List of commercial nuclear reactors#Finland

{{Short description|None}}

{{About|commercial nuclear fission reactors|other nuclear reactor lists|List of nuclear reactors}}

{{Dynamic list}}

{{Use British English|date=January 2023}}

{{Use dmy dates|date=January 2023}}

This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2025, there are 439 operable power reactors in the world, with a combined electrical capacity of 397.7 GW. Additionally, there are 68 reactors under construction and 108 reactors planned, with a combined capacity of 74 GW and 103 GW, respectively, while 359 more reactors are proposed.{{cite web |title=World Nuclear Power Reactors & Uranium Requirements |url=http://www.world-nuclear.org/information-library/facts-and-figures/world-nuclear-power-reactors-and-uranium-requireme.aspx |access-date=5 May 2020 |website=world-nuclear.org |publisher=World Nuclear Association}} For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).{{cite web |title=PRIS – Home |url=https://pris.iaea.org/pris/ |website=pris.iaea.org}}

In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[https://pris.iaea.org/PRIS/Glossary.aspx "Reference Unit Power"] at IAEA

{{horizontal TOC|limit=2}}

Argentina

{{main|Nuclear power in Argentina}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=3| Atucha{{cite web |title=Nuclear Power in Argentina {{!}} Argentinian Nuclear Energy – World Nuclear Association |url=https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/argentina.aspx |website=world-nuclear.org |access-date=4 Aug 2019}}1PHWRSiemens-KWU{{yes2|Operation suspended
(under maintenance)}}
362{{dts|1 Jun 1968}}{{dts|24 Jun 1974}}
2PHWRSiemens-KWU{{yes|Operational}}745{{dts|14 Jul 1981}}{{dts|27 Jun 2014}}
3PWRHualong One{{planned}}{{Cite news|date=2 Feb 2022|title=China inks $8 bln nuclear power plant deal in Argentina|language=en|work=Reuters|url=https://www.reuters.com/business/energy/china-inks-nuclear-power-plant-deal-with-argentina-2022-02-02/|access-date=2 Feb 2022}}1200
Embalse{{cite web|url=http://www.candu.org/nasa.html|archive-url=https://web.archive.org/web/20070708162652/http://www.candu.org/nasa.html|title=NASA fact sheet|author=Yulia Kosarenko|archive-date=8 Jul 2007|access-date=20 Aug 2015}}1PHWRCANDU-6{{yes|Operational}}683{{dts|1 Apr 1974}}{{dts|20 Jan 1984}}({{dts|2049}}){{cite web|url=https://www.bnamericas.com/en/news/the-embalse-nuclear-power-plant-returns-to-service-for-a-new-cycle-of-30-years|title=The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years|website=BNamericas.com}}
CAREM1PWRCAREM25{{partial|Under construction}}25{{dts|8 Feb 2014}}

Armenia

{{main|Nuclear power in Armenia}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Metsamor1PWRVVER-440/V-270{{no|Shut down}}376{{dts|1 Jul 1969}}{{dts|6 Oct 1977}}{{dts|25 Feb 1989}}
2PWRVVER-440/V-270{{yes|Operational}}375{{dts|1 Jul 1975}}{{dts|3 May 1980}}(2036){{cite web|url=https://www.world-nuclear-news.org/Articles/Metsamor-2-to-operate-until-2026|title = Metsamor 2 to operate until 2036 : Corporate – World Nuclear News}}

Austria

{{main|Nuclear power in Austria}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

Zwentendorf1BWRBWR-69 (KWU){{BLACK|Finished; never entered service}}878Apr 1972{{dts|5 Nov 1978}}

Bangladesh

{{main|Nuclear power in Bangladesh}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Rooppur1PWRVVER-1200/V-523{{partial|Under construction}}1080{{dts|30 Nov 2017}}{{cite web |title=Nuclear Power in Bangladesh – World Nuclear Association |url=http://world-nuclear.org/information-library/country-profiles/countries-a-f/bangladesh.aspx |website=world-nuclear.org |access-date=17 Jul 2018}}({{dts|2025}})
| 2PWRVVER-1200/V-523{{partial|Under construction}}1080{{dts|14 Jul 2018}}({{dts|2026}})

Belarus

{{main|Nuclear power in Belarus}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Ostrovets1PWRVVER-1200/V-491{{yes|Operational}}1109{{dts|6 Nov 2013}}10 Jun 2021{{cite web|url=https://www.rosatom.ru/journalist/news/energoblok-1-belorusskoy-aes-prinyat-v-promyshlennuyu-ekspluatatsiyu/|title=Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина|website=rosatom.ru}}
| 2PWRVVER-1200/V-491{{yes|Operational}}1109{{dts|24 Apr 2014}}{{dts|1 Nov 2023}}{{cite web|url=https://world-nuclear-news.org/Articles/Second-Belarus-unit-enters-commercial-operation|title=Second Belarus unit enters commercial operation|website=world-nuclear-news.org}}
rowspan=2| Minsk1PWRVVER-1000{{BLACK|Unfinished}}963{{dts|1983}}{{dts|1987}}
2PWRVVER-1000{{BLACK|Unfinished}}963{{dts|1983}}{{dts|1987}}

Belgium

{{main|Nuclear power in Belgium}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

| SCK•CEN1PWRWestinghouse (WH) BR-3{{no|Decommissioned}}10{{dts|1 Nov 1957}}{{dts|10 Oct 1962}}{{dts|30 Jun 1987}}
rowspan=4| Doel1PWRWH 2 loops{{no|Shut down}}445{{dts|1 Jul 1969}}{{dts|15 Feb 1975}}{{dts|14 Feb 2025}}
2PWRWH 2 loops{{yes|Operational}}445{{dts|1 Sep 1971}}{{dts|1 Dec 1975}}({{dts|1 dec 2025}})
3PWRFramatome 3 loops{{no|Shut down}}1006{{dts|1 Jan 1975}}{{dts|1 Oct 1982}}{{dts|23 Sep 2022}}{{cite web|url=https://www.brusselstimes.com/294161/doel-3-shutdown-confirmed-for-friday-despite-politicians-pleas|title=Doel 3: Shutdown confirmed for Friday|date=23 Sep 2022|publisher=RTBF Info|access-date=25 Sep 2022}}
4PWRBelgian firms plus WH 3 loops{{yes|Operational}}1039{{dts|1 Dec 1978}}{{dts|1 Jul 1985}}({{dts|1 nov 2035}})
rowspan=3| Tihange1PWRFramatome 3 loops{{yes|Operational}}962{{dts|1 Jun 1970}}{{dts|1 Oct 1975}}({{dts|1 oct 2025}})
2PWRFramatome 3 loops{{no|Shut down}}1008{{dts|1 Apr 1976}}{{dts|1 Jun 1983}}{{dts|31 Jan 2023}}{{cite web | url=https://www.world-nuclear-news.org/Articles/Second-Belgian-reactor-enters-retirement | title=Second Belgian reactor enters retirement : Corporate - World Nuclear News }}
3PWRBelgian firms plus WH 3 loops{{yes|Operational}}1046{{dts|1 Nov 1978}}{{dts|1 Sep 1985}}({{dts|1 nov 2035}})

Brazil

{{main|Nuclear power in Brazil}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=3| Angra1PWRWH 2 loops{{yes|Operational}}609{{dts|1 May 1971}}{{dts|1 Jan 1985}}
2PWRPre-Konvoi{{yes|Operational}}1275{{dts|1 Jan 1976}}{{dts|1 Feb 2001}}
3PWRPre-Konvoi{{partial|Under construction}}1245{{dts|1 Jun 2010}}(2028){{cite web | url=https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx | title=Plans for New Nuclear Reactors Worldwide - World Nuclear Association }}

Bulgaria

{{main|Nuclear power in Bulgaria}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=8| Kozloduy1PWRVVER-440/V-230{{no|Shut down}}408{{dts|1 Apr 1970}}{{dts|28 Oct 1974}}{{dts|31 Dec 2002}}
2PWRVVER-440/V-230{{no|Shut down}}408{{dts|1 Apr 1970}}{{dts|10 Nov 1975}}{{dts|31 Dec 2002}}
3PWRVVER-440/V-230{{no|Shut down}}408{{dts|1 Oct 1973}}{{dts|20 Jan 1981}}{{dts|31 Dec 2006}}
4PWRVVER-440/V-230{{no|Shut down}}408{{dts|1 Oct 1973}}{{dts|20 Jun 1982}}{{dts|31 Dec 2006}}
5PWRVVER-1000/V-320{{yes|Operational}}1003{{dts|9 Jul 1980}}{{dts|23 Dec 1988}}
6PWRVVER-1000/V-320{{yes|Operational}}1003{{dts|1 Apr 1982}}{{dts|30 Dec 1993}}
7PWRAP1000{{Planned}}1150({{dts|2033}}){{cite news|url=https://www.world-nuclear-news.org/Articles/Bulgaria-to-push-ahead-with-two-new-units-at-Kozlo |title=Bulgaria to push ahead with two new units at Kozloduy |work=world-nuclear-news.org |publisher=World Nuclear News |date=25 Oct 2023 |access-date=3 Nov 2023 }}
8PWRAP1000{{Planned}}1150
rowspan=2| Belene1PWRVVER-1000/V-320
VVER-1000/V-446B
{{BLACK|Unfinished}}953
1011
1987
2008
2PWRVVER-1000/V-320
VVER-1000/V-446B
{{BLACK|Unfinished}}953
1011
1987
2008

Canada

{{main|Nuclear power in Canada}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=8| Pickering1PHWRCANDU 500A{{no|Shut down}}515{{dts|Jun 1966}}{{dts|29 Jul 1971}}{{dts|1 Oct 2024}}
2PHWRCANDU 500A{{no|Shut down}}515{{dts|Sep 1966}}{{dts|30 Dec 1971}}{{dts|31 Dec 1997}}{{cite news | url=https://www.theglobeandmail.com/news/national/utility-abandons-pickering-reactor-overhaul/article18243747/ | title=Utility abandons Pickering reactor overhaul | newspaper=The Globe and Mail | date=13 August 2005 }}
3PHWRCANDU 500A{{no|Shut down}}515{{dts|Dec 1967}}{{dts|1 Jun 1972}}{{dts|29 Dec 1997}}
4PHWRCANDU 500A{{no|Shut down}}515{{dts|May 1968}}{{dts|17 Jun 1973}}{{dts|31 Dec 2024}}
5PHWRCANDU 500B{{yes|Operational}}516{{dts|Nov 1974}}{{dts|10 May 1983}}({{dts|2026}})
6PHWRCANDU 500B{{yes|Operational}}516{{dts|Oct 1975}}{{dts|1 Feb 1984}}({{dts|2026}})
7PHWRCANDU 500B{{yes|Operational}}516{{dts|Mar 1976}}{{dts|1 Jan 1985}}({{dts|2026}})
8PHWRCANDU 500B{{yes|Operational}}516{{dts|Sep 1976}}{{dts|28 Feb 1986}}({{dts|2026}}){{cite web | url=https://www.world-nuclear-news.org/Articles/Ontario-extends-Pickering-operations | title=Ontario extends Pickering operations|website=World Nuclear News|date=30 September 2022|accessdate=7 July 2023}}
rowspan=8| Darlington1PHWRCANDU 850{{yes|Operational}}878{{dts|Apr 1982}}{{dts|14 Nov 1992}}({{dts|2052}})
2PHWRCANDU 850{{yes|Operational}}878{{dts|Sep 1981}}{{dts|9 Oct 1990}}({{dts|2050}})
3PHWRCANDU 850{{yes|Operational}}878{{dts|Sep 1984}}{{dts|14 Feb 1993}}({{dts|2053}})
4PHWRCANDU 850{{yes|Operational}}878{{dts|Jul 1985}}{{dts|14 Jun 1993}}({{dts|2053}})
5{{cite web|last=Patel|first=Sonal|date=2 Dec 2021|title=Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection|url=https://www.powermag.com/darlington-nuclear-plant-will-get-a-bwrx-300-smr-as-ge-hitachi-bags-lucrative-opg-selection/|access-date=5 Dec 2021|website=POWER Magazine|language=en-US}}BWRBWRX-300{{partial|Under construction}}3008 May 2025https://www.world-nuclear-news.org/articles/opg-gets-go-ahead-to-build-first-smr-in-canada(2030)
6BWRBWRX-300{{Planned}}300
7BWRBWRX-300{{Planned}}300
8BWRBWRX-300{{Planned}}300
rowspan=8| Bruce1PHWRCANDU 791{{yes|Operational}}823{{dts|Jun 1971}}{{dts|1 Sep 1977}}({{dts|2043}})
2PHWRCANDU 791{{yes|Operational}}823{{cite web | url=https://www.brucepower.com/2022/05/06/unit-2-sets-record-run-ahead-of-planned-maintenance-outage/|website=brucepower.com | title=Unit 2 sets record run ahead of planned maintenance outage | date=6 May 2022 |accessdate=7 July 2023}}{{dts|Dec 1970}}{{dts|1 Sep 1977}}({{dts|2043}})
3PHWRCANDU 750A{{yes|Operational}}817{{dts|Jul 1972}}{{dts|1 Feb 1978}}({{dts|2064}}){{cite web|url=https://www.brucepower.com/life-extension-program-mcr-project/|title = Life-Extension Program & MCR Project|website=brucepower.com|accessdate=7 July 2023}}
4PHWRCANDU 750A{{yes|Operational}}817{{dts|Sep 1972}}{{dts|18 Jan 1979}}({{dts|2064}})
5PHWRCANDU 750B{{yes|Operational}}817{{dts|Jun 1978}}{{dts|1 Mar 1985}}({{dts|2064}})
6PHWRCANDU 750B{{yes|Operational}}880{{cite web | url=https://www.world-nuclear-news.org/Articles/Bruce-6-re-enters-commercial-operation | title=Bruce 6 re-enters commercial operation : Corporate - World Nuclear News }}{{dts|Jan 1978}}{{dts|15 Sep 1984}}({{dts|2064}})
7PHWRCANDU 750B{{yes|Operational}}817{{dts|May 1979}}{{dts|10 Apr 1986}}({{dts|2064}})
8PHWRCANDU 750B{{yes|Operational}}817{{dts|Aug 1979}}{{dts|22 May 1987}}({{dts|2064}})
NPD1PHWRCANDU{{no|Shut down}}19{{dts| Jan 1958}}{{dts|4 Jun 1962}}{{dts|1 Aug 1987}}
Douglas Point1PHWRCANDU 200{{no|Shut down}}200{{dts|Feb 1960}}{{dts|26 Sep 1968}}{{dts|4 May 1984}}
rowspan=2| Gentilly1BWRCANDU BLWR 250{{no|Shut down}}250{{dts|Sep 1966}}{{dts|1 May 1972}}{{dts|1 June 1977}}
2PHWRCANDU-6{{no|Shut down}}635{{dts|Apr 1974}}{{dts|1 Oct 1983}}{{dts|28 Dec 2012}}
Point Lepreau1PHWRCANDU-6{{yes|Operational}}635{{dts|May 1975}}{{dts|1 Feb 1983}}({{dts|2041}})

China

{{main|Nuclear power in China}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=6| Bailong1PWRCAP-1000{{planned}}1100
2PWRCAP-1000{{planned}}1100
3PWRCAP-1400{{planned}}1500
4PWRCAP-1400{{planned}}1500
5PWRCAP-1400{{planned}}1500
6PWRCAP-1400{{planned}}1500
rowspan=6 | ChangjiangI-1PWRCNP-600{{yes|Operational}}601{{dts|25 Apr 2010}}{{dts|25 Dec 2015}}
I-2PWRCNP-600{{yes|Operational}}601{{dts|21 Nov 2010}}{{dts|20 Jun 2016}}
I-3{{cite news |title=China / Construction Begins of Two Hualong One Reactors at Changjiang |url=https://www.nucnet.org/news/construction-begins-of-two-hualong-one-reactors-at-changjiang-11-2-2019 |access-date=28 Nov 2019 |work=The Independent Global Nuclear News Agency}}PWRHualong One{{partial|Under construction}}1200{{dts|31 Mar 2021}}{{cite news |title=我国自主三代核电华龙一号在海南正式开工建设 |url=http://www.cnnc.com.cn/cnnc/index/tpxwtj/563663/index.html |access-date=2 Apr 2021 |publisher=CNNC }}{{Dead link|date=August 2023 |bot=InternetArchiveBot |fix-attempted=yes }}
I-4PWRHualong One{{partial|Under construction}}1200{{dts|31 Mar 2021}}
II-1PWRACP-100{{partial|Under construction}}100{{dts|13 Jul 2021}}
II-2PWRACP-100{{planned}}100
rowspan=2 | Daya Bay1PWRM-310{{yes|Operational}}944{{dts|7 Aug 1987}}{{dts|1 Feb 1994}}
2PWRM-310{{yes|Operational}}944{{dts|7 Apr 1988}}{{dts|6 May 1994}}
rowspan=6 | Fangchenggang1PWRCPR-1000{{yes|Operational}}1000{{dts|30 Jul 2010}}{{dts|25 Oct 2015}}
2PWRCPR-1000{{yes|Operational}}1000{{dts|23 Dec 2010}}{{dts|15 Jul 2016}}
3PWRHualong One{{yes|Operational}}1000{{dts|24 Dec 2015}}{{dts|25 Mar 2023}}
4PWRHualong One{{yes|Operational}}1000{{dts|24 Dec 2016}}{{dts|25 May 2024}}
5PWRHualong One{{planned}}1117
6PWRHualong One{{planned}}1117
rowspan=2 | Fangjiashan1PWRCPR-1000{{yes|Operational}}1012{{dts|26 Dec 2008}}{{dts|15 Dec 2014}}
2PWRCPR-1000{{yes|Operational}}1012{{dts|17 Jul 2009}}{{dts|12 Feb 2015}}
rowspan=6| Fuqing1PWRCPR-1000{{yes|Operational}}1000{{dts|21 Nov 2008}}{{dts|19 Nov 2014}}
2PWRCPR-1000{{yes|Operational}}1000{{dts|17 Jun 2009}}{{dts|15 Oct 2015}}
3PWRCPR-1000{{yes|Operational}}1000{{dts|31 Dec 2010}}{{dts|7 Sep 2016}}
4PWRCPR-1000{{yes|Operational}}1000{{dts|17 Nov 2012}}{{dts|31 Jul 2017}}
5PWRHualong One{{yes|Operational}}1000{{dts|15 Apr 2015}}{{dts|30 Jan 2021}}{{cite news |title=China's first Hualong One nuclear reactor starts Opened|url=https://www.reuters.com/article/us-china-nuclearpower-idUSKBN29Z071 |work=Reuters |date=30 Jan 2021 |access-date=30 Jan 2021}}
6PWRHualong One{{yes|Operational}}1000{{dts|22 Dec 2015}}{{dts|25 Mar 2022}}{{cite web|url=https://www.world-nuclear-news.org/Articles/Second-Fuqing-Hualong-One-enters-commercial-operat|title = Second Fuqing Hualong One enters Opened: New Nuclear – World Nuclear News}}
rowspan=6| Haiyang1PWRAP1000{{yes|Operational}}1170{{dts|24 Sep 2009}}{{dts|23 Oct 2018}}{{cite web |title=Second AP1000 enters Opened |url=http://www.world-nuclear-news.org/Articles/Second-AP1000-enters-commercial-operation?feed=feed |website=World Nuclear News |publisher=World Nuclear Association |access-date=24 Oct 2018}}
2PWRAP1000{{yes|Operational}}1170{{dts|20 Jun 2010}}{{dts|9 Jan 2019}}{{cite web |title=Fourth Chinese AP1000 enters Opened |url=http://www.world-nuclear-news.org/Articles/Fourth-Chinese-AP1000-enters-commercial-operation |website=World Nuclear News |publisher=World Nuclear Association |access-date=13 Jan 2019}}
3PWRCAP-1000{{partial|Under construction}}1100{{dts|7 Jul 2022}}{{cite news|title=Begin
buildings on third Haiyang unit |url=http://www.world-nuclear-news.org/Articles/Construction-starts-on-third-Haiyang-unit |website=World Nuclear News |publisher=World Nuclear Association|access-date=25 Jul 2022}}
4PWRCAP-1000{{partial|Under construction}}1100{{dts|22 Apr 2023}}{{cite news|title=Construction begins of fourth Haiyang unit |url=https://www.world-nuclear-news.org/Articles/Construction-begins-of-fourth-Haiyang-unit |website=World Nuclear News |publisher=World Nuclear Association|access-date=26 Apr 2023}}
5PWRCAP-1000{{planned}}1100
6PWRCAP-1000{{planned}}1100
rowspan=2| Haixing{{cite web |title=China Nuclear Power {{!}} Chinese Nuclear Energy – World Nuclear Association |url=http://www.world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power.aspx |website=world-nuclear.org |access-date=16 Jul 2018}}1PWRCAP-1000{{planned}}1100
2PWRCAP-1000{{planned}}1100
rowspan=6| Hongyanhe1PWRCPR-1000{{yes|Operational}}1061{{dts|18 Aug 2007}}{{dts|6 Jun 2013}}
2PWRCPR-1000{{yes|Operational}}1061{{dts|28 Mar 2008}}{{dts|13 May 2014}}
3PWRCPR-1000{{yes|Operational}}1061{{dts|7 Mar 2009}}{{dts|23 Mar 2015}}
4PWRCPR-1000{{yes|Operational}}1061{{dts|15 Aug 2009}}{{dts|1 Apr 2016}}
5PWRACPR-1000{{yes|Operational}}1061{{dts|29 Mar 2015}}{{dts|2 Aug 2021}}{{cite web |title=Fifth Hongyanhe unit enters Opened |url=https://www.world-nuclear-news.org/Articles/Fifth-Hongyanhe-unit-enters-commercial-operation |website=World Nuclear News |publisher=World Nuclear Association |access-date=2 Aug 2021}}
6PWRACPR-1000{{yes|Operational}}1061{{dts|24 Jul 2015}}{{dts|23 Jun 2022}}
rowspan=6| Jinqimen1PWRHualong One{{planned}}1126
2PWRHualong One{{planned}}1126
3PWRHualong One{{planned}}1126
4PWRHualong One{{planned}}1126
5PWRHualong One{{planned}}1126
6PWRHualong One{{planned}}1126
rowspan=6| Lianjiang{{cite web |title=China Nuclear Power {{!}} Chinese Nuclear Energy – World Nuclear Association |url=http://www.world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power.aspx |website=world-nuclear.org |access-date=15 Jun 2018}}1PWRCAP-1000{{partial|Under construction}}1100{{dts|27 Sep 2023}}
2PWRCAP-1000{{partial|Under construction}}1100{{dts|26 April 2024}}
3PWRCAP-1000{{planned}}1100
4PWRCAP-1000{{planned}}1100
5PWRCAP-1000{{planned}}1100
6PWRCAP-1000{{planned}}1100
rowspan=4| Ling Ao1PWRM-310{{yes|Operational}}950{{dts|15 May 1997}}{{dts|28 May 2002}}
2PWRM-310{{yes|Operational}}950{{dts|28 Nov 1997}}{{dts|8 Jan 2003}}
3PWRCPR-1000{{yes|Operational}}1007{{dts|15 Dec 2005}}{{dts|15 Sep 2010}}
4PWRCPR-1000{{yes|Operational}}1007{{dts|15 Jun 2006}}{{dts|7 Aug 2011}}
rowspan=6| Lufeng1PWRCAP-1000{{partial|Under construction}}1100{{dts|24 Feb 2025}}
2PWRCAP-1000{{planned}}1100
3PWRCAP-1000{{planned}}1100
4PWRCAP-1000{{planned}}1100
5PWRHualong One{{partial|Under construction}}1000{{dts|8 Sep 2022}}{{cite web |title= Construction of Lufeng 5 gets under way |url=https://www.world-nuclear-news.org/Articles/Construction-of-Lufeng-5-gets-under-way |website=World Nuclear News |publisher=World Nuclear Association |access-date=9 Sep 2022}}
6PWRHualong One{{partial|Under construction}}1000{{dts|26 Aug 2023}}{{cite web |title= Construction of Lufeng 6 begins |url=https://www.world-nuclear-news.org/Articles/Construction-of-Lufeng-unit-6-begins |website=World Nuclear News |publisher=World Nuclear Association |access-date=29 Aug 2023}}
rowspan=6| Ningde1PWRCPR-1000{{yes|Operational}}1018{{dts|18 Feb 2008}}{{dts|15 Apr 2013}}
2PWRCPR-1000{{yes|Operational}}1018{{dts|12 Nov 2008}}{{dts|4 May 2014}}
3PWRCPR-1000{{yes|Operational}}1018{{dts|8 Jan 2010}}{{dts|10 Jun 2015}}
4PWRCPR-1000{{yes|Operational}}1018{{dts|29 Sep 2010}}{{dts|29 Mar 2016}}
5PWRHualong One{{partial|Under construction}}1080{{dts|28 Jul 2024}}
6PWRHualong One{{planned}}1080
rowspan=2| Pengze1PWRCAP-1000{{planned}}1100
2PWRCAP-1000{{planned}}1100
rowspan=7| QinshanI-1PWRCNP-300{{yes|Operational}}308{{dts|20 Mar 1985}}{{dts|1 Apr 1994}}
II-1PWRCNP-600{{yes|Operational}}610{{dts|2 Jun 1996}}{{dts|15 Apr 2002}}
II-2PWRCNP-600{{yes|Operational}}610{{dts|1 Apr 1997}}{{dts|3 May 2004}}
II-3PWRCNP-600{{yes|Operational}}619{{dts|28 Apr 2006}}{{dts|5 Oct 2010}}
II-4PWRCNP-600{{yes|Operational}}619{{dts|28 Jan 2007}}{{dts|30 Dec 2011}}
III-1PHWRCANDU-6{{yes|Operational}}677{{dts|8 Jun 1998}}{{dts|31 Dec 2002}}
III-2PHWRCANDU-6{{yes|Operational}}677{{dts|25 Sep 1998}}{{dts|24 Jul 2003}}
rowspan=6| San'ao{{cite news |title=Construction of new Chinese power plant begins: New Nuclear – World Nuclear News |url=https://www.world-nuclear-news.org/Articles/Construction-of-new-Chinese-power-plant-begins |access-date=5 Jan 2021 |work=world-nuclear-news.org}}

| 1

PWRHualong One{{partial|Under construction}}1117{{dts|31 Dec 2020}}
2PWRHualong One{{partial|Under construction}}1117{{dts|30 Dec 2021}}{{cite news |title=First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International |url=https://www.neimagazine.com/news/newsfirst-concrete-for-unit-2-of-chinas-sanao-nuclear-power-project-9360720 |access-date=4 Jan 2022}}
3PWRHualong One{{planned}}1116
4PWRHualong One{{planned}}1116
5PWRHualong One{{planned}}1116
6PWRHualong One{{planned}}1116
rowspan=6| Sanmen1PWRAP1000{{yes|Operational}}1157{{dts|19 Apr 2009}}{{dts|21 Sep 2018}}{{cite web |title=First AP1000 reactor enters Opened |url=http://www.world-nuclear-news.org/Articles/First-AP1000-reactor-enters-commercial-operation |website=World Nuclear News |publisher=World Nuclear Association |access-date=24 Oct 2018}}
2PWRAP1000{{yes|Operational}}1157{{dts|15 Dec 2009}}{{dts|5 Nov 2018}}{{cite news |title=Sanmen 2 AP1000 enters Opened – World Nuclear News |url=http://www.world-nuclear-news.org/Articles/Sanmen-2-AP1000-enters-commercial-operation |access-date=7 Nov 2018 |work=world-nuclear-news.org}}
3PWRCAP-1000{{partial|Under construction}}1163{{dts|28 Jun 2022}}{{Cite web |title=PRIS – Reactor Details |url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=995 |access-date=8 Jul 2022 |website=pris.iaea.org}}
4PWRCAP-1000{{partial|Under construction}}1163{{dts|22 Mar 2023}}{{Cite web |title=Begin
buildings on fourth Sanmen unit|url=https://www.world-nuclear-news.org/Articles/Construction-starts-on-fourth-Sanmen-unit |access-date=23 Mar 2023 |website=world-nuclear-news.org}}
5PWRHualong One{{planned}}1000
6PWRHualong One{{planned}}1000
rowspan=5| ShidaowanI-1HTGRHTR-PM{{yes|Operational}}200{{dts|9 Dec 2012}}{{dts|6 Dec 2023}}{{cite web |url=https://www.world-nuclear-news.org/Articles/Chinese-HTR-PM-Demo-begins-commercial-operation | title=China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News }}
II-1PWRCAP-1400{{yes|Operational}}1500{{dts|19 Jun 2019}}{{cite web |title=Shidaowan Guohe One 1| url=https://world-nuclear.org/nuclear-reactor-database/details/SHIDAOWAN-1A}}
II-2PWRCAP-1400{{partial|Under construction}}1500{{dts|4 Apr 2020}}{{cite web |title=Shidaowan Guohe One 2| url=https://world-nuclear.org/nuclear-reactor-database/details/SHIDAOWAN-2A}}
III-1PWRHualong One{{partial|Under construction}}1134{{dts|28 Jul 2024}}
III-2PWRHualong One{{partial|Under construction}}1134{{dts|5 May 2025}} {{cite web |title=Shidaowan 1

| url=https://world-nuclear.org/nuclear-reactor-database/details/SHIDAOWAN-1}}

rowspan=6| Taipingling1PWRHualong One{{partial|Under construction}}1116{{dts|26 Dec 2019}}
2PWRHualong One{{partial|Under construction}}1116{{dts|15 Oct 2020}}{{cite news |title=China approves first new nuclear reactors in 3-plus years |url=https://asia.nikkei.com/Business/Energy/China-approves-first-new-nuclear-reactors-in-3-plus-years |access-date=2 Aug 2019 |work=Nikkei Asian Review}}
3PWRHualong One{{planned}}1116
4PWRHualong One{{planned}}1116
5PWRHualong One{{planned}}1116
6PWRHualong One{{planned}}1116
rowspan=4| Taishan1PWREPR{{yes|Operational}}1660{{dts|18 Nov 2009}}{{dts|14 Dec 2018}}{{cite news |title=EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale |url=https://www.capital.fr/entreprises-Mares/edf-le-premier-des-2-epr-de-la-centrale-de-taishan-chine-entre-en-exploitation-commerciale-1319856 |access-date=14 Dec 2018 |work=Capital.fr |date=14 Dec 2018 |language=fr }}{{Dead link|date=November 2023 |bot=InternetArchiveBot |fix-attempted=yes }}
2PWREPR{{yes|Operational}}1660{{dts|15 Apr 2010}}{{dts|7 Sep 2019}}{{cite news |title=World's second EPR starts operations |url=http://www.world-nuclear-news.org/Articles/World-s-second-EPR-starts-operations |access-date=10 Sep 2019}}
3PWRHualong One{{planned}}1000
4PWRHualong One{{planned}}1000
rowspan=4| Taohuajiang1PWRCAP-1000{{planned}}1100
2PWRCAP-1000{{planned}}1100
3PWRCAP-1000{{planned}}1100
4PWRCAP-1000{{planned}}1100
rowspan=8| Tianwan1PWRVVER-1000/V-428{{yes|Operational}}990{{dts|20 Oct 1999}}{{dts|17 May 2007}}
2PWRVVER-1000/V-428{{yes|Operational}}990{{dts|20 Sep 2000}}{{dts|16 Aug 2007}}
3PWRVVER-1000/V-428M{{yes|Operational}}1045{{dts|27 Dec 2012}}{{dts|14 Feb 2018}}
4PWRVVER-1000/V-428M{{yes|Operational}}1045{{dts|27 Sep 2013}}{{dts|22 Dec 2018}}{{cite web |title=Fourth Tianwan unit enters Opened |url=http://www.world-nuclear-news.org/Articles/Fourth-Tianwan-unit-enters-commercial-operation |website=World Nuclear News |publisher=World Nuclear Association |access-date=27 Dec 2018}}
5PWRACPR-1000{{yes|Operational}}1000{{dts|27 Dec 2015}}{{dts|8 Sep 2020}}{{cite web |title=Fifth Tianwan unit starts Opened |url=https://www.world-nuclear-news.org/Articles/Fifth-Tianwan-unit-starts-commercial-operation |website=World Nuclear News |publisher=World Nuclear Association |access-date=9 Sep 2020}}
6PWRACPR-1000{{yes|Operational}}1000{{dts|7 Sep 2016}}{{dts|3 Jun 2021}}{{cite web | url=https://world-nuclear-news.org/Articles/Tianwan-6-enters-commercial-operation | title=Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News }}
7PWRVVER-1200/V-491{{partial|Under construction}}1150{{dts|19 May 2021}}(2027–2028)
8PWRVVER-1200/V-491{{partial|Under construction}}1150{{dts|25 Feb 2022}}{{cite web | url=https://www.world-nuclear-news.org/Articles/Construction-starts-on-eighth-Tianwan-unit | title=Begin
buildings on eighth Tianwan unit: New Nuclear – World Nuclear News}}
(2027–2028)
rowspan=2| Xianning1PWRCAP-1000{{planned}}1100
2PWRCAP-1000{{planned}}1100
rowspan=6| Xiapu{{cite news|url=http://www.wantchinatimes.com/news-subclass-cnt.aspx?cid=1205&MainCatID=12&id=20150816000002|date=16 Aug 2015|title=Fast nuclear reactor to start construction in Fujian in 2017|access-date=16 Aug 2015|url-status=dead|archive-url=https://web.archive.org/web/20150817060011/http://www.wantchinatimes.com/news-subclass-cnt.aspx?cid=1205&MainCatID=12&id=20150816000002|archive-date=17 Aug 2015}}I-1SFRCFR-600{{partial|Under construction}}642{{dts|29 Dec 2017}}({{dts|2024}})
| I-2SFRCFR-600{{partial|Under construction}}642{{dts|27 Dec 2020}}{{cite news |title=China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News |url=https://www.world-nuclear-news.org/Articles/China-starts-building-second-CFR-600-fast-reactor |access-date=30 Dec 2020 |work=world-nuclear-news.org}}
II-1PWRHualong One{{planned}}1000
II-2PWRHualong One{{planned}}1000
II-3PWRCAP-1400{{planned}}1500
II-4PWRCAP-1400{{planned}}1500
rowspan=6| Xudabao1PWRCAP-1000{{partial|Under construction}}1250{{dts|15 Nov 2023}}{{cite news |title=Work on Xudabao unit 1 gets under way |url=https://www.world-nuclear-news.org/Articles/Work-on-Xudabao-unit-1-gets-under-way |access-date=17 Nov 2023 |work=world-nuclear-news.org}}
2PWRCAP-1000{{partial|Under construction}}1100{{dts|17 Jul 2024}}
3PWRVVER-1200/V-491{{partial|Under construction}}1150{{dts|28 Jul 2021}}{{cite web|url=https://www.ruscable.ru/news/2021/05/19/Dan_start_sooruzheniu_novyx_blokov_rossijskogo_diz/|title=Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)|website=ruscable.ru}}(2027)
4PWRVVER-1200/V-491{{partial|Under construction}}1150{{dts|19 May 2022}}{{cite web | url=https://www.world-nuclear-news.org/Articles/Construction-of-Xudapu-4-under-way | title=Construction of Xudapu 4 under way: New Nuclear – World Nuclear News}}(2028)
5PWRVVER-1200/V-491{{planned}}1150
6PWRVVER-1200/V-491{{planned}}1150
rowspan=3| Xuwei1PWRHualong One{{Planned}}1116
2PWRHualong One{{planned}}1116
3HTGRHTR-PM{{planned}}200
rowspan=6| Yangjiang1PWRCPR-1000{{yes|Operational}}1000{{dts|16 Dec 2008}}{{dts|25 Mar 2014}}
2PWRCPR-1000{{yes|Operational}}1000{{dts|4 Jun 2009}}{{dts|8 Jun 2015}}
3PWRCPR-1000{{yes|Operational}}1000{{dts|15 Nov 2010}}{{dts|1 Jan 2016}}
4PWRCPR-1000{{yes|Operational}}1000{{dts|17 Nov 2012}}{{dts|15 Mar 2017}}
5PWRACPR-1000{{yes|Operational}}1000{{dts|18 Sep 2013}}{{dts|12 Jul 2018}}{{cite news |title=Yangjiang 5 enters Opened |url=http://www.world-nuclear-news.org/NN-Yangjiang-5-enters-commercial-operation-1307184.html |access-date=16 Jul 2018 |work=world-nuclear-news.org}}
6PWRACPR-1000{{yes|Operational}}1000{{dts|23 Dec 2013}}{{dts|24 Jul 2019}}
rowspan=6| Zhangzhou1PWRHualong One{{yes|Operational}}1126{{dts|16 Oct 2019}}{{cite news |title=Begin
buildings on first Zhangzhou unit – World Nuclear News |url=http://www.world-nuclear-news.org/Articles/Construction-starts-on-first-Zhangzhou-unit |access-date=18 Oct 2019 |work=world-nuclear-news.org}}
{{dts|1 Jan 2025}}
2PWRHualong One{{partial|Under construction}}1126{{dts|4 Sep 2020}}
3PWRHualong One{{partial|Under construction}}1126{{dts|22 Feb 2024}}
4PWRHualong One{{partial|Under construction}}1126{{dts|27 Sep 2024}}
5PWRHualong One{{planned}}1116
6PWRHualong One{{planned}}1116
rowspan=6| Zhaoyuan1PWRHualong One{{Planned}}1116
2PWRHualong One{{Planned}}1116
3PWRHualong One{{planned}}1116
4PWRHualong One{{planned}}1116
5PWRHualong One{{planned}}1116
6PWRHualong One{{planned}}1116

Cuba

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Juragua1PWRVVER-440/V-318{{BLACK|Unfinished}}440{{dts|1983}}{{dts|5 Sep 1992}}
2PWRVVER-440/V-318{{BLACK|Unfinished}}440{{dts|1985}}{{dts|5 Sep 1992}}

Czech Republic

{{main|Nuclear power in the Czech Republic}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan="6" | Dukovany1PWRVVER-440/V-213{{yes|Operational}}468{{dts|1 Jan 1979}}{{dts|3 May 1985}}
2PWRVVER-440/V-213{{yes|Operational}}471{{dts|1 Jan 1979}}{{dts|21 Mar 1986}}
3PWRVVER-440/V-213{{yes|Operational}}468{{dts|1 Mar 1979}}{{dts|20 Dec 1986}}
4PWRVVER-440/V-213{{yes|Operational}}471{{dts|1 Mar 1979}}{{dts|19 Jul 1987}}
5PWRAPR-1400{{planned}}1200
6PWRAPR-1400{{planned}}1200
rowspan="2" | Temelín1PWRVVER-1000/V-320{{yes|Operational}}1003{{dts|1 Feb 1987}}{{dts|10 Jun 2002}}
2PWRVVER-1000/V-320{{yes|Operational}}1003{{dts|1 Feb 1987}}{{dts|18 Apr 2003}}

Egypt

{{main|Nuclear program of Egypt}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=4| El Dabaa1PWRVVER-1200/V-529{{partial|Under construction}}120020 Jul 2022{{cite web | url=https://www.world-nuclear-news.org/Articles/Construction-of-Egypts-first-nuclear-power-plant-u | title=Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News }}({{dts|2028}})
2PWRVVER-1200/V-529{{partial|Under construction}}120019 Nov 2022{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=138 | title=PRIS – Reactor Details }}
3PWRVVER-1200/V-529{{partial|Under construction}}12003 May 2023{{cite web | url=https://www.world-nuclear-news.org/Articles/Construction-begins-of-third-unit-at-Egypt-s-El-Da | title=Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News }}
4PWRVVER-1200/V-529{{partial|Under construction}}120023 Jan 2024

Finland

{{main|Nuclear power in Finland}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

{{Cite web

|url=https://www.stuk.fi/web/en/topics/nuclear-power-plants/nuclear-power-plants-in-finland

|title=Nuclear power plants in Finland

|website=STUK

|date=6 Apr 2021

|access-date=13 May 2022}}

!Begin
building

!Commercial
operation

!Closed

Hanhikivi1PWRVVER-1200/V-491{{BLACK|Cancelled}}1200(2023)(2029)2 May 2022{{cite news

|url=https://www.world-nuclear-news.org/Articles/Fennovoima-cancels-Hanhikivi-1-contract-with-Russi

|title=Fennovoima cancels Hanhikivi 1 contract with Russia

|publisher=World Nuclear Association

|date=3 May 2022}}

{{cite news

|url=https://tass.com/economy/1446237

|title=Fennovoima terminates contract for Hanhikivi 1 NPP construction

|agency=TASS

|date=2 May 2022}}

rowspan=2| Loviisa1PWRVVER-440/V-213{{yes|Operational}}507{{dts|1 May 1971}}{{dts|9 May 1977}}
2PWRVVER-440/V-213{{yes|Operational}}507{{dts|1 Aug 1972}}{{dts|5 Jan 1981}}
rowspan=3| Olkiluoto1BWRASEA-III, BWR-2500{{yes|Operational}}890{{dts|1 Feb 1974}}{{dts|10 Oct 1979}}
2BWRASEA-III, BWR-2500{{yes|Operational}}890{{dts|1 Nov 1975}}{{dts|10 Jul 1982}}{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=160 | title=PRIS – Reactor Details }}
3PWREPR{{yes|Operational}}1600{{dts|12 Aug 2005}}{{dts|1 May 2023}}{{cite web | url=https://www.world-nuclear-news.org/Articles/Faulty-seals-replaced-in-Olkiluoto-EPR | title=Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News }}

France

{{main|Nuclear power in France}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Belleville1PWRP4 REP 1300{{yes|Operational}}1310{{dts|1 May 1980}}{{dts|1 Jun 1988}}
2PWRP4 REP 1300{{yes|Operational}}1310{{dts|1 Aug 1980}}{{dts|1 Jan 1989}}
rowspan=4| Blayais1PWRCP1{{yes|Operational}}910{{dts|1 Jan 1977}}{{dts|1 Dec 1981}}
2PWRCP1{{yes|Operational}}910{{dts|1 Jan 1977}}{{dts|1 Feb 1983}}
3PWRCP1{{yes|Operational}}910{{dts|1 Apr 1978}}{{dts|14 Nov 1983}}
4PWRCP1{{yes|Operational}}910{{dts|1 Apr 1978}}{{dts|1 Oct 1983}}
Brennilis1HWGCR{{no|Shut down}}/in decommissioning70{{dts|1 Jul 1962}}{{dts|1 Jun 1968}}{{dts|31 Jul 1985}}
rowspan=7| Bugey1GCRUNGG{{no|Shut down}}540{{dts|1 Dec 1965}}{{dts|1 Jul 1972}}{{dts|27 May 1994}}
2PWRCP0{{yes|Operational}}910{{dts|1 Nov 1972}}{{dts|1 Mar 1979}}
3PWRCP0{{yes|Operational}}910{{dts|1 Sep 1973}}{{dts|1 Mar 1979}}
4PWRCP0{{yes|Operational}}880{{dts|1 Jun 1974}}{{dts|1 Jul 1979}}
5PWRCP0{{yes|Operational}}880{{dts|1 Jul 1974}}{{dts|3 Jan 1980}}
6PWREPR2{{planned}}1670
7PWREPR2{{planned}}1670
rowspan=4| Cattenom1PWRP4 REP 1300{{yes|Operational}}1300{{dts|29 Oct 1979}}{{dts|1 Apr 1987}}
2PWRP4 REP 1300{{yes|Operational}}1300{{dts|28 Jul 1980}}{{dts|1 Feb 1988}}
3PWRP4 REP 1300{{yes|Operational}}1300{{dts|15 Jun 1982}}{{dts|1 Feb 1991}}
4PWRP4 REP 1300{{yes|Operational}}1300{{dts|28 Sep 1983}}{{dts|1 Jan 1992}}
rowspan=7| ChinonA-1GCRUNGG{{no|Shut down}}70{{dts|1 Feb 1957}}{{dts|1 Feb 1964}}{{dts|16 Apr 1973}}
A-2GCRUNGG{{no|Shut down}}180{{dts|1 Aug 1959}}{{dts|24 Feb 1965}}{{dts|14 Jun 1985}}
A-3GCRUNGG{{no|Shut down}}360{{dts|1 Mar 1961}}{{dts|4 Aug 1966}}{{dts|15 Jun 1990}}
B-1PWRCP2{{yes|Operational}}905{{dts|1 Mar 1977}}{{dts|1 Feb 1984}}
B-2PWRCP2{{yes|Operational}}905{{dts|1 Mar 1977}}{{dts|1 Aug 1984}}
B-3PWRCP2{{yes|Operational}}905{{dts|1 Oct 1980}}{{dts|4 Mar 1987}}
B-4PWRCP2{{yes|Operational}}905{{dts|1 Feb 1981}}{{dts|1 Apr 1988}}
rowspan=3| ChoozA-1PWRCHOOZ-A{{no|Decommissioned}}305{{dts|1 Jan 1962}}{{dts|15 Apr 1967}}{{dts|30 Oct 1991}}
B-1PWRN4 REP 1450{{yes|Operational}}1500{{dts|1 Jan 1984}}{{dts|15 May 2000}}
B-2PWRN4 REP 1450{{yes|Operational}}1500{{dts|1 Jan 1984}}{{dts|15 May 2000}}
rowspan=2| Civaux1PWRN4 REP 1450{{yes|Operational}}1495{{dts|15 Oct 1988}}{{dts|29 Jan 2002}}
2PWRN4 REP 1450{{yes|Operational}}1495{{dts|1 Apr 1991}}{{dts|23 Apr 2002}}
rowspan=4| Cruas1PWRCP2{{yes|Operational}}915{{dts|1 Aug 1978}}{{dts|2 Apr 1984}}
2PWRCP2{{yes|Operational}}915{{dts|15 Nov 1978}}{{dts|1 Apr 1985}}
3PWRCP2{{yes|Operational}}915{{dts|15 Apr 1979}}{{dts|10 Sep 1984}}
4PWRCP2{{yes|Operational}}915{{dts|1 Oct 1979}}{{dts|11 Feb 1985}}
rowspan=4| Dampierre1PWRCP1{{yes|Operational}}890{{dts|1 Feb 1975}}{{dts|10 Sep 1980}}
2PWRCP1{{yes|Operational}}890{{dts|1 Apr 1975}}{{dts|16 Feb 1981}}
3PWRCP1{{yes|Operational}}890{{dts|1 Sep 1975}}{{dts|27 May 1981}}
4PWRCP1{{yes|Operational}}890{{dts|1 Dec 1975}}{{dts|20 Nov 1981}}
rowspan=2| Fessenheim1PWRCP0{{no|Shut down}}880{{dts|1 Sep 1971}}{{dts|1 Jan 1978}}{{dts|22 Feb 2020}}
2PWRCP0{{no|Shut down}}880{{dts|1 Feb 1972}}{{dts|1 Apr 1978}}{{dts|29 Jun 2020}}
rowspan=3| Flamanville1PWRP4 REP 1300{{yes|Operational}}1330{{dts|1 Dec 1979}}{{dts|1 Dec 1986}}
2PWRP4 REP 1300{{yes|Operational}}1330{{dts|1 May 1980}}{{dts|9 Mar 1987}}
3PWREPR{{partial|Under commissioning}}https://www.reuters.com/business/energy/newest-french-reactor-faces-further-delays-due-new-issues-2025-04-11/1630{{dts|3 Dec 2007}}{{dts|21 Dec 2024}}
rowspan=2| Golfech1PWRP4 REP 1300{{yes|Operational}}1310{{dts|17 Nov 1982}}{{dts|1 Feb 1991}}
2PWRP4 REP 1300{{yes|Operational}}1310{{dts|1 Oct 1984}}{{dts|4 Mar 1994}}
rowspan=8| Gravelines1PWRCP1{{yes|Operational}}910{{dts|1 Feb 1975}}{{dts|25 Nov 1980}}
2PWRCP1{{yes|Operational}}910{{dts|1 Mar 1975}}{{dts|1 Dec 1980}}
3PWRCP1{{yes|Operational}}910{{dts|1 Dec 1975}}{{dts|1 Jun 1981}}
4PWRCP1{{yes|Operational}}910{{dts|1 Apr 1976}}{{dts|1 Oct 1981}}
5PWRCP1{{yes|Operational}}910{{dts|1 Oct 1979}}{{dts|15 Jan 1985}}
6PWRCP1{{yes|Operational}}910{{dts|1 Oct 1979}}{{dts|25 Oct 1985}}
7PWREPR2{{planned}}1670
8PWREPR2{{planned}}1670
rowspan=2|Nogent1PWRP4 REP 1300{{yes|Operational}}1310{{dts|26 May 1981}}{{dts|24 Feb 1988}}
2PWRP4 REP 1300{{yes|Operational}}1310{{dts|1 Jan 1982}}{{dts|1 May 1989}}
rowspan=4|Paluel1PWRP4 REP 1300{{yes|Operational}}1330{{dts|15 Aug 1977}}{{dts|1 Dec 1985}}
2PWRP4 REP 1300{{yes|Operational}}1330{{dts|1 Jan 1978}}{{dts|1 Dec 1985}}
3PWRP4 REP 1300{{yes|Operational}}1330{{dts|1 Feb 1979}}{{dts|1 Feb 1986}}
4PWRP4 REP 1300{{yes|Operational}}1330{{dts|1 Feb 1980}}{{dts|1 Jun 1986}}
rowspan="4" |Penly1PWRP4 REP 1300{{yes|Operational}}1330{{dts|1 Sep 1982}}{{dts|1 Dec 1990}}
2PWRP4 REP 1300{{yes|Operational}}1330{{dts|1 Aug 1984}}{{dts|1 Nov 1992}}
3PWREPR2{{planned}}1670(2024)
4PWREPR2{{planned}}1670(2024){{Cite web|url=https://world-nuclear-news.org/Articles/EDF-begins-permitting-process-for-two-new-reactors|title=EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News|website=world-nuclear-news.org|accessdate=9 December 2023}}
Phénix1FBRPH-250{{no|Shut down}}130{{dts|1 Nov 1968}}{{dts|14 Jul 1974}}{{dts|1 Feb 2010}}
rowspan=2|Saint-Alban1PWRP4 REP 1300{{yes|Operational}}1335{{dts|29 Jan 1979}}{{dts|1 May 1986}}
2PWRP4 REP 1300{{yes|Operational}}1335{{dts|31 Jul 1979}}{{dts|1 Mar 1987}}
rowspan=4|Saint-LaurentA-1GCRUNGG{{no|Shut down}}390{{dts|1 Oct 1963}}{{dts|1 Jun 1969}}{{dts|18 Apr 1990}}
A-2GCRUNGG{{no|Shut down}}465{{dts|1 Jan 1966}}{{dts|1 Nov 1971}}{{dts|27 May 1992}}
B-1PWRCP2{{yes|Operational}}915{{dts|1 May 1976}}{{dts|1 Aug 1983}}
B-2PWRCP2{{yes|Operational}}915{{dts|1 Jul 1976}}{{dts|1 Aug 1983}}
Superphénix1FBRNa-1200{{no|Shut down}}/in decommissioning1200{{dts|13 Dec 1976}}{{dts|1 Dec 1986}}{{dts|31 Dec 1998}}
rowspan=4| Tricastin1PWRCP1{{yes|Operational}}915{{dts|1 Nov 1974}}{{dts|1 Dec 1980}}
2PWRCP1{{yes|Operational}}915{{dts|1 Dec 1974}}{{dts|1 Dec 1980}}
3PWRCP1{{yes|Operational}}915{{dts|1 Apr 1975}}{{dts|11 May 1981}}
4PWRCP1{{yes|Operational}}915{{dts|1 May 1975}}{{dts|1 Nov 1981}}

Germany

{{main|Nuclear power in Germany}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

AVR1HTGRPBR Prototype{{no|Shut down}}13{{dts|1 Aug 1961}}{{dts|19 May 1969}}{{dts|31 Dec 1988}}
rowspan=2| Biblis1PWRSiemens-KWU{{no|Shut down/in decommissioning}}1167{{dts|1 Jan 1970}}{{dts|26 Feb 1975}}{{dts|6 Aug 2011}}
2PWRKWU{{no|Shut down/in decommissioning}}1240{{dts|1 Feb 1972}}{{dts|31 Jan 1977}}{{dts|6 Aug 2011}}
Brokdorf1PWRKWU{{no|Shut down}}1410{{dts|1 Jan 1976}}{{dts|22 Dec 1986}}{{dts|31 Dec 2021}}
Brunsbüttel1BWRBWR-69{{no|Shut down}}771{{dts|15 Apr 1970}}{{dts|9 Feb 1977}}{{dts|6 Aug 2011}}
Emsland1PWR{{ill|Konvoi|de|Konvoi (Kernkraftwerk)}} (KWU){{no|Shut down}}1329{{dts|10 Aug 1982}}{{dts|20 Jun 1988}}data-sort-value=2022-12-31 | {{dts|15 Apr 2023}}
Grafenrheinfeld1PWRKWU{{no|Shut down}}1275{{dts|1 Jan 1975}}{{dts|17 Jun 1982}}{{dts|27 Jun 2015}}
rowspan=6| Greifswald1PWRVVER-440/V-230{{no|Shut down/in decommissioning}}408{{dts|1 Mar 1970}}{{dts|12 Jul 1974}}{{dts|14 Feb 1990}}
2PWRVVER-440/V-230{{no|Shut down/in decommissioning}}408{{dts|1 Mar 1970}}{{dts|16 Apr 1975}}{{dts|14 Feb 1990}}
3PWRVVER-440/V-230{{no|Shut down/in decommissioning}}408{{dts|1 Apr 1972}}{{dts|1 May 1978}}{{dts|28 Feb 1990}}
4PWRVVER-440/V-230{{no|Shut down/in decommissioning}}408{{dts|1 Apr 1972}}{{dts|1 Nov 1979}}{{dts|22 Jul 1990}}
5PWRVVER-440/V-213{{no|Shut down/in decommissioning}}408{{dts|1 Dec 1976}}{{dts|1 Nov 1989}}{{dts|24 Nov 1989}}
6PWRVVER-440/V-213{{BLACK|Finished; never entered service}}408
Grohnde1PWRKWU{{no|Shut down}}1360{{dts|1 Jun 1976}}{{dts|1 Feb 1985}}{{dts|31 Dec 2021}}{{cite news|title=Germany shuts three of its last six nuclear plants|url=https://www.reuters.com/markets/commodities/germany-shuts-three-its-last-six-nuclear-plants-2022-01-01/|access-date=1 Jan 2022}}
Grosswelzheim1BWRBWR{{no|Dismantled}}25{{dts|1 Jan 1965}}{{dts|2 Aug 1970}}{{dts|20 Apr 1971}}
rowspan=3| GundremmingenABWRGE, BWR-1{{no|Shut down/in decommissioning}}237{{dts|12 Dec 1962}}{{dts|12 Apr 1967}}{{dts|13 Jan 1977}}
BBWRBWR-72 (KWU){{no|Shut down}}1284{{dts|20 Jul 1976}}{{dts|19 Jul 1984}}{{dts|31 Dec 2017}}{{cite news|title=German reactor permanently shut down|url=http://www.world-nuclear-news.org/C-German-reactor-permanently-shut-down-0201184.html|access-date=10 May 2018|work=world-nuclear-news.org}}
CBWRBWR-72 (KWU){{no|Shut down}}1288{{dts|20 Jul 1976}}{{dts|18 Jan 1985}}{{dts|31 Dec 2021}}
rowspan=2| Isar1BWRBWR-69{{no|Shut down/in decommissioning}}878{{dts|1 May 1972}}{{dts|21 Mar 1979}}{{dts|6 Aug 2011}}
2PWR{{ill|Konvoi|de|Konvoi (Kernkraftwerk)}} (KWU){{no|Shut down}}1410{{dts|15 Sep 1982}}{{dts|9 Apr 1988}}data-sort-value=2022-12-31 | {{dts|15 Apr 2023}}
Kahl1BWRBWR{{no|Dismantled}}15{{dts|1 Jul 1958}}{{dts|1 Feb 1962}}{{dts|25 Nov 1985}}
SNR-3001FBR{{BLACK|Finished; never entered service}}{{dts|1972}}{{dts|1985}}
KNK II1FBR{{no|Shut down}}17{{dts|1 Sep 1974}}{{dts|3 Mar 1979}}{{dts|23 Aug 1991}}
Krümmel1BWRBWR-69 (KWU){{no|Shut down}}1346{{dts|5 Apr 1974}}{{dts|28 Mar 1984}}{{dts|6 Aug 2011}}
Lingen1BWRBWR{{no|Shut down}}183{{dts|1 Oct 1964}}{{dts|1 Oct 1968}}{{dts|5 Jan 1977}}
Mülheim-Kärlich1PWRB & W{{no|Shut down/in decommissioning}}1219{{dts|15 Jan 1975}}{{dts|8 Aug 1987}}{{dts|9 Sep 1988}}
MZFR1PHWRPHWR{{no|Shut down}}52{{dts|1 Dec 1961}}{{dts|19 Dec 1966}}{{dts|3 May 1984}}
rowspan=2| Neckarwestheim1PWRKWU{{no|Shut down}}785{{dts|1 Feb 1972}}{{dts|1 Dec 1976}}{{dts|6 Aug 2011}}
2PWR{{ill|Konvoi|de|Konvoi (Kernkraftwerk)}} (KWU){{no|Shut down}}1310{{dts|9 Nov 1982}}{{dts|15 Apr 1989}}data-sort-value=2022-12-31 | {{dts|15 Apr 2023}}
Niederaichbach1HWGCRPressure tube reactor{{no|Shut down/decommissioned}}100{{dts|1 Jun 1966}}{{dts|1 Jan 1973}}{{dts|31 Jul 1974}}
Obrigheim1PWRSiemens{{no|Shut down/in decommissioning}}340{{dts|15 Mar 1965}}{{dts|31 Mar 1969}}{{dts|11 May 2005}}
rowspan=2| Philippsburg1BWRBWR-69{{no|Shut down}}890{{dts|1 Oct 1970}}{{dts|26 Mar 1980}}{{dts|6 Aug 2011}}
2PWRKWU{{no|Shut down}}1402{{dts|7 Jul 1977}}{{dts|18 Apr 1985}}{{dts|31 Dec 2019}}{{cite news|title=Germany shuts down Philippsburg 2|url=https://www.energycentral.com/news/germany-shuts-down-philippsburg-2|access-date=8 Jan 2020|work=energycentral.com}}
Rheinsberg1PWRVVER-70{{no|Shut down/in decommissioning}}62{{dts|1 Jan 1960}}{{dts|11 Oct 1966}}{{dts|1 Jun 1990}}
Stade1PWRSiemens{{no|Shut down/in decommissioning}}640{{dts|1 Dec 1967}}{{dts|19 May 1972}}{{dts|4 Nov 2003}}
rowspan=2| Stendal1PWRVVER-1000/V-320{{BLACK|Unfinished}}{{dts|1983}}{{dts|1990}}
2PWRVVER-1000/V-320{{BLACK|Unfinished}}{{dts|1983}}{{dts|1990}}
THTR-3001HTGRPBR{{no|Decommissioned}}296{{dts|3 May 1971}}{{dts|1 Jun 1987}}{{dts|29 Sep 1988}}
Unterweser1PWRKWU{{no|Shut down/in decommissioning}}1345{{dts|1 Jul 1972}}{{dts|6 Sep 1979}}{{dts|6 Aug 2011}}
Würgassen1BWRBWR-69 (AEG){{no|Shut down/in decommissioning}}640{{dts|26 Jan 1968}}{{dts|11 Nov 1975}}{{dts|26 Aug 1994}}

Hungary

{{main|Nuclear power in Hungary}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=6| Paks1PWRVVER-440/V-213{{yes|Operational}}470{{dts|1 Aug 1974}}{{dts|10 Aug 1983}}
2PWRVVER-440/V-213{{yes|Operational}}473{{dts|1 Aug 1974}}{{dts|14 Nov 1984}}
3PWRVVER-440/V-213{{yes|Operational}}473{{dts|1 Oct 1979}}{{dts|1 Dec 1986}}
4PWRVVER-440/V-213{{yes|Operational}}471{{dts|1 Oct 1979}}{{dts|1 Nov 1987}}
5PWRVVER-1200{{partial|Under construction}}1114({{dts|2024}})
6PWRVVER-1200{{partial|Under construction}}1114({{dts|2024}})

India

{{main|Nuclear power in India}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Chutka1rowspan=16| PHWRrowspan=6| IPHWR-700{{planned}}630
2{{planned}}630
rowspan=4| Gorakhpur1{{partial|Under construction}}630
2{{partial|Under construction}}630
3{{planned}}630
4{{planned}}630
rowspan=6| Kaiga1rowspan=4|IPHWR-220{{yes|Operational}}202{{dts|1 Sep 1989}}{{dts|16 Nov 2000}}
2{{yes|Operational}}202{{dts|1 Dec 1989}}{{dts|16 Mar 2000}}
3{{yes|Operational}}202{{dts|30 Mar 2002}}{{dts|6 May 2007}}
4{{yes|Operational}}202{{dts|10 May 2002}}{{dts|20 Jan 2011}}
5rowspan=2| IPHWR-700{{planned}}630
6{{planned}}630
rowspan=4| Kakrapar1rowspan=2| IPHWR-220{{yes|Operational}}202{{dts|1 Dec 1984}}{{dts|6 May 1993}}
2{{yes|Operational}}202{{dts|1 Apr 1985}}{{dts|1 Sep 1995}}
3rowspan=2| IPHWR-700{{yes|Operational}}630{{dts|22 Nov 2010}}{{dts|30 Jun 2023}}
4{{yes|Operational}}630{{dts|22 Nov 2010}}{{dts|31 Mar 2024}}
PFBR1SFRPFBR{{partial|Under construction}}490{{dts|23 Oct 2004}}(2026)
rowspan=6| Kudankulam1rowspan=6|PWRrowspan=6|VVER-1000/V-412{{yes|Operational}}932{{dts|31 Mar 2002}}{{dts|31 Dec 2014}}
2{{yes|Operational}}932{{dts|4 Jul 2002}}{{dts|31 Mar 2017}}
3{{partial|Under construction}}917{{dts|30 Jun 2017}}(2026)
4{{partial|Under construction}}917{{dts|23 Oct 2017}}(2027)
5{{partial|Under construction}}917{{dts|29 Jun 2021}}(2029)
6{{partial|Under construction}}917{{dts|20 Dec 2021}}(2030)
rowspan=2| Madras1rowspan=16| PHWRrowspan=2|IPHWR-220{{yes2|Operation suspended
(under maintenance)}}
205{{dts|1 Jan 1971}}{{dts|27 Jan 1984}}
2{{yes|Operational}}205{{dts|1 Oct 1972}}{{dts|21 Mar 1986}}
rowspan=4| Mahi Banswara1rowspan=4|IPHWR-700{{planned}}630(2031)
2{{planned}}630(2032)
3{{planned}}630(2033)
4{{planned}}630(2034)
rowspan=2| Narora1rowspan=2|IPHWR-220{{yes|Operational}}202{{dts|1 Dec 1976}}{{dts|1 Jan 1991}}
2{{yes|Operational}}202{{dts|1 Nov 1977}}{{dts|1 Jul 1992}}
rowspan=8| Rajasthan1rowspan=2|CANDU{{no|Shut down}}90{{dts|1 Aug 1965}}{{dts|16 Dec 1973}}{{dts|9 Oct 2004}}{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=302 | title=PRIS – Reactor Details }}
2{{yes|Operational}}187{{dts|1 Apr 1968}}{{dts|1 Apr 1981}}
3rowspan=4| IPHWR-220{{yes|Operational}}202{{dts|1 Feb 1990}}{{dts|1 Jun 2000}}
4{{yes|Operational}}202{{dts|1 Oct 1990}}{{dts|23 Dec 2000}}
5{{yes|Operational}}202{{dts|18 Sep 2002}}{{dts|4 Feb 2010}}
6{{yes|Operational}}202{{dts|20 Jan 2003}}{{dts|31 Mar 2010}}
7rowspan=2| IPHWR-700{{yes|Operational}}630{{dts|18 Jul 2011}}{{dts|15 Apr 2025}}
8{{partial|Under construction}}630{{dts|30 Sep 2011}}(2026)
rowspan=4| Tarapur1rowspan=2|BWRrowspan=2|BWR-1 (Mark 2){{yes2|Operation suspended
(under maintenance)}}
150{{dts|1 Oct 1964}}{{dts|28 Oct 1969}}
2{{yes2|Operation suspended
(under maintenance)}}
150{{dts|1 Oct 1964}}{{dts|28 Oct 1969}}
3rowspan=2|PHWRrowspan=2|IPHWR-540{{yes|Operational}}490{{dts|12 May 2000}}{{dts|18 Aug 2006}}
4{{yes|Operational}}490{{dts|8 Mar 2000}}{{dts|12 Sep 2005}}

Iran

{{main|Nuclear program of Iran}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=3| Bushehr1PWRVVER-1000/V-446{{yes|Operational}}915{{dts|1 May 1975}}{{dts|23 Sep 2013}}
2PWRVVER-1000/V-528{{partial|Under construction}}915{{dts|27 Sep 2019}}
3PWRVVER-1000{{planned}}915
Darkhovin1PWR{{BLACK|Unfinished; restart planned}}360

Italy

{{main|Nuclear power in Italy}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

Caorso1BWRBWR-4 Mark2{{no|Shut down/in decommissioning}}860{{dts|1 Jan 1970}}{{dts|1 Dec 1981}}{{dts|1 Jul 1990}}
Enrico Fermi1PWRWH 4-loop{{no|Shut down/in decommissioning}}260{{dts|1 Jul 1961}}{{dts|1 Jan 1965}}{{dts|1 Jul 1990}}
Garigliano1BWRBWR-1{{no|Shut down/in decommissioning}}150{{dts|1 Nov 1959}}{{dts|1 Jun 1964}}{{dts|1 Mar 1982}}
Latina1GCRMagnox{{no|Shut down/in decommissioning}}153{{dts|1 Nov 1958}}{{dts|1 Jan 1964}}{{dts|1 Dec 1987}}
rowspan=2| Montalto1BWR{{BLACK|Unfinished}}982{{dts|1 Jul 1982}}{{dts|1 Jan 1988}}
2BWR{{BLACK|Unfinished}}982{{dts|1 Jul 1982}}{{dts|1 Jul 1988}}
rowspan=2| {{ill|Trino 2|IT|Centrale elettronucleare Trino 2}}1PWR{{BLACK|Unfinished}}950{{dts|23 dec 1987}}
2PWR{{BLACK|Unfinished}}950{{dts|23 dec 1987}}

Japan

{{Main|Nuclear power in Japan}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

Fugen1HWLWRATR{{no|Shut down}}148{{dts|10 May 1972}}{{dts|20 Mar 1979}}{{dts|29 Mar 2003}}
rowspan=6 | Fukushima Daiichi1BWRBWR-3{{no|Inoperable/Core melt}}439{{dts|25 Jul 1967}}{{dts|26 Mar 1971}}{{dts|19 May 2011}}
2BWRBWR-4{{no|Inoperable/Core melt}}760{{dts|9 Jun 1969}}{{dts|18 Jul 1974}}{{dts|19 May 2011}}
3BWRBWR-4{{no|Inoperable/Core melt}}760{{dts|28 Dec 1970}}{{dts|27 Mar 1976}}{{dts|19 May 2011}}
4BWRBWR-4{{no|Inoperable}}760{{dts|12 Feb 1973}}{{dts|12 Oct 1978}}{{dts|19 May 2011}}
5BWRBWR-4{{no|Shut down}}760{{dts|22 May 1972}}{{dts|18 Apr 1978}}{{dts|17 Dec 2013}}
6BWRBWR-5{{no|Shut down}}1067{{dts|26 Oct 1973}}{{dts|24 Oct 1979}}{{dts|17 Dec 2013}}
rowspan=4 | Fukushima Daini1BWRBWR-5{{no|Shut down}}1067{{dts|16 Mar 1976}}{{dts|20 Apr 1982}}{{dts|30 Sep 2019}}
2BWRBWR-5{{no|Shut down}}1067{{dts|25 May 1979}}{{dts|3 Feb 1984}}{{dts|30 Sep 2019}}
3BWRBWR-5{{no|Shut down}}1067{{dts|23 Mar 1981}}{{dts|21 Jun 1985}}{{dts|30 Sep 2019}}
4BWRBWR-5{{no|Shut down}}1067{{dts|28 May 1981}}{{dts|25 Aug 1987}}{{dts|30 Sep 2019}}
rowspan=4 | Genkai1PWRMitsubishi (2-loop){{no|Shut down}}529{{dts|15 Sep 1971}}{{dts|15 Oct 1975}}{{dts|27 Apr 2015}}
2PWRMitsubishi (2-loop){{no|Shut down}}529{{dts|1 Feb 1977}}{{dts|30 Mar 1981}}{{dts|9 Apr 2019}}
3PWRMitsubishi (4-loop){{yes|Operational}}1127{{dts|1 Jun 1988}}{{dts|18 Mar 1994}}
4PWRMitsubishi (4-loop){{yes|Operational{{cite news |title=Genkai unit 4 supplying power again |url=http://www.world-nuclear-news.org/C-Genkai-unit-4-supplying-power-again-1906185.html |access-date=22 Jun 2018 |work=world-nuclear-news.org}}}}1127{{dts|15 Jul 1992}}{{dts|25 Jul 1997}}
rowspan=5 | Hamaoka1BWRBWR-4{{no|Shut down}}515{{dts|10 Jun 1971}}{{dts|17 Mar 1976}}{{dts|30 Jan 2009}}
2BWRBWR-4{{no|Shut down}}806{{dts|14 Jun 1974}}{{dts|29 Nov 1978}}{{dts|30 Jan 2009}}
3BWRBWR-5{{yes2|Operation suspended
(under review){{cite web|title=Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute|url=http://www.genanshin.jp/english/facility/map/|website=genanshin.jp|access-date=3 Oct 2021}}}}
1056{{dts|18 Apr 1983}}{{dts|28 Aug 1987}}
4BWRBWR-5{{yes2|Operation suspended
(under review)}}
1092{{dts|13 Oct 1989}}{{dts|3 Sep 1993}}
5BWRABWR{{yes2|Operation suspended}}1325{{dts|12 Jul 2000}}{{dts|18 Jan 2005}}
Higashidōri (Tōhoku)1BWRBWR-5{{yes2|Operation suspended
(under review)}}
1067{{dts|7 Nov 2000}}{{dts|8 Dec 2005}}
Higashidōri (Tokyo)1BWR

|ABWR

{{planned|Unfinished; restart planned}}1350{{dts|25 Jan 2011}}{{cite web|title=東通原子力発電所1号機の着工について |url=https://www.tepco.co.jp/cc/press/11012501-j.html |access-date=27 Jun 2023 |website=Tokyo Electric Power Company Holdings, Inc.}}
rowspan=3 | Ikata1PWRMitsubishi (2-loop){{no|Shut down}}538{{dts|1 Sep 1973}}{{dts|30 Sep 1977}}{{dts|25 Mar 2016}}
2PWRMitsubishi (2-loop){{no|Shut down}}538{{dts|1 Aug 1978}}{{dts|19 Mar 1982}}{{dts|27 Mar 2018}}
3PWRMitsubishi (3-loop){{yes|Operational}}846{{dts|1 Oct 1990}}{{dts|15 Dec 1994}}
rowspan=7 | Kashiwazaki-Kariwa1BWRBWR-5{{yes2|Operation suspended}}1067{{dts|5 Jun 1980}}{{dts|18 Sep 1985}}
2BWRBWR-5{{yes2|Operation suspended}}1067{{dts|18 Nov 1985}}{{dts|28 Sep 1990}}
3BWRBWR-5{{yes2|Operation suspended}}1067{{dts|7 Mar 1989}}{{dts|11 Aug 1993}}
4BWRBWR-5{{yes2|Operation suspended}}1067{{dts|5 Mar 1990}}{{dts|11 Aug 1994}}
5BWRBWR-5{{yes2|Operation suspended}}1067{{dts|20 Jun 1985}}{{dts|10 Apr 1990}}
6BWRABWR{{yes2|Operation suspended
(restart approved){{cite web|title=Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)|url=http://www.fepc.or.jp/english/nuclear/power_generation/plants/index.html|website=fepc.or.jp|access-date=8 May 2018}}}}
1315{{dts|3 Nov 1992}}{{dts|7 Nov 1996}}
7BWRABWR{{yes2|Operation suspended
(restart approved)}}
1315{{dts|1 Jul 1993}}{{dts|2 Jul 1997}}
rowspan=3 | Mihama1PWRMitsubishi (2-loop){{no|Shut down}}320{{dts|1 Feb 1967}}{{dts|28 Nov 1970}}{{dts|Mar 2015}}
2PWRMitsubishi (2-loop){{no|Shut down}}470{{dts|29 May 1968}}{{dts|25 Jul 1972}}{{dts|Mar 2015}}
3PWRMitsubishi (3-loop){{yes|Operational{{cite news|title=40年超の美浜原発3号機が再稼働 原発事故後 全国初 |url=https://www3.nhk.or.jp/news/html/20210623/k10013099101000.html|access-date=23 Jun 2021|work=NHK}}}}780{{dts|7 Aug 1972}}{{dts|1 Dec 1976}}
Monju1FBR{{no|Shut down}}246{{dts|10 May 1986}}{{dts|29 Aug 1995}}{{dts|5 Dec 2017}}
rowspan=4 | Ōi1PWRW (4-loop){{no|Shut down}}1120{{dts|26 Oct 1972}}{{dts|27 Mar 1979}}{{dts|Dec 2017}}
2PWRWestinghouse (4-loop){{no|Shut down}}1120{{dts|8 Dec 1972}}{{dts|5 Dec 1979}}{{dts|Dec 2017}}
3PWRMitsubishi (4-loop){{yes|Operational}}1127{{dts|3 Oct 1987}}{{dts|18 Dec 1991}}
4PWRMitsubishi (4-loop){{yes|Operational{{cite news|title=Ohi No.4 reactor restarted- News – NHK WORLD – English|url=https://www3.nhk.or.jp/nhkworld/en/news/20180509_30/|access-date=10 May 2018|work=NHK WORLD|archive-url=https://web.archive.org/web/20180510185734/https://www3.nhk.or.jp/nhkworld/en/news/20180509_30/|archive-date=10 May 2018|url-status=dead}}}}1127{{dts|13 Jun 1988}}{{dts|2 Feb 1993}}
Ōma1BWRABWR{{partial|Under construction}}1325{{dts|7 May 2010}}
rowspan=3 | Onagawa1BWRBWR-4{{no|Shut down}}498{{dts|8 Jul 1980}}{{dts|1 Jun 1984}}{{dts|21 Dec 2018}}
2BWRBWR-5{{yes|Operational{{cite news|title=Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters|url=https://www.reuters.com/world/japan/japans-tohoku-elec-restarts-onagawa-reactor-after-13-year-hiatus-2024-10-29/|publisher=Reuters|access-date=29 Oct 2024}}}}796{{dts|12 Apr 1991}}{{dts|28 Jul 1995}}
3BWRBWR-5{{yes2|Operation suspended}}796{{dts|23 Jan 1998}}{{dts|30 Jan 2002}}
rowspan="2" | Sendai1PWRMitsubishi (3-loop){{yes|Operational}}846{{dts|15 Dec 1979}}{{dts|4 Jul 1984}}
2PWRMitsubishi (3-loop){{yes|Operational}}846{{dts|12 Oct 1981}}{{dts|28 Nov 1985}}
rowspan=2 | Shika1BWRBWR-5{{yes2|Operation suspended}}505{{dts|1 Jul 1989}}{{dts|30 Jul 1993}}
2BWRABWR{{yes2|Operation suspended
(under review)}}
1108{{dts|20 Aug 2001}}{{dts|15 Mar 2006}}
rowspan=3 | Shimane1BWRBWR-3{{no|Shut down}}439{{dts|2 Jul 1970}}{{dts|29 Mar 1974}}{{dts|Mar 2015}}
2BWRBWR-5{{yes|Operational}}789{{dts|2 Feb 1985}}{{dts|10 Feb 1989}}
3BWRABWR{{partial|Under construction}}1325{{dts|12 Oct 2007}}
rowspan=4 | Takahama1PWRMitsubishi (3-loop){{yes|Operational{{cite news|title=運転開始40年超高浜原発1号機 約12年ぶりに再稼働|url=https://www3.nhk.or.jp/lnews/fukui/20230728/3050015301.html|access-date=28 Jul 2023}}}}780{{dts|25 Apr 1970}}{{dts|14 Nov 1974}}
2PWRMitsubishi (3-loop){{yes|Operational{{cite news|title=Takahama 2 reactor restarted|url=https://www.world-nuclear-news.org/Articles/Takahama-2-reactor-restarted|access-date=15 Sep 2023}}}}780{{dts|9 Mar 1971}}{{dts|14 Nov 1975}}
3PWRMitsubishi (3-loop){{yes|Operational}}830{{dts|12 Dec 1980}}{{dts|17 Jan 1985}}
4PWRMitsubishi (3-loop){{yes|Operational}}830{{dts|19 Mar 1981}}{{dts|5 Jun 1985}}
rowspan=2 | Tōkai1GCRMagnox{{no|Shut down}}137{{dts|1 Mar 1961}}{{dts|25 Jul 1966}}{{dts|31 Mar 1998}}
2BWRBWR-5{{yes2|Operation suspended
(restart approved){{cite news|title=Japan approves extension for reactor similar to Fukushima units that melted down – Reuters|url=https://www.reuters.com/article/japan-nuclear-restarts/japan-approves-extension-for-reactor-similar-to-fukushima-units-that-melted-down-idUSL4N1XI1TR|publisher=Reuters|access-date=29 Dec 2019}}}}
1060{{dts|3 Oct 1973}}{{dts|28 Nov 1978}}
rowspan=3 | Tomari1PWRMitsubishi (2-loop){{yes2|Operation suspended
(under review)}}
550{{dts|18 Apr 1985}}{{dts|22 Jun 1989}}
2PWRMitsubishi (2-loop){{yes2|Operation suspended
(under review)}}
550{{dts|13 Jun 1985}}{{dts|12 Apr 1991}}
3PWRMitsubishi (3-loop){{yes2|Operation suspended
(restart approved)https://www.japantimes.co.jp/news/2025/04/30/japan/tomari-nuclear-plant-restart-approved}}
866{{dts|18 Nov 2004}}{{dts|22 Dec 2009}}
rowspan="2" | Tsuruga1BWRBWR-2{{no|Shut down}}340{{dts|24 Nov 1966}}{{dts|14 Mar 1970}}{{dts|Mar 2015}}
2PWRMitsubishi (4-loop){{yes2|Operation suspended
(under review)}}
1108{{dts|6 Nov 1982}}{{dts|17 Feb 1987}}

Kazakhstan

{{main|Nuclear power in Kazakhstan}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

Aktau1FBRBN-350{{no|Shut down/in decommissioning}}350{{dts|1 Oct 1964}}{{dts|16 Jul 1973}}{{dts|22 Apr 1999}}

Lithuania

{{main|Nuclear power in Lithuania}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=3| Ignalina1LWGRRBMK-1500{{no|Shut down/in decommissioning}}1185{{dts|1 May 1977}}{{dts|31 Dec 1983}}{{dts|31 Dec 2004}}
2LWGRRBMK-1500{{no|Shut down/in decommissioning}}1185{{dts|1 Jan 1978}}{{dts|Aug 1987}}{{dts|31 Dec 2009}}
3LWGRRBMK-1500{{BLACK|Unfinished}}1185

Mexico

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Laguna Verde1BWRBWR-5{{yes|Operational}}804{{dts|1 Oct 1976}}{{dts|28 Jul 1990}}
2BWRBWR-5{{yes|Operational}}800{{dts|1 Jun 1977}}{{dts|10 Apr 1995}}

Netherlands

{{main|Nuclear power in the Netherlands}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

Borssele1PWRKWU 2LP{{yes|Operational}}482{{dts|1 Jul 1969}}{{dts|26 Oct 1973}}({{dts|2033}})
Dodewaard1BWRBWR-2{{no|Shut down}}55{{dts|1 May 1965}}{{dts|26 Mar 1969}}{{dts|26 Mar 1997}}

North Korea

{{main|Nuclear power in North Korea}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Yongbyon1GCRMagnox (Pu-production){{no|Shut down}}{{citation needed|date=January 2019}}5{{citation needed|date=January 2019}}{{dts|1994}}
2LWR{{cite news|url=http://38north.org/2016/01/yongbyon011416/ |title=North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor |work=38 North |publisher=U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies |date=14 Jan 2016 |access-date=4 Apr 2016 |url-status=live |archive-url=https://web.archive.org/web/20160409200249/http://38north.org/2016/01/yongbyon011416/ |archive-date=9 Apr 2016 }}{{planned}}30
Taechon1{{BLACK|Unfinished}}200{{dts|1994}}
rowspan=2| Kumho1PWR{{BLACK|Unfinished}}1000{{dts|2003}}
2PWR{{BLACK|Unfinished}}1000{{dts|2003}}

Pakistan

{{main|Nuclear power in Pakistan}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=5| Chashma1PWRCNP-300{{yes|Operational}}300{{dts|1 Aug 1993}}{{dts|15 Sep 2000}}
| 2PWRCNP-300{{yes|Operational}}300{{dts|28 Dec 2005}}{{dts|18 May 2011}}
| 3PWRCNP-300{{yes|Operational}}315{{dts|28 May 2011}}{{dts|6 Dec 2016}}
| 4PWRCNP-300{{yes|Operational}}313{{dts|18 Dec 2011}}{{dts|19 Sep 2017}}
| 5PWRHualong One{{partial|Under construction}}1100{{dts|30 Dec 2024}}
rowspan=3| Karachi1PHWRCANDU{{no|Shut down}}90{{dts|1 Aug 1966}}{{dts|7 Dec 1972}}{{dts|1 Aug 2021}}
| 2PWRHualong One{{yes|Operational}}1014{{dts|23 May 2013}}{{dts|19 Mar 2021}}{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=1067 | title=PRIS - Reactor Details }}
| 3PWRHualong One{{yes|Operational}}1014{{dts|31 May 2016}}{{dts|18 Apr 2022}}

Philippines

{{main|Nuclear power in the Philippines}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

Bataan1PWRWestinghouse{{

BLACK|Unfinished; restart planned{{cite web|url=https://www.world-nuclear-news.org/Articles/Philippines-relaunches-nuclear-energy-programme |title=Philippines relaunches nuclear energy programme : Nuclear Policies |publisher=World Nuclear News |date=3 Mar 2022 |accessdate=29 Apr 2022}}}}

621{{dts|1976}}{{dts|1986}}

Poland

{{main|Nuclear power in Poland}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Żarnowiec1PWRVVER-440{{BLACK|Unfinished}}440{{dts|31 Mar 1982}}{{dts|4 Sep 1990}}
2PWRVVER-440{{BLACK|Unfinished}}440{{dts|31 Mar 1982}}{{dts|4 Sep 1990}}
rowspan=3| Choczewo{{cite web|url=https://www.world-nuclear-news.org/Articles/Poland-s-Westinghouse-choice-deepens-strategic-re|title=Poland's Westinghouse choice 'deepens strategic relationship' with USA|date=31 Oct 2022}}1PWRAP1000{{planned}}1250{{cite web|url=https://www.world-nuclear-news.org/Articles/Poland%E2%80%99s-government-confirms-Westinghouse-for-nucl|title=Poland's government confirms Westinghouse for nuclear plant|date=4 Nov 2022}}({{dts|2026}})({{dts|2033}})
2PWRAP1000{{planned}}1250({{dts|2035}}–2036)
3PWRAP1000{{planned}}1250({{dts|2037}}–2039)
rowspan=2| Pątnów{{cite web|url=https://www.world-nuclear-news.org/Articles/South-Korea-s-KHNP-signs-letter-of-intent-on-Polis|title=South Korea's KHNP signs letter of intent on Polish nuclear|date=31 Oct 2022}}1PWRAPR-1400{{planned}}1340
2PWRAPR-1400{{planned}}1340
Włocławek1BWRBWRX-300{{planned}}300({{dts|2030}})
Ostrołęka1BWRBWRX-300{{planned}}300({{dts|2030}})
Warsaw1BWRBWRX-300{{planned}}300({{dts|2030}})
Tarnobrzeg/Stalowa Wola1BWRBWRX-300{{planned}}300({{dts|2030}})
Dąbrowa Górnicza1BWRBWRX-300{{planned}}300({{dts|2030}})
Stawy Monowskie1BWRBWRX-300{{planned}}300({{dts|2030}})
Kraków1BWRBWRX-300{{planned}}300({{dts|2030}}){{cite web|url=https://energetyka24.com/atom/analizy-i-komentarze/taki-reaktor-chca-zbudowac-orlen-i-synthos-znamy-jego-szczegoly-analiza/|title=Taki reaktor chcą zbudować Orlen i Synthos|date=18 Apr 2023}}

Romania

{{main|Nuclear power in Romania}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=5| Cernavodă1PHWRCANDU-6{{yes|Operational}}650{{dts|31 Mar 1983}}{{dts|2 Dec 1996}}
2PHWRCANDU-6{{yes|Operational}}650{{dts|1 Jul 1983}}{{dts|1 Nov 2007}}
3PHWRCANDU-6{{BLACK|Unfinished; restart planned}}650
4PHWRCANDU-6{{BLACK|Unfinished; restart planned}}650
5PHWRCANDU-6{{BLACK|Unfinished}}650

Russia

{{main|Nuclear power in Russia}}

{{See also|List of cancelled nuclear reactors in Russia}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Akademik Lomonosov1PWRKLT-40S{{yes|Operational}}32{{dts|15 Apr 2007}}{{dts|19 Dec 2019}}{{cite web|title=Rosatom State Atomic Energy Cooperation {{!}} ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East|url=http://rosatom.ru/en/press-centre/news/rosatom-s-first-of-a-kind-floating-power-unit-connects-to-isolated-electricity-grid-in-pevek-russia-/|website=rosatom.ru|access-date=1 Jan 2020}}
2PWRKLT-40S{{yes|Operational}}32{{dts|15 Apr 2007}}{{dts|19 Dec 2019}}
rowspan=4| Balakovo1PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Dec 1980}}{{dts|23 May 1986}}
2PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Aug 1981}}{{dts|18 Jan 1988}}
3PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Nov 1982}}{{dts|8 Apr 1989}}
4PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Apr 1984}}{{dts|22 Dec 1993}}
rowspan=5| Beloyarsk1LWGRAMB-100{{no|Shut down}}102{{dts|1 Jun 1958}}{{dts|26 Apr 1964}}{{dts|1 Jan 1983}}
2LWGRAMB-200{{no|Shut down}}146{{dts|1 Jan 1962}}{{dts|1 Dec 1969}}{{dts|1 Jan 1990}}
3SFRBN-600{{yes|Operational}}560{{dts|1 Jan 1969}}{{dts|1 Nov 1981}}
4SFRBN-800{{yes|Operational}}789{{dts|18 Jul 2006}}{{dts|10 Dec 2015}}
5SFRBN-1200{{planned}}1100
rowspan=4| Bilibino1LWGREGP-6{{no|Shut down}}11{{dts|1 Jan 1970}}{{dts|1 Apr 1974}}{{dts|14 Jan 2019}}
2LWGREGP-6{{yes|Operational}}11{{dts|1 Jan 1970}}{{dts|1 Feb 1975}}
3LWGREGP-6{{yes|Operational}}11{{dts|1 Jan 1970}}{{dts|1 Feb 1976}}
4LWGREGP-6{{yes|Operational}}11{{dts|1 Jan 1970}}{{dts|1 Jan 1977}}
rowspan=4| Kalinin1PWRVVER-1000/V-338{{yes|Operational}}950{{dts|1 Feb 1977}}{{dts|12 Jun 1985}}
2PWRVVER-1000/V-338{{yes|Operational}}950{{dts|1 Feb 1982}}{{dts|3 Mar 1987}}
3PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Oct 1985}}{{dts|8 Nov 2005}}
4PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Aug 1986}}{{dts|25 Dec 2012}}
Kaliningrad1PWRVVER-1200/V-491{{BLACK|Unfinished}}1109{{dts|22 Feb 2012}}
rowspan=4| Kola1PWRVVER-440/V-230{{yes|Operational}}441{{dts|1 May 1970}}{{dts|28 Dec 1973}}
2PWRVVER-440/V-230{{yes|Operational}}441{{dts|1 May 1970}}{{dts|21 Feb 1975}}
3PWRVVER-440/V-213{{yes|Operational}}441{{dts|1 Apr 1977}}{{dts|3 Dec 1982}}
4PWRVVER-440/V-213{{yes|Operational}}441{{dts|1 Aug 1976}}{{dts|6 Dec 1984}}
rowspan=2| Kola II{{cite web|title=Nuclear Power in Russia {{!}} Russian Nuclear Energy – World Nuclear Association|url=http://www.world-nuclear.org/information-library/country-profiles/countries-o-s/russia-nuclear-power.aspx|website=world-nuclear.org|access-date=14 May 2018}}{{Cite web|url=https://strana-rosatom.ru/2021/06/18/kolskuju-aes-2-nachnut-stroit-v-2028-godu/|title=Кольскую АЭС-2 начнут строить в 2028 году|accessdate=9 December 2023}}1PWRVVER-S-600{{planned}}600(2028)(2034)
2PWRVVER-S-600{{planned}}600(2028)(2034)
rowspan=6| Kursk1LWGRRBMK-1000{{no|Shut down}}925{{dts|1 Jun 1972}}{{dts|12 Oct 1977}}{{dts|19 Dec 2021}}
2LWGRRBMK-1000{{no|Shut down}}925{{dts|1 Jan 1973}}{{dts|17 Aug 1979}}{{dts|31 Jan 2024}}{{cite news |title=Kursk's second unit retires after 45 years operation|url=https://world-nuclear-news.org/Articles/Kursk-s-second-unit-retired-after-45-years-operati|access-date=31 Jan 2024}}
3LWGRRBMK-1000{{yes|Operational}}925{{dts|1 Apr 1978}}{{dts|30 Mar 1984}}
4LWGRRBMK-1000{{yes|Operational}}925{{dts|1 May 1981}}{{dts|5 Feb 1986}}
5LWGRRBMK-1000{{BLACK|Unfinished}}925{{dts|1985}}
6LWGRRBMK-1000{{BLACK|Unfinished}}925{{dts|1985}}
rowspan=4| Kursk II1PWRVVER-TOI/V-510{{partial|Under construction}}1115{{dts|29 Apr 2018}}(2025){{cite news | url=https://www.ixbt.com/news/2024/08/15/zapusk-pervogo-jenergobloka-kurskoj-ajes2-planiruetsja-v-dekabre-2024.html | title=Запуск первого энергоблока Курской АЭС-2 планируется в декабре 2024 | newspaper=Ixbt.com }}
2PWRVVER-TOI/V-510{{partial|Under construction}}1115{{dts|15 Apr 2019}}{{cite news |title=The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule |url=http://www.rosenergoatom.ru/en/for-journalists/news/31061/ |access-date=16 Apr 2019 |work=rosenergoatom.ru}}(2026)
3PWRVVER-TOI{{planned}}1115
4PWRVVER-TOI{{planned}}1115
rowspan=4| Leningrad1LWGRRBMK-1000{{no|Shut down}}925{{dts|1 Mar 1970}}{{dts|1 Nov 1974}}{{dts|21 Dec 2018}}{{cite web |title=Russia retires Leningrad unit 1 |url=http://www.world-nuclear-news.org/Articles/Russia-retires-Leningrad-unit-1 |website=World Nuclear News |publisher=World Nuclear Association |access-date=27 Dec 2018}}
2LWGRRBMK-1000{{no|Shut down}}925{{dts|1 Jun 1970}}{{dts|11 Feb 1976}}{{dts|10 Nov 2020}}
3LWGRRBMK-1000{{yes|Operational}}925{{dts|1 Dec 1973}}{{dts|29 Jun 1980}}
4LWGRRBMK-1000{{yes|Operational}}925{{dts|1 Feb 1975}}{{dts|29 Aug 1981}}
rowspan=4| Leningrad II{{cite web | url=https://rosatom-europe.com/press-centre/news/four-new-npp-units-will-be-built-in-russia/ | title=Four New NPP Units Will be Built in Russia}}1PWRVVER-1200/V-491{{yes|Operational}}1085{{dts|25 Oct 2008}}{{dts|29 Oct 2018}}
2PWRVVER-1200/V-491{{yes|Operational}}1085{{dts|15 Apr 2010}}{{dts|22 Mar 2021}}
3PWRVVER-1200{{partial|Under construction}}1085{{dts|14 Mar 2024}}{{cite web | url=https://spb.vedomosti.ru/technology/articles/2024/03/15/1025425-leningradskoi-atomnoi-stantsii | title=Ленинградской атомной станции добавят мощности | date=15 March 2024 }}(2030)
4PWRVVER-1200{{partial|Under construction}}108521 Mar 2025{{Cite web |date=2025-03-20 |title=На энергоблоке №4 Ленинградской АЭС-2 приступили к бетонированию фундамента реактора |url=https://neftegaz.ru/news/nuclear/883947-na-energobloke-4-leningradskoy-aes-2-pristupili-k-betonirovaniyu-fundamenta-reaktora/ |access-date=2025-03-21 |website=neftegaz.ru |language=ru}}(2032)
rowspan=2|{{abbr|MPEB|Modernized Floating Power Unit}} No. 1{{cite web|title=Russia commits to further floating NPPs : New Nuclear – World Nuclear News|url=https://www.world-nuclear-news.org/Articles/Russia-commits-to-further-floating-nuclear-power-p|access-date=28 Jul 2021|website=world-nuclear-news.org}}{{cite web|title="Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа|url=https://www.interfax.ru/business/788323|access-date=3 Sep 2021|website=Interfax.ru|language=ru}}{{cite web | url=https://www.neimagazine.com/news/newsrussia-plans-new-generation-of-fnpps-8442344 | title=Russia plans new generation of FNPPS – Nuclear Engineering International | date=6 January 2021 }}1PWRRITM-200S{{partial|Under construction}}53{{dts|30 Aug 2022}}{{Cite web |title=Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш |url=https://aem-group.ru/mediacenter/news/zalozhen-korpus-pervogo-plavuchego-energobloka-v-arkticheskom-ispolnenii-na-baze-reaktorov-ritm-200.html |access-date=30 Aug 2022 |website=aem-group.ru |archive-date=30 August 2022 |archive-url=https://web.archive.org/web/20220830114736/https://aem-group.ru/mediacenter/news/zalozhen-korpus-pervogo-plavuchego-energobloka-v-arkticheskom-ispolnenii-na-baze-reaktorov-ritm-200.html |url-status=dead }}(2027)
| 2PWRRITM-200S{{partial|Under construction}}53{{dts|30 Aug 2022}}(2027)
rowspan=2|{{abbr|MPEB|Modernized Floating Power Unit}} No. 21PWRRITM-200S{{Planned}}53(2022)(2027)
| 2PWRRITM-200S{{Planned}}53(2022)(2027)
rowspan=2|{{abbr|MPEB|Modernized Floating Power Unit}} No. 31PWRRITM-200S{{Planned}}53(2022)(2028)
| 2PWRRITM-200S{{Planned}}53(2022)(2028)
rowspan=2|{{abbr|MPEB|Modernized Floating Power Unit}} No. 41PWRRITM-200S{{Planned}}53(2022)(2031)
| 2PWRRITM-200S{{Planned}}53(2022)(2031)
rowspan=5| Novovoronezh1PWRVVER/V-210{{no|Shut down}}197{{dts|1 Jul 1957}}{{dts|31 Dec 1964}}{{dts|16 Feb 1988}}
2PWRVVER/V-365{{no|Shut down}}336{{dts|1 Jun 1964}}{{dts|14 Apr 1970}}{{dts|29 Aug 1990}}
3PWRVVER-440/V-179{{no|Shut down}}385{{dts|1 Jul 1967}}{{dts|29 Jun 1972}}{{dts|25 Dec 2016}}
4PWRVVER 440/V-179{{yes|Operational}}385{{dts|1 Jul 1967}}{{dts|24 Mar 1973}}
5PWRVVER-1000/V-187{{yes|Operational}}950{{dts|1 Mar 1974}}{{dts|20 Feb 1981}}
rowspan="3" | Novovoronezh II1PWRVVER-1200/V-392M{{yes|Operational}}1114{{dts|24 Jun 2008}}{{dts|27 Feb 2017}}
2PWRVVER-1200/V-392M{{yes|Operational}}1114{{dts|12 Jul 2009}}{{dts|6 Nov 2019}}
3PWRVVER-1200{{planned}}1175
Obninsk1LWGRAM-1{{no|Shut down}}5{{dts|1 Jan 1951}}{{dts|1 Dec 1954}}{{dts|29 Apr 2002}}
rowspan=4| Rostov1PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Sep 1981}}{{dts|25 Dec 2001}}
2PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 May 1983}}{{dts|10 Dec 2010}}
3PWRVVER-1000/V-320{{yes|Operational}}950{{dts|15 Sep 2009}}{{dts|27 Dec 2014}}
4PWRVVER-1000/V-320{{yes|Operational}}1011{{dts|16 Jun 2010}}{{dts|28 Sep 2018}}
rowspan=1| Sakha1PWRRITM-200N{{planned}}55(2024){{cite web | url=https://sakhapress.ru/archives/269241 | title=В Якутии собираются строить АЭС мощностью не менее 55 МВт}}(2028)
| Seversk1FBRBREST-300{{partial|Under construction}}280{{dts|8 Jun 2021}}{{cite web | url=https://iz.ru/1175752/2021-06-08/rosatom-nachal-stroitelstvo-reaktora-brest-300-v-severske | title="Росатом" начал строительство реактора Брест-300 в Северске | date=8 Jun 2021}}(2026)
rowspan=3| Smolensk1LWGRRBMK-1000{{yes|Operational}}925{{dts|1 Oct 1975}}{{dts|30 Sep 1983}}
2LWGRRBMK-1000{{yes|Operational}}925{{dts|1 Jun 1976}}{{dts|2 Jul 1985}}
3LWGRRBMK-1000{{yes|Operational}}925{{dts|1 May 1984}}{{dts|12 Oct 1990}}
rowspan=2| Smolensk II{{cite web | url=https://www.neimagazine.com/news/newsrussia-prepares-to-build-new-nuclear-reactors-at-leningrad-and-smolensk-7997091 | title=Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International| date=26 June 2020}}{{cite web | url=https://www.ans.org/news/article-326/vver-units-planned-for-leningrad-and-smolensk/ | title=VVER units planned for Leningrad and Smolensk}}1PWRVVER-TOI{{planned}}1300
2PWRVVER-TOI{{planned}}1300

Slovakia

{{main|Nuclear power in Slovakia}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=5| BohuniceA-1Shut down after a 1977 refuelling incident; decommission in progress since 1979HWGCRKS 150{{no|Decommissioned}}93{{dts|1 Aug 1958}}{{dts|25 Dec 1972}}{{dts|22 Feb 1977}}
1{{cite web|url=https://www.tasr.sk/|archiveurl=https://web.archive.org/web/20090120010401/http://www.tasr.sk/30.axd?k=20090110TBB00423|url-status=dead|title=Tlačová agentúra Slovenskej republiky – TASR.sk|archivedate=20 Jan 2009|website=tasr.sk}}PWRVVER-440/V-230{{no|Shut down}}408{{dts|24 Apr 1972}}{{dts|1 Apr 1980}}{{dts|31 Dec 2006}}
2PWRVVER-440/V-230{{no|Shut down}}408{{dts|24 Apr 1972}}{{dts|1 Jan 1981}}{{dts|31 Dec 2008}}
3PWRVVER-440/V-213{{yes|Operational}}472{{dts|1 Dec 1976}}{{dts|14 Feb 1985}}({{dts|2045|format=y}})
4PWRVVER-440/V-213{{yes|Operational}}471{{dts|1 Dec 1976}}{{dts|18 Dec 1985}}({{dts|2045|format=y}})
rowspan=4| Mochovce1PWRVVER-440 V-213{{yes|Operational}}436{{dts|13 Oct 1983}}{{dts|29 Oct 1998}}({{dts|2058|format=y}})
2PWRVVER-440/V-213{{yes|Operational}}436{{dts|13 Oct 1983}}{{dts|11 Apr 2000}}({{dts|2060|format=y}})
3PWRVVER-440/V-213{{yes|Operational}}440{{dts|27 Jan 1987}}{{dts|17 Oct 2023}}{{cite web | url=https://www.seas.sk/en/press-releases/mochovce-3-commissioning-trial-run/ | title=Power commissioning of Mochovce 3 completed }}
4PWRVVER-440/V-213{{partial|Under construction}}440{{dts|27 Jan 1987}}

Slovenia

{{main|Nuclear power in Slovenia}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan="2" |Krško1PWRWH 2 loops{{yes|Operational}}688{{dts|30 Mar 1975}}{{dts|1 Jan 1983}}(2043){{cite web | url=https://www.world-nuclear-news.org/Articles/Krsko-gets-an-overhaul | title=Krško gets an overhaul : Corporate – World Nuclear News }}
| 2PWRTBD{{planned|Planned}}1100(2030){{Cite web |date=30 Nov 2022 |title=Drugi blok NE Krško prve megavate mogao bi dati nakon 2030. |trans-title=The second block of NPP Krško could provide the first megawatts after 2030. |url=https://tockanai.hr/biznis/drugi-blok-ne-krsko-prve-megavate-mogao-bi-dati-nakon-2030-64033/ |access-date=14 Apr 2023 |website=Točka na I |language=hr}}

South Africa

{{main|Nuclear power in South Africa}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Koeberg1PWRCP1 (France){{yes|Operational}}930{{dts|1 Jul 1976}}{{dts|21 Jul 1984}}
| 2PWRCP1 (France){{yes|Operational}}930{{dts|1 Jul 1976}}{{dts|9 Nov 1985}}

South Korea

{{main|Nuclear power in South Korea}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation
(planned)

!Closed

rowspan=6| Hanbit1PWRWH F{{yes|Operational}}960{{dts|4 Jun 1981}}{{dts|25 Aug 1986}}
2PWRWH F{{yes|Operational}}958{{dts|10 Dec 1981}}{{dts|10 Jun 1987}}
3PWROPR-1000{{yes|Operational}}997{{dts|23 Dec 1989}}{{dts|31 Mar 1995}}
4PWROPR-1000{{yes|Operational}}997{{dts|26 May 1990}}{{dts|1 Jan 1996}}
5PWROPR-1000{{yes|Operational}}997{{dts|29 Jun 1997}}{{dts|21 May 2002}}
6PWROPR-1000{{yes|Operational}}995{{dts|20 Nov 1997}}{{dts|24 Dec 2002}}
rowspan=6| Hanul1PWRCP1 (France){{yes|Operational}}960{{dts|26 Jan 1983}}{{dts|10 Sep 1988}}
2PWRCP1 (France){{yes|Operational}}962{{dts|5 Jul 1983}}{{dts|30 Sep 1989}}
3PWROPR-1000{{yes|Operational}}994{{dts|21 Jul 1993}}{{dts|11 Aug 1998}}
4PWROPR-1000{{yes|Operational}}998{{dts|1 Nov 1993}}{{dts|31 Dec 1999}}
5PWROPR-1000{{yes|Operational}}996{{dts|1 Oct 1999}}{{dts|29 Jul 2004}}
6PWROPR-1000{{yes|Operational}}996{{dts|29 Sep 2000}}{{dts|22 Apr 2005}}
rowspan=4| Shin-Hanul1PWRAPR-1400{{yes|Operational}}1340{{dts|10 Jul 2012}}{{dts|7 Dec 2022}}{{cite web | url=https://www.world-nuclear-news.org/Articles/South-Korean-APR-1400-starts-commercial-operation | title=South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News }}
2PWRAPR-1400{{yes|Operational}}1340{{dts|19 Jul 2012}}{{dts|05 Apr 2024}}{{cite web | url=https://www.power-technology.com/news/unit-2-at-nuclear-power-plant-in-south-korea-enters-commercial-operation/ | title=Unit 2 at South Korean nuclear reactor enters commercial operation

| date=9 April 2024 }}

3PWRAPR-1400{{partial|Under construction}}https://www.world-nuclear-news.org/articles/construction-of-new-korean-reactor-begins1340{{dts|20 May 2025}}(2032)
4PWRAPR-1400{{planned}}1340(2033)
rowspan=4| Kori1PWRWH 60{{no|Shut down}}576{{dts|27 Apr 1972}}{{dts|29 Apr 1978}}{{dts|18 Jun 2017}}
2PWRWH F{{yes|Operational}}640{{dts|4 Dec 1977}}{{dts|25 Jul 1983}}
3PWRWH F{{yes|Operational}}1011{{dts|1 Oct 1979}}{{dts|30 Sep 1985}}
4PWRWH F{{yes|Operational}}1012{{dts|1 Apr 1980}}{{dts|29 Apr 1986}}
rowspan=2| Shin-Kori1PWROPR-1000{{yes|Operational}}996{{dts|16 Jun 2006}}{{dts|28 Feb 2011}}
2PWROPR-1000{{yes|Operational}}996{{dts|5 Jun 2007}}{{dts|20 Jul 2012}}
rowspan=4| Saeul1PWRAPR-1400{{yes|Operational}}1416{{dts|16 Oct 2008}}{{dts|15 Jan 2016}}
2PWRAPR-1400{{yes|Operational}}1418{{dts|19 Aug 2009}}{{dts|29 Aug 2019}}{{cite news |title=Second APR-1400 unit starts Opened |url=http://www.world-nuclear-news.org/Articles/Second-APR-1400-unit-starts-commercial-operation |access-date=3 Sep 2019 |work=world-nuclear-news.org}}
3PWRAPR-1400{{partial|Under construction}}1400{{dts|1 Apr 2017}}
4PWRAPR-1400{{partial|Under construction}}1400{{dts|20 Sep 2018}}
rowspan=4| Wolsong1PHWRCANDU-6{{no|Shut down}}657{{dts|30 Oct 1977}}{{dts|22 Apr 1983}}{{dts|24 Dec 2019}}
2PHWRCANDU-6{{yes|Operational}}655{{dts|22 Jun 1992}}{{dts|1 Jul 1997}}
3PHWRCANDU-6{{yes|Operational}}684{{dts|17 Mar 1994}}{{dts|1 Jul 1998}}
4PHWRCANDU-6{{yes|Operational}}688{{dts|22 Jul 1994}}{{dts|1 Oct 1999}}
rowspan=2| Shin-Wolsong1PWROPR-1000{{yes|Operational}}991{{dts|20 Nov 2007}}{{dts|31 Jul 2012}}
2PWROPR-1000{{yes|Operational}}960{{dts|23 Sep 2008}}{{dts|26 Feb 2015}}

Spain

{{main|Nuclear power in Spain}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Almaraz1PWRWH 3 loops{{yes|Operational}}1011{{dts|3 Jul 1973}}{{dts|1 Sep 1983}}
2PWRWH 3 loops{{yes|Operational}}1006{{dts|3 Jul 1973}}{{dts|1 Jul 1984}}
rowspan=2| Ascó1PWRWH 3 loops{{yes|Operational}}995{{dts|16 May 1974}}{{dts|10 Dec 1984}}
2PWRWH-3 loops{{yes|Operational}}997{{dts|7 Mar 1975}}{{dts|31 Mar 1986}}
Cofrentes1BWRBWR-6{{yes|Operational}}1064{{dts|9 Sep 1975}}{{dts|11 Mar 1985}}
José Cabrera1PWRWH 1 loop{{no|Shut down/in decommissioning}}141{{dts|24 Jun 1964}}{{dts|13 Aug 1969}}{{dts|30 Apr 2006}}
rowspan=2| Lemoniz1PWR{{BLACK|Unfinished}}{{dts|1972}}{{dts|1984}}
2PWR{{BLACK|Unfinished}}{{dts|1972}}{{dts|1984}}
Santa María de Garoña1BWRBWR-3{{no|Shut down/in decommissioning}}446{{dts|11 May 1971}}{{dts|15 Feb 1975}}{{dts|6 Jul 2013}}
Trillo1PWRKWU 3 loops{{yes|Operational}}1003{{dts|17 Aug 1979}}{{dts|6 Aug 1988}}
rowspan=2| Valdecaballeros1BWR{{BLACK|Unfinished}}{{dts|1975}}{{dts|1984}}
2BWR{{BLACK|Unfinished}}{{dts|1975}}{{dts|1984}}
rowspan=2| Vandellòs1GCRUNGG{{no|Shut down/in decommissioning}}480{{dts|1967}}{{dts|2 Aug 1972}}{{dts|31 Jul 1990}}
2PWRWH 3 loops{{yes|Operational}}1045{{dts|29 Dec 1980}}{{dts|8 Mar 1988}}

Sweden

{{main|Nuclear power in Sweden}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

!

Ågesta1PHWRR3{{no|Shut down}}/in decommissioning10{{dts|1 Dec 1957}}{{dts|1 May 1964}}{{dts|2 Jun 1974}}{{efn| The full reactor model name is R3/Adam.{{cite news |title=Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden |url=https://www.stralsakerhetsmyndigheten.se/publikationer/rapporter/sakerhet-vid-karnkraftverken/2007/200718/ |access-date=12 Jan 2023 |work=The Swedish Radiation Safety Authority |date=2007-03-31 |language=sv}} }}
rowspan=2| Barsebäck1BWRASEA-II{{no|Shut down}}/in decommissioning600{{dts|1 Feb 1971}}{{dts|1 Jul 1975}}{{dts|30 Nov 1999}}{{efn| The full reactor model name is ASEA-ATOM Gen II.{{cite news |title=IAEA Sweden reactors |url=https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=SE |access-date=12 Jan 2023 |work=IAEA |date= 2023-01-11 |language=en}} }}
2BWRASEA-II{{no|Shut down}}/in decommissioning600{{dts|1 Jan 1973}}{{dts|1 Jul 1977}}{{dts|31 May 2005}}{{efn| The full reactor model name is ASEA-ATOM Gen II. }}
rowspan=3| Forsmark1BWRASEA-III, BWR-2500{{yes|Operational}}986{{dts|1 Jun 1973}}{{dts|10 Dec 1980}}{{efn| The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.{{cite news |title=Forsmarks reaktorer i siffror |url=https://group.vattenfall.com/se/siteassets/sverige/forsmark/produktion/forsmarks-reaktorer-i-siffror-2016.pdf |access-date=12 Jan 2023 |work=Vattenfall |date=Apr 2016 |language=sv}} }}
2BWRASEA-III, BWR-2500{{yes|Operational}}1116{{dts|1 Jan 1975}}{{dts|7 Jul 1981}}{{efn| The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69. }}
3BWRASEA-IV, BWR-3000{{yes|Operational}}1167{{dts|1 Jan 1979}}{{dts|18 Aug 1985}}{{efn| The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75. }}
rowspan=3| Oskarshamn1BWRASEA-I{{no|Shut down}}/in decommissioning473{{dts|1 Aug 1966}}{{dts|6 Feb 1972}}{{dts|19 Jun 2017}}{{efn| The full reactor model name is ASEA-ATOM Gen I. }}
2BWRASEA-II{{no|Shut down}}/in decommissioning638{{dts|1 Sep 1969}}{{dts|1 Jan 1975}}{{dts|22 Dec 2016}}{{efn| The full reactor model name is ASEA-ATOM Gen II. }}
3BWRASEA-IV, BWR-3000{{yes|Operational}}1450{{dts|1 May 1980}}{{dts|15 Aug 1985}}{{efn| The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.{{cite news |title=MILSTOLPAR I VÅR HISTORIA |url=https://www.westinghousenuclear.com/sweden/om-oss/historik/milstolpar-i-var-historia |access-date=12 Jan 2023 |work=Westinghouse |language=sv}} }}
Marviken1BHWRR4{{BLACK|Unfinished}}196{{dts|1 Apr 1965}}{{dts|27 may 1970}}{{efn| The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.}}
rowspan=4| Ringhals1BWRASEA-I{{no|Shut down}}/in decommissioning881{{dts|1 Feb 1969}}{{dts|1 Jan 1976}}{{dts|31 Dec 2020}}{{efn| The full reactor model name is ASEA-ATOM Gen I. Closed at midnight on New Year's Eve.{{cite news |title=Ringhals 1 inne på slutspurten |url=https://www.svt.se/nyheter/lokalt/halland/ringhals-1-inne-pa-slutstrackan |access-date=29 Dec 2020 |work=SVT |date=26 Oct 2020 |language=sv}} }}
2PWRWH 3-loops{{no|Shut down}}/in decommissioning904{{dts|1 Oct 1970}}{{dts|1 May 1975}}{{dts|30 Dec 2019}}{{efn| The full reactor model name is Westinghouse 3-loops. }}
3PWRWH 3-loops{{yes|Operational}}1062{{dts|1 Sep 1972}}{{dts|9 Sep 1981}}{{efn| The full reactor model name is Westinghouse 3-loops. }}
4PWRWH 3-loops{{yes|Operational}}1104{{dts|1 Nov 1973}}{{dts|21 Nov 1983}}{{efn| The full reactor model name is Westinghouse 3-loops. }}

Switzerland

{{main|Nuclear power in Switzerland}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closedadmin.ch, The Federal Authorities, [http://www.admin.ch/aktuell/00089/index.html?lang=en&msg-id=39337 Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy] {{webarchive|url=https://web.archive.org/web/20130620231814/http://www.admin.ch/aktuell/00089/index.html?lang=en&msg-id=39337 |date=20 Jun 2013}}, 25 May 2011

rowspan=2| Beznau1PWRWH 2-loops{{yes|Operational}}365{{dts|1 Sep 1965}}{{dts|1 Sep 1969}}({{dts|2029}})
2PWRWH 2-loops{{yes|Operational}}365{{dts|1 Jan 1968}}{{dts|1 Dec 1971}}({{dts|2031}})
Gösgen1PWRKWU 3-loops{{yes|Operational}}1010{{dts|1 Dec 1973}}{{dts|1 Nov 1979}}
Leibstadt1BWRBWR-6{{yes|Operational}}1220{{dts|1 Jan 1974}}{{dts|15 Dec 1984}}
Lucens1HWGCRHWGCR{{no|Decommissioned}}6{{dts|1 Apr 1962}}{{dts|29 Dec 1966}}{{dts|21 Jan 1969}}
Mühleberg1BWRBWR-4{{no|Shut down}}/in decommissioning373{{dts|1 Mar 1967}}{{dts|6 Nov 1972}}{{dts|20 Dec 2019}}

Taiwan

{{main|Nuclear power in Taiwan}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Jinshan1BWRBWR-4{{no|Shut down/in decommissioning}}636{{dts|2 Jun 1972}}{{dts|10 Dec 1978}}{{dts|3 Oct 2018}}
2BWRBWR-4{{no|Shut down/in decommissioning}}636{{dts|7 Dec 1973}}{{dts|15 Jul 1979}}{{dts|3 Oct 2018}}
rowspan=2| Kuosheng1BWRBWR-6{{no|Shut down}}985{{dts|19 Nov 1975}}{{dts|28 Dec 1981}}1 Jul 2021{{cite web|url=https://www.world-nuclear-news.org/Articles/Early-shutdown-for-Taiwanese-reactor |title=Early shutdown for Taiwanese reactor : Corporate |publisher=World Nuclear News |date=1 Jul 2021 |accessdate=29 Apr 2022}}
2BWRBWR-6{{no|Shut down}}985{{dts|15 Mar 1976}}{{dts|16 Mar 1983}}{{dts|15 Mar 2023}}
rowspan=2| Lungmen1BWRABWR{{BLACK|Unfinished}}1350{{dts|31 Mar 1999}}{{dts|27 April 2014}} {{cite web |title=封存核四 馬英九:為下一代保留選擇權 |url=https://news.ltn.com.tw/news/politics/breakingnews/996408 |website=自由時報電子報 |accessdate=2024-11-08 |date=2014-04-27 |quote=馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。 |lang=zh-tw}}
2BWRABWR{{BLACK|Unfinished}}1350{{dts|30 Aug 1999}}{{dts|27 April 2014}}
rowspan=2| Maanshan1PWRWH 312 3-loop{{no|Shut down}}951{{dts|21 Aug 1978}}{{dts|27 Jul 1984}}{{dts|28 Jul 2024}}
2PWRWH 312 3-loop{{no|Shut down}}951{{dts|21 Feb 1979}}{{dts|18 May 1985}}{{dts|17 May 2025}}

Turkey

{{main|Nuclear power in Turkey}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=4| Akkuyu1PWRVVER-1200/V-509{{partial|Under construction}}11143 Apr 2018(2025){{cite web|url=https://www.world-nuclear-news.org/Articles/Major-components-in-place-at-Akkuyu-1 |title=Major components in place at Akkuyu 1 : New Nuclear |publisher=World Nuclear News |date=4 Mar 2022 |accessdate=29 Apr 2022}}
2PWRVVER-1200/V-509{{partial|Under construction}}11148 Apr 2020(2026)
3PWRVVER-1200/V-509{{partial|Under construction}}111410 Mar 2021(2027)
4PWRVVER-1200/V-509{{partial|Under construction}}111421 Jul 2022{{cite web | url=https://www.world-nuclear-news.org/Articles/Construction-begins-of-fourth-Turkish-reactor | title=Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News }}(2028)
rowspan=4| Sinop{{cite web | url=https://www.neimagazine.com/news/newsjapan-looks-to-cancel-turkish-project-6887714 | title=Japan looks to cancel Turkish project – Nuclear Engineering International | date=6 December 2018 }}{{cite web | url=https://www.hurriyetdailynews.com/turkey-japan-scrap-partnership-in-sinop-nuclear-plant-in-turkeys-north-151212 | title=Turkey, Japan scrap partnership in Sinop nuclear plant in Turkey's north – Turkey News | date=20 January 2020 }}1PWRAtmea-1{{BLACK|Cancelled}}1100
2PWRAtmea-1{{BLACK|Cancelled}}1100
3PWRAtmea-1{{BLACK|Cancelled}}1100
4PWRAtmea-1{{BLACK|Cancelled}}1100

Ukraine

{{main|Nuclear power in Ukraine}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=6| Chernobyl1LWGRRBMK-1000{{no|Shut down/in decommissioning}}740{{dts|1 Mar 1970}}{{dts|27 May 1978}}{{dts|30 Nov 1996}}
2LWGRRBMK-1000{{no|Shut down/in decommissioning}}925{{dts|1 Feb 1973}}{{dts|28 May 1979}}{{dts|11 Oct 1991}}
3LWGRRBMK-1000{{no|Shut down/in decommissioning}}925{{dts|1 Mar 1976}}{{dts|8 Jun 1982}}{{dts|15 Dec 2000}}
4LWGRRBMK-1000{{no|Destroyed}}925{{dts|1 Apr 1979}}{{dts|26 Mar 1984}}{{dts|26 Apr 1986}}
5LWGRRBMK-1000{{BLACK|Unfinished}}925
6LWGRRBMK-1000{{BLACK|Unfinished}}925
rowspan=4| Chyhyryn{{Cite web|url=https://gsminfo.com.ua/128698-v-ukrayini-zbuduyut-novu-atomnu-stancziyu-nazvano-misto-budivnycztva.html|title=В Україні збудують нову атомну станцію: названо місто будівництва|date=22 September 2022|website=GSMinfo|accessdate=9 December 2023}}1PWRAP1000{{planned}}1100
2PWRAP1000{{planned}}1100
3PWRAP1000{{planned}}1100
4PWRAP1000{{planned}}1100
rowspan=2| Crimean1PWRVVER-1000{{BLACK|Unfinished}}950{{dts|26 Jan 1984}}{{dts|1987}}
2PWRVVER-1000{{BLACK|Unfinished}}950{{dts|26 Jan 1984}}{{dts|1987}}
rowspan=2| Kharkiv1PWRVVER-1000{{BLACK|Unfinished}}900{{dts|1988}}{{dts|1990}}
2PWRVVER-1000{{BLACK|Unfinished}}900{{dts|1988}}{{dts|1990}}
rowspan=6| Khmelnytskyi1PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Nov 1981}}{{dts|13 Aug 1988}}
2PWRVVER-1000/V-320{{yes|Operational}}950{{dts|1 Feb 1985}}{{dts|15 Dec 2005}}
3PWRVVER-1000{{partial|Under construction}}950{{dts|1 Sep 1985}}({{dts|2026|
}){{cite web|url=http://www.xaec.org.ua/store/pages/ukr/khnppnews/2021-02-12/83.html|website=xaec.org.ua|title=На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків|date=12 Feb 2021|access-date=7 November 2022|archive-date=24 February 2021|archive-url=https://web.archive.org/web/20210224180138/http://xaec.org.ua/store/pages/ukr/khnppnews/2021-02-12/83.html|url-status=dead}} ||

|-

| 4 || PWR || VVER-1000 || {{partial|Under construction}} || 950 || {{dts|1 Jun 1986}} || ({{dts|2027||}}) ||

|-

| 5 || PWR || AP1000 || {{partial|Under construction}}{{cite web | url=https://www.neimagazine.com/news/ukraine-begins-construction-of-new-units-at-khmelnitsky-npp-11690350/ | title=Ukraine begins construction of new units at Khmelnitsky NPP | date=17 April 2024 }} || 1100 || {{dts|2024|4|11}} || ({{dts|2029||}}) ||

|-

| 6 || PWR || AP1000 || {{partial|Under construction}}{{cite web | url=https://ecoclubrivne.org/en/new-nuclear-reactors-in-ukraine/ | title=Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO }} || 1100 || {{dts|2024|4|11}} || ({{dts|2029||}}) ||

|-

| rowspan=2| Odesa || 1 || PWR || VVER-1000 || {{BLACK|Unfinished}} || 900 || || || {{dts|1989}}

|-

| 2 || PWR || VVER-1000 || {{BLACK|Unfinished}} || 900 || || || {{dts|1989}}

|-

| rowspan=5| Rivne || 1 || PWR || VVER-440/V-213 || {{yes|Operational}} || 381 || {{dts|1 Aug 1973}} || {{dts|22 Sep 1981}} ||

|-

| 2 || PWR || VVER-440/V-213 || {{yes|Operational}} || 376 || {{dts|1 Oct 1973}} || {{dts|29 Jul 1982}} ||

|-

| 3 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Feb 1980}} || {{dts|16 May 1987}} ||

|-

| 4 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Aug 1986}} || {{dts|6 Apr 2006}} ||

|-

| 5 || PWR || AP1000 || {{planned}} || 1100 || || ||

|-

| rowspan=4| South Ukraine || 1 || PWR || VVER-1000/V-302 || {{yes|Operational}} || 950 || {{dts|1 Aug 1976}} || {{dts|2 Dec 1983}} ||

|-

| 2 || PWR || VVER-1000/V-338 || {{yes|Operational}} || 950 || {{dts|1 Jul 1981}} || {{dts|6 Apr 1985}} ||

|-

| 3 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Nov 1984}} || {{dts|29 Dec 1989}} ||

|-

| 4 || PWR || AP1000 || {{planned}} || 1100 || || ||

|-

| rowspan=7| Zaporizhzhia || 1 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Apr 1980}} || {{dts|25 Dec 1985}} ||

|-

| 2 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Jan 1981}} || {{dts|15 Feb 1986}} ||

|-

| 3 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Apr 1982}} || {{dts|5 Mar 1987}} ||

|-

| 4 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Apr 1983}} || {{dts|14 Apr 1988}} ||

|-

| 5 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Nov 1985}} || {{dts|27 Oct 1989}} ||

|-

| 6 || PWR || VVER-1000/V-320 || {{yes|Operational}} || 950 || {{dts|1 Jun 1986}} || {{dts|17 Sep 1996}} ||

|-

| 7 || PWR || AP1000 || {{planned}} || 1100 || || ||

|}

United Arab Emirates

{{main|Nuclear power in the United Arab Emirates}}

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=4| Barakah1PWRAPR-1400{{yes|Operational}}1345{{dts|19 Jul 2012}}{{dts|6 Apr 2021}}{{cite news |title=UAE's first nuclear power plant begins Openeds |url=https://www.reuters.com/article/us-emirates-nuclearpower/uaes-first-nuclear-power-plant-begins-commercial-operations-idUSKBN2BT16E?il=0 |access-date=6 Apr 2021 |work=Reuters |date=6 Apr 2021}}
2PWRAPR-1400{{yes|Operational}}1345{{dts|16 Apr 2013}}{{dts|24 Mar 2022}}{{Cite web | url=https://www.nucnet.org/news/unit-2-begins-commercial-operation-at-arab-world-s-first-nuclear-station-3-4-2022 | title=Barakah / Unit 2 Begins Opened at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency | date=23 February 2022 }}
3PWRAPR-1400{{yes|Operational}}1345{{dts|24 Sep 2014}}24 Feb 2023{{cite web | url=https://www.world-nuclear-news.org/Articles/Third-Barakah-unit-begins-commercial-operation | title=Third Barakah unit begins Opened : New Nuclear - World Nuclear News }}
4PWRAPR-1400{{yes|Operational}}1345{{dts|30 Jul 2015}}{{dts|5 Sep 2024}}{{cite news |title=UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations| url=https://www.enec.gov.ae/news/latest-news/uae-celebrates-historic-milestone-as-unit-4-of-the-barakah-plant-commences-commercial-operation/ |date=5 Sep 2024}}

United Kingdom

{{main|Nuclear power in the United Kingdom}}

{{See also|Proposed nuclear power stations in the United Kingdom}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Berkeley1GCRMagnox{{no|Decommissioned}}138{{dts|1 Jan 1957}}{{dts|12 Jun 1962}}{{dts|31 Mar 1989}}
2GCRMagnox{{no|Decommissioned}}138{{dts|1 Jan 1957}}{{dts|20 Oct 1962}}{{dts|26 Oct 1988}}
rowspan=2| Bradwell1GCRMagnox{{no|Decommissioned}}123{{dts|1 Jan 1957}}{{dts|1 Jul 1962}}{{dts|31 Mar 2002}}
2GCRMagnox{{no|Decommissioned}}123{{dts|1 Jan 1957}}{{dts|12 Nov 1962}}{{dts|30 Mar 2002}}
rowspan=4| Calder Hall1GCRMagnox{{no|Shut down}}/in decommissioning49{{dts|1 Aug 1953}}{{dts|1 Oct 1956}}{{dts|31 Mar 2003}}
2GCRMagnox{{no|Shut down}}/in decommissioning49{{dts|1 Aug 1953}}{{dts|1 Feb 1957}}{{dts|31 Mar 2003}}
3GCRMagnox{{no|Shut down}}/in decommissioning49{{dts|1 Aug 1955}}{{dts|1 May 1958}}{{dts|31 Mar 2003}}
4GCRMagnox{{no|Shut down}}/in decommissioning49{{dts|1 Aug 1955}}{{dts|1 Apr 1959}}{{dts|31 Mar 2003}}
rowspan=4| Chapelcross1GCRMagnox{{no|Shut down}}/in decommissioning48{{dts|1 Oct 1955}}{{dts|1 Mar 1959}}{{dts|29 Jun 2004}}
2GCRMagnox{{no|Shut down}}/in decommissioning48{{dts|1 Oct 1955}}{{dts|1 Aug 1959}}{{dts|29 Jun 2004}}
3GCRMagnox{{no|Shut down}}/in decommissioning48{{dts|1 Oct 1955}}{{dts|1 Dec 1959}}{{dts|29 Jun 2004}}
4GCRMagnox{{no|Shut down}}/in decommissioning48{{dts|1 Oct 1955}}{{dts|1 Mar 1960}}{{dts|29 Jun 2004}}
rowspan=2| Dounreay1SFRDFR{{no|Shut down}}/in decommissioning11{{dts|1 Mar 1955}}{{dts|1 Oct 1962}}{{dts|1 Mar 1977}}
2SFRPFR{{no|Shut down}}/in decommissioning234{{dts|1 Jan 1966}}{{dts|1 Jul 1976}}{{dts|31 Mar 1994}}
rowspan=2| Dungeness AA-1GCRMagnox{{no|Shut down}}/in decommissioning225{{dts|1 Jul 1960}}{{dts|28 Oct 1965}}{{dts|31 Dec 2006}}
A-2GCRMagnox{{no|Shut down}}/in decommissioning225{{dts|1 Jul 1960}}{{dts|30 Dec 1965}}{{dts|31 Dec 2006}}
rowspan=2| Dungeness BB-1GCRAGR{{no|Shut down}}520{{dts|1 Oct 1965}}{{dts|1 Apr 1985}}{{dts|7 Jun 2021}}
B-2GCRAGR{{no|Shut down}}520{{dts|1 Oct 1965}}{{dts|1 Apr 1989}}{{dts|7 Jun 2021}}
rowspan=2| Hartlepool1GCRAGR{{yes|Operational}}595{{dts|1 Oct 1968}}{{dts|1 Apr 1989}}({{dts|2027}}){{cite news | url = https://www.theguardian.com/environment/2024/dec/04/four-of-uks-oldest-nuclear-plants-to-run-for-even-longer-as-hinkley-point-delayed | title = Four of UK’s oldest nuclear plants to run for even longer as Hinkley Point delayed | first1 = Jillian | last1 = Ambrose | date = 4 December 2024 | access-date = 4 December 2024}}
2GCRAGR{{yes|Operational}}585{{dts|1 Oct 1968}}{{dts|1 Apr 1989}}({{dts|2027}})
rowspan=4| HeyshamA-1GCRAGR{{yes|Operational}}585{{dts|1 Dec 1970}}{{dts|1 Apr 1989}}({{dts|2027}})
A-2GCRAGR{{yes|Operational}}575{{dts|1 Dec 1970}}{{dts|1 Apr 1989}}({{dts|2027}})
B-1GCRAGR{{yes|Operational}}610{{dts|1 Aug 1980}}{{dts|1 Apr 1989}}({{dts|2030}})
B-2GCRAGR{{yes|Operational}}610{{dts|1 Aug 1980}}{{dts|1 Apr 1989}}({{dts|2030}})
rowspan=2| Hinkley Point A1GCRMagnox{{no|Shut down}}/in decommissioning235{{dts|1 Nov 1957}}{{dts|30 Mar 1965}}{{dts|23 May 2000}}
2GCRMagnox{{no|Shut down}}/in decommissioning235{{dts|1 Nov 1957}}{{dts|5 May 1965}}{{dts|23 May 2000}}
rowspan=2| Hinkley Point B1GCRAGR{{no|Shut down/in decommissioning}}435{{dts|1 Sep 1967}}{{dts|2 Oct 1978}}{{dts|1 Aug 2022}}{{Cite web |title=Hinkley Point B enters retirement : Corporate – World Nuclear News |url=https://www.world-nuclear-news.org/Articles/Hinkley-Point-B-enters-retirement |access-date=2 Aug 2022 |website=world-nuclear-news.org}}
2GCRAGR{{no|Shut down/in decommissioning}}435{{dts|1 Sep 1967}}{{dts|27 Sep 1976}}{{dts|6 Jul 2022}}{{Cite web |title=PRIS – Reactor Details |url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=245 |access-date=25 Jul 2022 |website=pris.iaea.org}}
rowspan=2| Hinkley Point C1PWREPR{{partial|Under construction}}1600{{dts|11 Dec 2018}}(2029){{cite web | url=https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx | title=Plans for New Nuclear Reactors Worldwide - World Nuclear Association }}
2PWREPR{{partial|Under construction}}1600{{dts|12 Dec 2019}}(2030){{cite web | url=https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx | title=Plans for New Nuclear Reactors Worldwide - World Nuclear Association }}
rowspan=2| Hunterston A1GCRMagnox{{no|Shut down}}/in decommissioning150{{dts|1 Oct 1957}}{{dts|5 Feb 1964}}{{dts|30 Mar 1990}}
2GCRMagnox{{no|Shut down}}/in decommissioning150{{dts|1 Oct 1957}}{{dts|1 Jul 1964}}{{dts|31 Dec 1989}}
rowspan=2| Hunterston B1GCRAGR{{no|Shut down}}460{{dts|1 Nov 1967}}{{dts|6 Feb 1976}}{{dts|26 Nov 2021}}
2GCRAGR{{no|Shut down}}460{{dts|1 Nov 1967}}{{dts|31 Mar 1977}}{{dts|7 Jan 2022}}{{cite web | url=https://www.theguardian.com/business/2022/jan/07/hunterston-b-nuclear-power-station-retires-after-46-years-in-service | title=Hunterston B nuclear power station retires after 46 years in service | website=The Guardian | date=7 Jan 2022 }}
rowspan=2| Oldbury1GCRMagnox{{no|Shut down}}/in decommissioning217{{dts|1 May 1962}}{{dts|31 Dec 1967}}{{dts|29 Feb 2012}}
2GCRMagnox{{no|Shut down}}/in decommissioning217{{dts|1 May 1962}}{{dts|30 Sep 1968}}{{dts|30 Jun 2011}}
rowspan=2| Sizewell A1GCRMagnox{{no|Shut down}}/in decommissioning210{{dts|1 Apr 1961}}{{dts|25 Mar 1966}}{{dts|31 Dec 2006}}
2GCRMagnox{{no|Shut down}}/in decommissioning210{{dts|1 Apr 1961}}{{dts|15 Sep 1966}}{{dts|31 Dec 2006}}
Sizewell B1PWRWH SNUPPS{{yes|Operational}}1191{{dts|18 Jul 1988}}{{dts|22 Sep 1995}}({{dts|2035}})
rowspan=2| Sizewell C1PWREPR{{planned}}1600(2025)
2PWREPR{{planned}}1600(2025)
rowspan=2| Torness1GCRAGR{{yes|Operational}}595{{dts|1 Aug 1980}}{{dts|25 May 1988}}({{dts|2030}})
2GCRAGR{{yes|Operational}}595{{dts|1 Aug 1980}}{{dts|3 Feb 1989}}({{dts|2030}})
rowspan=2| Trawsfynydd1GCRMagnox{{no|Shut down}}/in decommissioning195{{dts|1 Jul 1959}}{{dts|24 Mar 1965}}{{dts|6 Feb 1991}}
2GCRMagnox{{no|Shut down}}/in decommissioning195{{dts|1 Jul 1959}}{{dts|24 Mar 1965}}{{dts|4 Feb 1991}}
Winfrith{{cite web |title=PRIS – Reactor Details |url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=239 |website=pris.iaea.org |access-date=24 Jan 2019}}1SGHWRSGHWR{{no|Shut down}}/in decommissioning92{{dts|1 May 1963}}{{dts|1 Jan 1968}}{{dts|11 Sep 1990}}
rowspan=2| Wylfa1GCRMagnox{{no|Shut down}}/in decommissioning490{{dts|1 Sep 1963}}{{dts|1 Nov 1971}}{{dts|30 Dec 2015}}
2GCRMagnox{{no|Shut down}}/in decommissioning490{{dts|1 Sep 1963}}{{dts|3 Jan 1972}}{{dts|25 Apr 2012}}

United States

{{main|Nuclear power in the United States}}

{{See also|List of cancelled nuclear reactors in the United States|Army Nuclear Power Program|List of United States Naval reactors}}

{{for|plutonium production reactors|Hanford Site|Savannah River Site}}

{{sticky header}}

class="wikitable sortable mw-datatable sticky-header"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan=2| Arkansas Nuclear One1PWRB & W (DRY-Cont){{yes|Operational}}836{{dts|1 Oct 1968}}{{dts|21 May 1974}}
2PWRCE (DRY){{yes|Operational}}988{{dts|6 Dec 1968}}{{dts|1 Sep 1978}}
rowspan=2| Beaver Valley1PWRWH 3-loop (DRY){{yes|Operational}}908{{dts|26 Jun 1970}}{{dts|2 Jul 1976}}
2PWRWH 3-loop (DRY){{yes|Operational}}905{{dts|3 May 1974}}{{dts|14 Aug 1987}}
Big Rock Point{{cite web|title=PRIS – Reactor Details|url=https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=601|website=iaea.org|access-date=11 May 2018}}1BWRBWR-1{{no|Dismantled}}67{{dts|1 May 1960}}{{dts|29 Mar 1963}}{{dts|29 Aug 1997}}
rowspan=2| Braidwood1{{cite web|title=PRIS – Reactor Details|url=https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737|website=iaea.org|access-date=11 May 2018}}PWRWH 4-loop (DRY){{yes|Operational}}1194{{dts|1 Aug 1975}}{{dts|29 Jul 1988}}
2{{cite web|title=PRIS – Reactor Details|url=https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=738|website=iaea.org|access-date=11 May 2018}}PWRWH 4-loop (DRY){{yes|Operational}}1160{{dts|1 Aug 1975}}{{dts|17 Oct 1988}}
rowspan=3| Browns Ferry1BWRBWR-4 (WET){{yes|Operational}}1200{{dts|1 May 1967}}{{dts|1 Aug 1974}}
2BWRBWR-4 (WET){{yes|Operational}}1200{{dts|1 May 1967}}{{dts|1 Mar 1975}}
3BWRBWR-4 (WET){{yes|Operational}}1210{{dts|1 Jul 1968}}{{dts|1 Mar 1977}}
rowspan=2| Brunswick1BWRBWR-4 (WET){{yes|Operational}}938{{dts|7 Feb 1970}}{{dts|18 Mar 1977}}{{cite web|url=http://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=662|title=Brunswick-1|publisher=IAEA|access-date=14 Apr 2013}}
2BWRBWR-4 (WET){{yes|Operational}}932{{dts|7 Feb 1970}}{{dts|3 Nov 1975}}{{cite web|url=http://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=661|title=Brunswick-2|publisher=IAEA|access-date=14 Apr 2013}}
rowspan=2| Byron1PWRWH 4-loop (DRY){{yes|Operational}}1164{{dts|1 Apr 1975}}{{dts|16 Sep 1985}}
2PWRWH 4-loop (DRY){{yes|Operational}}1136{{dts|1 Apr 1975}}{{dts|2 Aug 1987}}
Callaway1PWRWH 4-loop (DRY){{yes|Operational}}1215{{dts|1 Sep 1975}}{{dts|19 Dec 1984}}
rowspan=2| Calvert Cliffs1PWRCE 2-loop (DRY){{yes|Operational}}877{{dts|1 Jun 1968}}{{dts|8 May 1977}}
2PWRCE 2-loop (DRY){{yes|Operational}}855{{dts|1 Jun 1968}}{{dts|1 Apr 1977}}
rowspan="6" | Carbon Free Power Project{{cite web|url=https://www.world-nuclear-news.org/Articles/Scaled-down-SMR-pilot-project-remains-on-course |title=Scaled down SMR pilot project remains on course : New Nuclear |publisher=World Nuclear News |date=23 Jul 2021 |accessdate=29 Apr 2022}}{{cite news |url=https://www.world-nuclear-news.org/Articles/Idaho-SMR-project-terminated |title=Idaho SMR project terminated |website=World Nuclear News |date=9 November 2023 |access-date=9 November 2023}}1PWRVOYGR{{BLACK|Cancelled}}77data-sort-value="2029-01-01"|
2PWRVOYGR{{BLACK|Cancelled}}77data-sort-value="2029-01-01"|
3PWRVOYGR{{BLACK|Cancelled}}77data-sort-value="2029-01-01"|
4PWRVOYGR{{BLACK|Cancelled}}77data-sort-value="2029-01-01"|
5PWRVOYGR{{BLACK|Cancelled}}77data-sort-value="2029-01-01"|
6PWRVOYGR{{BLACK|Cancelled}}77data-sort-value="2029-01-01"|
rowspan=2| Catawba1PWRWH 4-loop (ICECOND){{yes|Operational}}1160{{dts|1 May 1974}}{{dts|29 Jun 1985}}
2PWRWH 4-loop (ICECOND){{yes|Operational}}1150{{dts|1 May 1974}}{{dts|19 Aug 1986}}
Clinch River1BWRBWRX-300{{planned}}300
Clinton1BWRBWR-6 (WET){{yes|Operational}}1062{{dts|1 Oct 1975}}{{dts|24 Nov 1987}}
Columbia1BWRBWR-5 (WET){{yes|Operational}}1131{{dts|1 Aug 1972}}{{dts|13 Dec 1984}}
rowspan=2| Comanche Peak1PWRWH 4-loop (DRY){{yes|Operational}}1205{{dts|19 Dec 1974}}{{dts|13 Aug 1990}}
2PWRWH 4-loop (DRY){{yes|Operational}}1195{{dts|19 Dec 1974}}{{dts|3 Aug 1993}}
Connecticut Yankee1PWRWH (DRY){{no|Dismantled}}582{{dts|1 May 1964}}{{dts|1 Jan 1968}}{{dts|5 Dec 1996}}
Cooper1BWRBWR-4 (WET){{yes|Operational}}769{{dts|1 Jun 1968}}{{dts|1 Jul 1974}}
Crystal River 31PWRB & W (DRY){{no|Shut down/in decommissioning}}860{{dts|25 Sep 1968}}{{dts|13 Mar 1977}}{{dts|5 Feb 2013}}
Davis–Besse1PWRB & W (DRY){{yes|Operational}}894{{dts|1 Sep 1970}}{{dts|31 Jul 1978}}
rowspan=2| Diablo Canyon1PWRWH 4-Loop (DRY){{yes|Operational}}1138{{dts|23 Apr 1968}}{{dts|7 May 1985}}
2PWRWH 4-Loop (DRY){{yes|Operational}}1118{{dts|9 Dec 1970}}{{dts|13 Mar 1986}}
rowspan=2| Donald C. Cook1PWRWH 4-Loop (ICECOND){{yes|Operational}}1020{{dts|25 Mar 1969}}{{dts|27 Aug 1975}}
2PWRWH 4-Loop (ICECOND){{yes|Operational}}1090{{dts|25 Mar 1969}}{{dts|1 Jul 1978}}
rowspan=3| Dresden1BWRBWR-1{{no|Shut down}}197{{dts|1 May 1956}}{{dts|4 Jul 1960}}{{dts|31 Oct 1978}}
2BWRBWR-3 (WET){{yes|Operational}}894{{dts|10 Jan 1966}}{{dts|9 Jun 1970}}
3BWRBWR-3 (WET){{yes|Operational}}879{{dts|14 Oct 1966}}{{dts|16 Nov 1971}}
Duane Arnold1BWRBWR-4 (WET){{no|Shut down}}601{{dts|22 May 1970}}{{dts|1 Feb 1975}}{{dts|10 Aug 2020}}
rowspan=2| Edwin I. Hatch1BWRBWR-4 (WET){{yes|Operational}}924{{dts|30 Sep 1968}}{{dts|31 Dec 1975}}
2BWRBWR-4 (WET){{yes|Operational}}924{{dts|1 Feb 1972}}{{dts|5 Sep 1979}}
Elk River1BWR{{no|Dismantled}}22{{dts|1 Jan 1959}}{{dts|1 Jul 1964}}{{dts|1 Feb 1968}}
rowspan=2| Fermi1FBRPrototype{{no|Shut down}}61{{dts|8 Aug 1956}}{{dts|7 Aug 1966}}{{dts|29 Nov 1972}}
2BWRBWR-4 (WET){{yes|Operational}}1115{{dts|26 Sep 1972}}{{dts|23 Jan 1988}}
Fort Calhoun1PWRCE 2-loop (WET){{no|Shut down}}482{{dts|7 Jun 1968}}

| {{dts|9 Aug 1973}}

{{dts|24 Oct 2016}}
Fort St. Vrain1HTGRGeneral Atomics{{no|Shut down}}330{{dts|1 Sep 1968}}{{dts|1 Jul 1979}}{{dts|29 Aug 1989}}
Ginna1PWRWH 2-loop (DRY){{yes|Operational}}560{{dts|25 Apr 1966}}{{dts|1 Jun 1970}}
Grand Gulf1BWRBWR-6 (WET){{yes|Operational}}1401{{dts|4 May 1974}}{{dts|1 Jul 1985}}
H. B. Robinson1PWRWH 3-loop (DRY){{yes|Operational}}735{{dts|13 Apr 1967}}{{dts|7 Mar 1971}}
Hallam1SGRAtomics International{{no|Dismantled}}75{{dts|1 Jan 1959}}{{dts|1 Nov 1963}}{{dts|1 Sep 1969}}
rowspan=4| HartsvilleA1{{Cite news|url=https://www.ans.org/news/article-1686/tva-prepares-to-write-final-nuclear-chapters/|title=TVA Prepares to Write Final Nuclear Chapters|date=17 Apr 2015|work=American Nuclear Society|access-date=5 Oct 2023|archive-date=29 July 2023|archive-url=https://web.archive.org/web/20230729001150/https://www.ans.org/news/article-1686/tva-prepares-to-write-final-nuclear-chapters/|url-status=dead}}BWRBWR-6{{BLACK|Unfinished}}1285{{dts|23 May 1975}}{{cite web |title=Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park |url=http://www.tva.gov/environment/reports/hartsville/hartsville_ea.pdf |author=Tennessee Valley Authority |access-date=5 Oct 2023 |url-status=dead |archive-url=https://web.archive.org/web/20090105233433/http://www.tva.gov/environment/reports/hartsville/hartsville_ea.pdf |archive-date=January 5, 2009 }}{{dts|29 Aug 1984}}
A2BWRBWR-6{{BLACK|Unfinished}}1285{{dts|23 May 1975}}{{dts|29 Aug 1984}}
B1BWRBWR-6{{BLACK|Unfinished}}1285{{dts|23 May 1975}}{{dts|22 Mar 1983}}
B2BWRBWR-6{{BLACK|Unfinished}}1285{{dts|23 May 1975}}{{dts|22 Mar 1983}}
Hope Creek1BWRBWR-4 (WET){{yes|Operational}}1172{{dts|1 Mar 1976}}{{dts|20 Dec 1986}}
Humboldt Bay1BWRBWR-1{{no|Dismantled}}63{{dts|1 Nov 1960}}{{dts|1 Aug 1963}}{{dts|2 Jul 1976}}
rowspan=3| Indian Point1PWR{{no|Shut down}}257{{dts|1 May 1956}}{{dts|1 Oct 1962}}{{dts|31 Oct 1974}}
2PWRWH 4-loop (DRY){{no|Shut down}}998{{dts|14 Oct 1966}}{{dts|1 Aug 1974}}{{dts|30 Apr 2020}}{{Cite news|url=http://www.safesecurevital.com/entergy-s-indian-point-unit-2-to-shut-down-permanently/|title=Entergy's Indian Point Unit 2 to Shut Down Permanently|date=29 Apr 2020|work=Indian Point Energy Center|access-date=30 Apr 2020|archive-date=3 Aug 2020|archive-url=https://web.archive.org/web/20200803092138/http://www.safesecurevital.com/entergy-s-indian-point-unit-2-to-shut-down-permanently/|url-status=usurped}}
3PWRWH 4-loop (DRY){{no|Shut down}}1030{{dts|1 Nov 1968}}{{dts|30 Aug 1976}}{{dts|30 Apr 2021}}
James A. FitzPatrick1BWRBWR-4 (WET){{yes|Operational}}813{{dts|1 Sep 1968}}{{dts|28 Jul 1975}}
rowspan=2| Joseph M. Farley1PWRWH 3-Loop (DRY){{yes|Operational}}874{{dts|1 Oct 1970}}{{dts|1 Dec 1977}}
2PWRWH 3-Loop (DRY){{yes|Operational}}883{{dts|1 Oct 1970}}{{dts|30 Jul 1981}}
Kemmerer1SFRNatrium{{partial|Under construction}}345{{dts|10 Jun 2024}}
Kewaunee1PWRWH 2-loop (DRY){{no|Shut down}}566{{dts|6 Aug 1968}}{{dts|16 Jun 1974}}{{dts|7 May 2013}}
La Crosse1BWRBWR-1{{no|Dismantled}}48{{dts|1 Mar 1963}}{{dts|7 Nov 1969}}{{dts|30 Apr 1987}}
rowspan=2| LaSalle County1BWRBWR-5 (WET){{yes|Operational}}1137{{dts|10 Sep 1973}}{{dts|1 Jan 1984}}
2BWRBWR-5 (WET){{yes|Operational}}1140{{dts|10 Sep 1973}}{{dts|19 Oct 1984}}
rowspan=2| Limerick1BWRBWR-5 (WET){{yes|Operational}}1134{{dts|19 Jun 1974}}{{dts|1 Feb 1986}}
2BWRBWR-5 (WET){{yes|Operational}}1134{{dts|19 Jun 1974}}{{dts|8 Jan 1990}}
rowspan=4| Long Mott1HTGRXe-100{{planned}}80
2HTGRXe-100{{planned}}80
3HTGRXe-100{{planned}}80
4HTGRXe-100{{planned}}80
Maine Yankee1PWRWH (DRY){{no|Dismantled}}860{{dts|1 Oct 1968}}{{dts|28 Dec 1972}}{{dts|1 Aug 1997}}
Marble Hill1PWRWH (DRY){{BLACK|Unfinished}}1130{{dts|1 Aug 1977}}{{dts|10 Jan 1984}}
rowspan=2| McGuire1PWRWH 4-Loop (ICECOND){{yes|Operational}}1158{{dts|1 Apr 1971}}{{dts|1 Dec 1981}}
2PWRWH 4-Loop (ICECOND){{yes|Operational}}1158{{dts|1 Apr 1971}}{{dts|1 Mar 1984}}
rowspan=3| Millstone1BWRBWR-3 (WET){{no|Shut down}}641{{dts|1 May 1966}}{{dts|28 Dec 1970}}{{dts|21 Jul 1998}}
2PWRCE 2-loop (DRY){{yes|Operational}}869{{dts|1 Nov 1969}}{{dts|26 Dec 1975}}
3PWRWH 4-Loop (DRY){{yes|Operational}}1210{{dts|9 Aug 1974}}{{dts|23 Apr 1986}}
Monticello1BWRBWR-3 (WET){{yes|Operational}}628{{dts|19 Jun 1967}}{{dts|30 Jun 1971}}
rowspan=2| Nine Mile Point1BWRBWR-2 (WET){{yes|Operational}}613{{dts|12 Apr 1965}}{{dts|1 Dec 1969}}
2BWRBWR-5 (WET){{yes|Operational}}1277{{dts|1 Aug 1975}}{{dts|11 Mar 1988}}
rowspan=2| North Anna1PWRWH 3-Loop (DRY){{yes|Operational}}948{{dts|19 Feb 1971}}{{dts|6 Jun 1978}}
2PWRWH 3-Loop (DRY){{yes|Operational}}944{{dts|19 Feb 1971}}{{dts|14 Dec 1980}}
rowspan=3| Oconee1PWRB & W (DRY){{yes|Operational}}847{{dts|6 Nov 1967}}{{dts|15 Jul 1973}}
2PWRB & W (DRY){{yes|Operational}}848{{dts|6 Nov 1967}}{{dts|9 Sep 1974}}
3PWRB & W (DRY){{yes|Operational}}859{{dts|6 Nov 1967}}{{dts|16 Dec 1974}}
Oyster Creek1BWRBWR-2 (WET){{no|Shut down}}619{{dts|15 Dec 1964}}{{dts|23 Dec 1969}}{{dts|17 Sep 2018}}
rowspan=3 | Palisades1PWRCE 2-loop (DRY){{partial|Restart Planned}}805{{dts|14 Mar 1967}}{{dts|31 Dec 1971}}{{dts|20 May 2022}}
2PWRSMR-300{{planned}}300
3PWRSMR-300{{planned}}300
rowspan=3 | Palo Verde1PWRCE80 2-loop (DRY){{yes|Operational}}1311{{dts|25 May 1976}}{{dts|28 Jan 1986}}
2PWRCE80 2-loop (DRY){{yes|Operational}}1314{{dts|1 Jun 1976}}{{dts|19 Sep 1986}}
3PWRCE80 2-loop (DRY){{yes|Operational}}1312{{dts|1 Jun 1976}}{{dts|8 Jan 1988}}
Parr1PHWRCVTR{{no|Dismantled}}17{{dts|1 Jan 1960}}{{dts|18 Dec 1963}}{{dts|10 Jan 1967}}
Pathfinder1BWRBWR-1{{no|Dismantled}}59{{dts|1 Jan 1959}}{{dts|1 Aug 1966}}{{dts|1 Oct 1967}}
rowspan=3| Peach Bottom1GCRPrototype{{no|Shut down}}40{{dts|1 Feb 1962}}{{dts|1 Jun 1966}}{{dts|1 Nov 1974}}
2BWRBWR-4 (WET){{yes|Operational}}1300{{dts|31 Jan 1968}}{{dts|5 Jul 1974}}
3BWRBWR-4 (WET){{yes|Operational}}1331{{dts|31 Jan 1968}}{{dts|23 Dec 1974}}
Perry1BWRBWR-6 (WET){{yes|Operational}}1240{{dts|1 Oct 1974}}{{dts|18 Nov 1987}}
Pilgrim1BWRBWR-3 (WET){{no|Shut down}}677{{dts|26 Aug 1968}}{{dts|9 Dec 1972}}{{dts|31 May 2019}}
Piqua1OCRAtomics International{{no|Decommissioned}}12{{dts|1 Jan 1960}}{{dts|1 Nov 1963}}{{dts|1 Jan 1966}}
rowspan=2| Point Beach1PWRWH 2-loop (DRY){{yes|Operational}}591{{dts|19 Jul 1967}}{{dts|21 Dec 1970}}
2PWRWH 2-loop (DRY){{yes|Operational}}591{{dts|25 Jul 1968}}{{dts|1 Oct 1972}}
rowspan=2| Prairie Island1PWRWH 2-loop (DRY){{yes|Operational}}522{{dts|25 Jun 1968}}{{dts|16 Dec 1973}}
2PWRWH 2-loop (DRY){{yes|Operational}}519{{dts|25 Jun 1969}}{{dts|21 Dec 1974}}
rowspan=2| Quad Cities1BWRBWR-4 (WET){{yes|Operational}}908{{dts|15 Feb 1967}}{{dts|18 Feb 1973}}
2BWRBWR-4 (WET){{yes|Operational}}911{{dts|15 Feb 1967}}{{dts|10 Mar 1973}}
Rancho Seco1PWRWH (DRY){{no|Decommissioned}}873{{dts|1 Apr 1969}}{{dts|17 Apr 1975}}{{dts|23 Jun 1989}}
River Bend1BWRBWR-6 (WET){{yes|Operational}}967{{dts|25 Mar 1977}}{{dts|16 Jun 1986}}
rowspan=2| Salem1PWRWH 4-loop (DRY){{yes|Operational}}1169{{dts|25 Sep 1968}}{{dts|30 Jun 1977}}
2PWRWH 4-loop (DRY){{yes|Operational}}1158{{dts|25 Sep 1968}}{{dts|31 Oct 1981}}
rowspan=3| San Onofre1PWRWH (DRY){{no|Dismantled}}436{{dts|16 Jul 1964}}{{dts|1 Jan 1968}}{{dts|30 Nov 1992}}
2PWRCE (DRY){{no|Shut down/in decommissioning}}1070{{dts|1 Mar 1974}}{{dts|8 Aug 1983}}{{dts|7 Jun 2013}}
3PWRCE (DRY){{no|Shut down/in decommissioning}}1180{{dts|1 Mar 1974}}{{dts|1 Apr 1984}}{{dts|7 Jun 2013}}
Saxton1PWR{{no|Decommissioned}}3{{dts|1 Jan 1960}}{{dts|Nov 1961}}{{dts|May 1972}}
Seabrook1PWRWH 4-Loop (DRY){{yes|Operational}}1246{{dts|7 Jul 1976}}{{dts|15 Mar 1990}}
rowspan=2| Sequoyah1PWRWH 4-Loop (ICECOND){{yes|Operational}}1152{{dts|27 May 1970}}{{dts|1 Jul 1981}}
2PWRWH 4-Loop (ICECOND){{yes|Operational}}1139{{dts|27 May 1970}}{{dts|1 Jun 1982}}
Shearon Harris1PWRWH 3-Loop (DRY){{yes|Operational}}964{{dts|28 Jan 1978}}{{dts|2 May 1987}}
Shippingport1PWRWH{{no|Dismantled}}60{{dts|6 Sep 1954}}{{dts|26 May 1958}}{{dts|Dec 1989}}
Shoreham1BWRGE{{no|Shut down}}820{{dts|1 Nov 1972}}{{dts|1 Aug 1986}}{{dts|1 May 1989}}
SRE1FBR{{no|Decommissioned}}6.5{{dts|1954}}{{dts|12 Jul 1957}}{{dts|15 Feb 1964}}
rowspan=2| South Texas1PWRWH 4-loop (DRY){{yes|Operational}}1280{{dts|22 Dec 1975}}{{dts|25 Aug 1988}}
2PWRWH 4-loop (DRY){{yes|Operational}}1280{{dts|22 Dec 1975}}{{dts|19 Jun 1989}}
rowspan=2| St. Lucie1PWRCE (DRY){{yes|Operational}}981{{dts|1 Jul 1970}}{{dts|1 Mar 1976}}
2PWRCE (DRY){{yes|Operational}}987{{dts|2 Jun 1977}}{{dts|10 Jun 1983}}
rowspan=2| Surry1PWRWH 3-loop (DRY){{yes|Operational}}838{{dts|25 Jun 1968}}{{dts|22 Dec 1972}}
2PWRWH 3-loop (DRY){{yes|Operational}}838{{dts|25 Jun 1968}}{{dts|1 May 1973}}
rowspan=2| Susquehanna1BWRBWR-5 (WET){{yes|Operational}}1257{{dts|2 Nov 1973}}{{dts|12 Nov 1982}}
2BWRBWR-5 (WET){{yes|Operational}}1257{{dts|2 Nov 1973}}{{dts|27 Jun 1984}}
rowspan=2| Three Mile Island1PWRB & W (DRY){{partial|Restart Planned}}819{{dts|18 May 1968}}{{dts|2 Sep 1974}}{{dts|20 Sep 2019}}
2PWRB & W (DRY){{no| Core melt}}880{{dts|1 Nov 1969}}{{dts|30 Dec 1978}}{{dts|28 Mar 1979}}
Trojan1PWRWH (DRY){{no|Dismantled}}1095{{dts|1 Feb 1970}}{{dts|20 May 1976}}{{dts|9 Nov 1992}}
rowspan=2| Turkey Point3PWRWH 3-Loop (DRY){{yes|Operational}}829{{dts|27 Apr 1967}}{{dts|14 Dec 1972}}
4PWRWH 3-Loop (DRY){{yes|Operational}}821{{dts|27 Apr 1967}}{{dts|7 Sep 1973}}
Vallecitos1BWRBWR-1{{no|Shut down}}25{{dts|1 Jan 1956}}{{dts|19 Oct 1957}}{{dts|9 Dec 1963}}
Vermont Yankee1BWRBWR-4 (WET){{no|Shut down}}605{{cite web | url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=626 | title=PRIS – Reactor Details }}{{dts|11 Dec 1967}}{{dts|30 Nov 1972}}{{dts|29 Dec 2014}}StarTribune.com, WILSON RING [http://www.startribune.com/business/287030041.html Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity] {{webarchive|url=https://web.archive.org/web/20141229231838/http://www.startribune.com/business/287030041.html |date=29 Dec 2014}}, 29 Dec 2014
rowspan=3 | Virgil C. Summer1PWRWH 3-Loop (DRY){{yes|Operational}}973{{dts|21 Mar 1973}}{{dts|1 Jan 1984}}
2PWRAP1000{{BLACK|Unfinished}}1117{{dts|9 Mar 2013}}
3PWRAP1000{{BLACK|Unfinished}}1117{{dts|2 Nov 2013}}
rowspan=4 | Vogtle1PWRWH 4-Loop (DRY){{yes|Operational}}1150{{dts|1 Aug 1976}}{{dts|1 Jun 1987}}
2PWRWH 4-Loop (DRY){{yes|Operational}}1152{{dts|1 Aug 1976}}{{dts|20 May 1989}}
3PWRAP1000{{yes|Operational}}1117{{dts|12 Mar 2013}}{{dts|31 Jul 2023}}{{cite web|url=https://www.prnewswire.com/news-releases/vogtle-unit-3-goes-into-operation-301889148.html |title=Vogtle Unit 3 goes into operation |publisher=Cision |date=31 Jul 2023 |accessdate=31 Jul 2023}}
4PWRAP1000{{yes|Operational}}1117{{dts|19 Nov 2013}}{{dts|29 April 2024}}{{cite web | url=https://www.world-nuclear-news.org/Articles/Commercial-operation-marks-completion-of-Vogtle-ex | title=Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News }}
Waterford1PWRCE 2-loop (DRY){{yes|Operational}}1168{{dts|14 Nov 1974}}{{dts|24 Sep 1985}}
rowspan=2| Watts Bar1PWRWH 4-Loop (ICECOND){{yes|Operational}}1157{{dts|20 Jul 1973}}{{dts|27 May 1996}}
2PWRWH 4-Loop (ICECOND){{yes|Operational}}1164{{dts|1 Sep 1973}}{{dts|4 Jun 2016}}
Wolf Creek1PWRWH 4-Loop (DRY){{yes|Operational}}1200{{dts|31 May 1977}}{{dts|3 Sep 1985}}
Yankee Rowe1PWRWH (DRY){{no|Dismantled}}167{{dts|1 Nov 1957}}{{dts|1 Jul 1961}}{{dts|1 Oct 1991}}
rowspan=2| Zion1PWRWH (DRY){{no|Dismantled}}1040{{dts|1 Dec 1968}}{{dts|31 Dec 1973}}{{dts|13 Feb 1998}}
2PWRWH (DRY){{no|Dismantled}}1040{{dts|1 Dec 1968}}{{dts|17 Sep 1974}}{{dts|13 Feb 1998}}

Uzbekistan

class="wikitable sortable mw-datatable"
Plant
name

!Unit
No.

!Type

!Model

!Status

!Capacity
(MW)

!Begin
building

!Commercial
operation

!Closed

rowspan="6" | Plant in the Jizzakh Region1PWRRITM-200N{{planned}}55
2PWRRITM-200N{{planned}}55
3

|PWR

|RITM-200N

| {{planned}}

|55

|

|

|

4

|PWR

|RITM-200N

| {{planned}}

|55

|

|

|

5

|PWR

|RITM-200N

| {{planned}}

|55

|

|

|

6

|PWR

|RITM-200N

| {{planned}}

|55

|

|

|

See also

Notes

{{notelist}}

References

{{reflist|colwidth=30em}}