project is now at the DPR stage. The project length is {{convert|45|km|mi|abbr=on}} and the estimated cost of the project is ₹13,500 crore.
MumbaiMetroOne(747).jpg|Railcars of the Mumbai Metro in 2010
Mumbai Metro Inside.jpg|Interior of a metro train
Trial Run of Metro.JPG|A metro train on an elevated viaduct
Metro Bridge.jpg|Metro bridge, part of the Mumbai Metro
Network
{{main|List of Mumbai Metro stations}}
File:Mumbai Metro and Suburban Railway Schematic Map.svg
Lines on the Mumbai Metro are currently identified by numbers. In March 2016, MMRDA Metropolitan Commissioner, U.P.S. Madan, announced that all lines on the system would be color-coded after more lines are opened.
class="wikitable sortable" style="text-align:center; width: 60%;"
! colspan="8" style="background:#ADD8E6;" |Operational Lines |
No.
!Line Name !Number ! colspan="2" |Terminals !Stations !Distance (km) !Opening Date |
---|
1
| style="background:#{{rail color|Mumbai Metro|blue}};text-align: center;" | Blue |1 |{{stl|Mumbai Metro|Versova}} |{{stl|Mumbai Metro|Ghatkopar}} | style="text-align:center;" |12 |style="text-align:center;"|{{Cvt|11.40|km |
|style="text-align:center;"|8 June 2014
|-
! rowspan="2" |2
| rowspan="2" style="background:#{{rcr|Mumbai Metro|yellow}}; text-align: center;" | Yellow
| rowspan="2 |2A
|{{stl|Mumbai Metro|Dahisar East}}
|{{stl|Mumbai Metro|Dahanukarwadi}}
| style="text-align:center;" |9
|style="text-align:center;"|{{Cvt|9.8|km|}}
|style="text-align:center;"|2 April 2022
|-
|{{stl|Mumbai Metro|Dahanukarwadi}}
|{{stl|Mumbai Metro|Andheri West}}
| style="text-align:center;" |8
|style="text-align:center;"|{{Cvt|8.8|km|}}
|style="text-align:center;"|19 January 2023
|-
! rowspan="2" |3
| rowspan="2" style="background:#{{rcr|Mumbai Metro|aqua}}; text-align: center;" | Aqua
| rowspan="2 |3
|{{stl|Mumbai Metro|Aarey JVLR}}
|{{stl|Mumbai Metro|Bandra Kurla Complex}}
| style="text-align:center;"|10
|style="text-align:center;"| {{Cvt|12.69|km|}}
|style="text-align:center;"|5 October 2024
|-
|{{stl|Mumbai Metro|Bandra Kurla Complex}}
|{{stl|Mumbai Metro|Acharya Atre Chowk}}
|6
|{{Cvt|9.77|km|}}
|9 May 2025
|-
! rowspan="2" |4
| rowspan="2" style="background:#{{rcr|Mumbai Metro|red}}; text-align: center;" | Red
| rowspan="2 |7
|{{stl|Mumbai Metro|Dahisar East}}
|{{stl|Mumbai Metro|Aarey}}
| style="text-align:center;" |10
|style="text-align:center;"|{{Cvt|10.7|km|}}
|style="text-align:center;"|2 April 2022
|-
|{{stl|Mumbai Metro|Aarey}}
|{{stl|Mumbai Metro|Gundavali}}
| style="text-align:center;" |4
|style="text-align:center;"|{{Cvt|5.8|km|}}
|style="text-align:center;"|19 January 2023
|-
! colspan="5" |
!57
!{{Cvt|68.97|km|}}
!
|-
! colspan="8" style="background:#ADD8E6;" |Under Construction Lines
|-
!rowspan="2"|1
|rowspan="2" style="background:#{{rcr|Mumbai Metro|yellow}}; text-align: center;" | Yellow
| rowspan="2 |2B
|{{stl|Mumbai Metro|Andheri West}}
|{{stl|Mumbai Metro|Diamond Garden}}
|15
|rowspan="2"| {{Cvt|23.6|km|}}
|December 2027
|-
|{{stl|Mumbai Metro|Diamond Garden}}
|{{stl|Mumbai Metro|Mandala}}
|5
|March 2026
|-
!2
|style="background:#{{rcr|Mumbai Metro|3}}; text-align: center;" | Aqua
|3
|{{stl|Mumbai Metro|Acharya Atre Chowk}}
|{{stl|Mumbai Metro|Cuffe Parade}}
|11
|{{Cvt|11.07|km|}}
|August 2025
|-
! rowspan="4" | 3
|rowspan="4" style="background:#{{rcr|Mumbai Metro|green}}; text-align: center;" | Green
|4A
|{{stl|Mumbai Metro|Gaimukh}}
|{{stl|Mumbai Metro|Kasarvadavali}}
|2
|{{Cvt|2.88|km|}}
|December 2025
|-
| rowspan="3" |4
|{{stl|Mumbai Metro|Kasarvadavali}}
|{{stl|Mumbai Metro|Cadbury Junction}}
|8
| rowspan="3" |{{Cvt|32.32|km|}}
|December 2025
|-
|{{stl|Mumbai Metro|Cadbury Junction}}
|{{stl|Mumbai Metro|Gandhi Nagar (Kanjurmarg)}}
|11
|December 2026
|-
|{{stl|Mumbai Metro|Gandhi Nagar (Kanjurmarg)}}
|{{stl|Mumbai Metro|Bhakti Park (Wadala)}}
|13
|November 2027
|-
! rowspan="2" |4
| rowspan="2" style="background:#{{rcr|Mumbai Metro|orange}}; text-align: center;"| Orange
|5
|{{stl|Mumbai Metro|Kapurbawdi}}
|{{stl|Mumbai Metro|Bhiwandi}}
|8
|{{Cvt|12.81|km|}}
|December 2026
|-
|12
|{{stl|Mumbai Metro|Kalyan APMC}}
|{{stl|Mumbai Metro|Taloja}}
|17
|{{Cvt|20.75|km|}}
|December 2027
|-
!5
| style="background:#{{rcr|Mumbai Metro|pink}}; text-align: center;" | Pink
|6
|{{stl|Mumbai Metro|Swami Samarth Nagar (Lokhandwala)}}
|{{stl|Mumbai Metro|Vikhroli EEH}}
|13
|{{Cvt|14.47|km|}}
|December 2026
|-
! rowspan="3"|6
| rowspan="3" style="background:#{{rcr|Mumbai Metro|red}}; text-align: center;" | Red
|7A
|{{stl|Mumbai Metro|Gundavali}}
|{{stl|Mumbai Metro|Chhatrapati Shivaji Maharaj International Airport - T2}}
|2
|{{Cvt|3.17|km|}}
|December 2026
|-
|rowspan="2"|9
|{{stl|Mumbai Metro|Subhash Chandra Bose Stadium}}
|{{stl|Mumbai Metro|Kashigaon}}
|4
| rowspan="2" |{{Cvt|11.38|km|}}
|December 2026
|-
|{{stl|Mumbai Metro|Kashigaon}}
|{{stl|Mumbai Metro|Dahisar East}}
|4
|December 2025
|-
! colspan="8" style="background:#ADD8E6;" |Proposed Lines
|-
! rowspan="2" |1
| rowspan="2"; style="background:#{{rcr|Mumbai Metro|green}}; text-align: center;" | Green
|10
|{{stl|Mumbai Metro|Gaimukh}}
|{{stl|Mumbai Metro|Shivaji Chowk (Mira Road)}}
|8
|{{Cvt|9.2|km|}}
|Awaiting environment clearance
|-
|11
|{{stl|Mumbai Metro|Anik Nagar Bus Depot}}
|{{stl|Mumbai Metro|SPM Circle}}
|15
|{{Cvt|18|km|}}
|undergoing soil testing
|-
!2
| style="background:#{{rcr|Mumbai Metro|orange}}; text-align: center;" | Orange
|5
|{{stl|Mumbai Metro|Bhiwandi}}
|{{stl|Mumbai Metro|Kalyan APMC}}
|9
|{{Cvt|10.72|km|}}
|DPR undergoing modifications
|-
!3
| style="background:#{{rcr|Mumbai Metro|gold}}; text-align: center;" | Gold
|8
|{{stl|Mumbai Metro|Chhatrapati Shivaji Maharaj International Airport - T2}}
|Navi Mumbai International Airport
|12
|{{Cvt|35|km|}}
|DPR in preparation
|-
!4
| style="background:#{{rcr|Mumbai Metro|purple}}; text-align: center;" | Purple
|13
|{{stl|Mumbai Metro|Shivaji Chowk (Mira Road)}}
|20
|{{Cvt|23|km|}}
|DPR in preparation
|-
!5
| style="background:#{{rcr|Mumbai Metro|magenta}}; text-align: center;" | Magenta
|14
|{{stl|Mumbai Metro|Vikhroli EEH}}
|40
|{{Cvt|45|km|}}
|DPR submitted
|}
Rolling stock
Reliance Infrastructure consulted a number of major international rolling stock builders to provide the train fleet for the Mumbai Metro. Bidders for the contract included established metro-vehicle manufacturers such as Kawasaki, Alstom, Siemens and Bombardier, but CRRC Nanjing Puzhen of China was ultimately chosen to supply rolling stock for ₹600 crore.[https://web.archive.org/web/20150306185020/http://www.railwaygazette.com/news/single-view/view/mumbais-beautiful-butterfly-emerges.html Mumbai's beautiful butterfly emerges] Railway Gazette International 25 March 2010{{cite web |url=http://www.mumbai-metro.com/projec-update |title=Mumbai Metro One Project updates |publisher=mumbai-metro.com |access-date=25 August 2010 |url-status=dead |archive-url=https://web.archive.org/web/20111118081246/http://www.mumbai-metro.com/projec-update |archive-date=18 November 2011 }} In May 2008, CSR Nanjing completed the first 16 trains, each comprising four cars. The first ten trains were reported to be ready for operation in January 2013.{{cite web|url=http://www.dnaindia.com/mumbai/report_mumbai-metro-trains-rearing-to-run-but-where-are-tracks_1791594|publisher=DNAIndia|title=Mumbai metro trains raring to run, but where are tracks?|date=23 January 2013|access-date=6 February 2013}}
The coaches are fire retardant,[http://www.dnaindia.com/mumbai/1829482/report-a-mumbai-metro-train-every-three-minutes "A Mumbai Metro train every three minutes"]. DNA India. 1 May 2013. Retrieved 7 July 2013. air-conditioned and designed to reduce noise and vibration, and will feature both high seating capacity and ample space for standing passengers. They will be outfitted with a number of features for safety and convenience, including LCD screens, 3D route maps, first-aid kits, wheelchair facilities, fire-fighting equipment and intercom systems permitting communication with the train driver. Each coach will furthermore feature a black box to assist in accident investigations.[https://web.archive.org/web/20130928033938/http://articles.timesofindia.indiatimes.com/2011-10-11/mumbai/30266316_1_pillars-metro-rail-mmopl "Metro first line hinges on Andheri bridge"]. Times of India. 11 October 2011. Retrieved 18 October 2011. The trains will be capable of carrying over 1,100 passengers in a four-car unit, with each carriage being approximately {{convert|2.9|m|ftin}} wide.{{cite web|last=Katkurwar |first=Saurabh |url=http://www.mid-day.com/news/2012/feb/260212-CIDCO-opts-for-wider-metro-coaches.htm |title=CIDCO opts for wider metro coaches |publisher=MiD DAY |date=26 February 2012 |access-date=28 March 2012}}
In 2018, the Mumbai Metro Rail Corporation chose Alstom to supply 31 eight car trains for Aqua line (line 3). These trains are capable of driverless operations and were built at Alstom's factory in Sri City, Andhra Pradesh.{{cite web|access-date=13 April 2020|title=Mumbai Metro Line 3: Alstom wins 'Make in India' contract for modern train sets worth 315 million euros|url=https://www.financialexpress.com/infrastructure/mumbai-metro-line-3-alstom-wins-make-in-india-contract-for-modern-train-sets-worth-315-million-euros/1309591/|date=11 September 2018|first=Devanjana|last=Nag|website=The Financial Express}}
In 2018, Mumbai Metropolitan Region Development Authority which will operate all metro lines except Line 3, awarded a tender to Bharat Earth Movers Ltd. (BEML) to supply 63 trainsets (378 coaches) for Yellow Line (Line 2) and Red Line (Line 7) at a cost of ₹3,015 crores ($427.33 million). Capable of driverless operations, the trains are manufactured at BEML's factory in Bengaluru and the first train set for the Yellow Line arrived in Mumbai on 27 January 2021, and will continue to receive the rest of the sets until 2022.{{cite news |title=BEML receives order worth Rs 3015 crore for Mumbai Metro |url=https://www.business-standard.com/article/news-cm/beml-receives-order-worth-rs-3015-crore-for-mumbai-metro-118112400212_1.html |access-date=30 November 2018 |work=Capital Market |publisher=Business Standard |date=24 November 2018}}{{cite news |title=BEML secures $427.33m Mumbai metro car supply contract |url=https://www.railway-technology.com/news/beml-secures-427-33m-mumbai-metro-car-supply-contract/ |access-date=30 November 2018 |publisher=Railway Technology |date=26 November 2018}} On 17 January 2021, Bombardier won the tender to supply 234 driverless coaches for the Green Line (Line 4) of six-car configuration for Mumbai metro. However, the contract was cancelled in March 2022 due to delays and uncertainties of the project.{{cite news|url=https://www.railjournal.com/fleet/alstom-terminates-mumbai-line-4-fleet-contract/|title=Alstom terminates Mumbai Line 4 fleet contract|date=10 March 2022|access-date=6 April 2022}}{{cite news|url=https://www.moneycontrol.com/news/business/economy/alstom-cancels-order-bagged-from-mmrda-for-supply-of-coaches-for-mumbai-metro-4-8195151.html|title=Alstom cancels order bagged from MMRDA for supply of coaches for Mumbai Metro 4|date=4 March 2022|accessdate=6 April 2022}}
Power supply
Mumbai Metro runs on alternating current (AC) which is typically more labour and cost-intensive. MMRDA joint project director Dilip Kawathkar stated that AC power was chosen "after a proper study by a team of experts" which found that the AC model was "a better option". Bidders for Line 3 were reportedly in favour of the DC model. Experts believe that the decision to use AC will escalate the project cost of underground lines by 15%, since more digging is required for the rail to work on AC.{{Cite web|url=https://www.mid-day.com/articles/mumbai-s-metro-3-will-be-one-of-the-few-in-the-world-to-run-on-ac/15298168|title=Mumbai's Metro-3 will be one of the few in the world to run on AC|date=15 May 2014|website=mid-day}}
Signalling and communications
The Mumbai Metro will feature an advanced signalling system, including an automatic train protection system (ATPS) and automated signalling to control train movements on the {{convert|11|km|mi|adj=on}} Line 1. A four-minute service interval is anticipated on the route.{{cite web|url=http://www.mmrdamumbai.org/|title=Mumbai Metro project|publisher=MMRDA|date=1 January 2008|access-date=1 January 2010|archive-date=31 August 2009|archive-url=https://web.archive.org/web/20090831070601/http://www.mmrdamumbai.org/|url-status=dead}}
Siemens will supply the signalling systems required for the project, while Thales Group will supply the Metro's communication systems. The network's signalling and train control systems will be based on LZB 700M technology.{{cite web|url=http://www.projectstoday.com/News/NewsDetails.aspx?smid=16&nid=22722|title=MMOPL awards contract to ABB, Siemens, SEW |publisher=Projects Today|date=8 January 2008|access-date=15 January 2010}}
Ridership
On 21 October 2019, 1,960 days (approx. 5 years) after Mumbai Metro Line 1's inception, the system crossed 600 million passengers, with an average daily ridership of around 450,000 passengers.{{cite news |url=https://timesofindia.indiatimes.com/city/mumbai/versova-ghatkopar-metro-one-crosses-60-crore-ridership-in-5-years/articleshow/71679574.cms |title=Versova-Ghatkopar Metro One crosses 60 crore ridership in 5 years |work=The Times of India |date=21 October 2019 |access-date=21 October 2019}}
Railway map of Mumbai including metro
See also
References
{{reflist|30em|refs=
}}
External links
{{commons category|Mumbai Metro}}
{{Wikivoyage|Mumbai}}
{{Rapid transit OSM map|display=title|text=Metro map}}
- [https://web.archive.org/web/20120319164955/http://202.54.119.40/projects_metro_rail.htm Mumbai Metro Rail Project - MMRDA site]
- [http://mumbaimetrorail.blogspot.com/ Mumbai Metro blog site]
- [https://web.archive.org/web/20190627205221/http://mumbai-metro.com/ Mumbai Metro unofficial magazine]
- [https://trainonrails.com/metro-trains/mumbai/route/ghatkopar-mumbai-metro-station-to-andheri-mumbai-metro-station Mumbai Metro unofficial Information Site]
{{Mumbai Metro navbox|all=yes}}
{{Maharashtra transit}}
{{Rapid transit in India}}
{{Rapid transit in Asia}}
{{Mumbai topics}}
{{Use dmy dates|date=October 2024}}
{{coord missing|Maharashtra}}
Category:Underground rapid transit in India
Category:Standard-gauge railways in India
Category:25 kV AC railway electrification