List of commercial nuclear reactors#Finland
{{Short description|None}}
{{About|commercial nuclear fission reactors|other nuclear reactor lists|List of nuclear reactors}}
{{Dynamic list}}
{{Use British English|date=January 2023}}
{{Use dmy dates|date=January 2023}}
This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2025, there are 439 operable power reactors in the world, with a combined electrical capacity of 397.7 GW. Additionally, there are 68 reactors under construction and 108 reactors planned, with a combined capacity of 74 GW and 103 GW, respectively, while 359 more reactors are proposed.{{cite web |title=World Nuclear Power Reactors & Uranium Requirements |url=http://www.world-nuclear.org/information-library/facts-and-figures/world-nuclear-power-reactors-and-uranium-requireme.aspx |access-date=5 May 2020 |website=world-nuclear.org |publisher=World Nuclear Association}} For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).{{cite web |title=PRIS – Home |url=https://pris.iaea.org/pris/ |website=pris.iaea.org}}
In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[https://pris.iaea.org/PRIS/Glossary.aspx "Reference Unit Power"] at IAEA
{{horizontal TOC|limit=2}}
Argentina
{{main|Nuclear power in Argentina}}
Armenia
{{main|Nuclear power in Armenia}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Metsamor | 1 | PWR | VVER-440/V-270 | {{no|Shut down}} | 376 | {{dts|1 Jul 1969}} | {{dts|6 Oct 1977}} | {{dts|25 Feb 1989}} |
2 | PWR | VVER-440/V-270 | {{yes|Operational}} | 375 | {{dts|1 Jul 1975}} | {{dts|3 May 1980}} | (2036){{cite web|url=https://www.world-nuclear-news.org/Articles/Metsamor-2-to-operate-until-2026|title = Metsamor 2 to operate until 2036 : Corporate – World Nuclear News}} |
Austria
{{main|Nuclear power in Austria}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
Zwentendorf | 1 | BWR | BWR-69 (KWU) | {{BLACK|Finished; never entered service}} | 878 | Apr 1972 | {{dts|5 Nov 1978}} |
Bangladesh
{{main|Nuclear power in Bangladesh}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Rooppur | 1 | PWR | VVER-1200/V-523 | {{partial|Under construction}} | 1080 | {{dts|30 Nov 2017}}{{cite web |title=Nuclear Power in Bangladesh – World Nuclear Association |url=http://world-nuclear.org/information-library/country-profiles/countries-a-f/bangladesh.aspx |website=world-nuclear.org |access-date=17 Jul 2018}} | ({{dts|2025}}) | |
| 2 | PWR | VVER-1200/V-523 | {{partial|Under construction}} | 1080 | {{dts|14 Jul 2018}} | ({{dts|2026}}) |
Belarus
{{main|Nuclear power in Belarus}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Ostrovets | 1 | PWR | VVER-1200/V-491 | {{yes|Operational}} | 1109 | {{dts|6 Nov 2013}} | 10 Jun 2021{{cite web|url=https://www.rosatom.ru/journalist/news/energoblok-1-belorusskoy-aes-prinyat-v-promyshlennuyu-ekspluatatsiyu/|title=Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина|website=rosatom.ru}} | |
| 2 | PWR | VVER-1200/V-491 | {{yes|Operational}} | 1109 | {{dts|24 Apr 2014}} | {{dts|1 Nov 2023}}{{cite web|url=https://world-nuclear-news.org/Articles/Second-Belarus-unit-enters-commercial-operation|title=Second Belarus unit enters commercial operation|website=world-nuclear-news.org}} | ||
rowspan=2| Minsk | 1 | PWR | VVER-1000 | {{BLACK|Unfinished}} | 963 | {{dts|1983}} | {{dts|1987}} | |
2 | PWR | VVER-1000 | {{BLACK|Unfinished}} | 963 | {{dts|1983}} | {{dts|1987}} |
Belgium
{{main|Nuclear power in Belgium}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
| SCK•CEN | 1 | PWR | Westinghouse (WH) BR-3 | {{no|Decommissioned}} | 10 | {{dts|1 Nov 1957}} | {{dts|10 Oct 1962}} | {{dts|30 Jun 1987}} |
rowspan=4| Doel | 1 | PWR | WH 2 loops | {{no|Shut down}} | 445 | {{dts|1 Jul 1969}} | {{dts|15 Feb 1975}} | {{dts|14 Feb 2025}} |
2 | PWR | WH 2 loops | {{yes|Operational}} | 445 | {{dts|1 Sep 1971}} | {{dts|1 Dec 1975}} | ({{dts|1 dec 2025}}) | |
3 | PWR | Framatome 3 loops | {{no|Shut down}} | 1006 | {{dts|1 Jan 1975}} | {{dts|1 Oct 1982}} | {{dts|23 Sep 2022}}{{cite web|url=https://www.brusselstimes.com/294161/doel-3-shutdown-confirmed-for-friday-despite-politicians-pleas|title=Doel 3: Shutdown confirmed for Friday|date=23 Sep 2022|publisher=RTBF Info|access-date=25 Sep 2022}} | |
4 | PWR | Belgian firms plus WH 3 loops | {{yes|Operational}} | 1039 | {{dts|1 Dec 1978}} | {{dts|1 Jul 1985}} | ({{dts|1 nov 2035}}) | |
rowspan=3| Tihange | 1 | PWR | Framatome 3 loops | {{yes|Operational}} | 962 | {{dts|1 Jun 1970}} | {{dts|1 Oct 1975}} | ({{dts|1 oct 2025}}) |
2 | PWR | Framatome 3 loops | {{no|Shut down}} | 1008 | {{dts|1 Apr 1976}} | {{dts|1 Jun 1983}} | {{dts|31 Jan 2023}}{{cite web | url=https://www.world-nuclear-news.org/Articles/Second-Belgian-reactor-enters-retirement | title=Second Belgian reactor enters retirement : Corporate - World Nuclear News }} | |
3 | PWR | Belgian firms plus WH 3 loops | {{yes|Operational}} | 1046 | {{dts|1 Nov 1978}} | {{dts|1 Sep 1985}} | ({{dts|1 nov 2035}}) |
Brazil
{{main|Nuclear power in Brazil}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=3| Angra | 1 | PWR | WH 2 loops | {{yes|Operational}} | 609 | {{dts|1 May 1971}} | {{dts|1 Jan 1985}} | |
2 | PWR | Pre-Konvoi | {{yes|Operational}} | 1275 | {{dts|1 Jan 1976}} | {{dts|1 Feb 2001}} | ||
3 | PWR | Pre-Konvoi | {{partial|Under construction}} | 1245 | {{dts|1 Jun 2010}} | (2028){{cite web | url=https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx | title=Plans for New Nuclear Reactors Worldwide - World Nuclear Association }} |
Bulgaria
{{main|Nuclear power in Bulgaria}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=8| Kozloduy | 1 | PWR | VVER-440/V-230 | {{no|Shut down}} | 408 | {{dts|1 Apr 1970}} | {{dts|28 Oct 1974}} | {{dts|31 Dec 2002}} |
2 | PWR | VVER-440/V-230 | {{no|Shut down}} | 408 | {{dts|1 Apr 1970}} | {{dts|10 Nov 1975}} | {{dts|31 Dec 2002}} | |
3 | PWR | VVER-440/V-230 | {{no|Shut down}} | 408 | {{dts|1 Oct 1973}} | {{dts|20 Jan 1981}} | {{dts|31 Dec 2006}} | |
4 | PWR | VVER-440/V-230 | {{no|Shut down}} | 408 | {{dts|1 Oct 1973}} | {{dts|20 Jun 1982}} | {{dts|31 Dec 2006}} | |
5 | PWR | VVER-1000/V-320 | {{yes|Operational}} | 1003 | {{dts|9 Jul 1980}} | {{dts|23 Dec 1988}} | ||
6 | PWR | VVER-1000/V-320 | {{yes|Operational}} | 1003 | {{dts|1 Apr 1982}} | {{dts|30 Dec 1993}} | ||
7 | PWR | AP1000 | {{Planned}} | 1150 | ({{dts|2033}}){{cite news|url=https://www.world-nuclear-news.org/Articles/Bulgaria-to-push-ahead-with-two-new-units-at-Kozlo |title=Bulgaria to push ahead with two new units at Kozloduy |work=world-nuclear-news.org |publisher=World Nuclear News |date=25 Oct 2023 |access-date=3 Nov 2023 }} | |||
8 | PWR | AP1000 | {{Planned}} | 1150 | ||||
rowspan=2| Belene | 1 | PWR | VVER-1000/V-320 VVER-1000/V-446B | {{BLACK|Unfinished}} | 953 1011 | 1987 2008 | ||
2 | PWR | VVER-1000/V-320 VVER-1000/V-446B | {{BLACK|Unfinished}} | 953 1011 | 1987 2008 |
Canada
{{main|Nuclear power in Canada}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=8| Pickering | 1 | PHWR | CANDU 500A | {{no|Shut down}} | 515 | {{dts|Jun 1966}} | {{dts|29 Jul 1971}} | {{dts|1 Oct 2024}} |
2 | PHWR | CANDU 500A | {{no|Shut down}} | 515 | {{dts|Sep 1966}} | {{dts|30 Dec 1971}} | {{dts|31 Dec 1997}}{{cite news | url=https://www.theglobeandmail.com/news/national/utility-abandons-pickering-reactor-overhaul/article18243747/ | title=Utility abandons Pickering reactor overhaul | newspaper=The Globe and Mail | date=13 August 2005 }} | |
3 | PHWR | CANDU 500A | {{no|Shut down}} | 515 | {{dts|Dec 1967}} | {{dts|1 Jun 1972}} | {{dts|29 Dec 1997}} | |
4 | PHWR | CANDU 500A | {{no|Shut down}} | 515 | {{dts|May 1968}} | {{dts|17 Jun 1973}} | {{dts|31 Dec 2024}} | |
5 | PHWR | CANDU 500B | {{yes|Operational}} | 516 | {{dts|Nov 1974}} | {{dts|10 May 1983}} | ({{dts|2026}}) | |
6 | PHWR | CANDU 500B | {{yes|Operational}} | 516 | {{dts|Oct 1975}} | {{dts|1 Feb 1984}} | ({{dts|2026}}) | |
7 | PHWR | CANDU 500B | {{yes|Operational}} | 516 | {{dts|Mar 1976}} | {{dts|1 Jan 1985}} | ({{dts|2026}}) | |
8 | PHWR | CANDU 500B | {{yes|Operational}} | 516 | {{dts|Sep 1976}} | {{dts|28 Feb 1986}} | ({{dts|2026}}){{cite web | url=https://www.world-nuclear-news.org/Articles/Ontario-extends-Pickering-operations | title=Ontario extends Pickering operations|website=World Nuclear News|date=30 September 2022|accessdate=7 July 2023}} | |
rowspan=8| Darlington | 1 | PHWR | CANDU 850 | {{yes|Operational}} | 878 | {{dts|Apr 1982}} | {{dts|14 Nov 1992}} | ({{dts|2052}}) |
2 | PHWR | CANDU 850 | {{yes|Operational}} | 878 | {{dts|Sep 1981}} | {{dts|9 Oct 1990}} | ({{dts|2050}}) | |
3 | PHWR | CANDU 850 | {{yes|Operational}} | 878 | {{dts|Sep 1984}} | {{dts|14 Feb 1993}} | ({{dts|2053}}) | |
4 | PHWR | CANDU 850 | {{yes|Operational}} | 878 | {{dts|Jul 1985}} | {{dts|14 Jun 1993}} | ({{dts|2053}}) | |
5{{cite web|last=Patel|first=Sonal|date=2 Dec 2021|title=Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection|url=https://www.powermag.com/darlington-nuclear-plant-will-get-a-bwrx-300-smr-as-ge-hitachi-bags-lucrative-opg-selection/|access-date=5 Dec 2021|website=POWER Magazine|language=en-US}} | BWR | BWRX-300 | {{partial|Under construction}} | 300 | 8 May 2025https://www.world-nuclear-news.org/articles/opg-gets-go-ahead-to-build-first-smr-in-canada | (2030) | ||
6 | BWR | BWRX-300 | {{Planned}} | 300 | ||||
7 | BWR | BWRX-300 | {{Planned}} | 300 | ||||
8 | BWR | BWRX-300 | {{Planned}} | 300 | ||||
rowspan=8| Bruce | 1 | PHWR | CANDU 791 | {{yes|Operational}} | 823 | {{dts|Jun 1971}} | {{dts|1 Sep 1977}} | ({{dts|2043}}) |
2 | PHWR | CANDU 791 | {{yes|Operational}} | 823{{cite web | url=https://www.brucepower.com/2022/05/06/unit-2-sets-record-run-ahead-of-planned-maintenance-outage/|website=brucepower.com | title=Unit 2 sets record run ahead of planned maintenance outage | date=6 May 2022 |accessdate=7 July 2023}} | {{dts|Dec 1970}} | {{dts|1 Sep 1977}} | ({{dts|2043}}) | |
3 | PHWR | CANDU 750A | {{yes|Operational}} | 817 | {{dts|Jul 1972}} | {{dts|1 Feb 1978}} | ({{dts|2064}}){{cite web|url=https://www.brucepower.com/life-extension-program-mcr-project/|title = Life-Extension Program & MCR Project|website=brucepower.com|accessdate=7 July 2023}} | |
4 | PHWR | CANDU 750A | {{yes|Operational}} | 817 | {{dts|Sep 1972}} | {{dts|18 Jan 1979}} | ({{dts|2064}}) | |
5 | PHWR | CANDU 750B | {{yes|Operational}} | 817 | {{dts|Jun 1978}} | {{dts|1 Mar 1985}} | ({{dts|2064}}) | |
6 | PHWR | CANDU 750B | {{yes|Operational}} | 880{{cite web | url=https://www.world-nuclear-news.org/Articles/Bruce-6-re-enters-commercial-operation | title=Bruce 6 re-enters commercial operation : Corporate - World Nuclear News }} | {{dts|Jan 1978}} | {{dts|15 Sep 1984}} | ({{dts|2064}}) | |
7 | PHWR | CANDU 750B | {{yes|Operational}} | 817 | {{dts|May 1979}} | {{dts|10 Apr 1986}} | ({{dts|2064}}) | |
8 | PHWR | CANDU 750B | {{yes|Operational}} | 817 | {{dts|Aug 1979}} | {{dts|22 May 1987}} | ({{dts|2064}}) | |
NPD | 1 | PHWR | CANDU | {{no|Shut down}} | 19 | {{dts| Jan 1958}} | {{dts|4 Jun 1962}} | {{dts|1 Aug 1987}} |
Douglas Point | 1 | PHWR | CANDU 200 | {{no|Shut down}} | 200 | {{dts|Feb 1960}} | {{dts|26 Sep 1968}} | {{dts|4 May 1984}} |
rowspan=2| Gentilly | 1 | BWR | CANDU BLWR 250 | {{no|Shut down}} | 250 | {{dts|Sep 1966}} | {{dts|1 May 1972}} | {{dts|1 June 1977}} |
2 | PHWR | CANDU-6 | {{no|Shut down}} | 635 | {{dts|Apr 1974}} | {{dts|1 Oct 1983}} | {{dts|28 Dec 2012}} | |
Point Lepreau | 1 | PHWR | CANDU-6 | {{yes|Operational}} | 635 | {{dts|May 1975}} | {{dts|1 Feb 1983}} | ({{dts|2041}}) |
China
{{main|Nuclear power in China}}
{{sticky header}}
Cuba
Czech Republic
{{main|Nuclear power in the Czech Republic}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan="6" | Dukovany | 1 | PWR | VVER-440/V-213 | {{yes|Operational}} | 468 | {{dts|1 Jan 1979}} | {{dts|3 May 1985}} | |
2 | PWR | VVER-440/V-213 | {{yes|Operational}} | 471 | {{dts|1 Jan 1979}} | {{dts|21 Mar 1986}} | ||
3 | PWR | VVER-440/V-213 | {{yes|Operational}} | 468 | {{dts|1 Mar 1979}} | {{dts|20 Dec 1986}} | ||
4 | PWR | VVER-440/V-213 | {{yes|Operational}} | 471 | {{dts|1 Mar 1979}} | {{dts|19 Jul 1987}} | ||
5 | PWR | APR-1400 | {{planned}} | 1200 | ||||
6 | PWR | APR-1400 | {{planned}} | 1200 | ||||
rowspan="2" | Temelín | 1 | PWR | VVER-1000/V-320 | {{yes|Operational}} | 1003 | {{dts|1 Feb 1987}} | {{dts|10 Jun 2002}} | |
2 | PWR | VVER-1000/V-320 | {{yes|Operational}} | 1003 | {{dts|1 Feb 1987}} | {{dts|18 Apr 2003}} |
Egypt
{{main|Nuclear program of Egypt}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=4| El Dabaa | 1 | PWR | VVER-1200/V-529 | {{partial|Under construction}} | 1200 | 20 Jul 2022{{cite web | url=https://www.world-nuclear-news.org/Articles/Construction-of-Egypts-first-nuclear-power-plant-u | title=Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News }} | ({{dts|2028}}) | |
2 | PWR | VVER-1200/V-529 | {{partial|Under construction}} | 1200 | 19 Nov 2022{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=138 | title=PRIS – Reactor Details }} | |||
3 | PWR | VVER-1200/V-529 | {{partial|Under construction}} | 1200 | 3 May 2023{{cite web | url=https://www.world-nuclear-news.org/Articles/Construction-begins-of-third-unit-at-Egypt-s-El-Da | title=Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News }} | |||
4 | PWR | VVER-1200/V-529 | {{partial|Under construction}} | 1200 | 23 Jan 2024 |
Finland
{{main|Nuclear power in Finland}}
France
{{main|Nuclear power in France}}
{{sticky header}}
class="wikitable sortable mw-datatable sticky-header" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Belleville | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1310 | {{dts|1 May 1980}} | {{dts|1 Jun 1988}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1310 | {{dts|1 Aug 1980}} | {{dts|1 Jan 1989}} | ||
rowspan=4| Blayais | 1 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Jan 1977}} | {{dts|1 Dec 1981}} | |
2 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Jan 1977}} | {{dts|1 Feb 1983}} | ||
3 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Apr 1978}} | {{dts|14 Nov 1983}} | ||
4 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Apr 1978}} | {{dts|1 Oct 1983}} | ||
Brennilis | 1 | HWGCR | {{no|Shut down}}/in decommissioning | 70 | {{dts|1 Jul 1962}} | {{dts|1 Jun 1968}} | {{dts|31 Jul 1985}} | |
rowspan=7| Bugey | 1 | GCR | UNGG | {{no|Shut down}} | 540 | {{dts|1 Dec 1965}} | {{dts|1 Jul 1972}} | {{dts|27 May 1994}} |
2 | PWR | CP0 | {{yes|Operational}} | 910 | {{dts|1 Nov 1972}} | {{dts|1 Mar 1979}} | ||
3 | PWR | CP0 | {{yes|Operational}} | 910 | {{dts|1 Sep 1973}} | {{dts|1 Mar 1979}} | ||
4 | PWR | CP0 | {{yes|Operational}} | 880 | {{dts|1 Jun 1974}} | {{dts|1 Jul 1979}} | ||
5 | PWR | CP0 | {{yes|Operational}} | 880 | {{dts|1 Jul 1974}} | {{dts|3 Jan 1980}} | ||
6 | PWR | EPR2 | {{planned}} | 1670 | ||||
7 | PWR | EPR2 | {{planned}} | 1670 | ||||
rowspan=4| Cattenom | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1300 | {{dts|29 Oct 1979}} | {{dts|1 Apr 1987}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1300 | {{dts|28 Jul 1980}} | {{dts|1 Feb 1988}} | ||
3 | PWR | P4 REP 1300 | {{yes|Operational}} | 1300 | {{dts|15 Jun 1982}} | {{dts|1 Feb 1991}} | ||
4 | PWR | P4 REP 1300 | {{yes|Operational}} | 1300 | {{dts|28 Sep 1983}} | {{dts|1 Jan 1992}} | ||
rowspan=7| Chinon | A-1 | GCR | UNGG | {{no|Shut down}} | 70 | {{dts|1 Feb 1957}} | {{dts|1 Feb 1964}} | {{dts|16 Apr 1973}} |
A-2 | GCR | UNGG | {{no|Shut down}} | 180 | {{dts|1 Aug 1959}} | {{dts|24 Feb 1965}} | {{dts|14 Jun 1985}} | |
A-3 | GCR | UNGG | {{no|Shut down}} | 360 | {{dts|1 Mar 1961}} | {{dts|4 Aug 1966}} | {{dts|15 Jun 1990}} | |
B-1 | PWR | CP2 | {{yes|Operational}} | 905 | {{dts|1 Mar 1977}} | {{dts|1 Feb 1984}} | ||
B-2 | PWR | CP2 | {{yes|Operational}} | 905 | {{dts|1 Mar 1977}} | {{dts|1 Aug 1984}} | ||
B-3 | PWR | CP2 | {{yes|Operational}} | 905 | {{dts|1 Oct 1980}} | {{dts|4 Mar 1987}} | ||
B-4 | PWR | CP2 | {{yes|Operational}} | 905 | {{dts|1 Feb 1981}} | {{dts|1 Apr 1988}} | ||
rowspan=3| Chooz | A-1 | PWR | CHOOZ-A | {{no|Decommissioned}} | 305 | {{dts|1 Jan 1962}} | {{dts|15 Apr 1967}} | {{dts|30 Oct 1991}} |
B-1 | PWR | N4 REP 1450 | {{yes|Operational}} | 1500 | {{dts|1 Jan 1984}} | {{dts|15 May 2000}} | ||
B-2 | PWR | N4 REP 1450 | {{yes|Operational}} | 1500 | {{dts|1 Jan 1984}} | {{dts|15 May 2000}} | ||
rowspan=2| Civaux | 1 | PWR | N4 REP 1450 | {{yes|Operational}} | 1495 | {{dts|15 Oct 1988}} | {{dts|29 Jan 2002}} | |
2 | PWR | N4 REP 1450 | {{yes|Operational}} | 1495 | {{dts|1 Apr 1991}} | {{dts|23 Apr 2002}} | ||
rowspan=4| Cruas | 1 | PWR | CP2 | {{yes|Operational}} | 915 | {{dts|1 Aug 1978}} | {{dts|2 Apr 1984}} | |
2 | PWR | CP2 | {{yes|Operational}} | 915 | {{dts|15 Nov 1978}} | {{dts|1 Apr 1985}} | ||
3 | PWR | CP2 | {{yes|Operational}} | 915 | {{dts|15 Apr 1979}} | {{dts|10 Sep 1984}} | ||
4 | PWR | CP2 | {{yes|Operational}} | 915 | {{dts|1 Oct 1979}} | {{dts|11 Feb 1985}} | ||
rowspan=4| Dampierre | 1 | PWR | CP1 | {{yes|Operational}} | 890 | {{dts|1 Feb 1975}} | {{dts|10 Sep 1980}} | |
2 | PWR | CP1 | {{yes|Operational}} | 890 | {{dts|1 Apr 1975}} | {{dts|16 Feb 1981}} | ||
3 | PWR | CP1 | {{yes|Operational}} | 890 | {{dts|1 Sep 1975}} | {{dts|27 May 1981}} | ||
4 | PWR | CP1 | {{yes|Operational}} | 890 | {{dts|1 Dec 1975}} | {{dts|20 Nov 1981}} | ||
rowspan=2| Fessenheim | 1 | PWR | CP0 | {{no|Shut down}} | 880 | {{dts|1 Sep 1971}} | {{dts|1 Jan 1978}} | {{dts|22 Feb 2020}} |
2 | PWR | CP0 | {{no|Shut down}} | 880 | {{dts|1 Feb 1972}} | {{dts|1 Apr 1978}} | {{dts|29 Jun 2020}} | |
rowspan=3| Flamanville | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|1 Dec 1979}} | {{dts|1 Dec 1986}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|1 May 1980}} | {{dts|9 Mar 1987}} | ||
3 | PWR | EPR | {{partial|Under commissioning}}https://www.reuters.com/business/energy/newest-french-reactor-faces-further-delays-due-new-issues-2025-04-11/ | 1630 | {{dts|3 Dec 2007}} | {{dts|21 Dec 2024}} | ||
rowspan=2| Golfech | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1310 | {{dts|17 Nov 1982}} | {{dts|1 Feb 1991}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1310 | {{dts|1 Oct 1984}} | {{dts|4 Mar 1994}} | ||
rowspan=8| Gravelines | 1 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Feb 1975}} | {{dts|25 Nov 1980}} | |
2 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Mar 1975}} | {{dts|1 Dec 1980}} | ||
3 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Dec 1975}} | {{dts|1 Jun 1981}} | ||
4 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Apr 1976}} | {{dts|1 Oct 1981}} | ||
5 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Oct 1979}} | {{dts|15 Jan 1985}} | ||
6 | PWR | CP1 | {{yes|Operational}} | 910 | {{dts|1 Oct 1979}} | {{dts|25 Oct 1985}} | ||
7 | PWR | EPR2 | {{planned}} | 1670 | ||||
8 | PWR | EPR2 | {{planned}} | 1670 | ||||
rowspan=2|Nogent | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1310 | {{dts|26 May 1981}} | {{dts|24 Feb 1988}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1310 | {{dts|1 Jan 1982}} | {{dts|1 May 1989}} | ||
rowspan=4|Paluel | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|15 Aug 1977}} | {{dts|1 Dec 1985}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|1 Jan 1978}} | {{dts|1 Dec 1985}} | ||
3 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|1 Feb 1979}} | {{dts|1 Feb 1986}} | ||
4 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|1 Feb 1980}} | {{dts|1 Jun 1986}} | ||
rowspan="4" |Penly | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|1 Sep 1982}} | {{dts|1 Dec 1990}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1330 | {{dts|1 Aug 1984}} | {{dts|1 Nov 1992}} | ||
3 | PWR | EPR2 | {{planned}} | 1670 | (2024) | |||
4 | PWR | EPR2 | {{planned}} | 1670 | (2024){{Cite web|url=https://world-nuclear-news.org/Articles/EDF-begins-permitting-process-for-two-new-reactors|title=EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News|website=world-nuclear-news.org|accessdate=9 December 2023}} | |||
Phénix | 1 | FBR | PH-250 | {{no|Shut down}} | 130 | {{dts|1 Nov 1968}} | {{dts|14 Jul 1974}} | {{dts|1 Feb 2010}} |
rowspan=2|Saint-Alban | 1 | PWR | P4 REP 1300 | {{yes|Operational}} | 1335 | {{dts|29 Jan 1979}} | {{dts|1 May 1986}} | |
2 | PWR | P4 REP 1300 | {{yes|Operational}} | 1335 | {{dts|31 Jul 1979}} | {{dts|1 Mar 1987}} | ||
rowspan=4|Saint-Laurent | A-1 | GCR | UNGG | {{no|Shut down}} | 390 | {{dts|1 Oct 1963}} | {{dts|1 Jun 1969}} | {{dts|18 Apr 1990}} |
A-2 | GCR | UNGG | {{no|Shut down}} | 465 | {{dts|1 Jan 1966}} | {{dts|1 Nov 1971}} | {{dts|27 May 1992}} | |
B-1 | PWR | CP2 | {{yes|Operational}} | 915 | {{dts|1 May 1976}} | {{dts|1 Aug 1983}} | ||
B-2 | PWR | CP2 | {{yes|Operational}} | 915 | {{dts|1 Jul 1976}} | {{dts|1 Aug 1983}} | ||
Superphénix | 1 | FBR | Na-1200 | {{no|Shut down}}/in decommissioning | 1200 | {{dts|13 Dec 1976}} | {{dts|1 Dec 1986}} | {{dts|31 Dec 1998}} |
rowspan=4| Tricastin | 1 | PWR | CP1 | {{yes|Operational}} | 915 | {{dts|1 Nov 1974}} | {{dts|1 Dec 1980}} | |
2 | PWR | CP1 | {{yes|Operational}} | 915 | {{dts|1 Dec 1974}} | {{dts|1 Dec 1980}} | ||
3 | PWR | CP1 | {{yes|Operational}} | 915 | {{dts|1 Apr 1975}} | {{dts|11 May 1981}} | ||
4 | PWR | CP1 | {{yes|Operational}} | 915 | {{dts|1 May 1975}} | {{dts|1 Nov 1981}} |
Germany
{{main|Nuclear power in Germany}}
{{sticky header}}
class="wikitable sortable mw-datatable sticky-header" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
AVR | 1 | HTGR | PBR Prototype | {{no|Shut down}} | 13 | {{dts|1 Aug 1961}} | {{dts|19 May 1969}} | {{dts|31 Dec 1988}} |
rowspan=2| Biblis | 1 | PWR | Siemens-KWU | {{no|Shut down/in decommissioning}} | 1167 | {{dts|1 Jan 1970}} | {{dts|26 Feb 1975}} | {{dts|6 Aug 2011}} |
2 | PWR | KWU | {{no|Shut down/in decommissioning}} | 1240 | {{dts|1 Feb 1972}} | {{dts|31 Jan 1977}} | {{dts|6 Aug 2011}} | |
Brokdorf | 1 | PWR | KWU | {{no|Shut down}} | 1410 | {{dts|1 Jan 1976}} | {{dts|22 Dec 1986}} | {{dts|31 Dec 2021}} |
Brunsbüttel | 1 | BWR | BWR-69 | {{no|Shut down}} | 771 | {{dts|15 Apr 1970}} | {{dts|9 Feb 1977}} | {{dts|6 Aug 2011}} |
Emsland | 1 | PWR | {{ill|Konvoi|de|Konvoi (Kernkraftwerk)}} (KWU) | {{no|Shut down}} | 1329 | {{dts|10 Aug 1982}} | {{dts|20 Jun 1988}} | data-sort-value=2022-12-31 | {{dts|15 Apr 2023}} |
Grafenrheinfeld | 1 | PWR | KWU | {{no|Shut down}} | 1275 | {{dts|1 Jan 1975}} | {{dts|17 Jun 1982}} | {{dts|27 Jun 2015}} |
rowspan=6| Greifswald | 1 | PWR | VVER-440/V-230 | {{no|Shut down/in decommissioning}} | 408 | {{dts|1 Mar 1970}} | {{dts|12 Jul 1974}} | {{dts|14 Feb 1990}} |
2 | PWR | VVER-440/V-230 | {{no|Shut down/in decommissioning}} | 408 | {{dts|1 Mar 1970}} | {{dts|16 Apr 1975}} | {{dts|14 Feb 1990}} | |
3 | PWR | VVER-440/V-230 | {{no|Shut down/in decommissioning}} | 408 | {{dts|1 Apr 1972}} | {{dts|1 May 1978}} | {{dts|28 Feb 1990}} | |
4 | PWR | VVER-440/V-230 | {{no|Shut down/in decommissioning}} | 408 | {{dts|1 Apr 1972}} | {{dts|1 Nov 1979}} | {{dts|22 Jul 1990}} | |
5 | PWR | VVER-440/V-213 | {{no|Shut down/in decommissioning}} | 408 | {{dts|1 Dec 1976}} | {{dts|1 Nov 1989}} | {{dts|24 Nov 1989}} | |
6 | PWR | VVER-440/V-213 | {{BLACK|Finished; never entered service}} | 408 | ||||
Grohnde | 1 | PWR | KWU | {{no|Shut down}} | 1360 | {{dts|1 Jun 1976}} | {{dts|1 Feb 1985}} | {{dts|31 Dec 2021}}{{cite news|title=Germany shuts three of its last six nuclear plants|url=https://www.reuters.com/markets/commodities/germany-shuts-three-its-last-six-nuclear-plants-2022-01-01/|access-date=1 Jan 2022}} |
Grosswelzheim | 1 | BWR | BWR | {{no|Dismantled}} | 25 | {{dts|1 Jan 1965}} | {{dts|2 Aug 1970}} | {{dts|20 Apr 1971}} |
rowspan=3| Gundremmingen | A | BWR | GE, BWR-1 | {{no|Shut down/in decommissioning}} | 237 | {{dts|12 Dec 1962}} | {{dts|12 Apr 1967}} | {{dts|13 Jan 1977}} |
B | BWR | BWR-72 (KWU) | {{no|Shut down}} | 1284 | {{dts|20 Jul 1976}} | {{dts|19 Jul 1984}} | {{dts|31 Dec 2017}}{{cite news|title=German reactor permanently shut down|url=http://www.world-nuclear-news.org/C-German-reactor-permanently-shut-down-0201184.html|access-date=10 May 2018|work=world-nuclear-news.org}} | |
C | BWR | BWR-72 (KWU) | {{no|Shut down}} | 1288 | {{dts|20 Jul 1976}} | {{dts|18 Jan 1985}} | {{dts|31 Dec 2021}} | |
rowspan=2| Isar | 1 | BWR | BWR-69 | {{no|Shut down/in decommissioning}} | 878 | {{dts|1 May 1972}} | {{dts|21 Mar 1979}} | {{dts|6 Aug 2011}} |
2 | PWR | {{ill|Konvoi|de|Konvoi (Kernkraftwerk)}} (KWU) | {{no|Shut down}} | 1410 | {{dts|15 Sep 1982}} | {{dts|9 Apr 1988}} | data-sort-value=2022-12-31 | {{dts|15 Apr 2023}} | |
Kahl | 1 | BWR | BWR | {{no|Dismantled}} | 15 | {{dts|1 Jul 1958}} | {{dts|1 Feb 1962}} | {{dts|25 Nov 1985}} |
SNR-300 | 1 | FBR | {{BLACK|Finished; never entered service}} | {{dts|1972}} | {{dts|1985}} | |||
KNK II | 1 | FBR | {{no|Shut down}} | 17 | {{dts|1 Sep 1974}} | {{dts|3 Mar 1979}} | {{dts|23 Aug 1991}} | |
Krümmel | 1 | BWR | BWR-69 (KWU) | {{no|Shut down}} | 1346 | {{dts|5 Apr 1974}} | {{dts|28 Mar 1984}} | {{dts|6 Aug 2011}} |
Lingen | 1 | BWR | BWR | {{no|Shut down}} | 183 | {{dts|1 Oct 1964}} | {{dts|1 Oct 1968}} | {{dts|5 Jan 1977}} |
Mülheim-Kärlich | 1 | PWR | B & W | {{no|Shut down/in decommissioning}} | 1219 | {{dts|15 Jan 1975}} | {{dts|8 Aug 1987}} | {{dts|9 Sep 1988}} |
MZFR | 1 | PHWR | PHWR | {{no|Shut down}} | 52 | {{dts|1 Dec 1961}} | {{dts|19 Dec 1966}} | {{dts|3 May 1984}} |
rowspan=2| Neckarwestheim | 1 | PWR | KWU | {{no|Shut down}} | 785 | {{dts|1 Feb 1972}} | {{dts|1 Dec 1976}} | {{dts|6 Aug 2011}} |
2 | PWR | {{ill|Konvoi|de|Konvoi (Kernkraftwerk)}} (KWU) | {{no|Shut down}} | 1310 | {{dts|9 Nov 1982}} | {{dts|15 Apr 1989}} | data-sort-value=2022-12-31 | {{dts|15 Apr 2023}} | |
Niederaichbach | 1 | HWGCR | Pressure tube reactor | {{no|Shut down/decommissioned}} | 100 | {{dts|1 Jun 1966}} | {{dts|1 Jan 1973}} | {{dts|31 Jul 1974}} |
Obrigheim | 1 | PWR | Siemens | {{no|Shut down/in decommissioning}} | 340 | {{dts|15 Mar 1965}} | {{dts|31 Mar 1969}} | {{dts|11 May 2005}} |
rowspan=2| Philippsburg | 1 | BWR | BWR-69 | {{no|Shut down}} | 890 | {{dts|1 Oct 1970}} | {{dts|26 Mar 1980}} | {{dts|6 Aug 2011}} |
2 | PWR | KWU | {{no|Shut down}} | 1402 | {{dts|7 Jul 1977}} | {{dts|18 Apr 1985}} | {{dts|31 Dec 2019}}{{cite news|title=Germany shuts down Philippsburg 2|url=https://www.energycentral.com/news/germany-shuts-down-philippsburg-2|access-date=8 Jan 2020|work=energycentral.com}} | |
Rheinsberg | 1 | PWR | VVER-70 | {{no|Shut down/in decommissioning}} | 62 | {{dts|1 Jan 1960}} | {{dts|11 Oct 1966}} | {{dts|1 Jun 1990}} |
Stade | 1 | PWR | Siemens | {{no|Shut down/in decommissioning}} | 640 | {{dts|1 Dec 1967}} | {{dts|19 May 1972}} | {{dts|4 Nov 2003}} |
rowspan=2| Stendal | 1 | PWR | VVER-1000/V-320 | {{BLACK|Unfinished}} | {{dts|1983}} | {{dts|1990}} | ||
2 | PWR | VVER-1000/V-320 | {{BLACK|Unfinished}} | {{dts|1983}} | {{dts|1990}} | |||
THTR-300 | 1 | HTGR | PBR | {{no|Decommissioned}} | 296 | {{dts|3 May 1971}} | {{dts|1 Jun 1987}} | {{dts|29 Sep 1988}} |
Unterweser | 1 | PWR | KWU | {{no|Shut down/in decommissioning}} | 1345 | {{dts|1 Jul 1972}} | {{dts|6 Sep 1979}} | {{dts|6 Aug 2011}} |
Würgassen | 1 | BWR | BWR-69 (AEG) | {{no|Shut down/in decommissioning}} | 640 | {{dts|26 Jan 1968}} | {{dts|11 Nov 1975}} | {{dts|26 Aug 1994}} |
Hungary
{{main|Nuclear power in Hungary}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=6| Paks | 1 | PWR | VVER-440/V-213 | {{yes|Operational}} | 470 | {{dts|1 Aug 1974}} | {{dts|10 Aug 1983}} | |
2 | PWR | VVER-440/V-213 | {{yes|Operational}} | 473 | {{dts|1 Aug 1974}} | {{dts|14 Nov 1984}} | ||
3 | PWR | VVER-440/V-213 | {{yes|Operational}} | 473 | {{dts|1 Oct 1979}} | {{dts|1 Dec 1986}} | ||
4 | PWR | VVER-440/V-213 | {{yes|Operational}} | 471 | {{dts|1 Oct 1979}} | {{dts|1 Nov 1987}} | ||
5 | PWR | VVER-1200 | {{partial|Under construction}} | 1114 | ({{dts|2024}}) | |||
6 | PWR | VVER-1200 | {{partial|Under construction}} | 1114 | ({{dts|2024}}) |
India
{{main|Nuclear power in India}}
{{sticky header}}
class="wikitable sortable mw-datatable sticky-header" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Chutka | 1 | rowspan=16| PHWR | rowspan=6| IPHWR-700 | {{planned}} | 630 | |||
2 | {{planned}} | 630 | ||||||
rowspan=4| Gorakhpur | 1 | {{partial|Under construction}} | 630 | |||||
2 | {{partial|Under construction}} | 630 | ||||||
3 | {{planned}} | 630 | ||||||
4 | {{planned}} | 630 | ||||||
rowspan=6| Kaiga | 1 | rowspan=4|IPHWR-220 | {{yes|Operational}} | 202 | {{dts|1 Sep 1989}} | {{dts|16 Nov 2000}} | ||
2 | {{yes|Operational}} | 202 | {{dts|1 Dec 1989}} | {{dts|16 Mar 2000}} | ||||
3 | {{yes|Operational}} | 202 | {{dts|30 Mar 2002}} | {{dts|6 May 2007}} | ||||
4 | {{yes|Operational}} | 202 | {{dts|10 May 2002}} | {{dts|20 Jan 2011}} | ||||
5 | rowspan=2| IPHWR-700 | {{planned}} | 630 | |||||
6 | {{planned}} | 630 | ||||||
rowspan=4| Kakrapar | 1 | rowspan=2| IPHWR-220 | {{yes|Operational}} | 202 | {{dts|1 Dec 1984}} | {{dts|6 May 1993}} | ||
2 | {{yes|Operational}} | 202 | {{dts|1 Apr 1985}} | {{dts|1 Sep 1995}} | ||||
3 | rowspan=2| IPHWR-700 | {{yes|Operational}} | 630 | {{dts|22 Nov 2010}} | {{dts|30 Jun 2023}} | |||
4 | {{yes|Operational}} | 630 | {{dts|22 Nov 2010}} | {{dts|31 Mar 2024}} | ||||
PFBR | 1 | SFR | PFBR | {{partial|Under construction}} | 490 | {{dts|23 Oct 2004}} | (2026) | |
rowspan=6| Kudankulam | 1 | rowspan=6|PWR | rowspan=6|VVER-1000/V-412 | {{yes|Operational}} | 932 | {{dts|31 Mar 2002}} | {{dts|31 Dec 2014}} | |
2 | {{yes|Operational}} | 932 | {{dts|4 Jul 2002}} | {{dts|31 Mar 2017}} | ||||
3 | {{partial|Under construction}} | 917 | {{dts|30 Jun 2017}} | (2026) | ||||
4 | {{partial|Under construction}} | 917 | {{dts|23 Oct 2017}} | (2027) | ||||
5 | {{partial|Under construction}} | 917 | {{dts|29 Jun 2021}} | (2029) | ||||
6 | {{partial|Under construction}} | 917 | {{dts|20 Dec 2021}} | (2030) | ||||
rowspan=2| Madras | 1 | rowspan=16| PHWR | rowspan=2|IPHWR-220 | {{yes2|Operation suspended (under maintenance)}} | 205 | {{dts|1 Jan 1971}} | {{dts|27 Jan 1984}} | |
2 | {{yes|Operational}} | 205 | {{dts|1 Oct 1972}} | {{dts|21 Mar 1986}} | ||||
rowspan=4| Mahi Banswara | 1 | rowspan=4|IPHWR-700 | {{planned}} | 630 | (2031) | |||
2 | {{planned}} | 630 | (2032) | |||||
3 | {{planned}} | 630 | (2033) | |||||
4 | {{planned}} | 630 | (2034) | |||||
rowspan=2| Narora | 1 | rowspan=2|IPHWR-220 | {{yes|Operational}} | 202 | {{dts|1 Dec 1976}} | {{dts|1 Jan 1991}} | ||
2 | {{yes|Operational}} | 202 | {{dts|1 Nov 1977}} | {{dts|1 Jul 1992}} | ||||
rowspan=8| Rajasthan | 1 | rowspan=2|CANDU | {{no|Shut down}} | 90 | {{dts|1 Aug 1965}} | {{dts|16 Dec 1973}} | {{dts|9 Oct 2004}}{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=302 | title=PRIS – Reactor Details }} | |
2 | {{yes|Operational}} | 187 | {{dts|1 Apr 1968}} | {{dts|1 Apr 1981}} | ||||
3 | rowspan=4| IPHWR-220 | {{yes|Operational}} | 202 | {{dts|1 Feb 1990}} | {{dts|1 Jun 2000}} | |||
4 | {{yes|Operational}} | 202 | {{dts|1 Oct 1990}} | {{dts|23 Dec 2000}} | ||||
5 | {{yes|Operational}} | 202 | {{dts|18 Sep 2002}} | {{dts|4 Feb 2010}} | ||||
6 | {{yes|Operational}} | 202 | {{dts|20 Jan 2003}} | {{dts|31 Mar 2010}} | ||||
7 | rowspan=2| IPHWR-700 | {{yes|Operational}} | 630 | {{dts|18 Jul 2011}} | {{dts|15 Apr 2025}} | |||
8 | {{partial|Under construction}} | 630 | {{dts|30 Sep 2011}} | (2026) | ||||
rowspan=4| Tarapur | 1 | rowspan=2|BWR | rowspan=2|BWR-1 (Mark 2) | {{yes2|Operation suspended (under maintenance)}} | 150 | {{dts|1 Oct 1964}} | {{dts|28 Oct 1969}} | |
2 | {{yes2|Operation suspended (under maintenance)}} | 150 | {{dts|1 Oct 1964}} | {{dts|28 Oct 1969}} | ||||
3 | rowspan=2|PHWR | rowspan=2|IPHWR-540 | {{yes|Operational}} | 490 | {{dts|12 May 2000}} | {{dts|18 Aug 2006}} | ||
4 | {{yes|Operational}} | 490 | {{dts|8 Mar 2000}} | {{dts|12 Sep 2005}} |
Iran
{{main|Nuclear program of Iran}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=3| Bushehr | 1 | PWR | VVER-1000/V-446 | {{yes|Operational}} | 915 | {{dts|1 May 1975}} | {{dts|23 Sep 2013}} | |
2 | PWR | VVER-1000/V-528 | {{partial|Under construction}} | 915 | {{dts|27 Sep 2019}} | |||
3 | PWR | VVER-1000 | {{planned}} | 915 | ||||
Darkhovin | 1 | PWR | {{BLACK|Unfinished; restart planned}} | 360 |
Italy
{{main|Nuclear power in Italy}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
Caorso | 1 | BWR | BWR-4 Mark2 | {{no|Shut down/in decommissioning}} | 860 | {{dts|1 Jan 1970}} | {{dts|1 Dec 1981}} | {{dts|1 Jul 1990}} |
Enrico Fermi | 1 | PWR | WH 4-loop | {{no|Shut down/in decommissioning}} | 260 | {{dts|1 Jul 1961}} | {{dts|1 Jan 1965}} | {{dts|1 Jul 1990}} |
Garigliano | 1 | BWR | BWR-1 | {{no|Shut down/in decommissioning}} | 150 | {{dts|1 Nov 1959}} | {{dts|1 Jun 1964}} | {{dts|1 Mar 1982}} |
Latina | 1 | GCR | Magnox | {{no|Shut down/in decommissioning}} | 153 | {{dts|1 Nov 1958}} | {{dts|1 Jan 1964}} | {{dts|1 Dec 1987}} |
rowspan=2| Montalto | 1 | BWR | {{BLACK|Unfinished}} | 982 | {{dts|1 Jul 1982}} | {{dts|1 Jan 1988}} | ||
2 | BWR | {{BLACK|Unfinished}} | 982 | {{dts|1 Jul 1982}} | {{dts|1 Jul 1988}} | |||
rowspan=2| {{ill|Trino 2|IT|Centrale elettronucleare Trino 2}} | 1 | PWR | {{BLACK|Unfinished}} | 950 | {{dts|23 dec 1987}} | |||
2 | PWR | {{BLACK|Unfinished}} | 950 | {{dts|23 dec 1987}} |
Japan
{{Main|Nuclear power in Japan}}
{{sticky header}}
class="wikitable sortable mw-datatable sticky-header" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
Fugen | 1 | HWLWR | ATR | {{no|Shut down}} | 148 | {{dts|10 May 1972}} | {{dts|20 Mar 1979}} | {{dts|29 Mar 2003}} |
rowspan=6 | Fukushima Daiichi | 1 | BWR | BWR-3 | {{no|Inoperable/Core melt}} | 439 | {{dts|25 Jul 1967}} | {{dts|26 Mar 1971}} | {{dts|19 May 2011}} |
2 | BWR | BWR-4 | {{no|Inoperable/Core melt}} | 760 | {{dts|9 Jun 1969}} | {{dts|18 Jul 1974}} | {{dts|19 May 2011}} | |
3 | BWR | BWR-4 | {{no|Inoperable/Core melt}} | 760 | {{dts|28 Dec 1970}} | {{dts|27 Mar 1976}} | {{dts|19 May 2011}} | |
4 | BWR | BWR-4 | {{no|Inoperable}} | 760 | {{dts|12 Feb 1973}} | {{dts|12 Oct 1978}} | {{dts|19 May 2011}} | |
5 | BWR | BWR-4 | {{no|Shut down}} | 760 | {{dts|22 May 1972}} | {{dts|18 Apr 1978}} | {{dts|17 Dec 2013}} | |
6 | BWR | BWR-5 | {{no|Shut down}} | 1067 | {{dts|26 Oct 1973}} | {{dts|24 Oct 1979}} | {{dts|17 Dec 2013}} | |
rowspan=4 | Fukushima Daini | 1 | BWR | BWR-5 | {{no|Shut down}} | 1067 | {{dts|16 Mar 1976}} | {{dts|20 Apr 1982}} | {{dts|30 Sep 2019}} |
2 | BWR | BWR-5 | {{no|Shut down}} | 1067 | {{dts|25 May 1979}} | {{dts|3 Feb 1984}} | {{dts|30 Sep 2019}} | |
3 | BWR | BWR-5 | {{no|Shut down}} | 1067 | {{dts|23 Mar 1981}} | {{dts|21 Jun 1985}} | {{dts|30 Sep 2019}} | |
4 | BWR | BWR-5 | {{no|Shut down}} | 1067 | {{dts|28 May 1981}} | {{dts|25 Aug 1987}} | {{dts|30 Sep 2019}} | |
rowspan=4 | Genkai | 1 | PWR | Mitsubishi (2-loop) | {{no|Shut down}} | 529 | {{dts|15 Sep 1971}} | {{dts|15 Oct 1975}} | {{dts|27 Apr 2015}} |
2 | PWR | Mitsubishi (2-loop) | {{no|Shut down}} | 529 | {{dts|1 Feb 1977}} | {{dts|30 Mar 1981}} | {{dts|9 Apr 2019}} | |
3 | PWR | Mitsubishi (4-loop) | {{yes|Operational}} | 1127 | {{dts|1 Jun 1988}} | {{dts|18 Mar 1994}} | ||
4 | PWR | Mitsubishi (4-loop) | {{yes|Operational{{cite news |title=Genkai unit 4 supplying power again |url=http://www.world-nuclear-news.org/C-Genkai-unit-4-supplying-power-again-1906185.html |access-date=22 Jun 2018 |work=world-nuclear-news.org}}}} | 1127 | {{dts|15 Jul 1992}} | {{dts|25 Jul 1997}} | ||
rowspan=5 | Hamaoka | 1 | BWR | BWR-4 | {{no|Shut down}} | 515 | {{dts|10 Jun 1971}} | {{dts|17 Mar 1976}} | {{dts|30 Jan 2009}} |
2 | BWR | BWR-4 | {{no|Shut down}} | 806 | {{dts|14 Jun 1974}} | {{dts|29 Nov 1978}} | {{dts|30 Jan 2009}} | |
3 | BWR | BWR-5 | {{yes2|Operation suspended (under review){{cite web|title=Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute|url=http://www.genanshin.jp/english/facility/map/|website=genanshin.jp|access-date=3 Oct 2021}}}} | 1056 | {{dts|18 Apr 1983}} | {{dts|28 Aug 1987}} | ||
4 | BWR | BWR-5 | {{yes2|Operation suspended (under review)}} | 1092 | {{dts|13 Oct 1989}} | {{dts|3 Sep 1993}} | ||
5 | BWR | ABWR | {{yes2|Operation suspended}} | 1325 | {{dts|12 Jul 2000}} | {{dts|18 Jan 2005}} | ||
Higashidōri (Tōhoku) | 1 | BWR | BWR-5 | {{yes2|Operation suspended (under review)}} | 1067 | {{dts|7 Nov 2000}} | {{dts|8 Dec 2005}} | |
Higashidōri (Tokyo) | 1 | BWR
|ABWR | {{planned|Unfinished; restart planned}} | 1350 | {{dts|25 Jan 2011}}{{cite web|title=東通原子力発電所1号機の着工について |url=https://www.tepco.co.jp/cc/press/11012501-j.html |access-date=27 Jun 2023 |website=Tokyo Electric Power Company Holdings, Inc.}} | |||
rowspan=3 | Ikata | 1 | PWR | Mitsubishi (2-loop) | {{no|Shut down}} | 538 | {{dts|1 Sep 1973}} | {{dts|30 Sep 1977}} | {{dts|25 Mar 2016}} |
2 | PWR | Mitsubishi (2-loop) | {{no|Shut down}} | 538 | {{dts|1 Aug 1978}} | {{dts|19 Mar 1982}} | {{dts|27 Mar 2018}} | |
3 | PWR | Mitsubishi (3-loop) | {{yes|Operational}} | 846 | {{dts|1 Oct 1990}} | {{dts|15 Dec 1994}} | ||
rowspan=7 | Kashiwazaki-Kariwa | 1 | BWR | BWR-5 | {{yes2|Operation suspended}} | 1067 | {{dts|5 Jun 1980}} | {{dts|18 Sep 1985}} | |
2 | BWR | BWR-5 | {{yes2|Operation suspended}} | 1067 | {{dts|18 Nov 1985}} | {{dts|28 Sep 1990}} | ||
3 | BWR | BWR-5 | {{yes2|Operation suspended}} | 1067 | {{dts|7 Mar 1989}} | {{dts|11 Aug 1993}} | ||
4 | BWR | BWR-5 | {{yes2|Operation suspended}} | 1067 | {{dts|5 Mar 1990}} | {{dts|11 Aug 1994}} | ||
5 | BWR | BWR-5 | {{yes2|Operation suspended}} | 1067 | {{dts|20 Jun 1985}} | {{dts|10 Apr 1990}} | ||
6 | BWR | ABWR | {{yes2|Operation suspended (restart approved){{cite web|title=Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)|url=http://www.fepc.or.jp/english/nuclear/power_generation/plants/index.html|website=fepc.or.jp|access-date=8 May 2018}}}} | 1315 | {{dts|3 Nov 1992}} | {{dts|7 Nov 1996}} | ||
7 | BWR | ABWR | {{yes2|Operation suspended (restart approved)}} | 1315 | {{dts|1 Jul 1993}} | {{dts|2 Jul 1997}} | ||
rowspan=3 | Mihama | 1 | PWR | Mitsubishi (2-loop) | {{no|Shut down}} | 320 | {{dts|1 Feb 1967}} | {{dts|28 Nov 1970}} | {{dts|Mar 2015}} |
2 | PWR | Mitsubishi (2-loop) | {{no|Shut down}} | 470 | {{dts|29 May 1968}} | {{dts|25 Jul 1972}} | {{dts|Mar 2015}} | |
3 | PWR | Mitsubishi (3-loop) | {{yes|Operational{{cite news|title=40年超の美浜原発3号機が再稼働 原発事故後 全国初 |url=https://www3.nhk.or.jp/news/html/20210623/k10013099101000.html|access-date=23 Jun 2021|work=NHK}}}} | 780 | {{dts|7 Aug 1972}} | {{dts|1 Dec 1976}} | ||
Monju | 1 | FBR | {{no|Shut down}} | 246 | {{dts|10 May 1986}} | {{dts|29 Aug 1995}} | {{dts|5 Dec 2017}} | |
rowspan=4 | Ōi | 1 | PWR | W (4-loop) | {{no|Shut down}} | 1120 | {{dts|26 Oct 1972}} | {{dts|27 Mar 1979}} | {{dts|Dec 2017}} |
2 | PWR | Westinghouse (4-loop) | {{no|Shut down}} | 1120 | {{dts|8 Dec 1972}} | {{dts|5 Dec 1979}} | {{dts|Dec 2017}} | |
3 | PWR | Mitsubishi (4-loop) | {{yes|Operational}} | 1127 | {{dts|3 Oct 1987}} | {{dts|18 Dec 1991}} | ||
4 | PWR | Mitsubishi (4-loop) | {{yes|Operational{{cite news|title=Ohi No.4 reactor restarted- News – NHK WORLD – English|url=https://www3.nhk.or.jp/nhkworld/en/news/20180509_30/|access-date=10 May 2018|work=NHK WORLD|archive-url=https://web.archive.org/web/20180510185734/https://www3.nhk.or.jp/nhkworld/en/news/20180509_30/|archive-date=10 May 2018|url-status=dead}}}} | 1127 | {{dts|13 Jun 1988}} | {{dts|2 Feb 1993}} | ||
Ōma | 1 | BWR | ABWR | {{partial|Under construction}} | 1325 | {{dts|7 May 2010}} | ||
rowspan=3 | Onagawa | 1 | BWR | BWR-4 | {{no|Shut down}} | 498 | {{dts|8 Jul 1980}} | {{dts|1 Jun 1984}} | {{dts|21 Dec 2018}} |
2 | BWR | BWR-5 | {{yes|Operational{{cite news|title=Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters|url=https://www.reuters.com/world/japan/japans-tohoku-elec-restarts-onagawa-reactor-after-13-year-hiatus-2024-10-29/|publisher=Reuters|access-date=29 Oct 2024}}}} | 796 | {{dts|12 Apr 1991}} | {{dts|28 Jul 1995}} | ||
3 | BWR | BWR-5 | {{yes2|Operation suspended}} | 796 | {{dts|23 Jan 1998}} | {{dts|30 Jan 2002}} | ||
rowspan="2" | Sendai | 1 | PWR | Mitsubishi (3-loop) | {{yes|Operational}} | 846 | {{dts|15 Dec 1979}} | {{dts|4 Jul 1984}} | |
2 | PWR | Mitsubishi (3-loop) | {{yes|Operational}} | 846 | {{dts|12 Oct 1981}} | {{dts|28 Nov 1985}} | ||
rowspan=2 | Shika | 1 | BWR | BWR-5 | {{yes2|Operation suspended}} | 505 | {{dts|1 Jul 1989}} | {{dts|30 Jul 1993}} | |
2 | BWR | ABWR | {{yes2|Operation suspended (under review)}} | 1108 | {{dts|20 Aug 2001}} | {{dts|15 Mar 2006}} | ||
rowspan=3 | Shimane | 1 | BWR | BWR-3 | {{no|Shut down}} | 439 | {{dts|2 Jul 1970}} | {{dts|29 Mar 1974}} | {{dts|Mar 2015}} |
2 | BWR | BWR-5 | {{yes|Operational}} | 789 | {{dts|2 Feb 1985}} | {{dts|10 Feb 1989}} | ||
3 | BWR | ABWR | {{partial|Under construction}} | 1325 | {{dts|12 Oct 2007}} | |||
rowspan=4 | Takahama | 1 | PWR | Mitsubishi (3-loop) | {{yes|Operational{{cite news|title=運転開始40年超高浜原発1号機 約12年ぶりに再稼働|url=https://www3.nhk.or.jp/lnews/fukui/20230728/3050015301.html|access-date=28 Jul 2023}}}} | 780 | {{dts|25 Apr 1970}} | {{dts|14 Nov 1974}} | |
2 | PWR | Mitsubishi (3-loop) | {{yes|Operational{{cite news|title=Takahama 2 reactor restarted|url=https://www.world-nuclear-news.org/Articles/Takahama-2-reactor-restarted|access-date=15 Sep 2023}}}} | 780 | {{dts|9 Mar 1971}} | {{dts|14 Nov 1975}} | ||
3 | PWR | Mitsubishi (3-loop) | {{yes|Operational}} | 830 | {{dts|12 Dec 1980}} | {{dts|17 Jan 1985}} | ||
4 | PWR | Mitsubishi (3-loop) | {{yes|Operational}} | 830 | {{dts|19 Mar 1981}} | {{dts|5 Jun 1985}} | ||
rowspan=2 | Tōkai | 1 | GCR | Magnox | {{no|Shut down}} | 137 | {{dts|1 Mar 1961}} | {{dts|25 Jul 1966}} | {{dts|31 Mar 1998}} |
2 | BWR | BWR-5 | {{yes2|Operation suspended (restart approved){{cite news|title=Japan approves extension for reactor similar to Fukushima units that melted down – Reuters|url=https://www.reuters.com/article/japan-nuclear-restarts/japan-approves-extension-for-reactor-similar-to-fukushima-units-that-melted-down-idUSL4N1XI1TR|publisher=Reuters|access-date=29 Dec 2019}}}} | 1060 | {{dts|3 Oct 1973}} | {{dts|28 Nov 1978}} | ||
rowspan=3 | Tomari | 1 | PWR | Mitsubishi (2-loop) | {{yes2|Operation suspended (under review)}} | 550 | {{dts|18 Apr 1985}} | {{dts|22 Jun 1989}} | |
2 | PWR | Mitsubishi (2-loop) | {{yes2|Operation suspended (under review)}} | 550 | {{dts|13 Jun 1985}} | {{dts|12 Apr 1991}} | ||
3 | PWR | Mitsubishi (3-loop) | {{yes2|Operation suspended (restart approved)https://www.japantimes.co.jp/news/2025/04/30/japan/tomari-nuclear-plant-restart-approved}} | 866 | {{dts|18 Nov 2004}} | {{dts|22 Dec 2009}} | ||
rowspan="2" | Tsuruga | 1 | BWR | BWR-2 | {{no|Shut down}} | 340 | {{dts|24 Nov 1966}} | {{dts|14 Mar 1970}} | {{dts|Mar 2015}} |
2 | PWR | Mitsubishi (4-loop) | {{yes2|Operation suspended (under review)}} | 1108 | {{dts|6 Nov 1982}} | {{dts|17 Feb 1987}} |
Kazakhstan
Lithuania
{{main|Nuclear power in Lithuania}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=3| Ignalina | 1 | LWGR | RBMK-1500 | {{no|Shut down/in decommissioning}} | 1185 | {{dts|1 May 1977}} | {{dts|31 Dec 1983}} | {{dts|31 Dec 2004}} |
2 | LWGR | RBMK-1500 | {{no|Shut down/in decommissioning}} | 1185 | {{dts|1 Jan 1978}} | {{dts|Aug 1987}} | {{dts|31 Dec 2009}} | |
3 | LWGR | RBMK-1500 | {{BLACK|Unfinished}} | 1185 |
Mexico
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Laguna Verde | 1 | BWR | BWR-5 | {{yes|Operational}} | 804 | {{dts|1 Oct 1976}} | {{dts|28 Jul 1990}} | |
2 | BWR | BWR-5 | {{yes|Operational}} | 800 | {{dts|1 Jun 1977}} | {{dts|10 Apr 1995}} |
Netherlands
{{main|Nuclear power in the Netherlands}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
Borssele | 1 | PWR | KWU 2LP | {{yes|Operational}} | 482 | {{dts|1 Jul 1969}} | {{dts|26 Oct 1973}} | ({{dts|2033}}) |
Dodewaard | 1 | BWR | BWR-2 | {{no|Shut down}} | 55 | {{dts|1 May 1965}} | {{dts|26 Mar 1969}} | {{dts|26 Mar 1997}} |
North Korea
{{main|Nuclear power in North Korea}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Yongbyon | 1 | GCR | Magnox (Pu-production) | {{no|Shut down}}{{citation needed|date=January 2019}} | 5{{citation needed|date=January 2019}} | {{dts|1994}} | ||
2 | LWR{{cite news|url=http://38north.org/2016/01/yongbyon011416/ |title=North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor |work=38 North |publisher=U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies |date=14 Jan 2016 |access-date=4 Apr 2016 |url-status=live |archive-url=https://web.archive.org/web/20160409200249/http://38north.org/2016/01/yongbyon011416/ |archive-date=9 Apr 2016 }} | {{planned}} | 30 | |||||
Taechon | 1 | {{BLACK|Unfinished}} | 200 | {{dts|1994}} | ||||
rowspan=2| Kumho | 1 | PWR | {{BLACK|Unfinished}} | 1000 | {{dts|2003}} | |||
2 | PWR | {{BLACK|Unfinished}} | 1000 | {{dts|2003}} |
Pakistan
{{main|Nuclear power in Pakistan}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=5| Chashma | 1 | PWR | CNP-300 | {{yes|Operational}} | 300 | {{dts|1 Aug 1993}} | {{dts|15 Sep 2000}} | |
| 2 | PWR | CNP-300 | {{yes|Operational}} | 300 | {{dts|28 Dec 2005}} | {{dts|18 May 2011}} | ||
| 3 | PWR | CNP-300 | {{yes|Operational}} | 315 | {{dts|28 May 2011}} | {{dts|6 Dec 2016}} | ||
| 4 | PWR | CNP-300 | {{yes|Operational}} | 313 | {{dts|18 Dec 2011}} | {{dts|19 Sep 2017}} | ||
| 5 | PWR | Hualong One | {{partial|Under construction}} | 1100 | {{dts|30 Dec 2024}} | |||
rowspan=3| Karachi | 1 | PHWR | CANDU | {{no|Shut down}} | 90 | {{dts|1 Aug 1966}} | {{dts|7 Dec 1972}} | {{dts|1 Aug 2021}} |
| 2 | PWR | Hualong One | {{yes|Operational}} | 1014 | {{dts|23 May 2013}} | {{dts|19 Mar 2021}}{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=1067 | title=PRIS - Reactor Details }} | ||
| 3 | PWR | Hualong One | {{yes|Operational}} | 1014 | {{dts|31 May 2016}} | {{dts|18 Apr 2022}} |
Philippines
{{main|Nuclear power in the Philippines}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
Bataan | 1 | PWR | Westinghouse | {{
BLACK|Unfinished; restart planned{{cite web|url=https://www.world-nuclear-news.org/Articles/Philippines-relaunches-nuclear-energy-programme |title=Philippines relaunches nuclear energy programme : Nuclear Policies |publisher=World Nuclear News |date=3 Mar 2022 |accessdate=29 Apr 2022}}}} | 621 | {{dts|1976}} | {{dts|1986}} |
Poland
{{main|Nuclear power in Poland}}
Romania
{{main|Nuclear power in Romania}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=5| Cernavodă | 1 | PHWR | CANDU-6 | {{yes|Operational}} | 650 | {{dts|31 Mar 1983}} | {{dts|2 Dec 1996}} | |
2 | PHWR | CANDU-6 | {{yes|Operational}} | 650 | {{dts|1 Jul 1983}} | {{dts|1 Nov 2007}} | ||
3 | PHWR | CANDU-6 | {{BLACK|Unfinished; restart planned}} | 650 | ||||
4 | PHWR | CANDU-6 | {{BLACK|Unfinished; restart planned}} | 650 | ||||
5 | PHWR | CANDU-6 | {{BLACK|Unfinished}} | 650 |
Russia
{{main|Nuclear power in Russia}}
{{See also|List of cancelled nuclear reactors in Russia}}
{{sticky header}}
Slovakia
{{main|Nuclear power in Slovakia}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=5| Bohunice | A-1Shut down after a 1977 refuelling incident; decommission in progress since 1979 | HWGCR | KS 150 | {{no|Decommissioned}} | 93 | {{dts|1 Aug 1958}} | {{dts|25 Dec 1972}} | {{dts|22 Feb 1977}} |
1{{cite web|url=https://www.tasr.sk/|archiveurl=https://web.archive.org/web/20090120010401/http://www.tasr.sk/30.axd?k=20090110TBB00423|url-status=dead|title=Tlačová agentúra Slovenskej republiky – TASR.sk|archivedate=20 Jan 2009|website=tasr.sk}} | PWR | VVER-440/V-230 | {{no|Shut down}} | 408 | {{dts|24 Apr 1972}} | {{dts|1 Apr 1980}} | {{dts|31 Dec 2006}} | |
2 | PWR | VVER-440/V-230 | {{no|Shut down}} | 408 | {{dts|24 Apr 1972}} | {{dts|1 Jan 1981}} | {{dts|31 Dec 2008}} | |
3 | PWR | VVER-440/V-213 | {{yes|Operational}} | 472 | {{dts|1 Dec 1976}} | {{dts|14 Feb 1985}} | ({{dts|2045|format=y}}) | |
4 | PWR | VVER-440/V-213 | {{yes|Operational}} | 471 | {{dts|1 Dec 1976}} | {{dts|18 Dec 1985}} | ({{dts|2045|format=y}}) | |
rowspan=4| Mochovce | 1 | PWR | VVER-440 V-213 | {{yes|Operational}} | 436 | {{dts|13 Oct 1983}} | {{dts|29 Oct 1998}} | ({{dts|2058|format=y}}) |
2 | PWR | VVER-440/V-213 | {{yes|Operational}} | 436 | {{dts|13 Oct 1983}} | {{dts|11 Apr 2000}} | ({{dts|2060|format=y}}) | |
3 | PWR | VVER-440/V-213 | {{yes|Operational}} | 440 | {{dts|27 Jan 1987}} | {{dts|17 Oct 2023}}{{cite web | url=https://www.seas.sk/en/press-releases/mochovce-3-commissioning-trial-run/ | title=Power commissioning of Mochovce 3 completed }} | ||
4 | PWR | VVER-440/V-213 | {{partial|Under construction}} | 440 | {{dts|27 Jan 1987}} |
Slovenia
{{main|Nuclear power in Slovenia}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan="2" |Krško | 1 | PWR | WH 2 loops | {{yes|Operational}} | 688 | {{dts|30 Mar 1975}} | {{dts|1 Jan 1983}} | (2043){{cite web | url=https://www.world-nuclear-news.org/Articles/Krsko-gets-an-overhaul | title=Krško gets an overhaul : Corporate – World Nuclear News }} |
| 2 | PWR | TBD | {{planned|Planned}} | 1100 | (2030){{Cite web |date=30 Nov 2022 |title=Drugi blok NE Krško prve megavate mogao bi dati nakon 2030. |trans-title=The second block of NPP Krško could provide the first megawatts after 2030. |url=https://tockanai.hr/biznis/drugi-blok-ne-krsko-prve-megavate-mogao-bi-dati-nakon-2030-64033/ |access-date=14 Apr 2023 |website=Točka na I |language=hr}} |
South Africa
{{main|Nuclear power in South Africa}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Koeberg | 1 | PWR | CP1 (France) | {{yes|Operational}} | 930 | {{dts|1 Jul 1976}} | {{dts|21 Jul 1984}} | |
| 2 | PWR | CP1 (France) | {{yes|Operational}} | 930 | {{dts|1 Jul 1976}} | {{dts|9 Nov 1985}} |
South Korea
{{main|Nuclear power in South Korea}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=6| Hanbit | 1 | PWR | WH F | {{yes|Operational}} | 960 | {{dts|4 Jun 1981}} | {{dts|25 Aug 1986}} | |
2 | PWR | WH F | {{yes|Operational}} | 958 | {{dts|10 Dec 1981}} | {{dts|10 Jun 1987}} | ||
3 | PWR | OPR-1000 | {{yes|Operational}} | 997 | {{dts|23 Dec 1989}} | {{dts|31 Mar 1995}} | ||
4 | PWR | OPR-1000 | {{yes|Operational}} | 997 | {{dts|26 May 1990}} | {{dts|1 Jan 1996}} | ||
5 | PWR | OPR-1000 | {{yes|Operational}} | 997 | {{dts|29 Jun 1997}} | {{dts|21 May 2002}} | ||
6 | PWR | OPR-1000 | {{yes|Operational}} | 995 | {{dts|20 Nov 1997}} | {{dts|24 Dec 2002}} | ||
rowspan=6| Hanul | 1 | PWR | CP1 (France) | {{yes|Operational}} | 960 | {{dts|26 Jan 1983}} | {{dts|10 Sep 1988}} | |
2 | PWR | CP1 (France) | {{yes|Operational}} | 962 | {{dts|5 Jul 1983}} | {{dts|30 Sep 1989}} | ||
3 | PWR | OPR-1000 | {{yes|Operational}} | 994 | {{dts|21 Jul 1993}} | {{dts|11 Aug 1998}} | ||
4 | PWR | OPR-1000 | {{yes|Operational}} | 998 | {{dts|1 Nov 1993}} | {{dts|31 Dec 1999}} | ||
5 | PWR | OPR-1000 | {{yes|Operational}} | 996 | {{dts|1 Oct 1999}} | {{dts|29 Jul 2004}} | ||
6 | PWR | OPR-1000 | {{yes|Operational}} | 996 | {{dts|29 Sep 2000}} | {{dts|22 Apr 2005}} | ||
rowspan=4| Shin-Hanul | 1 | PWR | APR-1400 | {{yes|Operational}} | 1340 | {{dts|10 Jul 2012}} | {{dts|7 Dec 2022}}{{cite web | url=https://www.world-nuclear-news.org/Articles/South-Korean-APR-1400-starts-commercial-operation | title=South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News }} | |
2 | PWR | APR-1400 | {{yes|Operational}} | 1340 | {{dts|19 Jul 2012}} | {{dts|05 Apr 2024}}{{cite web | url=https://www.power-technology.com/news/unit-2-at-nuclear-power-plant-in-south-korea-enters-commercial-operation/ | title=Unit 2 at South Korean nuclear reactor enters commercial operation
| date=9 April 2024 }} | ||
3 | PWR | APR-1400 | {{partial|Under construction}}https://www.world-nuclear-news.org/articles/construction-of-new-korean-reactor-begins | 1340 | {{dts|20 May 2025}} | (2032) | ||
4 | PWR | APR-1400 | {{planned}} | 1340 | (2033) | |||
rowspan=4| Kori | 1 | PWR | WH 60 | {{no|Shut down}} | 576 | {{dts|27 Apr 1972}} | {{dts|29 Apr 1978}} | {{dts|18 Jun 2017}} |
2 | PWR | WH F | {{yes|Operational}} | 640 | {{dts|4 Dec 1977}} | {{dts|25 Jul 1983}} | ||
3 | PWR | WH F | {{yes|Operational}} | 1011 | {{dts|1 Oct 1979}} | {{dts|30 Sep 1985}} | ||
4 | PWR | WH F | {{yes|Operational}} | 1012 | {{dts|1 Apr 1980}} | {{dts|29 Apr 1986}} | ||
rowspan=2| Shin-Kori | 1 | PWR | OPR-1000 | {{yes|Operational}} | 996 | {{dts|16 Jun 2006}} | {{dts|28 Feb 2011}} | |
2 | PWR | OPR-1000 | {{yes|Operational}} | 996 | {{dts|5 Jun 2007}} | {{dts|20 Jul 2012}} | ||
rowspan=4| Saeul | 1 | PWR | APR-1400 | {{yes|Operational}} | 1416 | {{dts|16 Oct 2008}} | {{dts|15 Jan 2016}} | |
2 | PWR | APR-1400 | {{yes|Operational}} | 1418 | {{dts|19 Aug 2009}} | {{dts|29 Aug 2019}}{{cite news |title=Second APR-1400 unit starts Opened |url=http://www.world-nuclear-news.org/Articles/Second-APR-1400-unit-starts-commercial-operation |access-date=3 Sep 2019 |work=world-nuclear-news.org}} | ||
3 | PWR | APR-1400 | {{partial|Under construction}} | 1400 | {{dts|1 Apr 2017}} | |||
4 | PWR | APR-1400 | {{partial|Under construction}} | 1400 | {{dts|20 Sep 2018}} | |||
rowspan=4| Wolsong | 1 | PHWR | CANDU-6 | {{no|Shut down}} | 657 | {{dts|30 Oct 1977}} | {{dts|22 Apr 1983}} | {{dts|24 Dec 2019}} |
2 | PHWR | CANDU-6 | {{yes|Operational}} | 655 | {{dts|22 Jun 1992}} | {{dts|1 Jul 1997}} | ||
3 | PHWR | CANDU-6 | {{yes|Operational}} | 684 | {{dts|17 Mar 1994}} | {{dts|1 Jul 1998}} | ||
4 | PHWR | CANDU-6 | {{yes|Operational}} | 688 | {{dts|22 Jul 1994}} | {{dts|1 Oct 1999}} | ||
rowspan=2| Shin-Wolsong | 1 | PWR | OPR-1000 | {{yes|Operational}} | 991 | {{dts|20 Nov 2007}} | {{dts|31 Jul 2012}} | |
2 | PWR | OPR-1000 | {{yes|Operational}} | 960 | {{dts|23 Sep 2008}} | {{dts|26 Feb 2015}} |
Spain
{{main|Nuclear power in Spain}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Almaraz | 1 | PWR | WH 3 loops | {{yes|Operational}} | 1011 | {{dts|3 Jul 1973}} | {{dts|1 Sep 1983}} | |
2 | PWR | WH 3 loops | {{yes|Operational}} | 1006 | {{dts|3 Jul 1973}} | {{dts|1 Jul 1984}} | ||
rowspan=2| Ascó | 1 | PWR | WH 3 loops | {{yes|Operational}} | 995 | {{dts|16 May 1974}} | {{dts|10 Dec 1984}} | |
2 | PWR | WH-3 loops | {{yes|Operational}} | 997 | {{dts|7 Mar 1975}} | {{dts|31 Mar 1986}} | ||
Cofrentes | 1 | BWR | BWR-6 | {{yes|Operational}} | 1064 | {{dts|9 Sep 1975}} | {{dts|11 Mar 1985}} | |
José Cabrera | 1 | PWR | WH 1 loop | {{no|Shut down/in decommissioning}} | 141 | {{dts|24 Jun 1964}} | {{dts|13 Aug 1969}} | {{dts|30 Apr 2006}} |
rowspan=2| Lemoniz | 1 | PWR | {{BLACK|Unfinished}} | {{dts|1972}} | {{dts|1984}} | |||
2 | PWR | {{BLACK|Unfinished}} | {{dts|1972}} | {{dts|1984}} | ||||
Santa María de Garoña | 1 | BWR | BWR-3 | {{no|Shut down/in decommissioning}} | 446 | {{dts|11 May 1971}} | {{dts|15 Feb 1975}} | {{dts|6 Jul 2013}} |
Trillo | 1 | PWR | KWU 3 loops | {{yes|Operational}} | 1003 | {{dts|17 Aug 1979}} | {{dts|6 Aug 1988}} | |
rowspan=2| Valdecaballeros | 1 | BWR | {{BLACK|Unfinished}} | {{dts|1975}} | {{dts|1984}} | |||
2 | BWR | {{BLACK|Unfinished}} | {{dts|1975}} | {{dts|1984}} | ||||
rowspan=2| Vandellòs | 1 | GCR | UNGG | {{no|Shut down/in decommissioning}} | 480 | {{dts|1967}} | {{dts|2 Aug 1972}} | {{dts|31 Jul 1990}} |
2 | PWR | WH 3 loops | {{yes|Operational}} | 1045 | {{dts|29 Dec 1980}} | {{dts|8 Mar 1988}} |
Sweden
{{main|Nuclear power in Sweden}}
class="wikitable sortable mw-datatable" | |||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed ! | |||||||||
---|---|---|---|---|---|---|---|---|---|
Ågesta | 1 | PHWR | R3 | {{no|Shut down}}/in decommissioning | 10 | {{dts|1 Dec 1957}} | {{dts|1 May 1964}} | {{dts|2 Jun 1974}} | {{efn| The full reactor model name is R3/Adam.{{cite news |title=Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden |url=https://www.stralsakerhetsmyndigheten.se/publikationer/rapporter/sakerhet-vid-karnkraftverken/2007/200718/ |access-date=12 Jan 2023 |work=The Swedish Radiation Safety Authority |date=2007-03-31 |language=sv}} }} |
rowspan=2| Barsebäck | 1 | BWR | ASEA-II | {{no|Shut down}}/in decommissioning | 600 | {{dts|1 Feb 1971}} | {{dts|1 Jul 1975}} | {{dts|30 Nov 1999}} | {{efn| The full reactor model name is ASEA-ATOM Gen II.{{cite news |title=IAEA Sweden reactors |url=https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=SE |access-date=12 Jan 2023 |work=IAEA |date= 2023-01-11 |language=en}} }} |
2 | BWR | ASEA-II | {{no|Shut down}}/in decommissioning | 600 | {{dts|1 Jan 1973}} | {{dts|1 Jul 1977}} | {{dts|31 May 2005}} | {{efn| The full reactor model name is ASEA-ATOM Gen II. }} | |
rowspan=3| Forsmark | 1 | BWR | ASEA-III, BWR-2500 | {{yes|Operational}} | 986 | {{dts|1 Jun 1973}} | {{dts|10 Dec 1980}} | {{efn| The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.{{cite news |title=Forsmarks reaktorer i siffror |url=https://group.vattenfall.com/se/siteassets/sverige/forsmark/produktion/forsmarks-reaktorer-i-siffror-2016.pdf |access-date=12 Jan 2023 |work=Vattenfall |date=Apr 2016 |language=sv}} }} | |
2 | BWR | ASEA-III, BWR-2500 | {{yes|Operational}} | 1116 | {{dts|1 Jan 1975}} | {{dts|7 Jul 1981}} | {{efn| The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69. }} | ||
3 | BWR | ASEA-IV, BWR-3000 | {{yes|Operational}} | 1167 | {{dts|1 Jan 1979}} | {{dts|18 Aug 1985}} | {{efn| The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75. }} | ||
rowspan=3| Oskarshamn | 1 | BWR | ASEA-I | {{no|Shut down}}/in decommissioning | 473 | {{dts|1 Aug 1966}} | {{dts|6 Feb 1972}} | {{dts|19 Jun 2017}} | {{efn| The full reactor model name is ASEA-ATOM Gen I. }} |
2 | BWR | ASEA-II | {{no|Shut down}}/in decommissioning | 638 | {{dts|1 Sep 1969}} | {{dts|1 Jan 1975}} | {{dts|22 Dec 2016}} | {{efn| The full reactor model name is ASEA-ATOM Gen II. }} | |
3 | BWR | ASEA-IV, BWR-3000 | {{yes|Operational}} | 1450 | {{dts|1 May 1980}} | {{dts|15 Aug 1985}} | {{efn| The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.{{cite news |title=MILSTOLPAR I VÅR HISTORIA |url=https://www.westinghousenuclear.com/sweden/om-oss/historik/milstolpar-i-var-historia |access-date=12 Jan 2023 |work=Westinghouse |language=sv}} }} | ||
Marviken | 1 | BHWR | R4 | {{BLACK|Unfinished}} | 196 | {{dts|1 Apr 1965}} | {{dts|27 may 1970}} | {{efn| The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.}} | |
rowspan=4| Ringhals | 1 | BWR | ASEA-I | {{no|Shut down}}/in decommissioning | 881 | {{dts|1 Feb 1969}} | {{dts|1 Jan 1976}} | {{dts|31 Dec 2020}} | {{efn| The full reactor model name is ASEA-ATOM Gen I. Closed at midnight on New Year's Eve.{{cite news |title=Ringhals 1 inne på slutspurten |url=https://www.svt.se/nyheter/lokalt/halland/ringhals-1-inne-pa-slutstrackan |access-date=29 Dec 2020 |work=SVT |date=26 Oct 2020 |language=sv}} }} |
2 | PWR | WH 3-loops | {{no|Shut down}}/in decommissioning | 904 | {{dts|1 Oct 1970}} | {{dts|1 May 1975}} | {{dts|30 Dec 2019}} | {{efn| The full reactor model name is Westinghouse 3-loops. }} | |
3 | PWR | WH 3-loops | {{yes|Operational}} | 1062 | {{dts|1 Sep 1972}} | {{dts|9 Sep 1981}} | {{efn| The full reactor model name is Westinghouse 3-loops. }} | ||
4 | PWR | WH 3-loops | {{yes|Operational}} | 1104 | {{dts|1 Nov 1973}} | {{dts|21 Nov 1983}} | {{efn| The full reactor model name is Westinghouse 3-loops. }} |
Switzerland
{{main|Nuclear power in Switzerland}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Beznau | 1 | PWR | WH 2-loops | {{yes|Operational}} | 365 | {{dts|1 Sep 1965}} | {{dts|1 Sep 1969}} | ({{dts|2029}}) |
2 | PWR | WH 2-loops | {{yes|Operational}} | 365 | {{dts|1 Jan 1968}} | {{dts|1 Dec 1971}} | ({{dts|2031}}) | |
Gösgen | 1 | PWR | KWU 3-loops | {{yes|Operational}} | 1010 | {{dts|1 Dec 1973}} | {{dts|1 Nov 1979}} | |
Leibstadt | 1 | BWR | BWR-6 | {{yes|Operational}} | 1220 | {{dts|1 Jan 1974}} | {{dts|15 Dec 1984}} | |
Lucens | 1 | HWGCR | HWGCR | {{no|Decommissioned}} | 6 | {{dts|1 Apr 1962}} | {{dts|29 Dec 1966}} | {{dts|21 Jan 1969}} |
Mühleberg | 1 | BWR | BWR-4 | {{no|Shut down}}/in decommissioning | 373 | {{dts|1 Mar 1967}} | {{dts|6 Nov 1972}} | {{dts|20 Dec 2019}} |
Taiwan
{{main|Nuclear power in Taiwan}}
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Jinshan | 1 | BWR | BWR-4 | {{no|Shut down/in decommissioning}} | 636 | {{dts|2 Jun 1972}} | {{dts|10 Dec 1978}} | {{dts|3 Oct 2018}} |
2 | BWR | BWR-4 | {{no|Shut down/in decommissioning}} | 636 | {{dts|7 Dec 1973}} | {{dts|15 Jul 1979}} | {{dts|3 Oct 2018}} | |
rowspan=2| Kuosheng | 1 | BWR | BWR-6 | {{no|Shut down}} | 985 | {{dts|19 Nov 1975}} | {{dts|28 Dec 1981}} | 1 Jul 2021{{cite web|url=https://www.world-nuclear-news.org/Articles/Early-shutdown-for-Taiwanese-reactor |title=Early shutdown for Taiwanese reactor : Corporate |publisher=World Nuclear News |date=1 Jul 2021 |accessdate=29 Apr 2022}} |
2 | BWR | BWR-6 | {{no|Shut down}} | 985 | {{dts|15 Mar 1976}} | {{dts|16 Mar 1983}} | {{dts|15 Mar 2023}} | |
rowspan=2| Lungmen | 1 | BWR | ABWR | {{BLACK|Unfinished}} | 1350 | {{dts|31 Mar 1999}} | {{dts|27 April 2014}} {{cite web |title=封存核四 馬英九:為下一代保留選擇權 |url=https://news.ltn.com.tw/news/politics/breakingnews/996408 |website=自由時報電子報 |accessdate=2024-11-08 |date=2014-04-27 |quote=馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。 |lang=zh-tw}} | |
2 | BWR | ABWR | {{BLACK|Unfinished}} | 1350 | {{dts|30 Aug 1999}} | {{dts|27 April 2014}} | ||
rowspan=2| Maanshan | 1 | PWR | WH 312 3-loop | {{no|Shut down}} | 951 | {{dts|21 Aug 1978}} | {{dts|27 Jul 1984}} | {{dts|28 Jul 2024}} |
2 | PWR | WH 312 3-loop | {{no|Shut down}} | 951 | {{dts|21 Feb 1979}} | {{dts|18 May 1985}} | {{dts|17 May 2025}} |
Turkey
{{main|Nuclear power in Turkey}}
Ukraine
{{main|Nuclear power in Ukraine}}
{{sticky header}}
class="wikitable sortable mw-datatable sticky-header" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=6| Chernobyl | 1 | LWGR | RBMK-1000 | {{no|Shut down/in decommissioning}} | 740 | {{dts|1 Mar 1970}} | {{dts|27 May 1978}} | {{dts|30 Nov 1996}} |
2 | LWGR | RBMK-1000 | {{no|Shut down/in decommissioning}} | 925 | {{dts|1 Feb 1973}} | {{dts|28 May 1979}} | {{dts|11 Oct 1991}} | |
3 | LWGR | RBMK-1000 | {{no|Shut down/in decommissioning}} | 925 | {{dts|1 Mar 1976}} | {{dts|8 Jun 1982}} | {{dts|15 Dec 2000}} | |
4 | LWGR | RBMK-1000 | {{no|Destroyed}} | 925 | {{dts|1 Apr 1979}} | {{dts|26 Mar 1984}} | {{dts|26 Apr 1986}} | |
5 | LWGR | RBMK-1000 | {{BLACK|Unfinished}} | 925 | ||||
6 | LWGR | RBMK-1000 | {{BLACK|Unfinished}} | 925 | ||||
rowspan=4| Chyhyryn{{Cite web|url=https://gsminfo.com.ua/128698-v-ukrayini-zbuduyut-novu-atomnu-stancziyu-nazvano-misto-budivnycztva.html|title=В Україні збудують нову атомну станцію: названо місто будівництва|date=22 September 2022|website=GSMinfo|accessdate=9 December 2023}} | 1 | PWR | AP1000 | {{planned}} | 1100 | |||
2 | PWR | AP1000 | {{planned}} | 1100 | ||||
3 | PWR | AP1000 | {{planned}} | 1100 | ||||
4 | PWR | AP1000 | {{planned}} | 1100 | ||||
rowspan=2| Crimean | 1 | PWR | VVER-1000 | {{BLACK|Unfinished}} | 950 | {{dts|26 Jan 1984}} | {{dts|1987}} | |
2 | PWR | VVER-1000 | {{BLACK|Unfinished}} | 950 | {{dts|26 Jan 1984}} | {{dts|1987}} | ||
rowspan=2| Kharkiv | 1 | PWR | VVER-1000 | {{BLACK|Unfinished}} | 900 | {{dts|1988}} | {{dts|1990}} | |
2 | PWR | VVER-1000 | {{BLACK|Unfinished}} | 900 | {{dts|1988}} | {{dts|1990}} | ||
rowspan=6| Khmelnytskyi | 1 | PWR | VVER-1000/V-320 | {{yes|Operational}} | 950 | {{dts|1 Nov 1981}} | {{dts|13 Aug 1988}} | |
2 | PWR | VVER-1000/V-320 | {{yes|Operational}} | 950 | {{dts|1 Feb 1985}} | {{dts|15 Dec 2005}} | ||
3 | PWR | VVER-1000 | {{partial|Under construction}} | 950 | {{dts|1 Sep 1985}} | ({{dts|2026| |
|-
| 4 || PWR || VVER-1000 || {{partial|Under construction}} || 950 || {{dts|1 Jun 1986}} || ({{dts|2027||}}) ||
|-
| 5 || PWR || AP1000 || {{partial|Under construction}}{{cite web | url=https://www.neimagazine.com/news/ukraine-begins-construction-of-new-units-at-khmelnitsky-npp-11690350/ | title=Ukraine begins construction of new units at Khmelnitsky NPP | date=17 April 2024 }} || 1100 || {{dts|2024|4|11}} || ({{dts|2029||}}) ||
|-
| 6 || PWR || AP1000 || {{partial|Under construction}}{{cite web | url=https://ecoclubrivne.org/en/new-nuclear-reactors-in-ukraine/ | title=Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO }} || 1100 || {{dts|2024|4|11}} || ({{dts|2029||}}) ||
|-
| rowspan=2| Odesa || 1 || PWR || VVER-1000 || {{BLACK|Unfinished}} || 900 || || || {{dts|1989}}
|-
| 2 || PWR || VVER-1000 || {{BLACK|Unfinished}} || 900 || || || {{dts|1989}}
|-
| rowspan=5| Rivne || 1 || PWR || VVER-440/V-213 || {{yes|Operational}} || 381 || {{dts|1 Aug 1973}} || {{dts|22 Sep 1981}} ||
|-
| 2 || PWR || VVER-440/V-213 || {{yes|Operational}} || 376 || {{dts|1 Oct 1973}} || {{dts|29 Jul 1982}} ||
|-
| 3 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Feb 1980}} || {{dts|16 May 1987}} ||
|-
| 4 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Aug 1986}} || {{dts|6 Apr 2006}} ||
|-
| 5 || PWR || AP1000 || {{planned}} || 1100 || || ||
|-
| rowspan=4| South Ukraine || 1 || PWR || VVER-1000/V-302 || {{yes|Operational}} || 950 || {{dts|1 Aug 1976}} || {{dts|2 Dec 1983}} ||
|-
| 2 || PWR || VVER-1000/V-338 || {{yes|Operational}} || 950 || {{dts|1 Jul 1981}} || {{dts|6 Apr 1985}} ||
|-
| 3 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Nov 1984}} || {{dts|29 Dec 1989}} ||
|-
| 4 || PWR || AP1000 || {{planned}} || 1100 || || ||
|-
| rowspan=7| Zaporizhzhia || 1 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Apr 1980}} || {{dts|25 Dec 1985}} ||
|-
| 2 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Jan 1981}} || {{dts|15 Feb 1986}} ||
|-
| 3 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Apr 1982}} || {{dts|5 Mar 1987}} ||
|-
| 4 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Apr 1983}} || {{dts|14 Apr 1988}} ||
|-
| 5 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Nov 1985}} || {{dts|27 Oct 1989}} ||
|-
| 6 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Jun 1986}} || {{dts|17 Sep 1996}} ||
|-
| 7 || PWR || AP1000 || {{planned}} || 1100 || || ||
|}
United Arab Emirates
{{main|Nuclear power in the United Arab Emirates}}
United Kingdom
{{main|Nuclear power in the United Kingdom}}
{{See also|Proposed nuclear power stations in the United Kingdom}}
{{sticky header}}
class="wikitable sortable mw-datatable sticky-header" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Berkeley | 1 | GCR | Magnox | {{no|Decommissioned}} | 138 | {{dts|1 Jan 1957}} | {{dts|12 Jun 1962}} | {{dts|31 Mar 1989}} |
2 | GCR | Magnox | {{no|Decommissioned}} | 138 | {{dts|1 Jan 1957}} | {{dts|20 Oct 1962}} | {{dts|26 Oct 1988}} | |
rowspan=2| Bradwell | 1 | GCR | Magnox | {{no|Decommissioned}} | 123 | {{dts|1 Jan 1957}} | {{dts|1 Jul 1962}} | {{dts|31 Mar 2002}} |
2 | GCR | Magnox | {{no|Decommissioned}} | 123 | {{dts|1 Jan 1957}} | {{dts|12 Nov 1962}} | {{dts|30 Mar 2002}} | |
rowspan=4| Calder Hall | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 49 | {{dts|1 Aug 1953}} | {{dts|1 Oct 1956}} | {{dts|31 Mar 2003}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 49 | {{dts|1 Aug 1953}} | {{dts|1 Feb 1957}} | {{dts|31 Mar 2003}} | |
3 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 49 | {{dts|1 Aug 1955}} | {{dts|1 May 1958}} | {{dts|31 Mar 2003}} | |
4 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 49 | {{dts|1 Aug 1955}} | {{dts|1 Apr 1959}} | {{dts|31 Mar 2003}} | |
rowspan=4| Chapelcross | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 48 | {{dts|1 Oct 1955}} | {{dts|1 Mar 1959}} | {{dts|29 Jun 2004}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 48 | {{dts|1 Oct 1955}} | {{dts|1 Aug 1959}} | {{dts|29 Jun 2004}} | |
3 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 48 | {{dts|1 Oct 1955}} | {{dts|1 Dec 1959}} | {{dts|29 Jun 2004}} | |
4 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 48 | {{dts|1 Oct 1955}} | {{dts|1 Mar 1960}} | {{dts|29 Jun 2004}} | |
rowspan=2| Dounreay | 1 | SFR | DFR | {{no|Shut down}}/in decommissioning | 11 | {{dts|1 Mar 1955}} | {{dts|1 Oct 1962}} | {{dts|1 Mar 1977}} |
2 | SFR | PFR | {{no|Shut down}}/in decommissioning | 234 | {{dts|1 Jan 1966}} | {{dts|1 Jul 1976}} | {{dts|31 Mar 1994}} | |
rowspan=2| Dungeness A | A-1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 225 | {{dts|1 Jul 1960}} | {{dts|28 Oct 1965}} | {{dts|31 Dec 2006}} |
A-2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 225 | {{dts|1 Jul 1960}} | {{dts|30 Dec 1965}} | {{dts|31 Dec 2006}} | |
rowspan=2| Dungeness B | B-1 | GCR | AGR | {{no|Shut down}} | 520 | {{dts|1 Oct 1965}} | {{dts|1 Apr 1985}} | {{dts|7 Jun 2021}} |
B-2 | GCR | AGR | {{no|Shut down}} | 520 | {{dts|1 Oct 1965}} | {{dts|1 Apr 1989}} | {{dts|7 Jun 2021}} | |
rowspan=2| Hartlepool | 1 | GCR | AGR | {{yes|Operational}} | 595 | {{dts|1 Oct 1968}} | {{dts|1 Apr 1989}} | ({{dts|2027}}){{cite news | url = https://www.theguardian.com/environment/2024/dec/04/four-of-uks-oldest-nuclear-plants-to-run-for-even-longer-as-hinkley-point-delayed | title = Four of UK’s oldest nuclear plants to run for even longer as Hinkley Point delayed | first1 = Jillian | last1 = Ambrose | date = 4 December 2024 | access-date = 4 December 2024}} |
2 | GCR | AGR | {{yes|Operational}} | 585 | {{dts|1 Oct 1968}} | {{dts|1 Apr 1989}} | ({{dts|2027}}) | |
rowspan=4| Heysham | A-1 | GCR | AGR | {{yes|Operational}} | 585 | {{dts|1 Dec 1970}} | {{dts|1 Apr 1989}} | ({{dts|2027}}) |
A-2 | GCR | AGR | {{yes|Operational}} | 575 | {{dts|1 Dec 1970}} | {{dts|1 Apr 1989}} | ({{dts|2027}}) | |
B-1 | GCR | AGR | {{yes|Operational}} | 610 | {{dts|1 Aug 1980}} | {{dts|1 Apr 1989}} | ({{dts|2030}}) | |
B-2 | GCR | AGR | {{yes|Operational}} | 610 | {{dts|1 Aug 1980}} | {{dts|1 Apr 1989}} | ({{dts|2030}}) | |
rowspan=2| Hinkley Point A | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 235 | {{dts|1 Nov 1957}} | {{dts|30 Mar 1965}} | {{dts|23 May 2000}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 235 | {{dts|1 Nov 1957}} | {{dts|5 May 1965}} | {{dts|23 May 2000}} | |
rowspan=2| Hinkley Point B | 1 | GCR | AGR | {{no|Shut down/in decommissioning}} | 435 | {{dts|1 Sep 1967}} | {{dts|2 Oct 1978}} | {{dts|1 Aug 2022}}{{Cite web |title=Hinkley Point B enters retirement : Corporate – World Nuclear News |url=https://www.world-nuclear-news.org/Articles/Hinkley-Point-B-enters-retirement |access-date=2 Aug 2022 |website=world-nuclear-news.org}} |
2 | GCR | AGR | {{no|Shut down/in decommissioning}} | 435 | {{dts|1 Sep 1967}} | {{dts|27 Sep 1976}} | {{dts|6 Jul 2022}}{{Cite web |title=PRIS – Reactor Details |url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=245 |access-date=25 Jul 2022 |website=pris.iaea.org}} | |
rowspan=2| Hinkley Point C | 1 | PWR | EPR | {{partial|Under construction}} | 1600 | {{dts|11 Dec 2018}} | (2029){{cite web | url=https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx | title=Plans for New Nuclear Reactors Worldwide - World Nuclear Association }} | |
2 | PWR | EPR | {{partial|Under construction}} | 1600 | {{dts|12 Dec 2019}} | (2030){{cite web | url=https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx | title=Plans for New Nuclear Reactors Worldwide - World Nuclear Association }} | ||
rowspan=2| Hunterston A | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 150 | {{dts|1 Oct 1957}} | {{dts|5 Feb 1964}} | {{dts|30 Mar 1990}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 150 | {{dts|1 Oct 1957}} | {{dts|1 Jul 1964}} | {{dts|31 Dec 1989}} | |
rowspan=2| Hunterston B | 1 | GCR | AGR | {{no|Shut down}} | 460 | {{dts|1 Nov 1967}} | {{dts|6 Feb 1976}} | {{dts|26 Nov 2021}} |
2 | GCR | AGR | {{no|Shut down}} | 460 | {{dts|1 Nov 1967}} | {{dts|31 Mar 1977}} | {{dts|7 Jan 2022}}{{cite web | url=https://www.theguardian.com/business/2022/jan/07/hunterston-b-nuclear-power-station-retires-after-46-years-in-service | title=Hunterston B nuclear power station retires after 46 years in service | website=The Guardian | date=7 Jan 2022 }} | |
rowspan=2| Oldbury | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 217 | {{dts|1 May 1962}} | {{dts|31 Dec 1967}} | {{dts|29 Feb 2012}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 217 | {{dts|1 May 1962}} | {{dts|30 Sep 1968}} | {{dts|30 Jun 2011}} | |
rowspan=2| Sizewell A | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 210 | {{dts|1 Apr 1961}} | {{dts|25 Mar 1966}} | {{dts|31 Dec 2006}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 210 | {{dts|1 Apr 1961}} | {{dts|15 Sep 1966}} | {{dts|31 Dec 2006}} | |
Sizewell B | 1 | PWR | WH SNUPPS | {{yes|Operational}} | 1191 | {{dts|18 Jul 1988}} | {{dts|22 Sep 1995}} | ({{dts|2035}}) |
rowspan=2| Sizewell C | 1 | PWR | EPR | {{planned}} | 1600 | (2025) | ||
2 | PWR | EPR | {{planned}} | 1600 | (2025) | |||
rowspan=2| Torness | 1 | GCR | AGR | {{yes|Operational}} | 595 | {{dts|1 Aug 1980}} | {{dts|25 May 1988}} | ({{dts|2030}}) |
2 | GCR | AGR | {{yes|Operational}} | 595 | {{dts|1 Aug 1980}} | {{dts|3 Feb 1989}} | ({{dts|2030}}) | |
rowspan=2| Trawsfynydd | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 195 | {{dts|1 Jul 1959}} | {{dts|24 Mar 1965}} | {{dts|6 Feb 1991}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 195 | {{dts|1 Jul 1959}} | {{dts|24 Mar 1965}} | {{dts|4 Feb 1991}} | |
Winfrith{{cite web |title=PRIS – Reactor Details |url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=239 |website=pris.iaea.org |access-date=24 Jan 2019}} | 1 | SGHWR | SGHWR | {{no|Shut down}}/in decommissioning | 92 | {{dts|1 May 1963}} | {{dts|1 Jan 1968}} | {{dts|11 Sep 1990}} |
rowspan=2| Wylfa | 1 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 490 | {{dts|1 Sep 1963}} | {{dts|1 Nov 1971}} | {{dts|30 Dec 2015}} |
2 | GCR | Magnox | {{no|Shut down}}/in decommissioning | 490 | {{dts|1 Sep 1963}} | {{dts|3 Jan 1972}} | {{dts|25 Apr 2012}} |
United States
{{main|Nuclear power in the United States}}
{{See also|List of cancelled nuclear reactors in the United States|Army Nuclear Power Program|List of United States Naval reactors}}
{{for|plutonium production reactors|Hanford Site|Savannah River Site}}
{{sticky header}}
class="wikitable sortable mw-datatable sticky-header" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan=2| Arkansas Nuclear One | 1 | PWR | B & W (DRY-Cont) | {{yes|Operational}} | 836 | {{dts|1 Oct 1968}} | {{dts|21 May 1974}} | |
2 | PWR | CE (DRY) | {{yes|Operational}} | 988 | {{dts|6 Dec 1968}} | {{dts|1 Sep 1978}} | ||
rowspan=2| Beaver Valley | 1 | PWR | WH 3-loop (DRY) | {{yes|Operational}} | 908 | {{dts|26 Jun 1970}} | {{dts|2 Jul 1976}} | |
2 | PWR | WH 3-loop (DRY) | {{yes|Operational}} | 905 | {{dts|3 May 1974}} | {{dts|14 Aug 1987}} | ||
Big Rock Point{{cite web|title=PRIS – Reactor Details|url=https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=601|website=iaea.org|access-date=11 May 2018}} | 1 | BWR | BWR-1 | {{no|Dismantled}} | 67 | {{dts|1 May 1960}} | {{dts|29 Mar 1963}} | {{dts|29 Aug 1997}} |
rowspan=2| Braidwood | 1{{cite web|title=PRIS – Reactor Details|url=https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737|website=iaea.org|access-date=11 May 2018}} | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1194 | {{dts|1 Aug 1975}} | {{dts|29 Jul 1988}} | |
2{{cite web|title=PRIS – Reactor Details|url=https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=738|website=iaea.org|access-date=11 May 2018}} | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1160 | {{dts|1 Aug 1975}} | {{dts|17 Oct 1988}} | ||
rowspan=3| Browns Ferry | 1 | BWR | BWR-4 (WET) | {{yes|Operational}} | 1200 | {{dts|1 May 1967}} | {{dts|1 Aug 1974}} | |
2 | BWR | BWR-4 (WET) | {{yes|Operational}} | 1200 | {{dts|1 May 1967}} | {{dts|1 Mar 1975}} | ||
3 | BWR | BWR-4 (WET) | {{yes|Operational}} | 1210 | {{dts|1 Jul 1968}} | {{dts|1 Mar 1977}} | ||
rowspan=2| Brunswick | 1 | BWR | BWR-4 (WET) | {{yes|Operational}} | 938 | {{dts|7 Feb 1970}} | {{dts|18 Mar 1977}}{{cite web|url=http://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=662|title=Brunswick-1|publisher=IAEA|access-date=14 Apr 2013}} | |
2 | BWR | BWR-4 (WET) | {{yes|Operational}} | 932 | {{dts|7 Feb 1970}} | {{dts|3 Nov 1975}}{{cite web|url=http://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=661|title=Brunswick-2|publisher=IAEA|access-date=14 Apr 2013}} | ||
rowspan=2| Byron | 1 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1164 | {{dts|1 Apr 1975}} | {{dts|16 Sep 1985}} | |
2 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1136 | {{dts|1 Apr 1975}} | {{dts|2 Aug 1987}} | ||
Callaway | 1 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1215 | {{dts|1 Sep 1975}} | {{dts|19 Dec 1984}} | |
rowspan=2| Calvert Cliffs | 1 | PWR | CE 2-loop (DRY) | {{yes|Operational}} | 877 | {{dts|1 Jun 1968}} | {{dts|8 May 1977}} | |
2 | PWR | CE 2-loop (DRY) | {{yes|Operational}} | 855 | {{dts|1 Jun 1968}} | {{dts|1 Apr 1977}} | ||
rowspan="6" | Carbon Free Power Project{{cite web|url=https://www.world-nuclear-news.org/Articles/Scaled-down-SMR-pilot-project-remains-on-course |title=Scaled down SMR pilot project remains on course : New Nuclear |publisher=World Nuclear News |date=23 Jul 2021 |accessdate=29 Apr 2022}}{{cite news |url=https://www.world-nuclear-news.org/Articles/Idaho-SMR-project-terminated |title=Idaho SMR project terminated |website=World Nuclear News |date=9 November 2023 |access-date=9 November 2023}} | 1 | PWR | VOYGR | {{BLACK|Cancelled}} | 77 | data-sort-value="2029-01-01"| | ||
2 | PWR | VOYGR | {{BLACK|Cancelled}} | 77 | data-sort-value="2029-01-01"| | |||
3 | PWR | VOYGR | {{BLACK|Cancelled}} | 77 | data-sort-value="2029-01-01"| | |||
4 | PWR | VOYGR | {{BLACK|Cancelled}} | 77 | data-sort-value="2029-01-01"| | |||
5 | PWR | VOYGR | {{BLACK|Cancelled}} | 77 | data-sort-value="2029-01-01"| | |||
6 | PWR | VOYGR | {{BLACK|Cancelled}} | 77 | data-sort-value="2029-01-01"| | |||
rowspan=2| Catawba | 1 | PWR | WH 4-loop (ICECOND) | {{yes|Operational}} | 1160 | {{dts|1 May 1974}} | {{dts|29 Jun 1985}} | |
2 | PWR | WH 4-loop (ICECOND) | {{yes|Operational}} | 1150 | {{dts|1 May 1974}} | {{dts|19 Aug 1986}} | ||
Clinch River | 1 | BWR | BWRX-300 | {{planned}} | 300 | |||
Clinton | 1 | BWR | BWR-6 (WET) | {{yes|Operational}} | 1062 | {{dts|1 Oct 1975}} | {{dts|24 Nov 1987}} | |
Columbia | 1 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1131 | {{dts|1 Aug 1972}} | {{dts|13 Dec 1984}} | |
rowspan=2| Comanche Peak | 1 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1205 | {{dts|19 Dec 1974}} | {{dts|13 Aug 1990}} | |
2 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1195 | {{dts|19 Dec 1974}} | {{dts|3 Aug 1993}} | ||
Connecticut Yankee | 1 | PWR | WH (DRY) | {{no|Dismantled}} | 582 | {{dts|1 May 1964}} | {{dts|1 Jan 1968}} | {{dts|5 Dec 1996}} |
Cooper | 1 | BWR | BWR-4 (WET) | {{yes|Operational}} | 769 | {{dts|1 Jun 1968}} | {{dts|1 Jul 1974}} | |
Crystal River 3 | 1 | PWR | B & W (DRY) | {{no|Shut down/in decommissioning}} | 860 | {{dts|25 Sep 1968}} | {{dts|13 Mar 1977}} | {{dts|5 Feb 2013}} |
Davis–Besse | 1 | PWR | B & W (DRY) | {{yes|Operational}} | 894 | {{dts|1 Sep 1970}} | {{dts|31 Jul 1978}} | |
rowspan=2| Diablo Canyon | 1 | PWR | WH 4-Loop (DRY) | {{yes|Operational}} | 1138 | {{dts|23 Apr 1968}} | {{dts|7 May 1985}} | |
2 | PWR | WH 4-Loop (DRY) | {{yes|Operational}} | 1118 | {{dts|9 Dec 1970}} | {{dts|13 Mar 1986}} | ||
rowspan=2| Donald C. Cook | 1 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1020 | {{dts|25 Mar 1969}} | {{dts|27 Aug 1975}} | |
2 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1090 | {{dts|25 Mar 1969}} | {{dts|1 Jul 1978}} | ||
rowspan=3| Dresden | 1 | BWR | BWR-1 | {{no|Shut down}} | 197 | {{dts|1 May 1956}} | {{dts|4 Jul 1960}} | {{dts|31 Oct 1978}} |
2 | BWR | BWR-3 (WET) | {{yes|Operational}} | 894 | {{dts|10 Jan 1966}} | {{dts|9 Jun 1970}} | ||
3 | BWR | BWR-3 (WET) | {{yes|Operational}} | 879 | {{dts|14 Oct 1966}} | {{dts|16 Nov 1971}} | ||
Duane Arnold | 1 | BWR | BWR-4 (WET) | {{no|Shut down}} | 601 | {{dts|22 May 1970}} | {{dts|1 Feb 1975}} | {{dts|10 Aug 2020}} |
rowspan=2| Edwin I. Hatch | 1 | BWR | BWR-4 (WET) | {{yes|Operational}} | 924 | {{dts|30 Sep 1968}} | {{dts|31 Dec 1975}} | |
2 | BWR | BWR-4 (WET) | {{yes|Operational}} | 924 | {{dts|1 Feb 1972}} | {{dts|5 Sep 1979}} | ||
Elk River | 1 | BWR | {{no|Dismantled}} | 22 | {{dts|1 Jan 1959}} | {{dts|1 Jul 1964}} | {{dts|1 Feb 1968}} | |
rowspan=2| Fermi | 1 | FBR | Prototype | {{no|Shut down}} | 61 | {{dts|8 Aug 1956}} | {{dts|7 Aug 1966}} | {{dts|29 Nov 1972}} |
2 | BWR | BWR-4 (WET) | {{yes|Operational}} | 1115 | {{dts|26 Sep 1972}} | {{dts|23 Jan 1988}} | ||
Fort Calhoun | 1 | PWR | CE 2-loop (WET) | {{no|Shut down}} | 482 | {{dts|7 Jun 1968}}
| {{dts|9 Aug 1973}} | {{dts|24 Oct 2016}} | |
Fort St. Vrain | 1 | HTGR | General Atomics | {{no|Shut down}} | 330 | {{dts|1 Sep 1968}} | {{dts|1 Jul 1979}} | {{dts|29 Aug 1989}} |
Ginna | 1 | PWR | WH 2-loop (DRY) | {{yes|Operational}} | 560 | {{dts|25 Apr 1966}} | {{dts|1 Jun 1970}} | |
Grand Gulf | 1 | BWR | BWR-6 (WET) | {{yes|Operational}} | 1401 | {{dts|4 May 1974}} | {{dts|1 Jul 1985}} | |
H. B. Robinson | 1 | PWR | WH 3-loop (DRY) | {{yes|Operational}} | 735 | {{dts|13 Apr 1967}} | {{dts|7 Mar 1971}} | |
Hallam | 1 | SGR | Atomics International | {{no|Dismantled}} | 75 | {{dts|1 Jan 1959}} | {{dts|1 Nov 1963}} | {{dts|1 Sep 1969}} |
rowspan=4| Hartsville | A1{{Cite news|url=https://www.ans.org/news/article-1686/tva-prepares-to-write-final-nuclear-chapters/|title=TVA Prepares to Write Final Nuclear Chapters|date=17 Apr 2015|work=American Nuclear Society|access-date=5 Oct 2023|archive-date=29 July 2023|archive-url=https://web.archive.org/web/20230729001150/https://www.ans.org/news/article-1686/tva-prepares-to-write-final-nuclear-chapters/|url-status=dead}} | BWR | BWR-6 | {{BLACK|Unfinished}} | 1285 | {{dts|23 May 1975}}{{cite web |title=Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park |url=http://www.tva.gov/environment/reports/hartsville/hartsville_ea.pdf |author=Tennessee Valley Authority |access-date=5 Oct 2023 |url-status=dead |archive-url=https://web.archive.org/web/20090105233433/http://www.tva.gov/environment/reports/hartsville/hartsville_ea.pdf |archive-date=January 5, 2009 }} | {{dts|29 Aug 1984}} | |
A2 | BWR | BWR-6 | {{BLACK|Unfinished}} | 1285 | {{dts|23 May 1975}} | {{dts|29 Aug 1984}} | ||
B1 | BWR | BWR-6 | {{BLACK|Unfinished}} | 1285 | {{dts|23 May 1975}} | {{dts|22 Mar 1983}} | ||
B2 | BWR | BWR-6 | {{BLACK|Unfinished}} | 1285 | {{dts|23 May 1975}} | {{dts|22 Mar 1983}} | ||
Hope Creek | 1 | BWR | BWR-4 (WET) | {{yes|Operational}} | 1172 | {{dts|1 Mar 1976}} | {{dts|20 Dec 1986}} | |
Humboldt Bay | 1 | BWR | BWR-1 | {{no|Dismantled}} | 63 | {{dts|1 Nov 1960}} | {{dts|1 Aug 1963}} | {{dts|2 Jul 1976}} |
rowspan=3| Indian Point | 1 | PWR | {{no|Shut down}} | 257 | {{dts|1 May 1956}} | {{dts|1 Oct 1962}} | {{dts|31 Oct 1974}} | |
2 | PWR | WH 4-loop (DRY) | {{no|Shut down}} | 998 | {{dts|14 Oct 1966}} | {{dts|1 Aug 1974}} | {{dts|30 Apr 2020}}{{Cite news|url=http://www.safesecurevital.com/entergy-s-indian-point-unit-2-to-shut-down-permanently/|title=Entergy's Indian Point Unit 2 to Shut Down Permanently|date=29 Apr 2020|work=Indian Point Energy Center|access-date=30 Apr 2020|archive-date=3 Aug 2020|archive-url=https://web.archive.org/web/20200803092138/http://www.safesecurevital.com/entergy-s-indian-point-unit-2-to-shut-down-permanently/|url-status=usurped}} | |
3 | PWR | WH 4-loop (DRY) | {{no|Shut down}} | 1030 | {{dts|1 Nov 1968}} | {{dts|30 Aug 1976}} | {{dts|30 Apr 2021}} | |
James A. FitzPatrick | 1 | BWR | BWR-4 (WET) | {{yes|Operational}} | 813 | {{dts|1 Sep 1968}} | {{dts|28 Jul 1975}} | |
rowspan=2| Joseph M. Farley | 1 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 874 | {{dts|1 Oct 1970}} | {{dts|1 Dec 1977}} | |
2 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 883 | {{dts|1 Oct 1970}} | {{dts|30 Jul 1981}} | ||
Kemmerer | 1 | SFR | Natrium | {{partial|Under construction}} | 345 | {{dts|10 Jun 2024}} | ||
Kewaunee | 1 | PWR | WH 2-loop (DRY) | {{no|Shut down}} | 566 | {{dts|6 Aug 1968}} | {{dts|16 Jun 1974}} | {{dts|7 May 2013}} |
La Crosse | 1 | BWR | BWR-1 | {{no|Dismantled}} | 48 | {{dts|1 Mar 1963}} | {{dts|7 Nov 1969}} | {{dts|30 Apr 1987}} |
rowspan=2| LaSalle County | 1 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1137 | {{dts|10 Sep 1973}} | {{dts|1 Jan 1984}} | |
2 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1140 | {{dts|10 Sep 1973}} | {{dts|19 Oct 1984}} | ||
rowspan=2| Limerick | 1 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1134 | {{dts|19 Jun 1974}} | {{dts|1 Feb 1986}} | |
2 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1134 | {{dts|19 Jun 1974}} | {{dts|8 Jan 1990}} | ||
rowspan=4| Long Mott | 1 | HTGR | Xe-100 | {{planned}} | 80 | |||
2 | HTGR | Xe-100 | {{planned}} | 80 | ||||
3 | HTGR | Xe-100 | {{planned}} | 80 | ||||
4 | HTGR | Xe-100 | {{planned}} | 80 | ||||
Maine Yankee | 1 | PWR | WH (DRY) | {{no|Dismantled}} | 860 | {{dts|1 Oct 1968}} | {{dts|28 Dec 1972}} | {{dts|1 Aug 1997}} |
Marble Hill | 1 | PWR | WH (DRY) | {{BLACK|Unfinished}} | 1130 | {{dts|1 Aug 1977}} | {{dts|10 Jan 1984}} | |
rowspan=2| McGuire | 1 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1158 | {{dts|1 Apr 1971}} | {{dts|1 Dec 1981}} | |
2 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1158 | {{dts|1 Apr 1971}} | {{dts|1 Mar 1984}} | ||
rowspan=3| Millstone | 1 | BWR | BWR-3 (WET) | {{no|Shut down}} | 641 | {{dts|1 May 1966}} | {{dts|28 Dec 1970}} | {{dts|21 Jul 1998}} |
2 | PWR | CE 2-loop (DRY) | {{yes|Operational}} | 869 | {{dts|1 Nov 1969}} | {{dts|26 Dec 1975}} | ||
3 | PWR | WH 4-Loop (DRY) | {{yes|Operational}} | 1210 | {{dts|9 Aug 1974}} | {{dts|23 Apr 1986}} | ||
Monticello | 1 | BWR | BWR-3 (WET) | {{yes|Operational}} | 628 | {{dts|19 Jun 1967}} | {{dts|30 Jun 1971}} | |
rowspan=2| Nine Mile Point | 1 | BWR | BWR-2 (WET) | {{yes|Operational}} | 613 | {{dts|12 Apr 1965}} | {{dts|1 Dec 1969}} | |
2 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1277 | {{dts|1 Aug 1975}} | {{dts|11 Mar 1988}} | ||
rowspan=2| North Anna | 1 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 948 | {{dts|19 Feb 1971}} | {{dts|6 Jun 1978}} | |
2 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 944 | {{dts|19 Feb 1971}} | {{dts|14 Dec 1980}} | ||
rowspan=3| Oconee | 1 | PWR | B & W (DRY) | {{yes|Operational}} | 847 | {{dts|6 Nov 1967}} | {{dts|15 Jul 1973}} | |
2 | PWR | B & W (DRY) | {{yes|Operational}} | 848 | {{dts|6 Nov 1967}} | {{dts|9 Sep 1974}} | ||
3 | PWR | B & W (DRY) | {{yes|Operational}} | 859 | {{dts|6 Nov 1967}} | {{dts|16 Dec 1974}} | ||
Oyster Creek | 1 | BWR | BWR-2 (WET) | {{no|Shut down}} | 619 | {{dts|15 Dec 1964}} | {{dts|23 Dec 1969}} | {{dts|17 Sep 2018}} |
rowspan=3 | Palisades | 1 | PWR | CE 2-loop (DRY) | {{partial|Restart Planned}} | 805 | {{dts|14 Mar 1967}} | {{dts|31 Dec 1971}} | {{dts|20 May 2022}} |
2 | PWR | SMR-300 | {{planned}} | 300 | ||||
3 | PWR | SMR-300 | {{planned}} | 300 | ||||
rowspan=3 | Palo Verde | 1 | PWR | CE80 2-loop (DRY) | {{yes|Operational}} | 1311 | {{dts|25 May 1976}} | {{dts|28 Jan 1986}} | |
2 | PWR | CE80 2-loop (DRY) | {{yes|Operational}} | 1314 | {{dts|1 Jun 1976}} | {{dts|19 Sep 1986}} | ||
3 | PWR | CE80 2-loop (DRY) | {{yes|Operational}} | 1312 | {{dts|1 Jun 1976}} | {{dts|8 Jan 1988}} | ||
Parr | 1 | PHWR | CVTR | {{no|Dismantled}} | 17 | {{dts|1 Jan 1960}} | {{dts|18 Dec 1963}} | {{dts|10 Jan 1967}} |
Pathfinder | 1 | BWR | BWR-1 | {{no|Dismantled}} | 59 | {{dts|1 Jan 1959}} | {{dts|1 Aug 1966}} | {{dts|1 Oct 1967}} |
rowspan=3| Peach Bottom | 1 | GCR | Prototype | {{no|Shut down}} | 40 | {{dts|1 Feb 1962}} | {{dts|1 Jun 1966}} | {{dts|1 Nov 1974}} |
2 | BWR | BWR-4 (WET) | {{yes|Operational}} | 1300 | {{dts|31 Jan 1968}} | {{dts|5 Jul 1974}} | ||
3 | BWR | BWR-4 (WET) | {{yes|Operational}} | 1331 | {{dts|31 Jan 1968}} | {{dts|23 Dec 1974}} | ||
Perry | 1 | BWR | BWR-6 (WET) | {{yes|Operational}} | 1240 | {{dts|1 Oct 1974}} | {{dts|18 Nov 1987}} | |
Pilgrim | 1 | BWR | BWR-3 (WET) | {{no|Shut down}} | 677 | {{dts|26 Aug 1968}} | {{dts|9 Dec 1972}} | {{dts|31 May 2019}} |
Piqua | 1 | OCR | Atomics International | {{no|Decommissioned}} | 12 | {{dts|1 Jan 1960}} | {{dts|1 Nov 1963}} | {{dts|1 Jan 1966}} |
rowspan=2| Point Beach | 1 | PWR | WH 2-loop (DRY) | {{yes|Operational}} | 591 | {{dts|19 Jul 1967}} | {{dts|21 Dec 1970}} | |
2 | PWR | WH 2-loop (DRY) | {{yes|Operational}} | 591 | {{dts|25 Jul 1968}} | {{dts|1 Oct 1972}} | ||
rowspan=2| Prairie Island | 1 | PWR | WH 2-loop (DRY) | {{yes|Operational}} | 522 | {{dts|25 Jun 1968}} | {{dts|16 Dec 1973}} | |
2 | PWR | WH 2-loop (DRY) | {{yes|Operational}} | 519 | {{dts|25 Jun 1969}} | {{dts|21 Dec 1974}} | ||
rowspan=2| Quad Cities | 1 | BWR | BWR-4 (WET) | {{yes|Operational}} | 908 | {{dts|15 Feb 1967}} | {{dts|18 Feb 1973}} | |
2 | BWR | BWR-4 (WET) | {{yes|Operational}} | 911 | {{dts|15 Feb 1967}} | {{dts|10 Mar 1973}} | ||
Rancho Seco | 1 | PWR | WH (DRY) | {{no|Decommissioned}} | 873 | {{dts|1 Apr 1969}} | {{dts|17 Apr 1975}} | {{dts|23 Jun 1989}} |
River Bend | 1 | BWR | BWR-6 (WET) | {{yes|Operational}} | 967 | {{dts|25 Mar 1977}} | {{dts|16 Jun 1986}} | |
rowspan=2| Salem | 1 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1169 | {{dts|25 Sep 1968}} | {{dts|30 Jun 1977}} | |
2 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1158 | {{dts|25 Sep 1968}} | {{dts|31 Oct 1981}} | ||
rowspan=3| San Onofre | 1 | PWR | WH (DRY) | {{no|Dismantled}} | 436 | {{dts|16 Jul 1964}} | {{dts|1 Jan 1968}} | {{dts|30 Nov 1992}} |
2 | PWR | CE (DRY) | {{no|Shut down/in decommissioning}} | 1070 | {{dts|1 Mar 1974}} | {{dts|8 Aug 1983}} | {{dts|7 Jun 2013}} | |
3 | PWR | CE (DRY) | {{no|Shut down/in decommissioning}} | 1180 | {{dts|1 Mar 1974}} | {{dts|1 Apr 1984}} | {{dts|7 Jun 2013}} | |
Saxton | 1 | PWR | {{no|Decommissioned}} | 3 | {{dts|1 Jan 1960}} | {{dts|Nov 1961}} | {{dts|May 1972}} | |
Seabrook | 1 | PWR | WH 4-Loop (DRY) | {{yes|Operational}} | 1246 | {{dts|7 Jul 1976}} | {{dts|15 Mar 1990}} | |
rowspan=2| Sequoyah | 1 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1152 | {{dts|27 May 1970}} | {{dts|1 Jul 1981}} | |
2 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1139 | {{dts|27 May 1970}} | {{dts|1 Jun 1982}} | ||
Shearon Harris | 1 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 964 | {{dts|28 Jan 1978}} | {{dts|2 May 1987}} | |
Shippingport | 1 | PWR | WH | {{no|Dismantled}} | 60 | {{dts|6 Sep 1954}} | {{dts|26 May 1958}} | {{dts|Dec 1989}} |
Shoreham | 1 | BWR | GE | {{no|Shut down}} | 820 | {{dts|1 Nov 1972}} | {{dts|1 Aug 1986}} | {{dts|1 May 1989}} |
SRE | 1 | FBR | {{no|Decommissioned}} | 6.5 | {{dts|1954}} | {{dts|12 Jul 1957}} | {{dts|15 Feb 1964}} | |
rowspan=2| South Texas | 1 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1280 | {{dts|22 Dec 1975}} | {{dts|25 Aug 1988}} | |
2 | PWR | WH 4-loop (DRY) | {{yes|Operational}} | 1280 | {{dts|22 Dec 1975}} | {{dts|19 Jun 1989}} | ||
rowspan=2| St. Lucie | 1 | PWR | CE (DRY) | {{yes|Operational}} | 981 | {{dts|1 Jul 1970}} | {{dts|1 Mar 1976}} | |
2 | PWR | CE (DRY) | {{yes|Operational}} | 987 | {{dts|2 Jun 1977}} | {{dts|10 Jun 1983}} | ||
rowspan=2| Surry | 1 | PWR | WH 3-loop (DRY) | {{yes|Operational}} | 838 | {{dts|25 Jun 1968}} | {{dts|22 Dec 1972}} | |
2 | PWR | WH 3-loop (DRY) | {{yes|Operational}} | 838 | {{dts|25 Jun 1968}} | {{dts|1 May 1973}} | ||
rowspan=2| Susquehanna | 1 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1257 | {{dts|2 Nov 1973}} | {{dts|12 Nov 1982}} | |
2 | BWR | BWR-5 (WET) | {{yes|Operational}} | 1257 | {{dts|2 Nov 1973}} | {{dts|27 Jun 1984}} | ||
rowspan=2| Three Mile Island | 1 | PWR | B & W (DRY) | {{partial|Restart Planned}} | 819 | {{dts|18 May 1968}} | {{dts|2 Sep 1974}} | {{dts|20 Sep 2019}} |
2 | PWR | B & W (DRY) | {{no| Core melt}} | 880 | {{dts|1 Nov 1969}} | {{dts|30 Dec 1978}} | {{dts|28 Mar 1979}} | |
Trojan | 1 | PWR | WH (DRY) | {{no|Dismantled}} | 1095 | {{dts|1 Feb 1970}} | {{dts|20 May 1976}} | {{dts|9 Nov 1992}} |
rowspan=2| Turkey Point | 3 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 829 | {{dts|27 Apr 1967}} | {{dts|14 Dec 1972}} | |
4 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 821 | {{dts|27 Apr 1967}} | {{dts|7 Sep 1973}} | ||
Vallecitos | 1 | BWR | BWR-1 | {{no|Shut down}} | 25 | {{dts|1 Jan 1956}} | {{dts|19 Oct 1957}} | {{dts|9 Dec 1963}} |
Vermont Yankee | 1 | BWR | BWR-4 (WET) | {{no|Shut down}} | 605{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=626 | title=PRIS – Reactor Details }} | {{dts|11 Dec 1967}} | {{dts|30 Nov 1972}} | {{dts|29 Dec 2014}}StarTribune.com, WILSON RING [http://www.startribune.com/business/287030041.html Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity] {{webarchive|url=https://web.archive.org/web/20141229231838/http://www.startribune.com/business/287030041.html |date=29 Dec 2014}}, 29 Dec 2014 |
rowspan=3 | Virgil C. Summer | 1 | PWR | WH 3-Loop (DRY) | {{yes|Operational}} | 973 | {{dts|21 Mar 1973}} | {{dts|1 Jan 1984}} | |
2 | PWR | AP1000 | {{BLACK|Unfinished}} | 1117 | {{dts|9 Mar 2013}} | |||
3 | PWR | AP1000 | {{BLACK|Unfinished}} | 1117 | {{dts|2 Nov 2013}} | |||
rowspan=4 | Vogtle | 1 | PWR | WH 4-Loop (DRY) | {{yes|Operational}} | 1150 | {{dts|1 Aug 1976}} | {{dts|1 Jun 1987}} | |
2 | PWR | WH 4-Loop (DRY) | {{yes|Operational}} | 1152 | {{dts|1 Aug 1976}} | {{dts|20 May 1989}} | ||
3 | PWR | AP1000 | {{yes|Operational}} | 1117 | {{dts|12 Mar 2013}} | {{dts|31 Jul 2023}}{{cite web|url=https://www.prnewswire.com/news-releases/vogtle-unit-3-goes-into-operation-301889148.html |title=Vogtle Unit 3 goes into operation |publisher=Cision |date=31 Jul 2023 |accessdate=31 Jul 2023}} | ||
4 | PWR | AP1000 | {{yes|Operational}} | 1117 | {{dts|19 Nov 2013}} | {{dts|29 April 2024}}{{cite web | url=https://www.world-nuclear-news.org/Articles/Commercial-operation-marks-completion-of-Vogtle-ex | title=Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News }} | ||
Waterford | 1 | PWR | CE 2-loop (DRY) | {{yes|Operational}} | 1168 | {{dts|14 Nov 1974}} | {{dts|24 Sep 1985}} | |
rowspan=2| Watts Bar | 1 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1157 | {{dts|20 Jul 1973}} | {{dts|27 May 1996}} | |
2 | PWR | WH 4-Loop (ICECOND) | {{yes|Operational}} | 1164 | {{dts|1 Sep 1973}} | {{dts|4 Jun 2016}} | ||
Wolf Creek | 1 | PWR | WH 4-Loop (DRY) | {{yes|Operational}} | 1200 | {{dts|31 May 1977}} | {{dts|3 Sep 1985}} | |
Yankee Rowe | 1 | PWR | WH (DRY) | {{no|Dismantled}} | 167 | {{dts|1 Nov 1957}} | {{dts|1 Jul 1961}} | {{dts|1 Oct 1991}} |
rowspan=2| Zion | 1 | PWR | WH (DRY) | {{no|Dismantled}} | 1040 | {{dts|1 Dec 1968}} | {{dts|31 Dec 1973}} | {{dts|13 Feb 1998}} |
2 | PWR | WH (DRY) | {{no|Dismantled}} | 1040 | {{dts|1 Dec 1968}} | {{dts|17 Sep 1974}} | {{dts|13 Feb 1998}} |
Uzbekistan
class="wikitable sortable mw-datatable" | ||||||||
Plant name !Unit !Type !Model !Status !Capacity !Begin !Commercial !Closed | ||||||||
---|---|---|---|---|---|---|---|---|
rowspan="6" | Plant in the Jizzakh Region | 1 | PWR | RITM-200N | {{planned}} | 55 | |||
2 | PWR | RITM-200N | {{planned}} | 55 | ||||
3
|PWR |RITM-200N | {{planned}} |55 | | | | ||||||||
4
|PWR |RITM-200N | {{planned}} |55 | | | | ||||||||
5
|PWR |RITM-200N | {{planned}} |55 | | | | ||||||||
6
|PWR |RITM-200N | {{planned}} |55 | | | |
See also
- Economics of nuclear power plants
- Integrated Nuclear Fuel Cycle Information System
- List of nuclear power stations
- List of boiling water reactors
- List of largest power stations
- List of small modular reactor designs
- List of nuclear reprocessing sites
- Lists of nuclear disasters and radioactive incidents
- Nuclear power by country
- Nuclear power reactors in Europe
Notes
{{notelist}}
References
{{reflist|colwidth=30em}}
External links
- [http://www-pub.iaea.org/MTCD/publications/PDF/RDS2-26_web.pdf IAEA list as of 2006]
- [https://web.archive.org/web/20120314153513/http://www.nukleer.web.tr/indexe.htm NED Database of Commercial Nuclear Power Reactors]
- [http://www.world-nuclear.org/information-library/facts-and-figures/reactor-database.aspx Reactors Database] by the World Nuclear Association
{{Power stations|state=expanded}}
{{Nuclear fission reactors|state=expanded}}
{{Portal bar|Energy|Nuclear technology}}
{{DEFAULTSORT:Nuclear Reactors, Commercial}}